Qn. 277.
APPENDIX XXII.
STATEMENT OF EXPENDITURE ON NEW WORKS, ALTERATIONS AND ADDITIONS, 1962-63 (VOTE 9, SUBHEAD B).
Work No. |
Service and Description |
Total Estimate |
Vote 1962-63 |
Expenditure |
Observamions |
1962-63 |
To 31-3-62 |
To 31-3-63 |
|
|
£ |
£ |
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
President’s Establishment: |
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Árus an Uachtaráin—Improvement of Planthouse Accommodation |
8,250 |
5,000 |
2,924 |
3 |
7 |
262 |
5 |
11 |
3,186 |
9 |
6 |
In progress. |
|
Total: |
|
|
5,000 |
2,924 |
3 |
7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Houses of the Oireachtas: |
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Leinster House—Extension |
... |
... |
... |
... |
... |
... |
300,000 |
90,000 |
49,034 |
8 |
4 |
59 6,549 |
14 18 |
2 4 |
55,644 |
0 |
10 |
In progress. |
|
Total: |
|
|
90,000 |
49,034 |
8 |
4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of An Taoiseach: |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
State Apartments—Restoration of burnt-out Drawing Rooms |
... |
104,000 |
1,000 |
103 |
18 |
6 |
6,092 |
11 |
2 |
6,196 |
9 |
8 |
In planning. |
|
Total: |
|
|
1,000 |
103 |
18 |
6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Statue of Thomas Davis |
... |
... |
... |
... |
... |
... |
... |
6,500 |
1,000 |
214 |
1 |
8 |
150 |
0 |
0 |
364 |
1 |
8 |
Commissioned. |
5 |
Central Heating Station—Renewal of Plant |
... |
... |
... |
... |
50,000 |
25,000 |
88 |
10 |
0 |
— |
88 |
10 |
0 |
In progress. |
6 |
State Buildings (Upper Merrion Street and Kildare Street)—New |
|
|
|
|
|
|
|
|
|
|
|
|
|
Electricity Distribution System |
... |
... |
... |
... |
... |
5,500 |
5,300 |
— |
97 |
1 |
7 |
97 |
1 |
7 |
In planning. |
|
Revenue Commissioners: |
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Dublin Castle—Rebuilding of Cross Block |
... |
... |
... |
115,000 |
60,000 |
21,246 |
4 |
11 |
16,886 |
7 |
9 |
38,132 |
12 |
8 |
In progress. |
8 |
Stamping Branch—New Premises |
... |
... |
... |
... |
525,000 |
2,000 |
— |
2,270 |
16 |
11 |
2,270 |
16 |
11 |
In planning. |
9 |
Carrickcarnan Customs Frontier Post—Office and Residence |
15,000 |
10,000 |
10,376 |
0 |
0 |
1,599 |
0 |
2 |
11,975 |
0 |
2 |
Virtually completed. |
10 |
Dundalk, New Customs Road Station |
... |
... |
... |
... |
17,500 |
250 |
— |
— |
— |
In planning. |
11 |
Lifford Customs Post—Erection |
... |
... |
... |
... |
... |
9,500 |
5,000 |
— |
— |
— |
Tenders under consideration. |
12 |
Wexford, New Government Office and Telephone Exchange |
... |
33,000 |
12,000 |
4,100 |
0 |
1 |
3 |
3 |
0 |
4,103 |
3 |
1 |
In progress. |
13 |
Government Publications Sale Office—Additional Accommodation |
... |
3,000 |
2,000 |
— |
— |
— |
In planning. |
14 |
Phoenix Park—Improvement of Water Supply |
... |
... |
... |
25,000 |
14,000 |
758 |
14 |
9 |
270 |
8 |
0 |
1,029 |
2 |
9 |
Planning completed. |
|
Rotunda Gardens: |
|
|
|
|
|
|
|
|
|
|
|
|
15 |
Garden of Remembrance—Architectural Works |
... |
... |
144,000 |
75,000 |
57,332 |
0 |
0 |
40,708 |
15 |
0 |
98,040 |
15 |
0 |
In progress. |
16 |
Memorial Sculpture |
... |
... |
... |
... |
... |
... |
— |
1,000 |
— |
— |
— |
Under consideration. |
|
Dún Laoghaire Harbour: |
|
|
|
|
|
|
|
|
|
|
|
|
17 |
Mail Boat Pier Improvements |
... |
... |
... |
... |
... |
208,300 |
60,000 |
59,127 |
3 |
7 |
116,554 |
8 |
9 |
175,681 |
12 |
4 |
In progress. |
18 |
Car Ferry Terminal |
... |
... |
... |
... |
... |
... |
300,000 |
90,000 |
2,307 |
3 |
4 |
— |
2,307 |
3 |
4 |
Trial-boring completed. |
18A* |
River Shannon—Bailey Bridge Offaly |
... |
... |
... |
... |
... |
— |
— |
2,144 |
0 |
0 |
— |
2,144 |
0 |
0 |
Completed. |
|
Total: |
|
|
362,550 |
157,693 |
18 |
4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Justice: |
|
|
|
|
|
|
|
|
|
|
|
|
19 |
Garda Síochána Depot—Extension of Garage and Workshop |
|
|
|
|
|
|
|
|
|
|
|
|
|
Accommodation |
... |
... |
... |
... |
... |
... |
... |
54,000 |
1,000 |
— |
— |
— |
In planning. |
20 |
New Garda Training Centre—Templemore—Adaptation, etc., works |
435,000 |
200,000 |
207,708 |
5 |
9 |
93,506 |
5 |
3 |
301,214 |
11 |
0 |
In progress. |
21 |
Erection of new Garda Síochána Stations and improvement of |
|
|
|
|
|
|
|
|
|
|
|
|
|
existing specified Stations |
... |
... |
... |
... |
... |
... |
375,000 |
140,000 |
93,313 |
7 |
9 |
|
|
|
|
|
|
|
|
|
|
|
|
(as under) |
(detailed as follows) |
|
|
|
|
|
|
|
|
Dublin Metropolitan Division: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cabra—New Station |
... |
... |
... |
... |
... |
... |
38,000 |
22,000 |
22,870 |
0 |
0 |
815 |
12 |
4 |
23,685 |
12 |
4 |
In progress. |
|
Crumlin—New Divisional Headquarters |
... |
... |
... |
... |
41,000 |
10,000 |
3,366 |
12 |
11 |
— |
3,366 |
12 |
11 |
In progress. |
|
Division of Dublin-Wicklow: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Clondalkin—New Station |
... |
... |
... |
... |
... |
... |
12,000 |
2,000 |
— |
— |
— |
In planning. |
|
Divisional and District Headquarters Outside Dublin: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Roscommon—New Divisional Headquarters |
... |
... |
... |
25,000 |
3,000 |
4,420 |
12 |
0 |
18,644 |
12 |
8 |
23,065 |
4 |
8 |
Completed. |
|
Bantry—New District Headquarters |
... |
... |
... |
... |
10,000 |
5,000 |
4,905 |
0 |
0 |
3,760 |
10 |
3 |
8,665 |
10 |
3 |
Virtually completed. |
|
Ballyconnell—New District Headquarters |
... |
... |
... |
13,000 |
5,000 |
342 |
17 |
8 |
— |
342 |
17 |
8 |
In progress. |
|
Other New Stations as under: |
200,000 |
80,000 |
47,458 |
8 |
4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(as under) |
|
|
|
|
|
|
|
|
Co. Cavan: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cootehill |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
450 |
0 |
0 |
— |
450 |
0 |
0 |
In progress. |
|
Killeshandra |
... |
... |
... |
... |
... |
... |
... |
|
|
2,520 |
0 |
0 |
— |
2,520 |
0 |
0 |
In progress. |
|
Kingscourt |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
3,600 |
0 |
0 |
— |
3,600 |
0 |
0 |
In progress. |
|
Co. Clare: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ardnacrusha |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
In planning. |
|
Labasheeda |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
273 |
17 |
6 |
— |
273 |
17 |
6 |
In planning (work completed on well). |
|
Co. Cork: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Castletownroche |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
Tenders invited. |
|
Donoughmore |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
Contract placed. |
|
Kinsale |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
Tenders invited. |
|
Co. Donegal: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Burtonport |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
Tenders under consideration. |
|
Carndonagh |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
Contract placed. |
|
Castlefin |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
3,420 |
0 |
0 |
— |
3,420 |
0 |
0 |
In progress. |
|
Co. Galway: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ahascragh |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
2,250 |
0 |
0 |
— |
2,250 |
0 |
0 |
In progress. |
|
Portumna |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
5,478 |
0 |
0 |
— |
5,478 |
0 |
0 |
In progress. |
|
Co. Kerry: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Kilgarvan |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
153 |
0 |
0 |
— |
153 |
0 |
0 |
Planning completed (work completed on well). |
|
Co. Leitrim: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballinamore |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
Contract about to be placed. |
|
Cloone |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
3,060 |
0 |
0 |
257 |
1 |
6 |
3,317 |
1 |
6 |
In progress. |
|
Co. Louth: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Castlebellingham |
... |
... |
... |
... |
... |
... |
... |
|
|
1,890 |
0 |
0 |
— |
1,890 |
0 |
0 |
In progress. |
|
Co. Mayo: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Killala |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
2,880 |
0 |
0 |
— |
2,880 |
0 |
0 |
In progress. |
|
Co. Meath: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballivor |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
1,170 |
0 |
0 |
— |
1,170 |
0 |
0 |
In progress. |
|
Enfield |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
2,385 |
0 |
0 |
1,300 |
0 |
0 |
3,685 |
0 |
0 |
Completed. |
|
Slane |
... |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
450 |
0 |
0 |
— |
450 |
0 |
0 |
In planning. |
|
Co. Monaghan: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Clontibret |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
3,060 |
0 |
0 |
146 |
10 |
9 |
3,206 |
10 |
9 |
In progress. |
|
Offaly: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Banagher |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
2,250 |
0 |
0 |
— |
2,250 |
0 |
0 |
In progress. |
|
Co. Roscommon: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Kilmore |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
292 |
0 |
0 |
— |
292 |
0 |
0 |
Well boring completed. |
|
Strokestown |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
1,170 |
0 |
0 |
— |
1,170 |
0 |
0 |
In progress. |
|
Co. Sligo: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballinafad |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
In planning. |
|
Collooney |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
5,400 |
0 |
0 |
— |
5,400 |
0 |
0 |
In progress. |
|
Co. Tipperary: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballingarry North |
... |
... |
... |
... |
... |
... |
... |
|
|
230 |
6 |
0 |
— |
230 |
6 |
0 |
In progress. |
|
Grangemockler |
... |
... |
... |
... |
... |
... |
... |
|
|
1,372 |
1 |
6 |
3,452 |
15 |
10 |
4,824 |
17 |
4 |
Completed. |
|
Co. Westmeath: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballymore |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
10 |
0 |
0 |
— |
10 |
0 |
0 |
In progress. |
|
Rochfortbridge |
... |
... |
... |
... |
... |
... |
... |
|
|
810 |
0 |
0 |
— |
810 |
0 |
0 |
In progress. |
|
Co. Wexford: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Glynn |
... |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
2,884 |
3 |
4 |
6,031 |
13 |
0 |
8,915 |
16 |
4 |
Completed. |
|
Co. Wicklow: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Rathdrum |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
In planning. |
|
Improvement Schemes as under: |
36,000 |
13,000 |
9,949 |
16 |
10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(as under) |
|
|
|
|
Dublin Metropolitan Division: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Bridewell |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
2,891 |
0 |
9 |
18,842 |
13 |
8 |
21,733 |
14 |
5 |
Completed. |
|
Parkgate Hall, Conyngham Road |
... |
... |
... |
... |
... |
|
|
443 |
8 |
11 |
945 |
13 |
2 |
1,389 |
2 |
1 |
Completed. |
|
Co. Cork: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Inchigeela |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
924 |
10 |
7 |
454 |
2 |
6 |
1,378 |
13 |
1 |
Completed. |
|
Co. Donegal: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Buncrana |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
1,508 |
15 |
10 |
— |
1,508 |
15 |
10 |
Completed. |
|
Co. Galway: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Leenane |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
1,604 |
2 |
3 |
131 |
17 |
4 |
1,735 |
19 |
7 |
Completed. |
|
Oranmore |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
1,033 |
7 |
6 |
64 |
0 |
4 |
1,097 |
7 |
10 |
Completed. |
|
Co. Limerick: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Bruff |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
— |
— |
In planning. |
|
Pallas |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
917 |
18 |
6 |
917 |
18 |
6 |
Completed. |
|
Co. Sligo: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Bunninadden |
... |
... |
... |
... |
... |
... |
... |
|
|
324 |
0 |
0 |
461 |
18 |
2 |
785 |
18 |
2 |
Completed. |
|
Sligo |
... |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
860 |
11 |
0 |
630 |
0 |
0 |
1,490 |
11 |
0 |
Completed. |
|
Co. Waterford: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballymacarbery |
... |
... |
... |
... |
... |
... |
... |
|
|
— |
1,302 |
15 |
0 |
1,302 |
15 |
0 |
Completed. |
|
Co. Wexford: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Blackwater |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
360 |
0 |
0 |
— |
360 |
0 |
0 |
In progress. |
22 |
Improvement of other Garda Síochána Stations: |
20,000 |
20,000 |
14,709 |
19 |
9 |
|
|
|
|
|
|
|
|
|
|
|
(as under) |
|
|
|
|
|
|
|
|
Co. Carlow: |
|
|
|
|
|
|
|
|
|
|
|
|
37/48 of 61/62 |
Muinebeag |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
788 |
0 |
0 |
1 |
5 |
0 |
789 |
5 |
0 |
In progress. |
|
Co. Cavan: |
|
|
|
|
|
|
|
|
|
|
|
|
22/52 |
Stradone |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
200 |
0 |
0 |
— |
200 |
0 |
0 |
In progress. |
|
Co. Clare: |
|
|
|
|
|
|
|
|
|
|
|
|
22/21 |
Lissyeasey |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
108 |
15 |
0 |
— |
108 |
15 |
0 |
Completed. |
|
Co. Cork: |
|
|
|
|
|
|
|
|
|
|
|
|
22/35 |
Ballinspittle |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
327 |
11 |
2 |
— |
327 |
11 |
2 |
Completed. |
22/33 |
Coachford |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
616 |
10 |
4 |
— |
616 |
10 |
4 |
Completed. |
22/24 |
Fermoy |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
662 |
12 |
5 |
— |
662 |
12 |
5 |
Completed. |
22/61 |
Union Quay |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
135 |
13 |
0 |
— |
135 |
13 |
0 |
Completed. |
|
Co. Donegal: |
|
|
|
|
|
|
|
|
|
|
|
|
27/21 of 61/62 |
Annagry |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
83 |
2 |
8 |
250 |
0 |
0 |
333 |
2 |
8 |
Completed. |
22/40 |
Muff |
... |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
900 |
0 |
0 |
— |
900 |
0 |
0 |
In progress. |
26 of 61/62 |
Rathmullen |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
218 |
17 |
2 |
650 |
0 |
0 |
868 |
17 |
2 |
In progress. |
|
Dublin: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Pearse Street (College): |
|
|
|
|
|
|
|
|
|
|
|
|
22/60 |
New Mess Hall |
... |
... |
... |
... |
... |
... |
... |
|
|
293 |
15 |
6 |
— |
293 |
15 |
6 |
In progress. |
27/33 of 61/62 |
Canteen Improvements |
... |
... |
... |
... |
... |
... |
|
|
27 |
8 |
9 |
156 |
11 |
7 |
184 |
0 |
4 |
Completed. |
22/19 |
Accommodation for Ban Gárdaí |
... |
... |
... |
... |
... |
|
|
383 |
9 |
1 |
— |
383 |
9 |
1 |
In progress. |
22/25 |
Clontarf |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
343 |
3 |
5 |
— |
343 |
3 |
5 |
Completed. |
22/45 |
Cabinteely |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
112 |
7 |
3 |
— |
112 |
7 |
3 |
In progress. |
27/50 of 61/62 |
Kevin Street |
... |
... |
... |
... |
... |
... |
... |
|
|
21 |
1 |
9 |
427 |
8 |
4 |
448 |
10 |
1 |
Completed. |
27/29 of 61/62 |
Kilmainham |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
24 |
0 |
6 |
140 |
1 |
11 |
164 |
2 |
5 |
Completed. |
22/23 |
Store Street |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
528 |
17 |
10 |
— |
528 |
17 |
10 |
In progress. |
|
Co. Galway: |
|
|
|
|
|
|
|
|
|
|
|
|
27/32 of 61/62 |
Clifden |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
254 |
7 |
0 |
|
16 |
0 |
255 |
3 |
0 |
Completed. |
27/34 of 61/62 |
Headford |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
480 |
0 |
0 |
24 |
6 |
9 |
504 |
6 |
9 |
Completed. |
22/3 |
Lettermore |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
140 |
10 |
3 |
— |
140 |
10 |
3 |
Completed. |
|
Co. Kildare: |
|
|
|
|
|
|
|
|
|
|
|
|
22/20 |
Castledermot |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
636 |
11 |
0 |
— |
636 |
11 |
0 |
Completed. |
22/34 |
Kilcock |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
300 |
0 |
0 |
— |
300 |
0 |
0 |
In progress. |
|
Laois: |
|
|
|
|
|
|
|
|
|
|
|
|
22/28 |
Ballylinan |
... |
... |
... |
... |
... |
... |
... |
|
|
600 |
0 |
0 |
— |
600 |
0 |
0 |
Completed. |
|
Co. Leitrim. |
|
|
|
|
|
|
|
|
|
|
|
|
22/30 |
Carrick-on-Shannon |
... |
... |
... |
... |
... |
... |
... |
|
|
100 |
0 |
0 |
— |
100 |
0 |
0 |
Completed. |
|
Co. Limerick: |
|
|
|
|
|
|
|
|
|
|
|
|
22/13 |
Askeaton |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
193 |
14 |
9 |
— |
193 |
14 |
9 |
Completed. |
27/57 of 61/62 |
Athea |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
517 |
12 |
6 |
1 |
5 |
0 |
518 |
17 |
6 |
Completed. |
22/39 |
Limerick (Edward Street) |
... |
... |
... |
... |
... |
|
|
443 |
11 |
1 |
— |
443 |
11 |
1 |
Completed. |
27/37 of 61/62 |
Pallasgreen (New Pallas) |
... |
... |
... |
... |
... |
... |
|
|
304 |
0 |
0 |
87 |
5 |
4 |
391 |
5 |
4 |
In progress. |
|
Co. Louth: |
|
|
|
|
|
|
|
|
|
|
|
|
22/26 |
Hackballscross |
... |
... |
... |
... |
... |
... |
... |
|
|
1,018 |
4 |
6 |
— |
1,018 |
4 |
6 |
In progress. |
|
Co. Mayo: |
|
|
|
|
|
|
|
|
|
|
|
|
22/15 |
Balla |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
381 |
10 |
9 |
— |
381 |
10 |
9 |
Completed. |
22/59 |
Bangor Erris |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
400 |
0 |
0 |
— |
400 |
0 |
0 |
In progress. |
27/8 of 61/62 |
Blacksod |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
64 |
5 |
0 |
338 |
6 |
7 |
402 |
11 |
7 |
Completed. |
22/17 |
Cong |
... |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
405 |
12 |
8 |
— |
405 |
12 |
8 |
Completed. |
22/7 |
Kiltimagh |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
214 |
14 |
6 |
— |
214 |
14 |
6 |
In progress. |
|
Co. Meath: |
... |
|
|
|
|
|
|
|
|
|
|
|
|
22/48 |
Oldcastle |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
180 |
0 |
0 |
— |
180 |
0 |
0 |
In progress. |
|
Co. Monaghan: |
|
|
|
|
|
|
|
|
|
|
|
|
22/76 |
Corrinshigagh |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
350 |
0 |
0 |
— |
350 |
0 |
0 |
In progress. |
|
Offaly: |
|
|
|
|
|
|
|
|
|
|
|
|
22/27 |
Kilcormac |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
185 |
12 |
6 |
— |
185 |
12 |
6 |
Completed. |
|
Co. Roscommon: |
|
|
|
|
|
|
|
|
|
|
|
|
27/30 of 61/62 |
Cootchall |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
198 |
12 |
6 |
600 |
0 |
0 |
798 |
12 |
6 |
Completed. |
|
Co. Sligo: |
|
|
|
|
|
|
|
|
|
|
|
|
22/10 |
Dromore West |
... |
... |
... |
... |
... |
... |
... |
|
|
270 |
15 |
0 |
— |
270 |
15 |
0 |
Completed. |
|
Co. Tipperary: |
|
|
|
|
|
|
|
|
|
|
|
|
22/55 |
Thurles |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
233 |
13 |
0 |
— |
233 |
13 |
0 |
In progress. |
|
Co. Westmeath: |
|
|
|
|
|
|
|
|
|
|
|
|
42/19 of 60/61 |
Kilbeggan |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
71 |
6 |
11 |
602 |
13 |
4 |
674 |
0 |
3 |
Completed. |
|
Co. Wicklow: |
|
|
|
|
|
|
|
|
|
|
|
|
22/31 |
Greystones |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
990 |
0 |
0 |
— |
990 |
0 |
0 |
In progress. |
23 |
Houses for married members of the Garda Síochána |
... |
... |
25,000 |
25,000 |
101,254 |
0 |
0 |
— |
101,254 |
0 |
0 |
In progress. |
24 |
Courts of Justice—Renewal of Defective Stonework |
... |
... |
... |
50,000 |
10,000 |
1,460 |
13 |
7 |
3,485 |
0 |
10 |
4,945 |
14 |
5 |
Stage 1 completed. |
|
Land Registry: |
|
|
|
|
|
|
|
|
|
|
|
|
25 |
Improvements |
... |
... |
... |
... |
... |
... |
... |
7,500 |
450 |
370 |
5 |
4 |
7,002 |
7 |
8 |
7,372 |
13 |
0 |
Virtually completed. |
26 |
Fire Precaution Works |
... |
... |
... |
... |
... |
... |
5,200 |
2,600 |
3,460 |
17 |
11 |
330 |
14 |
7 |
3,791 |
12 |
6 |
In progress. |
|
Total: |
|
|
399,050 |
422,277 |
10 |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Education: |
|
|
|
|
|
|
|
|
|
|
|
|
27 |
National Schools—Grants for Building, Enlarging, Enclosing, etc. |
... |
1,900,000 |
1,900,000 |
1,824,429 |
19 |
0 |
— |
1,824,429 |
19 |
0 |
|
|
National Library: |
|
|
|
|
|
|
|
|
|
|
|
|
28 |
Improvement of goods lift |
... |
... |
... |
... |
... |
... |
1,375 |
500 |
525 |
0 |
0 |
900 |
15 |
10 |
1,425 |
15 |
10 |
Completed. |
29 |
National Library and National Museum. Renewal of defective |
|
|
|
|
|
|
|
|
|
|
|
|
|
stonework—Stage II |
... |
... |
... |
... |
... |
... |
30,000 |
7,300 |
5,357 |
12 |
1 |
39,779 |
18 |
9 |
45,137 |
10 |
10 |
Nearing completion. |
30 |
Dublin (Preventive Centre)—Erection |
... |
... |
... |
... |
... |
150,000 |
500 |
— |
— |
— |
In planning. |
31 |
National Gallery—Extension |
... |
... |
... |
... |
... |
... |
277,000 |
250 |
2,411 |
5 |
4 |
— |
2,411 |
5 |
4 |
In planning. |
|
Total: |
|
|
1,908,550 |
1,832,723 |
16 |
5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
|
|
32 |
21-24 Upper Merrion Street Improvement of electrical installations |
... |
7,600 |
2,000 |
— |
— |
— |
In planning. |
|
Forestry Division: |
|
|
|
|
|
|
|
|
|
|
|
|
33 |
Avondale House—Adaptation as Forestry Training and |
|
|
|
|
|
|
|
|
|
|
|
|
|
Conference Centre |
... |
... |
... |
... |
... |
... |
... |
32,000 |
500 |
— |
— |
— |
In planning. |
34 |
Kinnitty Castle Forestry Training Centre—Additional |
|
|
|
|
|
|
|
|
|
|
|
|
|
Accommodation for Trainees and Fire Precaution Works |
... |
... |
7,900 |
1,000 |
2,035 |
9 |
4 |
270 6,252 |
0 6 |
5 1 |
8,557 |
15 |
10 |
Completed. |
|
Fisheries Division: |
|
|
|
|
|
|
|
|
|
|
|
|
35 |
Galway, Fisheries Research Station—Erection |
... |
... |
... |
140,000 |
500 |
— |
— |
— |
In planning. |
36 |
Major Fishery Harbours (Stage 1) |
... |
... |
... |
... |
1,260,000 |
140,000 |
57,058 |
7 |
0 |
|
|
|
|
|
|
|
|
|
|
|
(as under) |
|
|
|
|
|
|
|
|
Castletownbere |
... |
... |
... |
... |
... |
... |
... |
|
|
7,181 |
3 |
4 |
1,038 |
14 |
7 |
8,219 |
17 |
11 |
Trial-borings completed. |
|
Dunmore East |
... |
... |
... |
... |
... |
... |
... |
|
|
11,522 |
4 |
5 |
— |
11,522 |
4 |
5 |
In planning. |
|
Galway |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
21,316 |
17 |
7 |
2,420 |
2 |
7 |
23,737 |
0 |
2 |
Trial-borings completed. |
|
Howth |
... |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
2,406 |
9 |
11 |
1,512 |
6 |
6 |
3,918 |
16 |
5 |
Trial-borings in progress. |
|
Killybegs |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
3,443 |
17 |
3 |
908 3,272 |
2 4 |
7 8 |
7,624 |
4 |
6 |
In planning. |
|
Other expenditure |
... |
... |
... |
... |
... |
... |
... |
|
|
11,187 |
14 |
6 |
2,961 |
0 |
10 |
14,148 |
15 |
4 |
|
37 |
Works of Economic Development at other Fishery Harbours |
... |
70,210 |
50,000 |
24,157 |
17 |
5 |
|
|
|
|
|
|
|
|
|
|
|
(as under) |
|
|
|
|
|
|
|
|
Aileen Reef |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
164 |
4 |
2 |
131 |
8 |
3 |
295 |
12 |
5 |
Completed. |
|
Burtonport |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
1,493 |
12 |
1 |
3,074 |
15 |
4 |
4,568 |
7 |
5 |
Virtually completed. |
|
Cahore |
... |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
492 |
14 |
4 |
— |
492 |
14 |
4 |
Completed. |
|
Clogherhead |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
2,162 |
0 |
7 |
— |
2,162 |
0 |
7 |
Nearing completion. |
|
Dingle |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
3 |
11 |
4 |
4,650 |
0 |
0 |
4,653 |
11 |
4 |
Completed. |
|
Greencastle |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
19,354 |
18 |
2 |
12,240 |
12 |
6 |
31,595 |
10 |
8 |
In progress. |
|
Giles Quay |
... |
... |
... |
... |
... |
... |
... |
... |
|
|
452 |
12 |
0 |
— |
452 |
12 |
0 |
Completed. |
|
Kilmore Quay |
... |
... |
... |
... |
... |
... |
... |
|
|
34 |
4 |
9 |
— |
34 |
4 |
9 |
In planning. |
|
Total: |
|
|
194,000 |
83,251 |
13 |
9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Veterinary College, Ballsbridge: |
|
|
|
|
|
|
|
|
|
|
|
|
38 (1) |
Improvements |
... |
... |
... |
... |
... |
... |
... |
20,000 |
5,000 |
5,703 |
2 |
5 |
9,578 |
0 |
3 |
15,281 |
2 |
8 |
Virtually completed. |
38 (2) |
Pathological Anatomy Unit |
... |
... |
... |
... |
... |
11,900 |
6,000 |
1,839 |
12 |
0 |
150 |
0 |
0 |
1,989 |
12 |
0 |
In progress. |
39 |
Botanic Gardens—New Fern House |
... |
... |
... |
... |
... |
10,000 |
1,000 |
179 |
8 |
0 |
— |
179 |
8 |
0 |
Contract about to be placed. |
|
Abbotstown Farm: |
|
|
|
|
|
|
|
|
|
|
|
|
40 (1) |
Artifical Insemination Experimental Station |
... |
... |
... |
23,500 |
1,000 |
139 |
7 |
6 |
20,555 |
15 |
0 |
20,695 |
2 |
6 |
Completed. |
40 (2) |
Experimental Animals Farmyard |
... |
... |
... |
66,000 |
20,000 |
24,398 |
6 |
0 |
11,060 |
6 |
11 |
35,458 |
12 |
11 |
In progress. |
40 (3) |
Foundation Stock Farmyard |
... |
... |
... |
... |
... |
65,000 |
20,000 |
6,534 |
0 |
6 |
17,484 |
7 |
1 |
24,018 |
7 |
7 |
Stages II and III in progress. |
40 (4) |
Residence for Director |
... |
... |
... |
... |
... |
... |
5,800 |
3,800 |
2,520 |
0 |
0 |
678 |
3 |
6 |
3,198 |
3 |
6 |
In progress. |
40 (5) |
Residence for Farm Manager |
... |
... |
... |
... |
... |
4,400 |
2,500 |
3,164 |
0 |
0 |
147 |
7 |
2 |
3,311 |
7 |
2 |
Virtually completed. |
40 (6) |
Veterinary Field Station |
... |
... |
... |
... |
... |
... |
90,000 |
500 |
— |
— |
— |
Contract placed. |
|
Athenry Agricultural School: |
|
|
|
|
|
|
|
|
|
|
|
|
41 (1) |
Precaution Works |
... |
... |
... |
... |
... |
... |
... |
1,500 |
500 |
— |
3 |
11 |
8 |
3 |
11 |
8 |
In planning. |
41 (2) |
Improvement of Water Supply |
... |
... |
... |
... |
... |
12,000 |
2,000 |
320 |
19 |
3 |
912 |
13 |
4 |
1,233 |
12 |
7 |
Pump installed. |
41 (3) |
New Building |
... |
... |
... |
... |
... |
... |
... |
... |
110,000 |
45,000 |
34,271 |
5 |
0 |
19,287 |
11 |
9 |
53,558 |
16 |
9 |
In progress. |
41 (4) |
Provision of additional facilities at Turkey Hatchery |
... |
... |
|
— |
9,171 |
3 |
10 |
— |
9,171 |
3 |
10 |
In progress. |
|
Ballyhaise Agricultural School: |
|
|
|
|
|
|
|
|
|
|
|
|
42 (1) |
Employees’ Cottages |
... |
... |
... |
... |
... |
... |
13,000 |
1,500 |
2,859 |
0 |
0 |
11,064 |
8 |
10 |
13,923 |
8 |
10 |
Completed. |
42 (2) |
Re-arrangement of Grinding Plant |
... |
... |
... |
... |
2,100 |
500 |
— |
433 |
12 |
6 |
433 |
12 |
6 |
Plant delivered. |
|
Clonakilty Agricultural School: |
|
|
|
|
|
|
|
|
|
|
|
|
43 (1) |
Fire Precaution Works |
... |
... |
... |
... |
... |
... |
2,250 |
500 |
— |
633 |
9 |
11 |
633 |
9 |
11 |
In progress. |
43 (2) |
Improvement of Water Supply |
... |
... |
... |
... |
... |
12,250 |
8,000 |
753 |
12 |
11 |
552 |
8 |
0 |
1,306 |
0 |
11 |
In progress. |
43 (3) |
New Building |
... |
... |
... |
... |
... |
... |
... |
... |
110,000 |
45,000 |
33,300 |
0 |
0 |
6,699 |
16 |
2 |
39,999 |
16 |
2 |
In progress. |
|
Johnstown Castle: |
|
|
|
|
|
|
|
|
|
|
|
|
44 |
Improvement of Water Supply |
... |
... |
... |
... |
... |
21,000 |
1,000 |
2,459 |
17 |
0 |
18,033 |
8 |
5 |
20,493 |
5 |
5 |
Completed. |
|
Munster Institute: |
|
|
|
|
|
|
|
|
|
|
|
|
45 (1) |
Fire Precaution Works |
... |
... |
... |
... |
... |
... |
2,500 |
1,500 |
27 |
10 |
11 |
209 |
0 |
3 |
236 |
11 |
2 |
Minor architectural works in progress. |
45 (2) |
Improved accommodation |
... |
... |
... |
... |
... |
... |
20,000 |
3,000 |
1,960 |
0 |
0 |
15,291 |
3 |
2 |
17,251 |
3 |
2 |
Completed. |
45 (3) |
New Poultry Plant |
... |
... |
... |
... |
... |
... |
... |
98,500 |
200 |
— |
17,093 |
2 |
7 |
17,093 |
2 |
7 |
Adaptations completed, further works in planning. |
45 (4) |
Reconstruction of Cattle Court and Calf Sheds |
... |
... |
... |
5,000 |
2,000 |
— |
— |
— |
In planning. |
46 |
Thorndale—Detention Station for Imported Livestock |
... |
... |
12,000 |
3,000 |
280 |
0 |
0 |
— |
280 |
0 |
0 |
Planning completed. |
|
Total: |
|
|
173,500 |
129,881 |
5 |
4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Transport and Power: |
|
|
|
|
|
|
|
|
|
|
|
|
47 |
Valentia Observatory—Accommodation for Seismological Instruments |
1,500 |
1,200 |
2,603 |
5 |
3 |
7 |
16 |
0 |
2,611 |
1 |
3 |
Completed. |
|
Total: |
|
|
1,200 |
2,603 |
5 |
3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Posts and Telegraphs: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Dublin: |
|
|
|
|
|
|
|
|
|
|
|
|
48 |
New Central Sorting Office |
... |
... |
... |
... |
... |
... |
600,000 |
175,000 |
84,954 |
12 |
8 |
1,490 |
2 |
4 |
86,444 |
15 |
0 |
In progress. |
49 |
New District Sorting Office and Telephone Exchange Coolock, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Raheny |
... |
... |
... |
... |
... |
... |
... |
... |
13,500 |
250 |
13 |
10 |
0 |
— |
13 |
10 |
0 |
In planning. |
50 |
New District Sorting Office and Telephone Exchange, Finglas |
... |
18,200 |
6,000 |
3,974 |
11 |
0 |
31 |
8 |
10 |
4,005 |
19 |
10 |
In progress. |
51 |
G.P.O. Arcade—Conversion of Shop to Office Accommodation |
6,000 |
3,500 |
5,449 |
3 |
0 |
— |
5,449 |
3 |
0 |
Completed. |
52 |
New Warehousing, etc., accommodation |
... |
... |
... |
190,000 |
2,000 |
— |
— |
— |
In planning. |
53 |
Arklow Post Office—Improvements and New Telephone Exchange |
12,850 |
3,000 |
847 |
12 |
1 |
— |
847 |
12 |
1 |
Tenders under consideration. |
54 |
Ballinasloe—New Post Office and Telephone Exchange |
... |
... |
24,500 |
7,500 |
512 |
13 |
3 |
— |
512 |
13 |
3 |
In progress. |
55 |
Carrick-on-Shannon Post Office—Improvements |
... |
... |
... |
19,000 |
8,000 |
7,479 |
13 |
8 |
10,176 |
6 |
1 |
17,655 |
19 |
9 |
Virtually completed. |
56 |
Ennis Post Office—Improvements and New Telephone Exchange |
... |
9,600 |
6,400 |
3,638 |
11 |
2 |
2,050 |
3 |
9 |
5,688 |
14 |
11 |
In progress. |
57 |
Killarney Post Office—Improvements |
... |
... |
... |
... |
... |
2,880 |
500 |
421 |
12 |
11 |
1,709 |
3 |
2 |
2,130 |
16 |
1 |
Completed. |
|
Limerick: |
|
|
|
|
|
|
|
|
|
|
|
|
58 |
New Engineering Stores and Garages |
... |
... |
... |
... |
1,700 |
1,600 |
— |
— |
— |
Planning completed. |
59 |
Post Office Improvements |
... |
... |
... |
... |
... |
... |
13,000 |
7,500 |
6,840 |
0 |
0 |
53 |
5 |
0 |
6,893 |
5 |
0 |
In progress. |
60 |
Sligo Post Office—Improvements |
... |
... |
... |
... |
... |
6,000 |
4,000 |
1,620 |
0 |
0 |
3,611 |
5 |
4 |
5,231 |
5 |
4 |
Completed. |
61 |
Waterford Post Office—Improvements |
... |
... |
... |
... |
1,700 |
200 |
1,150 |
1 |
2 |
662 |
8 |
0 |
1,812 |
9 |
2 |
Completed. |
|
Wexford: |
|
|
|
|
|
|
|
|
|
|
|
|
62 |
New Area Engineering Headquarters |
... |
... |
... |
... |
1,500 |
1,500 |
1,710 |
0 |
0 |
375 |
0 |
0 |
2,085 |
0 |
0 |
Nearing completion. |
63 |
Post Office—Improvements |
... |
... |
... |
... |
... |
... |
6,000 |
1,200 |
1,709 |
4 |
4 |
3,500 |
19 |
3 |
5,210 |
3 |
7 |
Completed. |
64 |
Wicklow—New Post Office and Telephone Exchange |
... |
... |
29,800 |
13,700 |
15,778 |
0 |
0 |
3,252 |
15 |
6 |
19,030 |
15 |
6 |
In progress. |
65 |
Youghal—New Post Office and Telephone Exchange |
... |
... |
... |
13,000 |
8,000 |
3,096 |
11 |
9 |
— |
3,096 |
11 |
9 |
In progress. |
|
Total: |
|
|
249,850 |
139,195 |
17 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
|
|
66 |
School of Civil Defence—Improved Accommodation |
... |
... |
23,500 |
14,000 |
3,803 |
1 |
3 |
414 |
18 |
6 |
4,217 |
19 |
9 |
In progress. |
67 |
Dublin, Cathal Brugha Barracks—Dining Hall and Cookhouse |
... |
62,000 |
25,000 |
560 |
4 |
4 |
500 |
0 |
0 |
1,060 |
4 |
4 |
Planning completed. |
68 |
Curragh Camp—New Catholic Church |
... |
... |
... |
... |
... |
124,000 |
5,000 |
— |
118,529 |
17 |
7 |
118,529 |
17 |
7 |
Completed. |
69 |
Arbour Hill Detention Prison—Memorial to 1916 Leaders |
... |
... |
29,000 |
1,000 |
816 |
0 |
0 |
25,011 |
0 |
3 |
25,827 |
0 |
3 |
In progress. |
|
Total: |
|
|
45,000 |
5,179 |
5 |
7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of External Affairs: |
|
|
|
|
|
|
|
|
|
|
|
|
70 |
Irish Embassy to the Federation of Nigeria—Residences for |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ambassador and Secretary |
... |
... |
... |
... |
... |
... |
... |
64,000 |
500 |
— |
80 |
0 |
0 |
80 |
0 |
0 |
In planning. |
|
Total: |
|
|
500 |
— |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Social Welfare: |
|
|
|
|
|
|
|
|
|
|
|
|
71 |
Dublin—New Headquarters, Haddington Road |
... |
... |
... |
1,100,000 |
15,000 |
3,151 |
6 |
8 |
3 |
14 |
0 |
3,155 |
0 |
8 |
In planning. |
72 |
Achill—New Employment Exchange |
... |
... |
... |
... |
... |
7,800 |
1,000 |
536 |
11 |
0 |
7,425 |
11 |
1 |
7,962 |
2 |
1 |
Completed. |
73 |
Carrick-on-Shannon—New Employment Exchange |
... |
... |
... |
14,000 |
11,500 |
9,967 |
16 |
11 |
226 |
17 |
6 |
10,194 |
14 |
5 |
Virtually completed. |
74 |
Mullingar—New Employment Exchange |
... |
... |
... |
... |
20,500 |
14,000 |
12,099 |
14 |
6 |
313 |
7 |
11 |
12,413 |
2 |
5 |
In progress. |
75 |
Tralee—New Employment Exchange |
... |
... |
... |
... |
42,500 |
1,000 |
3,148 |
18 |
3 |
37,707 |
19 |
9 |
40,856 |
18 |
0 |
Completed. |
|
Total: |
|
|
42,500 |
28,904 |
7 |
4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Department of Health: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Central Mental Hospital, Dundrum: |
|
|
|
|
|
|
|
|
|
|
|
|
76 (1) |
Fire Prevention and Control |
... |
... |
... |
... |
... |
5,500 |
1,400 |
837 |
6 |
2 |
4,131 |
7 |
6 |
4,968 |
13 |
8 |
Nearing completion. |
76 (2) |
New Residence for Governor |
... |
... |
... |
... |
... |
5,600 |
4,500 |
6,120 |
0 |
0 |
111 |
7 |
0 |
6,231 |
7 |
0 |
Completed. |
|
Total: |
|
|
5,900 |
6,957 |
6 |
2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
General: |
|
|
|
|
|
|
|
|
|
|
|
|
77 |
Minor New Works not exceeding £2,000 each |
... |
... |
... |
... |
20,000 |
20,000 |
31,989 |
7 |
1 |
— |
— |
Details appended. |
78 |
Urgent and Unforeseen Works |
... |
... |
... |
... |
... |
... |
5,000 |
5,000 |
38,040 |
14 |
0 |
— |
— |
Details appended. |
79 |
Minor Balances of Expenditure (not provided for above) on works of |
|
|
|
|
|
|
|
|
|
|
|
|
|
prior years which may not be completed on 1st April, 1962 |
... |
15,000 |
15,000 |
16,394 |
0 |
1 |
— |
— |
Details appended. |
|
Total: |
|
|
3,518,600 |
2,947,154 |
16 |
10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Deduct: |
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) for works which might not have been carried out during the year (£173,600) and (2) for adjustment for expenditure previously |
|
|
|
|
|
|
|
|
|
|
|
|
|
borne on Vote 9 (£25,000) |
... |
... |
... |
... |
... |
... |
|
198,600 |
|
|
|
|
|
|
|
|
|
|
|
Net Totals: |
|
|
3,320,000 |
2,947,154 |
16 |
10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DETAILS OF 77—MINOR NEW WORKS NOT EXCEEDING £2,000
Minor Work No. |
Service and Description |
Expenditure |
Observamions |
1962-63 |
To 31-3-62 |
To 31-3-63 |
|
|
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
Department of An Taoiseach: |
|
|
|
|
|
|
|
|
|
|
|
Central Statistics Office: |
|
|
|
|
|
|
|
|
|
|
82/1/ of 1961/62 |
Partitioning |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
29 |
17 |
4 |
180 |
12 |
2 |
210 |
9 |
6 |
Completed. |
82/57 of 1961/62 |
Ladies’ Rest Room |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
|
5 |
2 |
194 |
9 |
1 |
194 |
14 |
3 |
Completed. |
46 |
Heating Improvement |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
622 |
19 |
1 |
— |
622 |
19 |
1 |
Completed. |
78 |
Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
263 |
8 |
1 |
— |
263 |
8 |
1 |
Completed. |
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
37 |
Headquarters—Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
181 |
2 |
2 |
— |
181 |
2 |
2 |
Completed. |
49 |
O. M. Section—Adaptations, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
1,304 |
5 |
4 |
— |
1,304 |
5 |
4 |
Completed. |
90/52 of 1960/61 |
Finance Section—Electrical Installation |
... |
... |
... |
... |
... |
... |
... |
... |
... |
|
1 |
11 |
236 |
11 |
5 |
236 |
13 |
4 |
Completed. |
|
Office of Revenue Commissioners: |
|
|
|
|
|
|
|
|
|
|
100 |
Custom House, Dublin—Partitioning |
... |
... |
... |
... |
... |
... |
... |
... |
... |
139 |
19 |
8 |
— |
139 |
19 |
8 |
Completed. |
82/70 of 1961/62 |
Dublin Castle—Improved Ventilation |
... |
... |
... |
... |
... |
... |
... |
... |
... |
41 |
13 |
3 |
11 |
18 |
11 |
53 |
12 |
2 |
Completed. |
82/98 of 1961/62 |
9-10 Upper O’ConnellStreet, Dublin—Adaptations |
... |
... |
... |
... |
... |
... |
... |
878 |
15 |
1 |
271 |
3 |
7 |
1,149 |
18 |
8 |
Completed. |
52 |
51 Lr. Baggot Street, Dublin—Elecrrical Installation |
... |
... |
... |
... |
... |
... |
... |
621 |
9 |
4 |
— |
621 |
9 |
4 |
Completed. |
30 |
Clondergole Customs Huts—Electrical Installation |
... |
... |
... |
... |
... |
... |
... |
160 |
11 |
8 |
— |
160 |
11 |
8 |
Completed. |
82/19 of 1961/62 |
Donegal St. Johnstown Customs Hut—Sanitary Facilities, etc. |
... |
... |
... |
... |
... |
15 |
10 |
0 |
196 |
1 |
6 |
211 |
11 |
6 |
Completed. |
70 |
Limerick Government Offices—Improvements etc. |
... |
... |
... |
... |
... |
... |
... |
242 |
8 |
3 |
— |
242 |
8 |
3 |
In progress. |
27 |
Moybridge Customs Station—Electrical Installation |
... |
... |
... |
... |
... |
... |
... |
116 |
9 |
11 |
— |
116 |
9 |
11 |
Completed. |
87 |
Tralee Customs House—Electrical Installation |
... |
... |
... |
... |
... |
... |
... |
... |
280 |
8 |
6 |
— |
280 |
8 |
6 |
Completed. |
|
Valuation Office: |
|
|
|
|
|
|
|
|
|
|
4 |
5-6 Ely Place—Improved Heating, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
... |
561 |
6 |
2 |
— |
561 |
6 |
2 |
Completed. |
82/39 of 1961/62 |
5-6 Ely Place—Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
501 |
9 |
7 |
31 |
17 |
0 |
533 |
6 |
7 |
Completed. |
90/90 of 1960/61 |
Ordance Survey Office—Alterations |
... |
... |
... |
... |
... |
... |
... |
... |
... |
18 |
0 |
0 |
655 |
7 |
6 |
673 |
7 |
6 |
Completed. |
82/58 of 1961/62 |
Ordance Survey Office—Sanitary Facilities |
... |
... |
... |
... |
... |
... |
... |
... |
138 |
3 |
11 |
34 |
19 |
8 |
173 |
3 |
7 |
Completed. |
96 |
Ordnance Survey Office—Electrical Installation |
... |
... |
... |
... |
... |
... |
... |
244 |
12 |
2 |
— |
244 |
12 |
2 |
Completed. |
|
Office of Public Works: |
|
|
|
|
|
|
|
|
|
|
82/44 of 1961/62 |
51 St. Stephen’s Green, Dublin—Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
21 |
0 |
10 |
685 |
4 |
7 |
706 |
5 |
5 |
Completed. |
8 |
51 St. Stephen’s Green—Lunch Club Equipment |
... |
... |
... |
... |
... |
... |
... |
305 |
16 |
5 |
— |
305 |
16 |
5 |
Completed. |
80 |
Engineer’s Branch—Heating and Equipment |
... |
... |
... |
... |
... |
... |
... |
... |
|
15 |
2 |
— |
|
15 |
2 |
Deferred to 1963 64 |
77 |
District Office, Castlebar—Improved Heating |
... |
... |
... |
... |
... |
... |
... |
... |
110 |
17 |
2 |
— |
110 |
17 |
2 |
Completed. |
113 |
District Office, Waterford—Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
145 |
11 |
0 |
— |
145 |
11 |
0 |
Completed. |
95 |
Central Engineering Workshop—Partitioning |
... |
... |
... |
... |
... |
... |
... |
... |
175 |
3 |
0 |
— |
175 |
3 |
0 |
In progress. |
|
Phoenix Park: |
|
|
|
|
|
|
|
|
|
|
6 |
Extension at Chapelizod Gate-Lodge |
... |
... |
... |
... |
... |
... |
... |
... |
... |
931 |
16 |
11 |
— |
931 |
16 |
11 |
Completed. |
73 |
Improvement of Spa Lodge, East |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
552 |
7 |
9 |
— |
552 |
7 |
9 |
Completed. |
82/79 of 1961/62 |
Improvements at Ashview House |
... |
... |
... |
... |
... |
... |
... |
... |
... |
340 |
0 |
0 |
360 |
0 |
0 |
700 |
0 |
0 |
Completed. |
105 |
Heating for Glasshouses |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
160 |
0 |
0 |
— |
160 |
0 |
0 |
Completed. |
18 |
Improvement of Knockmary Lodge |
... |
... |
... |
... |
... |
... |
... |
... |
... |
389 |
17 |
4 |
— |
389 |
17 |
4 |
In progress. |
68 |
Garinish Island—Improved Heating of House |
... |
... |
... |
... |
... |
... |
... |
... |
269 |
14 |
6 |
— |
269 |
14 |
6 |
Completed. |
82/3/ of 1961/62 |
Garinish Island—Office, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
11 |
3 |
0 |
631 |
18 |
6 |
643 |
1 |
6 |
Completed. |
75 |
Dunmore East Harbour—New Structure |
... |
... |
... |
... |
... |
... |
... |
... |
... |
771 |
4 |
7 |
— |
771 |
4 |
7 |
Completed. |
57 |
Royal Hospital, Kilmainham—Improvement of West Avenue Cottage |
... |
... |
... |
... |
... |
396 |
1 |
6 |
— |
396 |
1 |
6 |
Completed. |
67 |
Dun Laoghaire, Former Coast Guard Station—Improvement of Cottages |
... |
... |
... |
... |
597 |
9 |
4 |
— |
597 |
9 |
4 |
Completed. |
|
Chief State Solicitor’s Office: |
|
|
|
|
|
|
|
|
|
|
82/40 of 1961/62 |
Renovation of Rooms over Children’s Court |
... |
... |
... |
... |
... |
... |
... |
... |
197 |
1 |
9 |
865 |
8 |
0 |
1,062 |
9 |
9 |
Completed. |
103 |
Basement Storage Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
98 |
3 |
9 |
— |
98 |
3 |
9 |
In progress. |
|
Department of Justice: |
|
|
|
|
|
|
|
|
|
|
106 |
Public Record Office—Provision of Book Lift |
... |
... |
... |
... |
... |
... |
... |
... |
31 |
12 |
3 |
— |
31 |
12 |
3 |
In progress. |
39 |
Garda Depot—Storage |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
285 |
19 |
6 |
— |
285 |
19 |
6 |
Completed. |
82/60 of 1961/62 |
Police Huts |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
17 |
11 |
0 |
249 |
10 |
0 |
267 |
1 |
0 |
Completed. |
82/103 of 1961/62 |
Land Registry—Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
755 |
14 |
7 |
56 |
12 |
7 |
812 |
7 |
2 |
Completed. |
72 |
Registry of Deeds—Improved Heating |
... |
... |
... |
... |
... |
... |
... |
... |
... |
441 |
16 |
4 |
— |
441 |
16 |
4 |
Completed. |
|
Department of Education: |
|
|
|
|
|
|
|
|
|
|
76 |
Headquarters—Alterations |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
137 |
15 |
7 |
— |
137 |
15 |
7 |
Completed. |
122 |
Headquarters—Improvements (Room 18) |
... |
... |
... |
... |
... |
... |
... |
... |
... |
45 |
9 |
4 |
— |
45 |
9 |
4 |
In progress. |
|
Technical Instruction Branch: |
|
|
|
|
|
|
|
|
|
|
32/34 of 1961/62 |
Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
60 |
3 |
2 |
156 |
7 |
2 |
216 |
10 |
4 |
Completed. |
43 |
Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
406 |
9 |
9 |
— |
406 |
9 |
9 |
Completed. |
58 |
Improved Storage |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
172 |
19 |
0 |
— |
172 |
19 |
0 |
In progress. |
82/74 of 1961/62 |
National Museum—Improved Lighting |
... |
... |
... |
... |
... |
... |
... |
... |
... |
17 |
11 |
0 |
107 |
10 |
4 |
125 |
1 |
4 |
Completed. |
115 |
National Museum—Improved Lighting (Central Court) |
... |
... |
... |
... |
... |
... |
... |
11 |
4 |
3 |
— |
11 |
4 |
3 |
In progress. |
82/87 of 1961/62 |
National Gallery—Fire Precaution Work, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
336 |
14 |
2 |
54 |
9 |
4 |
391 |
3 |
6 |
Completed. |
90 |
National College of Art—Adaptation, etc. (Room 9) |
... |
... |
... |
... |
... |
... |
... |
479 |
15 |
0 |
— |
479 |
15 |
0 |
In progress. |
104 |
Model School, St. Joseph’s—Partitioning, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
452 |
8 |
4 |
— |
452 |
8 |
4 |
In progress. |
69 |
Model School, Sligo—Electrical Installation |
... |
... |
... |
... |
... |
... |
... |
... |
242 |
8 |
4 |
— |
242 |
8 |
4 |
Completed. |
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
56 |
Land Commission—Sanitary Facilities |
... |
... |
... |
... |
... |
... |
... |
... |
... |
262 |
14 |
3 |
— |
262 |
14 |
3 |
Completed. |
3 |
Land Commission—Incinerators |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
148 |
10 |
0 |
— |
148 |
10 |
0 |
Completed. |
94 |
Forestry Branch, Headquarters—Shelving |
... |
... |
... |
... |
... |
... |
... |
... |
... |
73 |
15 |
6 |
— |
73 |
15 |
6 |
In progress. |
82/26 of 1961/62 |
Forestry Branch, Kilkenny—Partitioning, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
299 |
12 |
0 |
21 |
9 |
6 |
321 |
1 |
6 |
Completed. |
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
85 |
Government Buildings (South Block)—Shelving |
... |
... |
... |
... |
... |
... |
... |
... |
105 |
6 |
4 |
— |
105 |
6 |
4 |
Completed. |
|
Botanic Gardens: |
|
|
|
|
|
|
|
|
|
|
82/83 of 1961/62 |
Garage |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
3 |
6 |
7 |
170 |
6 |
11 |
173 |
13 |
6 |
Completed. |
53 |
Oil Storage |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
178 |
0 |
5 |
— |
178 |
0 |
5 |
Completed. |
63 |
Improved Water Supply |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
10 |
0 |
3 |
— |
10 |
0 |
3 |
In progress. |
82/59 of 1961/62 |
Abbotstown Farm—Fire Precautions |
... |
... |
... |
... |
... |
... |
... |
... |
... |
341 |
4 |
5 |
191 |
3 |
5 |
532 |
7 |
10 |
Completed. |
84 |
Thorndale Veterinary Laboratory—Fencing, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
540 |
13 |
9 |
— |
540 |
13 |
9 |
Completed. |
82/47 of 1961/62 |
Munster Institute, Pig Progeny Testing Station—Partitioning |
... |
... |
... |
... |
... |
... |
12 |
17 |
11 |
312 |
18 |
5 |
325 |
16 |
4 |
Completed. |
|
Bovine Tuberculosis Eradication Scheme Offices: |
|
|
|
|
|
|
|
|
|
|
55 |
Cork—Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
573 |
1 |
7 |
— |
573 |
1 |
7 |
Completed. |
19 |
Ennis—Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
252 |
2 |
4 |
— |
252 |
2 |
4 |
Completed. |
82/56 of 1961/62 |
Galway—Improved Heating, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
... |
146 |
7 |
2 |
405 |
0 |
0 |
551 |
7 |
2 |
Completed. |
|
Department of Transport and Power: |
|
|
|
|
|
|
|
|
|
|
101 |
Kildare Street—Partitioning |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
107 |
16 |
10 |
— |
107 |
16 |
10 |
In progress. |
|
Meteorological Office: |
|
|
|
|
|
|
|
|
|
|
90/55 of 1960/61 |
Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
30 |
18 |
6 |
1,607 |
4 |
6 |
1,638 |
3 |
0 |
Completed. |
1 |
Formation of Laboratory |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
938 |
3 |
9 |
— |
938 |
3 |
9 |
Completed. |
33 |
Fire Precautions |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
671 |
14 |
6 |
— |
671 |
14 |
6 |
Completed. |
24 |
Mullingar—Electrical Installation |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
223 |
0 |
0 |
— |
223 |
0 |
0 |
Completed. |
7 |
Mercantile Marine Office—Improvement of Heating |
... |
... |
... |
... |
... |
... |
... |
373 |
1 |
4 |
— |
373 |
1 |
4 |
Completed. |
|
Department of Industry and Commerce: |
|
|
|
|
|
|
|
|
|
|
82/80 of 1961/62 |
Headquarters (Kildare Street)—Partitioning |
... |
... |
... |
... |
... |
... |
... |
... |
62 |
7 |
0 |
155 |
2 |
5 |
217 |
9 |
5 |
Completed. |
60 |
Patents Office—Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
14 |
2 |
0 |
— |
14 |
2 |
0 |
In progress. |
82/97 of 1961/62 |
Industrial Development Authority—Renovations |
... |
... |
... |
... |
... |
... |
... |
545 |
2 |
7 |
17 |
5 |
0 |
562 |
7 |
7 |
Completed. |
|
Department of Posts and Telegraphs: |
|
|
|
|
|
|
|
|
|
|
35 |
Central Telegraph Office—Conversion of Telex |
... |
... |
... |
... |
... |
... |
... |
... |
982 |
10 |
0 |
— |
982 |
10 |
0 |
Completed. |
71 |
Central Telegraph Office—Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
... |
230 |
6 |
10 |
— |
230 |
6 |
10 |
Completed. |
83 |
Telephone Exchange, Crown Alley—Improvements |
... |
... |
... |
... |
... |
... |
... |
287 |
11 |
5 |
— |
287 |
11 |
5 |
Completed. |
50 |
Dublin Post Office Factory—Installation of Petrol Pump |
... |
... |
... |
... |
... |
... |
... |
142 |
0 |
0 |
— |
142 |
0 |
0 |
Completed. |
32 |
Athy Post Office—Partitioning |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
139 |
15 |
4 |
— |
139 |
15 |
4 |
Completed. |
82/92 of 1961/62 |
Cork Sorting Office—Partitioning, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
... |
382 |
9 |
7 |
182 |
16 |
1 |
565 |
5 |
8 |
Completed. |
40 |
Cork Sorting Office—Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
152 |
9 |
9 |
— |
152 |
9 |
9 |
Completed. |
45 |
Kinsale Post Office—Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
157 |
10 |
0 |
— |
157 |
10 |
0 |
Completed. |
9 |
Longford Post Office—Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
822 |
7 |
3 |
— |
822 |
7 |
3 |
Completed. |
17 |
Tipperary Post Office—Fire Precautions |
... |
... |
... |
... |
... |
... |
... |
... |
... |
50 |
0 |
0 |
— |
50 |
0 |
0 |
In progress. |
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
|
General Headquarters: |
|
|
|
|
|
|
|
|
|
|
82/9 of 1961/62 |
Ladies’ Cloakroom |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
28 |
16 |
0 |
218 |
19 |
2 |
247 |
15 |
2 |
Completed. |
82/68 of 1961/62 |
Arrangement of accommodation |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
145 |
14 |
9 |
280 |
13 |
7 |
426 |
8 |
4 |
Completed. |
21 |
Improvement of Heating |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
528 |
10 |
0 |
— |
528 |
10 |
0 |
Completed. |
28 |
Adaptations (Strongroom) |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
224 |
7 |
8 |
— |
224 |
7 |
8 |
Completed. |
59 |
Government Buildings (Main Guard Room)—Erection of Partitions |
... |
... |
... |
... |
... |
258 |
16 |
11 |
— |
258 |
16 |
11 |
Completed. |
82/66 of 1961/62 |
Civil Defence Store, Newbridge—Surfacing Approaches |
... |
... |
... |
... |
... |
... |
... |
147 |
4 |
2 |
59 |
0 |
0 |
206 |
4 |
2 |
In progress. |
|
Department of External Affairs: |
|
|
|
|
|
|
|
|
|
|
|
Headquarters: |
|
|
|
|
|
|
|
|
|
|
82/95 of 1961/62 |
Shelving |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
48 |
3 |
7 |
53 |
8 |
7 |
101 |
12 |
2 |
Completed. |
91 |
Improvement of Lighting |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
8 |
11 |
8 |
— |
8 |
11 |
8 |
In progress. |
|
Embassies Abroad: |
|
|
|
|
|
|
|
|
|
|
62 |
Bonn—Improvement of Heating |
... |
... |
... |
... |
... |
... |
... |
... |
... |
489 |
17 |
5 |
— |
489 |
17 |
5 |
Completed. |
82/102 of 1961/62 |
Brussels—Partitioning |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
581 |
6 |
9 |
387 |
16 |
0 |
969 |
2 |
9 |
Completed. |
51 |
Canberra—Partitioning |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
798 |
15 |
1 |
— |
798 |
15 |
1 |
Completed. |
2 |
Lagos—Partitioning |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
1,952 |
7 |
1 |
— |
1,952 |
7 |
1 |
Completed. |
|
Department of Social Welfare: |
|
|
|
|
|
|
|
|
|
|
29 |
Áras Mhic Dhiarmada—Equipment for Lunch Club |
... |
... |
... |
... |
... |
... |
... |
158 |
13 |
6 |
— |
158 |
13 |
6 |
Completed. |
|
Employment Exchanges: |
|
|
|
|
|
|
|
|
|
|
90/70 of 1960/61 |
Beresford Place (Northumberland House)—Improved electric lighting |
... |
... |
... |
... |
98 |
13 |
7 |
170 |
7 |
5 |
269 |
1 |
0 |
Completed. |
81 |
Gardiner Street—Partitioning, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
... |
122 |
13 |
10 |
— |
122 |
13 |
10 |
Completed. |
36 |
Gardiner Street—Shelving, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
959 |
15 |
0 |
— |
959 |
15 |
0 |
Completed. |
114 |
Dundalk—Improved lighting |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
245 |
19 |
10 |
— |
245 |
19 |
10 |
Completed. |
41 |
Limerick—Improved lighting |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
80 |
9 |
5 |
— |
80 |
9 |
5 |
Part Completed. |
20 |
Mallow Social Welfare Office—Improved Heating |
... |
... |
... |
... |
... |
... |
... |
116 |
19 |
6 |
— |
116 |
19 |
6 |
Completed. |
|
Total: |
|
... |
£31,989 |
7 |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DETAILS OF No. 78—URGENT AND UNFORESEEN WORKS.
Work No. |
Service and Description |
Expenditure |
Observamions |
1962-63 |
To 31-3-62 |
To 31-3-63 |
|
|
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
Oireachtas: |
|
|
|
|
|
|
|
|
|
|
7 |
Dáil Chamber—Improved acoustics |
... |
... |
... |
... |
... |
... |
... |
... |
... |
1,555 |
9 |
2 |
— |
1,555 |
9 |
2 |
Stage I completed. |
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
|
Office of the Revenue Commissioners: |
|
|
|
|
|
|
|
|
|
|
6 |
21 Parliament Street, Dublin—Adaptation for Claims Branch |
... |
... |
... |
... |
... |
2,889 |
17 |
10 |
— |
2,889 |
17 |
10 |
In progress. |
13 |
9-10 Upper O’ConnellStreet, Dublin—Installation of computer |
... |
... |
... |
... |
... |
5,293 |
12 |
7 |
— |
5,293 |
12 |
7 |
In progress. |
10 |
55-56 Upper O’ConnellStreet, Dublin—Adaptations, etc. |
... |
... |
... |
... |
... |
... |
3,139 |
0 |
11 |
— |
3,139 |
0 |
11 |
In progress. |
12 |
19-22 Dame Street, Dublin—Adaptations, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
1,163 |
10 |
0 |
— |
1,163 |
10 |
0 |
Virtually completed. |
|
Department of Local Government: |
|
|
|
|
|
|
|
|
|
|
1 |
121 Lower Baggot Street, Dublin—Adaptations, etc., for Road Traffic Section |
... |
... |
... |
4,709 |
14 |
6 |
— |
4,709 |
14 |
6 |
In progress. |
|
Department of Education: |
|
|
|
|
|
|
|
|
|
|
8 |
9-10 Burlington Road, Dublin—Adaptations, etc. for Institute for Advanced Studies |
... |
... |
... |
5,601 |
16 |
1 |
— |
5,601 |
16 |
1 |
In progress. |
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
9 |
69 Fitzwilliam Square, Dublin—Adaptations, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
800 |
10 |
0 |
— |
800 |
10 |
0 |
In progress. |
|
Department of Industry and Commerce: |
|
|
|
|
|
|
|
|
|
|
3 |
1, 7 8 Mount Street Crescent—Adaptations etc. for An Foras Tionscail and the Industrial |
|
|
|
|
|
|
|
|
|
|
|
Development Authority |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
6,033 |
6 |
2 |
— |
6,033 |
6 |
2 |
In progress. |
4 |
21 Fitzwilliam Square, Dublin—Adaptations etc. for An Cheard Chomhairle |
... |
... |
... |
5,301 |
6 |
8 |
— |
5,301 |
6 |
8 |
In progress. |
|
Department of External Affairs: |
|
|
|
|
|
|
|
|
|
|
11 |
Stockholm Legation—Adaptations, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
... |
1,552 |
10 |
1 |
— |
1,552 |
10 |
1 |
In progress. |
|
Total: |
... |
38,040 |
14 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DETAILS OF B.79—MINOR BALANCES OF EXPENDITURE.
Work No. |
Service and Description |
Expenditure |
Observamions |
1962-63 |
To 31-3-62 |
To 31-3-63 |
|
|
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
Oireachtas: |
|
|
|
|
|
|
|
|
|
|
3 of 1960/61 |
Leinster House—Reconstruction of loggias |
... |
... |
... |
... |
... |
... |
... |
... |
... |
1,772 |
2 |
1 |
14,112 |
17 |
11 |
15,885 |
0 |
0 |
Completed. |
|
Department of An Taoiseach: |
|
|
|
|
|
|
|
|
|
|
|
Central Statistics Office: |
|
|
|
|
|
|
|
|
|
|
4 of 1961/62 |
Accommodation for Census of Population Staff |
... |
... |
... |
... |
... |
... |
... |
2,166 |
5 |
9 |
23,953 |
17 |
9 |
26,120 |
3 |
6 |
In progress. |
91/3 of 1960/61 |
Transfer of dining club, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
29 |
6 |
6 |
3,721 |
17 |
6 |
3,751 |
4 |
0 |
In progress. |
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
9 of 1961/62 |
Economic Research Institute (73 Lr. Baggot Street, Dublin)—Adaptations |
... |
... |
... |
... |
1,827 |
9 |
2 |
6,226 |
5 |
7 |
8,053 |
14 |
9 |
Completed. |
|
Office of Public Works: |
|
|
|
|
|
|
|
|
|
|
9a of 1961/62 |
Adaptations at 8-9 Merrion Row, Dublin |
... |
... |
... |
... |
... |
... |
... |
... |
2 |
0 |
1 |
2,023 |
5 |
6 |
2,025 |
5 |
7 |
In progress. |
9b of 1961/62 |
Adaptations at 50-51 St. Stephen’s Green, Dublin |
... |
... |
... |
... |
... |
... |
... |
68 |
19 |
2 |
2,271 |
10 |
7 |
2,340 |
9 |
9 |
In progress. |
11a of 1961/62 |
Cork Government Offices—Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
185 |
0 |
0 |
969 |
18 |
0 |
1,154 |
18 |
0 |
In progress. |
12a of 1961/62 |
Cloghore Customs Frontier Post—Improvements |
... |
... |
... |
... |
... |
... |
... |
205 |
8 |
5 |
1,092 |
8 |
4 |
1,297 |
116 |
9 |
In progress. |
|
Ordnance Survey Office: |
|
|
|
|
|
|
|
|
|
|
11 of 1960/61 |
Fundamental Bench Marks |
... |
... |
... |
... |
... |
... |
... |
... |
... |
208 |
11 |
4 |
3,251 |
17 |
2 |
3,460 |
8 |
6 |
In progress. |
17 of 1961/62 |
Improvement of storage equipment |
... |
... |
... |
... |
... |
... |
... |
... |
... |
525 |
0 |
0 |
634 |
12 |
11 |
1,159 |
12 |
11 |
In progress. |
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
96/3 of 1957/58 |
Kilkenny Forestry Office—Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
... |
135 |
4 |
6 |
490 |
11 |
7 |
625 |
16 |
1 |
Completed. |
34 of 1961/62 |
Shelton Abbey Forestry School—Accommodation for additional trainees |
... |
... |
... |
... |
192 |
4 |
6 |
3,693 |
19 |
1 |
3,886 |
3 |
7 |
Completed. |
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
48 of 1961/62 |
Cork: Egg and Poultry Inspection—Accommodation |
... |
... |
... |
... |
... |
... |
... |
623 |
2 |
11 |
2,074 |
2 |
6 |
2,697 |
5 |
5 |
In progress. |
49 of 1961/62 |
Waterford Bovine Tuberculosis and Portal Inspection Offices—Adaptations |
... |
... |
... |
... |
558 |
5 |
9 |
4,637 |
4 |
0 |
5,195 |
9 |
9 |
Completed. |
|
Department of Transport and Power: |
|
|
|
|
|
|
|
|
|
|
50 of 1961/62 |
Valentia Observatory—Alterations and additions |
... |
... |
... |
... |
... |
... |
... |
... |
2,531 |
16 |
7 |
63,210 |
15 |
5 |
65,742 |
12 |
0 |
Completed. |
|
Department of Posts and Telegraphs: |
|
|
|
|
|
|
|
|
|
|
57a of 1960/61 |
General Post Office, Dublin—Partitions in Post Office Savings Bank |
... |
... |
... |
... |
... |
198 |
0 |
0 |
1,786 |
19 |
0 |
1,984 |
19 |
0 |
Completed. |
35 of 1961/62 |
Bandon—New Telephone Exchange, Engineers Stores and Garages |
... |
... |
... |
... |
... |
395 |
12 |
10 |
1,030 |
4 |
10 |
1,425 |
17 |
8 |
In progress. |
58 of 1960/61 |
Churchtown, Dublin—New District Sorting Office |
... |
... |
... |
... |
... |
... |
... |
54 |
13 |
6 |
17,309 |
6 |
9 |
17,364 |
0 |
3 |
Completed. |
57 of 1961/62 |
Droichead Nua—New Post Office and Telephone Exchange |
... |
... |
... |
... |
... |
... |
167 |
0 |
4 |
15,682 |
6 |
3 |
15,849 |
6 |
7 |
In progress. |
59 of 1961/62 |
Galway—New Post Office and Telephone Exchange |
... |
... |
... |
... |
... |
... |
... |
358 |
17 |
8 |
55,542 |
14 |
0 |
55,901 |
11 |
8 |
In progress. |
60 of 1961/62 |
Gorey Post Office—Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
217 |
11 |
10 |
2,573 |
0 |
2 |
2,790 |
12 |
0 |
In progress. |
70 of 1961/62 |
Letterkenny—New Post Office and Telephone Exchange |
... |
... |
... |
... |
... |
... |
... |
30 |
1 |
4 |
31,310 |
8 |
10 |
31,340 |
10 |
2 |
Completed. |
64 of 1961/62 |
Mallow Post Office—Improvements |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
810 |
11 |
5 |
1,654 |
4 |
7 |
2,464 |
16 |
0 |
In progress. |
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
73 of 1961/62 |
Curragh Camp, Plunkett Barracks—Dining Hall and Cookhouse |
... |
... |
... |
... |
... |
1,891 |
5 |
4 |
69,449 |
2 |
2 |
71,340 |
7 |
6 |
Completed. |
74 of 1961/62 |
Haulbowline—New water main |
... |
... |
... |
... |
... |
... |
... |
... |
... |
... |
1,210 |
15 |
6 |
9,383 |
4 |
5 |
10,593 |
19 |
11 |
Completed. |
|
Department of Health: |
|
|
|
|
|
|
|
|
|
|
88 of 1960/61 |
Central Mental Hospital—New water main |
... |
... |
... |
... |
... |
... |
... |
... |
12 |
16 |
1 |
5,125 |
11 |
1 |
5,138 |
7 |
2 |
Completed. |
88a of 1960/61 |
Customs House, Dublin—Demolition of annexe |
... |
... |
... |
... |
... |
... |
... |
... |
15 |
17 |
6 |
3,409 |
3 |
3 |
3,425 |
0 |
9 |
Completed. |
|
Total: |
... |
16,394 |
0 |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|