Committee Reports::Report - Appropriation Accounts 1974::21 April, 1977::Appendix

APPENDIX 10

Qn. 526.


STATEMENT OF EXPENDITURE ON NEW WORKS, ALTERATIONS AND ADDITIONS, 1 APRIL-31 DECEMBER, 1974 (VOTE 9: SUBHEAD E)

Work No.

Service and Description

Total Estimate

Vote 1 April to 31 December 1974

Expenditure

Observations

1 April to 31 December 1974

to 31/3/74

to 31/12/74

 

 

£

£

£

£

£

 

1 (1)

President

 

 

 

 

 

 

 

Arus an Uachtararáin: Improvements

11,000

10,000

8,660.35

2,070.88

10,731.23

Completed

 

 

 

 

8,660.35

 

 

 

 

Oireachtas

 

 

 

 

 

 

1 (2)

Leinster House: Installation of Standby Generators

36,000

1,000

In Planning

1 (3)

Leinster House: Additional Accommodation

 

30,000

Under consideration.

1 (4)

Leinster House: Erection of Barriers at Entrance

20,000

 

19,076.44

19,076.44

In Progress.

 

 

 

 

19,076.44

 

 

 

 

Taoiseach

 

 

 

 

 

 

2

State Apartments: Adaptation of former Stamping Branch

 

 

 

 

 

 

 

Premises

..

..

..

..

..

..

..

 

7,000

Under consideration.

2 (A)

State Apartments: Extension of Automatic Fire Detection

 

 

 

 

 

 

 

System

..

..

..

..

..

..

..

 

 

5,000.00

8,601.62

13,601.62

Completed.

 

 

 

 

5,000.00

 

 

 

 

Department of Finance

 

 

 

 

 

 

3 (1)

Provision of Building for Computer—Stage 1

..

..

325,000

20,000

35,836.18

288,088.63

323,924.81

Completed.

3 (2)

Provision of Building for Computer—Stage 2

..

..

250,000

1,000

In planning.

4

Fitting out of New Office premises for occupation

..

 

302,000

327,692.61

 

 

 

 

 

Detailed as follows:

 

 

 

 

Pearse House

..

..

..

..

..

..

 

 

5,267.22

44,613.68

49,880.90

In progress.

 

O’Connell Bridge House, Extension

..

..

..

 

 

713.36

22,230.91

22,944.27

In Progress

 

52, St. Stephens Green

..

..

..

..

..

 

 

10,236.47

75,571.03

85,807.50

do.

 

Hume House

..

..

..

..

..

..

 

 

693.98

10,769.25

11,463.23

do.

 

D’Olier House

..

..

..

..

..

..

 

 

14,920.35

35,722.89

50,643.24

do.

 

Earlsfort House

..

..

..

..

..

..

 

 

108,005.87

130,440.23

238,446.10

Virtually completed.

 

Number 1, Grand Canal St.

..

..

..

..

 

 

31,972.99

21,818.54

53,791.53

In progress

 

Hawkins House

..

..

..

..

..

..

 

 

7,949.27

9,005.33

16,954.60

Completed.

 

Ossian House, Pearse St.

..

..

..

..

 

 

85,820.86

85,820.86

In progress.

 

Osmond House, Little Ship Street

..

..

..

 

 

19,531.95

19,531.95

do.

 

St. Munchins’ House, Limerick

..

..

..

..

 

 

26,299.51

26,299.51

do.

 

Hynes Building, Galway

..

..

..

..

..

 

 

505.66

18,587.18

19,092.84

Completed.

 

Apollo House, Tara Street.

..

..

..

..

 

 

84.86

21,998.90

22,083.76

do.

 

Phibsboro House

..

..

..

..

..

..

 

 

30.09

32,819.27

32,849.36

do.

 

3, South Frederick Street.

..

..

..

..

 

 

76.68

6,587.32

6,664.00

do.

 

39, Dawson Street.

..

..

..

..

..

 

 

360.72

14,774.12

15,134.84

do.

 

Arkle House

..

..

..

..

..

..

 

 

6,391.34

17,658.25

24,049.59

do.

 

Bishop Street.

..

..

..

..

..

..

 

 

1,268.48

1,268.48

In progress.

 

Sidmonton Place, Bray

..

..

..

..

..

 

 

7,200.00

7,200.00

do.

 

Leeson Lane, Dublin

..

..

..

..

..

 

 

362.95

362.95

In planning.

5

Revenue Commissioners: New Offices Dublin Castle

1,400,000

180,000

192,254.72

1,120,314.07

1,312,568.79

In Progress

6

Revenue Commissioners: Provision of Additional

 

 

 

 

 

 

 

Computer Accommodation

..

..

..

..

250,000

20,000

17,126.40

232,100.19

249,226.59

Completed

7

Revenue Commissioners: Aras Brugha, Adaptations

93,000

10,000

12,513.80

79,748.90

92,262.70

do.

8

Revenue Commissioners: 11/13 Upper O’Connell St.

 

 

 

 

 

 

 

Dublin: Adaptations

..

..

..

..

..

42,000

8,000

2,268.31

61,996.14

64,264.45

do.

9

Monaghan: New Customs Road Station

..

..

..

60,000

10,000

661.37

1,260.91

1,922.28

In planning.

10

Carrigans: New Frontier Customs Post

..

..

..

14,000

1,000

Deferred.

11

Blacklion: Frontier Customs Post Stage II

..

..

 

1,000

Under consideration.

12

Dundalk Customs Road Station: Enlargement

..

..

 

1,000

Site to be acquired.

13

Government Buildings: New Lifts

..

..

..

30,000

1,000

In planning.

14

New Office Buildings, Dublin: Erection

..

..

..

2,500,000

138,000

8,991.34

 

 

 

 

 

 

 

Detailed as follows:

 

 

 

 

Haddington Road

..

..

..

..

..

..

 

 

8,691.06

8,691.06

do.

 

Shelbourne Road

..

..

..

..

..

..

 

 

2,304.43

2,414.69

4,719.12

do.

 

Ship Street (Dublin Castle)

..

..

..

..

 

 

4,533.75

4,533.75

do.

 

Glasnevin (Marlboro House Site)

..

..

..

..

 

 

4,293.30

4,293.30

do.

 

13/14 Earlsfort Terrace

..

..

..

..

..

 

 

2,153.16

4,811.77

6,964.93

do.

15

15, Merrion Square: Adaptations

..

..

..

..

16,000

5,000

1,217.45

3,090.23

4,307.68

In progress.

16

Dublin Central Buildings Maintenance Workshops:

 

 

 

 

 

 

 

Adaptations

..

..

..

..

..

..

30,000

1,000

Deferred.

17

Ordnance Survey: New Printing Building

..

..

225,000

60,000

67,984.16

3,784.26

71,768.42

In progress.

18 (1)

Ordnance Survey: Improvement of Residential Quarters

17,000

5,000

In planning.

18 (2)

Ordnance Survey: Provision of Canteen Facilities

..

5,500

5,000

do.

19

Dundalk: New Government Offices

..

..

..

 

5,000

2,552.27

10,819.90

13,372.17

Deferred.

20

Drogheda: New Government Offices

..

..

..

116,000

7,000

3,454.67

100,715.79

104,170.46

Completed.

21

Letterkenny: New Government Offices

..

..

..

130,000

60,000

117,118.57

57,511.96

174,630.53

do.

22

Mullingar: New Government Offices

..

..

..

135,000

25,000

In planning.

23

Roscommon: New Government Offices

..

..

..

 

6,000

Contract placed.

24

Tralee: New Government Offices

..

..

..

..

25,000

2,000

48.96

26,250.07

26,299.03

Completed

25

Waterford: New Government Offices

..

..

..

186,000

5,000

85.70

528.28

613.98

In planning.

26

New Premises for the Institute of Public Administration

 

 

 

 

 

 

 

and the Dept. of the Public Service Training Centre

..

1,200,000

15,000

50,949.15

50,949.15

In planning.

27

State Memorial to the Late President Kennedy

..

..

3,810,000

2,000

137,167.84

137,167.84

Under Consideration

28

Scoil Eanna, Rathfarnham, Restoration of Buildings,

 

 

 

 

 

 

 

Stage II

..

..

..

..

..

..

..

 

16,000

525.00

525.00

In planning.

29

Royal Hospital, Kilmainham Restoration, Stage II

..

 

10,000

765.95

509.67

1,275.62

do.

30

Government Buildings South Block: Adaptations

..

 

10,000

do.

31

Government Buildings South Block: Installation of

 

 

 

 

 

 

 

Standby Generators

..

..

..

..

..

..

 

1,000

do.

32

Clare Island: Harbour Improvements

..

..

..

90,000

39,000

22,256.00

22,256.00

In progress.

33 (1)

Dún Laoghaire Harbour: Removal of Temporary Car

 

 

 

 

 

 

 

Ferry Terminal

..

..

..

..

..

..

10,000

1,000

2,928.79

2,541.84

5,470.63

do.

33 (2)

Dún Laoghaire Harbour: Multi-purpose Ship Facilities

250,000

100,000

155,558.00

2,392.18

157,950.18

do.

34 (1)

Bourn Vincent National Park: Improvement to Workshops

 

3,000

3,353.00

1,081.98

4,434.98

do.

34 (2)

Bourn Vincent National Park: Public Toilets

..

..

15,000

5,000

5,480.63

5,480.63

do.

34 (3)

Bourn Vincent National Park: Mucross House Sanitary

 

 

 

 

 

 

 

Services

..

..

..

..

..

..

..

50,000

2,000

729.01

729.01

In planning.

34 (4)

Bourn Vincent National Park: Roads Development

..

 

4,000

3,510.92

556.72

4,067.64

In Progress

35

Kilkenny Castle: Restoration of Picture Gallery Wing

100,000

18,000

57,622.28

15,060.00

72,682.28

do.

36

Phoenix Park Extension (Islandbridge Park) General

 

 

 

 

 

 

 

Development Stage I

..

..

..

..

..

80,000

10,000

2,621.02

39,502.38

42,123.40

do.

36A

Ballinamore and Ballyconnell Canal Survey

..

..

 

 

1,810.44

5,879.65

7,690.09

do.

37 (1)

Shannon Navigation: General Improvements

..

..

100,000

20,000

14,771.93

75,768.66

90,540.59

do.

37 (2)

Shannon Navigation: New jetty at Hodson Bay

..

40,000

7,000

373.94

373.94

In planning.

37 (3)

Shannon Navigation: Extension of Pier at Mountshannon

13,000

5,000

11,580.04

6,171.31

17,751.35

In progress.

37 (4)

Shannon Navigation: General Study

..

..

..

17,000

6,000

6,000.00

6,028.33

12,028.33

do.

37 (5)

Shannon Navigation: Extension of Quay at Rossmore

..

11,000

5,000

53,25

53.25

In planning.

38

National Monuments: Dunmore Caves/Visitor Centre,

 

 

 

 

 

 

 

Co. Kilkenny

..

..

..

..

..

..

18,000

8,000

17,683.60

583.30

18,266.90

In progress.

39

National Monuments: Clonmacnoise Visitor Centre

..

72,000

2,000

In planning.

40

National Monuments: Cashel, Visitor Centre

..

..

25,000

10,000

2,424.05

2,424.05

In progress.

41

National Monuments: New Depot at Killarney

..

..

 

2,000

Deferred.

42

National Monuments: New Depot at Kilkenny

..

..

15,000

3,000

In planning.

43

National Monuments: New Depot at Parkes Castle, Co.

 

 

 

 

 

 

 

Sligo

..

..

..

..

..

..

..

20,000

6,000

do.

44

National Monuments: New Depot at Athenry

..

..

40,000

4,000

do.

 

 

 

 

1,071,014.78

 

 

 

 

Department of Justice

 

 

 

 

 

 

45

Garda Headquarters: Technical Bureau: Improvements

55,000

10,000

4,276.82

24,953.83

29,230.65

Virtually completed.

46

Garda Headquarters: Improved accommodation for

 

 

 

 

 

 

 

Commissioners Staff

..

..

..

..

..

40,000

30,000

31,988.56

4,500.00

36,488.56

In progress.

47

Garda Training Centre, Templemore: Adaptations, etc.

..

647,000

1,000

1,258.00

645,571.14

646,829.14

Completed.

48

Erection of New Garda Stations:

..

..

..

..

 

200,000

206,276.48

 

 

 

 

 

 

 

Detailed as follows:

 

 

 

 

Dublin Metropolition Division:

 

 

 

 

 

 

 

Ballymum

..

..

..

..

..

..

 

 

1,801.62

29,683.14

31,484.76

Completed.

 

Coolock

..

..

..

..

..

..

..

 

 

1,547.17

54,025.54

55,572.71

do.

 

Store Street

..

..

..

..

..

..

 

 

47,771.00

53,582.70

101,353.70

In progress.

 

Mountjoy

..

..

..

..

..

..

 

 

7,975.95

7,975.95

do.

 

Co. Dublin

 

 

 

 

 

 

 

Blanchardstown

..

..

..

..

..

 

 

4,980.00

6,030.00

11,010.00

Completed.

 

Howth

..

..

..

..

..

..

..

 

 

555.00

10,545.00

11,100.00

do.

 

Co. Cavan

 

 

 

 

 

 

 

Belturbet

..

..

..

..

..

..

 

 

2,403.87

8,747.87

11,151.74

do.

 

Co. Cork

 

 

 

 

 

 

 

Kanturk

..

..

..

..

..

..

..

 

 

46.37

46.37

In planning.

 

Skibbereen

..

..

..

..

..

..

 

 

4,950.00

2,886.45

7,836.45

In progress.

 

Co. Donegal:

 

 

 

 

 

 

 

Bunbeg

..

..

..

..

..

..

..

 

 

4,375.00

4,680.00

9,055.00

Completed.

 

Culdaff

..

..

..

..

..

..

..

 

 

1,980.00

1,980.00

In progress.

 

Dungloe

..

..

..

..

..

..

..

 

 

741.34

4,578.00

5,319.34

Completed.

 

Raphoe

..

..

..

..

..

..

..

 

 

823.01

8,925.13

9,748.14

In progress.

 

Co. Galway:

 

 

 

 

 

 

 

Menlough

..

..

..

..

..

..

 

 

380.00

380.00

In planning.

 

Rosmuc

..

..

..

..

..

..

..

 

 

11,940.00

1,170.00

13,110.00

Completed.

 

Co. Kildare:

 

 

 

 

 

 

 

Clane

..

..

..

..

..

..

..

 

 

624.60

11,165.52

11,790.12

Completed.

 

Naas

..

..

..

..

..

..

..

 

 

10,587.00

10,587.00

In progress.

 

Co. Kilkenny:

 

 

 

 

 

 

 

Graiguenamanagh

..

..

..

..

..

 

 

650.00

12,375.59

13,025.59

do.

 

Co. Limerick:

 

 

 

 

 

 

 

Limerick City: (Divisional Headquarters)

..

..

 

 

15,223.51

5,240.68

20,464.19

Tenders invited.

 

Askeaton

..

..

..

..

..

..

 

 

550.00

11,455.13

12,005.13

Completed.

 

Co. Mayo:

 

 

 

 

 

 

 

Newport

..

..

..

..

..

..

 

 

5,564.72

13,578.97

19,143.69

do.

 

Co. Meath:

 

 

 

 

 

 

 

Dunboyne

..

..

..

..

..

..

 

 

199.00

9,921.20

10,120.20

do.

 

Co. Monaghan:

 

 

 

 

 

 

 

Emyvale

..

..

..

..

..

..

..

 

 

2,700.00

2,700.00

In progress.

 

Co. Offaly:

 

 

 

 

 

 

 

Shannonbridge

..

..

..

..

..

..

 

 

9,000.00

9,000.00

Virtually completed.

 

Co. Roscommon:

 

 

 

 

 

 

 

Knockcroghery

..

..

..

..

..

..

 

 

10,530.00

1,440.00

11,970.00

do.

 

Co. Waterford:

 

 

 

 

 

 

 

Waterford City (Divisional Headquarters)

..

..

 

 

6,029.18

140,671.70

146,700.88

Completed.

 

Portlaw

..

..

..

..

..

..

..

 

 

26.19

10,476.58

10,502.77

do.

 

Co. Westmeath:

 

 

 

 

 

 

 

Ballynacargy

..

..

..

..

..

..

 

 

12,330.00

1,440.00

13,770.00

Virtually completed.

 

Ballinahown

..

..

..

..

..

..

 

 

7,650.00

5,400.00

13,050.00

do.

 

Kinnegad

..

..

..

..

..

..

 

 

623.66

10,490.26

11,113.92

Completed.

 

Multyfarnham

..

..

..

..

..

..

 

 

1,645.00

12,600.00

14,245.00

Virtually completed.

 

Delvin

..

..

..

..

..

..

..

 

 

680.00

11,650.12

12,330.12

Completed.

 

Moate

..

..

..

..

..

..

..

 

 

657.00

12,961.62

13,618.62

Virtually completed.

 

Co. Wexford:

 

 

 

 

 

 

 

Rosslare Strand

..

..

..

..

..

 

 

8,100.00

8,100.00

Completed.

 

Clonroche

..

..

..

..

..

..

 

 

6,750.00

6,750.00

In progress.

 

Bunclody

..

..

..

..

..

..

 

 

550.00

11,665.13

12,215.13

Completed.

 

Co. Wicklow:

 

 

 

 

 

 

 

Enniskerry

..

..

..

..

..

..

 

 

12,721.29

3,226.00

15,947.29

Completed.

 

Carnew

..

..

..

..

..

..

..

 

 

615.00

12,770.26

13,385.26

do.

49

Improvement Schemes at existing Garda Stations

..

 

70,000

77,964.97

 

 

 

Sub No.

Dublin Metropolitan Division:

 

 

Detailed as follows:

 

 

 

55

Cabra

..

..

..

..

..

..

..

 

 

438.57

438.57

do.

43/57 of 72/73

Dublin Castle: Accommodation for Garda Task Force

 

 

32.01

1,822.36

1,854.37

do.

43/38 of 72/73

Dublin Castle: Detective Unit and Fire Precaution

 

 

 

 

 

 

 

Works

..

..

..

..

..

..

..

 

 

41.84

2,210.75

2,252.59

do.

31

Fitzgibbon St.—Adaptations to 1st and 2nd floors

..

 

 

3,118.00

3,118.00

In progress.

46/54 of 73/74

Fitzgibbon St.—Improvements to Heating and Lighting

 

 

910.81

408.81

1,319.62

Completed.

48

Fitzgibbon St.—Improvements to cell accommodation

 

 

382.57

382.57

In Progress.

43/26 of 72/73

Fitzgibbon St.—Improvements

..

..

..

..

 

 

344.24

7,389.75

7,733.99

Completed.

43/55 of 72/73

Garda Depot—Canteen, Stores, Adaptations

..

..

 

 

19.08

1,864.33

1,883.41

do.

46/29 of 73/74

Garda Depot—Storage Accommodation

..

..

 

 

285.20

2,885.50

3,170.70

In progress.

42

Garda Depot—Alteration to Guardroom

..

..

 

 

1,479.59

1,479.59

do.

50

Garda Depot—Crime Branch, Partitioning etc

..

 

 

344.41

344.41

do.

35

Garda Depot—Crime Branch, Extension of heating etc

 

 

928.35

928.35

do.

62

Irishtown

..

..

..

..

..

..

..

 

 

195.90

195.90

do.

46/50 of 73/74

Kilmainham—Adaptations

..

..

..

..

 

 

47.83

3,966.92

4,014.75

do.

41

Santry

..

..

..

..

..

..

..

 

 

4,185.06

4,185.06

do.

29

Terenure

..

..

..

..

..

..

..

 

 

2,012.00

2,012.00

do.

 

Dublin Metropolitian Division (Contd.)

 

 

 

 

 

 

 

Co. Dublin:

 

 

 

 

 

 

43/7 of 72/73

Balbriggan

..

..

..

..

..

..

..

 

 

2,418.85

26.50

2,445.35

Completed.

46/58 of 73/74

Lusk

..

..

..

..

..

..

..

 

 

5,130.00

1,800.00

6,930.00

do.

44

Skerries

..

..

..

..

..

..

..

 

 

315.00

315.00

do.

27

Cabinteely

..

..

..

..

..

..

..

 

 

6,982.00

6,982.00

In progress.

 

Co. Clare:

 

 

 

 

 

 

46/73 of 73/74

Mountshannon

..

..

..

..

..

..

 

 

700.00

600.77

1,300.77

do.

 

Co. Cork:

 

 

 

 

 

 

46/35 of 73/74

Cork Courthouse—Provision of Warrant Office

..

 

 

432.84

639.38

1,072.22

do.

26

Ballygurteen

..

..

..

..

..

..

 

 

1,820.40

1,820.40

do.

43/46 of 72/73

Bridewell

..

..

..

..

..

..

..

 

 

386.51

1,115.68

1,502.19

Completed.

46/24 of 73/74

McCurtain St.—Alterations

..

..

..

..

 

 

611.72

1,482.08

2,093.80

do.

46/78 of 73/74

McCurtain St.—Installation of Heating

..

..

 

 

3,410.18

594.00

4,004.18

do.

46/17 of 73/74

St. Lukes

..

..

..

..

..

..

..

 

 

22.12

579.91

602.03

In progress.

49

 

 

 

 

 

 

 

Sub. No.

Co. Cork (Contd.)

 

 

 

 

 

 

19

Union Quay

..

..

..

..

..

..

 

 

269.18

269.18

In progress.

13

Timoleague

..

..

..

..

..

..

 

 

600.00

600.00

Completed.

 

Co. Donegal:

 

 

 

 

 

 

45

Provision of Huts at Donegal/Cavan Border

..

..

 

 

5,672.17

5,672.17

In progress.

33

Killybegs

..

..

..

..

..

..

..

 

 

355.48

355.48

Completed.

 

Co. Galway:

 

 

 

 

 

 

39

Ahascragh

..

..

..

..

..

..

..

 

 

900.00

900.00

Completed.

36

Kilconly

..

..

..

..

..

..

..

 

 

159.05

159.05

In progress.

46/9 of 73/74

Recess

..

..

..

..

..

..

..

 

 

1,051.07

1,485.00

2,536.07

Completed.

38

Tuam

..

..

..

..

..

..

..

 

 

657.73

657.73

do.

 

Co. Kerry:

 

 

 

 

 

 

43/54 of 72/73

Beaufort

..

..

..

..

..

..

..

 

 

389.27

1,800.00

2,189.27

do.

32/39 of 71/72

Farranfore

..

..

..

..

..

..

..

 

 

799.00

3,998.90

4,797.90

do.

 

Co. Kildare:

 

 

 

 

 

 

58

Maynooth

..

..

..

..

..

..

..

 

 

1,530.00

1,530.00

do.

 

Co. Kilkenny:

 

 

 

 

 

 

9

Mooncoin

..

..

..

..

..

..

..

 

 

4,950.00

4,950.00

In progress.

31/15 of 68/69

Stoneyford

..

..

..

..

..

..

 

 

1,226.96

1,380.00

2,606.96

Completed.

 

Co. Laois:

 

 

 

 

 

 

21

Portlaoise

..

..

..

..

..

..

..

 

 

1,053.90

1,053.90

do.

39 Sub. No.

 

 

 

 

 

 

 

 

Co. Limerick:

 

 

 

 

 

 

32/20 of 71/72

Kilfinane

..

..

..

..

..

..

..

 

 

42.06

1,456.89

1,498.95

Completed.

46/16 of 73/74

Kilmeedy

..

..

..

..

..

..

..

 

 

900.00

900.00

1,800.00

In progress.

24

Mary St.

..

..

..

..

..

..

..

 

 

248.14

248.14

Completed.

46/74 of 73/74

William St.

..

..

..

..

..

..

 

 

630.00

300.00

930.00

In progress.

 

Co. Longford:

 

 

 

 

 

 

46/21 of 73/74

Garda Houses, Longford

..

..

..

..

 

 

164.82

1,050.00

1,214.82

Completed.

46/34 of 73/74

Longford

..

..

..

..

..

..

..

 

 

3.25

4,115.00

4,118.25

In progress.

 

Co. Louth:

 

 

 

 

 

 

15

Drogheda

..

..

..

..

..

..

..

 

 

1,350.00

1,350.00

do.

 

Co. Mayo:

 

 

 

 

 

 

43/18 of 72/73

Ballycroy

..

..

..

..

..

..

 

 

398.52

630.00

1,028.52

Virtually completed.

16

Balmullet

..

..

..

..

..

..

..

 

 

260.00

260.00

Completed.

12

Ballindine

..

..

..

..

..

..

 

 

1,350.00

1,350.00

In progress.

14

Foxford

..

..

..

..

..

..

..

 

 

491.00

491.00

Completed.

28

Westport

..

..

..

..

..

..

..

 

 

585.00

585.00

In progress.

 

Co. Meath:

 

 

 

 

 

 

46/86 of 73/74

Dunboyne

..

..

..

..

..

..

..

 

 

238.88

741.00

979.88

Completed.

49

 

 

 

 

 

 

 

Sub. No.

Co. Offaly:

 

 

 

 

 

 

30

Geashill

..

..

..

..

..

..

..

 

 

3,380.00

3,380.00

In progress.

 

Co. Roscommon:

 

 

 

 

 

 

25

Loughglynn

..

..

..

..

..

..

 

 

273.00

273.00

Completed.

 

Co. Sligo:

 

 

 

 

 

 

46/57 of 73/74

Sligo

..

..

..

..

..

..

..

 

 

975.00

9,000.00

9,975.00

In progress.

 

Co. Tipperary:

 

 

 

 

 

 

3

Ballinure

..

..

..

..

..

..

..

 

 

3,600.00

3,600.00

do.

32/25 of 71/72

Clogheen

..

..

..

..

..

..

..

 

 

900.00

1,530.00

2,430.00

Completed.

46/6 of 73/74

Clonmel

..

..

..

..

..

..

..

 

 

712.00

720.00

1,432.00

In progress.

46/65 of 73/74

Dundrum

..

..

..

..

..

..

..

 

 

2,850.00

90.00

2,940.00

do.

 

Co. Westmeath:

 

 

 

 

 

 

18

Mullingar

..

..

..

..

..

..

..

 

 

1,413.53

1,413.53

Completed.

 

Co. Wexford:

 

 

 

 

 

 

27/52 of 69/70

Ferns

..

..

..

..

..

..

..

 

 

590.88

3,562.50

4,153.38

do.

50

Provision of Alternative Accommodation for Garda

 

 

 

 

 

 

 

Personnel at Dublin Castle

..

..

..

..

70,000

3,000

5,350.00

64,203.95

69,553.95

In progress.

50A

Provision of Accommodation for Female Clerical

 

 

 

 

 

 

 

Assistants in Garda Stations

..

..

..

..

 

 

1,764.23

6,716.73

8,480.96

do.

51

Dublin: Temporary Accommodation for Courts

..

250,000

50,000

1,067.50

1,067.50

Under consideration.

52

Dublin: New Permanent Courts

..

..

..

 

3,000

do.

53

Houses for Married Members of the Garda Siochána

..

 

1,000

4,894.00

1,142,547.00

1,147,441.00

 

 

 

 

 

334,840.56

 

 

 

 

Department of Education

 

 

 

 

 

 

54

Athlone: New Offices

..

..

..

..

..

550,000

191,000

82,760.41

48,879.18

131,639.59

In progress.

55

Marlboro St., Dublin: Improvement to Heating

..

18,000

4,000

Under consideration.

55A

Central Model Schools: General Improvements

..

100,000

 

40,607.67

752.29

41,359.96

In progress.

56

National Museum: Improvement to Lighting

..

..

 

1,000

Under consideration.

57

National Museum: Stonework

..

..

..

..

 

1,000

do.

58

Dublin Preventive Centre Finglas

..

..

..

450,000

10,000

9,398.81

430,100.42

439,509.23

In progress.

59

National Schools: Grants for building, enlarging,

 

 

 

 

 

 

 

enclosing etc.

..

..

..

..

..

..

 

5,030,000

7,590,579.41

 

 

 

 

 

 

 

7,723,346.30

 

 

 

 

Department of Lands

 

 

 

 

 

 

60

Castlebar: New Offices

..

..

..

..

..

700,000

264,000

274,649.56

183,764.89

458,414.45

In progress.

 

 

 

 

274,649.56

 

 

 

61

Botanic Gardens: Office and Toilet Accommodation

..

7,000

6,000

9,000.00

9,000.00

In progress.

62

Regional Veterinary and Dairy Produce Laboratories

..

280,000

30,000

44,554.42

220,817.10

265,371.52

do.

63

Abbotstown Farm: New Milking Parlour

..

..

14,100

8,000

840.00

1.52

841.52

do.

64

Abbotstown Farm: Farm Managers Residence

..

..

9,000

5,000

In planning.

65

Abbotstown Farm: Incinerator

..

..

..

..

26,000

20,000

do.

66

Abbotstown Farm: Accommodation for Scientific and

 

 

 

 

 

 

 

Research Staff (Fisheries)

..

..

..

..

125,000

5,000

do.

67

Backweston Farm: New Farm Buildings

..

..

69,000

2,000

1,000.00

66,915.65

67,915.65

In progress.

68

Tully West, Co. Kildare: Performance Testing Station for

 

 

 

 

 

 

 

Beef Bulls

..

..

..

..

..

..

64,000

6,000

21,217.65

55,268.53

76,486.18

do.

69

Thorndale: Butter Testing Station

..

..

..

 

3,000

In planning.

70

Thorndale: Pig Progeny Testing Station

..

..

14,000

10,000

8,150.00

5,863.20

14,013.20

In progress.

71

Thorndale: Alterations to old Laboratory

..

..

40,000

15,000

In planning.

72

Kildalton College: Adaptations

..

..

..

..

 

7,000

21.70

21.70

do.

73

Kildalton College: New Water Supply

..

..

..

31,000

8,000

780.95

780.95

do.

74

Kildalton College: House for Superintendent

..

..

 

3,000

do.

75

Carlow District: Veterinary Office

..

..

..

65,000

15,000

19,853.13

44,165.25

64,018.38

In progress.

76

Provision of Storage Accommodation for Departmental

 

 

 

 

 

 

 

Records, etc.

..

..

..

..

..

..

80,000

16,000

19,600.16

60,890.76

80,490.92

do.

77

Spike Island: Quarantine Station Extension

..

..

 

30,000

5,820.69

5,820.69

Under consideration

78

Ballyhaise Agricultural School: Sewage Disposal

..

68,000

5,000

2,743.46

2,743.46

In planning

79

Raphoe District Veterinary Office: Erection

..

..

 

3,000

do.

80

New Office Block, Kildare Place: Fitting out, Furnishing

 

 

 

 

 

 

 

etc...

..

..

..

..

..

..

..

1,000,000

100,000

469,950.31

850,381.72

1,320,332.03

In progress.

 

 

 

 

602,751.52

 

 

 

81

Mullingar: New Meteorological Station

..

..

14,000

1,000

1,222.90

13,026.68

14,249.58

Virtually completed.

 

 

 

 

1,222.90

 

 

 

 

Department of Posts and Telegraphs

 

 

 

 

 

 

82

Aldboro House: Adaptations

..

..

..

..

 

1,000

1,465.19

1,465.19

Under consideration.

83

Baldoyle: New Sorting Office

..

..

..

..

66,000

25,000

37,705.54

2,109.05

39,814.59

In progress.

84

Central Sorting Office: Ventilation

..

..

..

180,000

70,000

81,863.85

4,784.53

86,648.38

do.

85

Clondalkin Polefield: Resurfacing

..

..

..

20,000

5,000

Under consideration.

86

Dundrum: Computer Building

..

..

..

..

90,000

10,000

10,040.29

82,128.03

92,168.32

In progress.

87

Dundrum: Engineering Training Centre

..

..

..

40,000

3,000

825.62

5,184.00

6,099.62

In planning.

88

Fairview: New Sorting Office

..

..

..

..

 

2,000

do.

89

Finglas: Extension to Sorting Office

..

..

..

13,000

1,000

do.

90

G.P.O.: New Lifts

..

..

..

..

..

..

 

4,000

do.

91

G.P.O.: Philatelic Sales Office

..

..

..

..

8,000

5,000

do.

92

G.P.O.: Adaptation of Accommodation formerly used by

 

 

 

 

 

 

 

R.T.E.

..

..

..

..

..

..

..

 

3,000

685.19

685.19

In progress.

93

Phibsboro Post Office: Extension

..

..

..

..

65,000

20,000

14,995.09

43,973.87

58,968.96

do.

94

St. John’s Rd. Depot: New Paint Store

..

..

..

8,000

1,000

10,095.08

10,095.08

Completed.

95

St. John’s Rd. Depot: Alterations to Sprinkler System

12,000

12,000

In planning.

95A

St. John’s Rd. Depot: Warehouses etc.

..

..

..

 

 

10,592.63

317,249.28

327,841.91

In progress.

96

Stillorgan: New Sorting Office

..

..

..

..

80,000

2,000

1,301.80

1,301.80

Under consideration.

96A

Townsend St.: New Offices: Fitting Out

..

..

..

 

 

18,521.36

95,373.85

113,895.21

Virtually completed.

97

Ballinlough Sorting Office, Cork: Adaptations

..

..

7,000

5,000

In Planning

98

Ballyhaunis Post Office: Modernisation

..

..

..

20,000

4,000

109.19

109.19

In planning.

99

Cavan New Post Office

..

..

..

..

..

80,000

2,000

178.76

82,230.85

82,409.61

Completed.

100

Clonmel New Post Office

..

..

..

..

..

58,500

10,000

901.23

4,388.25

5,289.48

In planning.

101

Donegal New Post Office

..

..

..

..

..

135,000

30,000

2,898.00

2,986.70

5,884.70

In progress.

102

Dungarvan New Post Office

..

..

..

..

50,000

20,000

15,727.47

24,983.05

40,710.52

do.

103

Enniscorthy Post Office: Improvements

..

..

..

10,000

2,000

941.35

941.35

In planning.

103A

Ceanannus Mor Post Office: Alterations

..

..

..

9,000

 

4,950.00

4,950.00

In progress.

104

Letterkenny Post Office: Extension

..

..

..

47,000

8,000

7,802.17

7,802.17

In progress.

105

Limerick Post Office: Improvements

..

..

..

 

2,000

1,180.33

1,180.33

In planning.

106

Listowel New Post Office

..

..

..

..

..

42,000

25,000

15,351.00

5,715.00

21,066.00

In progress.

107

Longford New Post Office

..

..

..

..

..

90,000

5,000

In planning.

108

Mullingar New Post Office

..

..

..

..

..

150,000

5,000

do.

109

Shannon New Post Office

..

..

..

..

..

 

15,000

6,685.94

1,060.43

7,746.37

In progress.

110

Tipperary New Post Office

..

..

..

..

..

130,000

10,000

1,599.34

2,310.00

3,909.34

In planning.

111

Waterford Post Office: Improvements

..

..

..

60,000

5,000

do.

 

 

 

 

243,540.24

 

 

 

 

Department of Foreign Affairs

 

 

 

 

 

 

112

Ottawa Embassy: Extension and Improvements

..

 

2,000

109.24

109.24

do.

112A

New York—United Nations Mission—Chancery

..

20,000

 

4,330.35

4,330.35

In progress.

113

Embassy to the Holy Sea: Adaptations

..

..

..

30,000

5,000

26,707.90

46,431.50

73,139.40

do.

114

E.E.C. Mission Brussels: Fitting out of New Office

..

27,000

5,000

5,296.95

21,570.03

26,866.98

do.

114A

E.E.C. Conferences, Dublin: Provision of Facilities

..

110,000

 

56,926.92

56,926.92

do.

115

Iveagh House: Provision of Strong Room

..

..

12,000

3,000

3,059.54

9,457.98

12,517.52

Completed.

116

Embassy at Tokyo: Fitting out for occupation

..

..

 

35,000

9,725.12

26.64

9,751.76

In progress.

117

Embassy at Moscow (includes Staff Residence): Fitting out for occupation

..

..

..

..

..

 

35,000

52,185.90

52,185.90

In progress.

118

Embassy at Luxembourg: Fitting out for occupation

..

 

25,000

19,709.00

555.60

20,264.60

do.

119

Embassy at Geneva: Fitting out for occupation

..

8,000

8,000

3,297.40

4,973.75

8,271.15

do.

120

Embassy at Lagos: Erection

..

..

..

..

1,000

In planning.

120A

Embassy at Bonn: Fitting out of New Office

..

..

12,000

 

13,284.16

13,284.16

In progress.

 

 

 

 

194,523.24

 

 

 

121

Minor New Works not exceeding £5,000 each

..

..

 

100,000

128,785.58

 

 

 

122

Urgent and Unforseen Works

..

..

..

..

 

14,000

 

 

 

123

Balances of Expenditure on works of prior years which

 

 

 

 

 

 

 

might not have been completed on 1st April, 1974

..

 

40,000

38,004.74

 

 

 

 

Original

 

7,993,000

10,645,416.21

Receipt from

 

 

 

Supplementary

 

2,561,000

(—)10,000.00

Vote 50

 

 

 

 

 

10,554,000

10,635,416.21

 

 

 

DETAILS OF NO. 121—MINOR NEW WORKS

Work No.

Service and Description

Total Estimate

Vote 1 April to 31 December 1974

Expenditure

Observations

1 April to 31 December 1974

to 31/3/74

to 31/12/74

 

 

£

£

£

£

£

 

 

President

 

 

 

 

 

 

19

Arus An Uachtaráin—Back Gate Lodge: Provision of

 

 

 

 

 

 

 

Bathroom, etc.

..

..

..

..

..

..

 

 

777.71

777.71

In progress.

93

Aras An Uachtaráin—Back Gate Lodge: New Boat House

 

 

3,398.06

3,398.06

Completed.

88

Back Gate Lodge and Kitchen Garden Cottage—Electrical

 

 

 

 

 

 

 

installation

..

..

..

..

..

..

 

 

1,117.22

1,117.22

In progress.

 

Oireachtas

 

 

 

 

 

 

106

Leinster House—Provision of Room for Librarian

..

 

 

1,287.84

1,287.84

Completed.

 

Department of Taoiseach

 

 

 

 

 

 

49

Griffith Barracks (Central Statistics Office)—Fire Escape

 

 

1,700.00

1,700.00

In progress.

140

State Apartments Dublin Castle:—Presidental

 

 

 

 

 

 

 

Inauguration

..

..

..

..

..

..

..

 

 

282.60

282.60

Completed.

 

Department of Finance

 

 

 

 

 

 

118

Athlone Government Offices—Heating System

..

 

 

659.87

659.87

In progress.

103/48 of 73/74

Castlebar Government Offices—Resurfacing of yard

..

 

 

812.59

2,070.00

2,882.59

Completed.

128

Carlow Government Offices—Heating System

..

..

 

 

113.73

113.73

In progress.

67

St. Martins House—National Science Council

..

..

 

 

227.21

227.21

Completed.

103/50 of 73/74

Valuation Office, Ely Place—Adaptations

..

..

 

 

134.91

68.50

203.41

In progress.

39

Wexford Government Offices—Heating System

..

..

 

 

1,840.18

1,840.18

do.

 

Revenue Commissioners

 

 

 

 

 

 

66

Aras Brugha—Provision of Store

..

..

..

..

 

 

357.53

357.53

Completed.

141

Dundalk—Renovations

..

..

..

..

..

 

 

1,053.04

1,053.04

In progress.

71

Dundalk—Roden House: Conversion

..

..

..

 

 

367.77

367.77

In Progress

103/160 of 73/74

Dun Laoghaire Harbour—New Clearing Station

..

 

 

3,284.85

70.20

3,355.05

do.

42

Ennis—Electrical Works Etc.

..

..

..

..

 

 

285.24

285.24

Completed.

59

Government Buildings, Cork—Electrical Works Etc.

..

 

 

592.46

592.46

Completed.

103/18 of 73/74

Kilkenny Garda Station—Accommodation for Revenue

 

 

 

 

 

 

 

Staff

..

..

..

..

..

..

..

 

 

53.78

1,793.54

1,847.32

do.

125

Lord Edward St., Dublin—Heating System

..

..

 

 

158.84

158.84

In progress.

111

14, St. Stephen’s Green—Adaptations

..

..

..

 

 

237.99

237.99

do.

103/17 of 73/74

Waterford Customs and Excise Office—Storage Heating

 

 

439.02

600.00

1,039.02

Completed.

84/97 of 72/73

Waterford Income Tax Office—Storage Heating

..

 

 

490.13

1,000.00

1,490.13

do.

103/118 of 73/74

Wexford Tax Office—Adaptations

..

..

..

 

 

1,044.25

784.70

1,828.95

In progress.

 

Office of Public Works

 

 

 

 

 

 

103/38 of 73/74

Bourn Vincent Memorial Park—Bus park at Torc

..

 

 

2,056.96

3,450.71

5,507.67

Completed.

18

Bourn Vincent Memorial Park —Car park at

 

 

 

 

 

 

 

Carrigafreaghane

..

..

..

..

..

..

 

 

835.50

835.50

In progress.

103/30 of 73/74

Phoenix Park—Children’s playground

..

..

..

 

 

1,736.80

774.00

2,510.80

do.

103/159 of 73/74

Phoenix Park—Whitefields: Provision of Central Heating

 

 

67.00

1,281.00

1,348.00

Completed.

103/97 of 73/74

St. Stephen’s Green—Supts. Residence: Provision of

 

 

 

 

 

 

 

Central Heating

..

..

..

..

..

..

 

 

48.00

983.46

1,031.46

do.

121

St. Stephen’s Green—Supt’s. Residence: Centre piece

..

 

 

60.00

60.00

do.

147

Kenmare Estate—Water Supply

..

..

..

..

 

 

592.03

592.03

do.

85

Shannon Navigation—Portumna Toll House—Sanitary

 

 

 

 

 

 

 

facilities

..

..

..

..

..

..

..

 

 

2,025.00

2,025.00

In progress.

54

Royal Hospital—Provision of Bathroom etc. at West Ave.

 

 

 

 

 

 

 

Cottage

..

..

..

..

..

..

..

 

 

1,426.59

1,426.59

In progress.

53

Dún Laoghaire Harbour—Provision of Store at

 

 

 

 

 

 

 

Car-ferry terminal

..

..

..

..

..

..

 

 

88.43

88.43

do.

72

Drainage Maintenance Workshop, Lifford—

 

 

 

 

 

 

 

Improvements

..

..

..

..

..

..

..

 

 

2,748.95

2,748.95

do.

74

Drainage Maintenance Workshop, Limerick—

 

 

 

 

 

 

 

Improvements

..

..

..

..

..

..

..

 

 

3,207.50

 

3,207.50

do.

103/127 of 73/74

City Hall, Cork—Stand at Science and Technology

 

 

 

 

 

 

 

Exhibition 1974

..

..

..

..

..

..

 

 

49.16

515.00

564.16

Completed.

 

Department of the Public Service

 

 

 

 

 

 

103/82 of 73/74

72-76 St. Stephen’s Green—Adaptations

..

..

 

 

207.87

4,150.25

4,358.12

do.

87

72-76 St. Stephen’s Green—Security Works

..

..

 

 

473.46

473.46

In progress.

115

72-76 St. Stephen’s Green—Partitioning etc.

..

..

 

 

36.92

36.92

do.

 

Department of Justice

 

 

 

 

 

 

103/42 of 73/74

Four Courts—Toilet Accommodation

..

..

..

 

 

117.83

1,491.52

1,609.35

Completed.

55

Four Courts—Amplification System

..

..

..

 

 

853.23

853.23

do.

112

Four Courts—Improvements: Chief Justices’ Chambers

 

 

24.58

24.58

In progress.

38

39 Dawson Street—Partitioning

..

..

..

..

 

 

287.47

287.47

Completed.

81

Public Record Office—Improvement Works

..

..

 

 

117.98

117.98

In progress.

76

128 Lower Baggot Street—Adaptations to Basement

..

 

 

21.00

21.00

do.

 

Department of Local Government

 

 

 

 

 

 

103/123 of 73/74

Parkgate Hall Driving Test Centre—Provision of Public

 

 

 

 

 

 

 

Toilet

..

..

..

..

..

..

..

 

 

59.57

338.22

397.79

Completed.

17

Waterford Driving Test Centre—Improvements

..

 

 

1,350.00

1,350.00

In progress.

 

Department of Education

 

 

 

 

 

 

103/107 of 73/74

Limerick Model School—Accommodation for

 

 

 

 

 

 

 

Inspectorate

..

..

..

..

..

..

 

 

264.33

164.91

429.24

In progress.

120

National Library—Partitioning and Electrical Works

..

 

 

31.05

31.05

do.

10

National Museum—Provision of sales cubicles

..

..

 

 

978.25

978.25

Completed.

61

National Museum—Improvement of Sanitary

 

 

 

 

 

 

 

Accommodation etc.

..

..

..

..

..

..

 

 

1,348.82

1,348.82

In progress.

103/54 of 73/74

Sligo former Technical School—Accommodation for

 

 

 

 

 

 

 

Inspectorate

..

..

..

..

..

..

..

 

 

866.42

2,134.54

3,000.96

do.

 

Department of Lands

 

 

 

 

 

 

103/25 of 73/74

Land Commission—23/34 Upper Merrion St.—Transfer

 

 

 

 

 

 

 

of Court ..

..

..

..

..

..

..

 

 

1,063.30

2,241.01

3,304.31

Completed.

84/41 of 72/73

Land Commission—Rear of 23 Upper Merrion St. Storage

 

 

 

 

 

 

 

access and car park improvements

..

..

..

 

 

313.90

740.95

1,054.85

do.

95

Land Commission—23 Upper Merrion St.—Provision of

 

 

 

 

 

 

 

Training Facilities

..

..

..

..

..

 

 

1,111.08

1,111.08

do.

103/29 of 73/74

Kinnity Castle, Birr—Adaptations

..

..

..

 

 

290.44

3,770.00

4,060.44

do.

29

Kinnity Castle, Birr—Provision of Central Heating

..

 

 

4,746.70

4,746.70

do.

 

Department of Agriculture and Fisheries

 

 

 

 

 

 

103/76 of 73/74

Abbotstown Farm Research Laboratory—Adaptations to

 

 

 

 

 

 

 

piggery

..

..

..

..

..

..

..

 

 

2,197.64

834.56

3,032.20

In progress.

103/79 of 73/74

Abbotstown Farm Research Laboratory—Provision of

 

 

 

 

 

 

 

Store

..

..

..

..

..

..

..

 

 

216.65

2,307.97

2,524.62

Completed.

103/98 of 73/74

Abbotstown Farm Research Laboratory—Central Heating

 

 

 

 

 

 

 

in Directors House

..

..

..

..

..

 

 

65.10

1,280.41

1,345.51

do.

82

Abbotstown Farm Research Laboratory—Improvements

 

 

 

 

 

 

 

to Dairy

..

..

..

..

..

..

..

 

 

241.83

241.83

In progress.

94

Abbotstown Farm Research Laboratory—Adaptations to

 

 

 

 

 

 

 

Small Animal Unit

..

..

..

..

..

 

 

948.49

948.49

Completed.

100

Abbotstown Farm Research Laboratory—Heating System

 

 

 

 

 

 

 

—Improvements

..

..

..

..

..

..

 

 

928.29

928.29

In progress.

103/117 of 73/74

Abbotstown Farm Research Laboratory—Provision of

 

 

 

 

 

 

 

A.I. Research Unit

..

..

..

..

..

 

 

1,455.60

814.50

2,270.10

do.

15

Ballyhaise Agricultural College—New Shower Unit

..

 

 

1,937.10

1,937.10

Completed.

56

Ballyhaise Agricultural College—Well Boring

..

..

 

 

3,197.02

3,197.02

do.

77

Ballyhaise Agricultural College—Improvements to House

 

 

 

 

 

 

 

Masters House

..

..

..

..

..

..

 

 

345.00

345.00

In progress.

78

Ballyhaise Agricultural College—Erection of Retaining

 

 

 

 

 

 

 

Walls

..

..

..

..

..

..

..

 

 

3,420.00

3,420.00

Completed.

102

Backweston Farm—Improvement of heating system

..

 

 

1,299.33

1,299.33

In progress.

103/81 of 73/74

Ballsbridge Veterinary College—Improved toilet and

 

 

 

 

 

 

 

canteen facilities

..

..

..

..

..

..

 

 

289.45

3,127.28

3,416.73

do.

73

Ballsbridge Veterinary College—New microbiology

 

 

 

 

 

 

 

unit

..

..

..

..

..

..

..

..

 

 

1,157.71

1,157.71

do.

103/84 of 73/74

Ballsbridge Veterinary College,—Improvement of teaching

 

 

 

 

 

 

 

facilities

..

..

..

..

..

..

..

 

 

222.90

3,224.37

3,447.27

Completed.

28

Castletownbere—Provision of Field Laboratory

..

 

 

6,511.72

6,511.72

In progress.

58

Chantilly Field Station—Laboratory improvements

..

 

 

120.52

120.52

do.

103/90 of 73/74

Kildalton Abbey—Provision of cooking equipment

..

 

 

32.06

1,573.57

1,605.63

do.

103/137 of 73/74

Ennis District Veterinary Office—Alterations

..

..

 

 

398.49

300.00

698.49

Completed.

84/45 of 72/73

Mellows Agricultural College—Supts. Residence:

 

 

 

 

 

 

 

Improvements

..

..

..

..

..

..

 

 

1,074.55

3,416.94

4,491.49

do.

84/95 of 72/73

Mellows Agricultural College—Erection of building to

 

 

 

 

 

 

 

house generator

..

..

..

..

..

 

 

1,585.92

2,554.00

4,139.92

do.

70

Munster Institute—Improved kitchen equipment

..

 

 

991.94

991.94

In progress.

86

Munster Institute—Improvements to Poultry Processin

 

 

 

 

 

 

 

building

..

..

..

..

..

..

..

 

 

578.09

578.09

In progress.

103/35 of 73/74

Thorndale Laboratory—Provision of cattle crush chute

 

 

335.78

512.99

848.77

Completed.

45

Thorndale Laboratory—Provision of meal store

..

 

 

92.68

92.68

In progress.

103/31 of 73/74

Thorndale Laboratory—Improvement of entrance

..

 

 

6.21

3,706.47

3,712.68

Completed.

 

Department of Labour

 

 

 

 

 

 

143

Bray Employment Exchange—Adaptations

..

..

 

 

1,000.00

1,000.00

In progress.

62

Manpower Service, Athlone—Storage heating

..

..

 

 

365.80

365.80

Completed.

50

Manpower Service, Clonmel—Fitting out

..

..

 

 

401.25

401.25

do.

84/12 of 72/73

Manpower Services, Ballybofey—Conversion of premises

 

 

 

 

 

 

 

(Finn College)

..

..

..

..

..

..

 

 

466.27

1,161.44

1,627.71

do.

35

Manpower Service, Limerick—Partitioning etc.

..

..

 

 

75.50

75.50

In progress.

74/98 of 71/72

Manpower Service, Waterford—Adaptations

..

..

 

 

500.00

4,258.41

4,758.41

Completed.

64

Manpower Service, O’Connell Bridge House—Partitioning

 

 

1,066.98

1,066.98

Completed.

103/69 of 73/74

Ansley House—Tea Room facilities

..

..

..

 

 

9.77

645.01

654.78

do.

103/41 of 73/74

Werburgh St. Employment Exchange—Provision of

 

 

 

 

 

 

 

protective grill and counter

..

..

..

..

..

 

 

488.06

482.00

970.00

do.

75

Department of Industry and Commerce

 

 

 

 

 

 

 

 

 

 

 

Kildare Street—Adaptations

..

..

..

..

 

 

937.55

937.55

In progress.

20

Kildare Street—Partitioning

..

..

..

..

 

 

1,306.19

1,306.19

Completed.

14

Geological Survey Office, Hume St.—Stores for

 

 

 

 

 

 

 

Equipment etc.

..

..

..

..

..

..

..

 

 

126.49

126.49

In progress.

 

Department of Transport and Power

 

 

 

 

 

 

74/35 of 71/72

Cork Mercantile Marine Office—Improvements

..

 

 

35.25

4,042.63

4,077.88

Completed.

84/60 of 72/73

Valentia Radio Station—Improvements to Married

 

 

 

 

 

 

 

Quarters

..

..

..

..

..

..

..

..

 

 

984.50

2,668.00

3,652.50

do.

52

Kildare Street—Additional Accommodation

..

..

 

 

997.39

997.39

In progress.

 

Department of Posts and Telegraphs

 

 

 

 

 

 

103/153 of 73/74

G.P.O., Dublin—Improvements

..

..

..

..

 

 

11,680.62

1,784.95

13,465.57

In progress.

84

G.P.O., Dublin—Improvements to windows

..

..

 

 

1,572.37

1,572.37

Completed.

103/63 of 73/74

St. John’s Road Depot—Provision of store

..

..

 

 

742.65

809.41

1,552.06

do.

103/51 of 73/74

Stores Depot, Infirmary Road—Erection of prefab dining

 

 

 

 

 

 

 

room

..

..

..

..

..

..

..

 

 

133.75

348.41

482.16

do.

90

Central Sorting Office—Security improvements

..

..

 

 

762.50

762.50

In progress.

97

Central Sorting Office—Improvement of Dining Club

 

 

 

 

 

 

 

facilities

..

..

..

..

..

..

..

 

 

1,687.65

1,687.65

do.

103/131 of 73/74

Sandwith St. Garage—Provision of parking area

..

 

 

307.63

68.53

376.16

Completed.

84/48 of 72/73

Hammam Buildings, 11/13 Upper O’Connell Street—

 

 

 

 

 

 

 

Internal adaptations

..

..

..

..

..

 

 

1.61

3,079.49

3,081.10

do.

139

Priory Hall (Tallaght) Post Office—Adaptations

..

..

 

 

2,177.09

2,177.09

In progress.

103/115 of 73/74

Ballina Post Office—New floor in Sorting Office, etc

..

 

 

655.00

600.00

1,255.00

Completed.

117

Carlow Post Office—Improvements to heating system

..

 

 

360.07

360.07

In progress.

57

Castlebar Post Office—Alterations

..

..

..

 

 

4,050.00

4,050.00

do.

43

Fenian House, Dublin—Partitioning etc.

..

..

 

 

2,579.72

2,579.72

do.

68

Roscommon Post Office—Provision of petrol pump

..

 

 

421.01

421.01

Completed.

41

Sligo Post Office—Alterations to yard entrance

..

..

 

 

325.00

325.00

do.

65

Tuam Post Office—Sanitary accommodation

..

..

 

 

3,330.00

3,330.00

In progress.

44

Westport Post Office—Sanitary accommodation

..

 

 

900.00

900.00

do.

40

Wexford Post Office—Provision of fire escape

..

..

 

 

1,272.50

1,272.50

Completed.

 

Department of Defence

 

 

 

 

 

 

103/52 of 73/74

G.H.Q., Parkgate Street—Adaptations

..

..

..

 

 

482.78

967.16

1,449.94

In progress.

103/73 of 73/74

G.H.Q., Parkgate Street—Improvements to toilets

..

 

 

71.00

413.08

484.08

Completed.

101

Red House—Infirmary Road—Improved heating system

 

 

401.85

401.85

do.

74/46 of 71/72

Coláiste Caoimhin—Inprovements

..

..

..

 

 

27.25

4,524.88

4,552.13

In progress.

 

Department of Foreign Affairs

 

 

 

 

 

 

30

30 Earlsfort Terrace—Central heating

..

..

..

 

 

990.00

990.00

Completed.

103/102 of 73/74

Brussels Embassy—Fitting out of new offices

..

..

 

 

822.21

479.88

1,302.09

In progress.

25

The Hague Embassy Residence—New Bathroom

..

 

 

1,496.21

1,496.21

Completed.

 

Department of Social Welfare

 

 

 

 

 

 

32

Kilmallock Social Welfare Office—Adaptations

..

..

 

 

366.29

366.29

do.

103/41 of 73/74

Granard Social Welfare Office—New Building

..

..

 

 

1,393.84

1,710.00

3,103.84

In progress.

 

Department of Health

 

 

 

 

 

 

89

Custom House—Adaptations to General Register Office

 

 

878.07

878.07

do.

109

Custom House—Tiling of corridors

..

..

..

 

 

262.90

262.90

do.

DETAILS OF NO. 123—MINOR BALANCES OF EXPENDITURE

Work No.

Service and Description

Total Estimate

Vote 1 April to 31 December 1974

Expenditure

Observations

1 April to 31 December 1974

to 31/3/74

to 31/12/74

 

Oireachtas

£

£

£

£

£

 

1 (1) of 71/72

Leinster House—Extension and alterations

..

..

 

 

1,000.00

770,968.92

771,968.92

Completed.

 

Department of an Taoiseach

 

 

 

 

 

 

3A of 72/73

State Apartments, Dublin Castle—Rebuilding of Drawing Room,

 

 

 

 

 

 

 

 

 

Bedroom, Block and Main Entrance

..

..

 

 

3,091.45

527,899.90

530,991.35

do.

 

Department of Finance

 

 

 

 

 

 

5 of 72/3

4 Kildare St.—Improvements

..

..

..

..

 

 

68.13

29,650.50

29718.63

do.

21 of 72/3

Garden of Remembrance—Inscription on back wall

..

 

 

150.00

6,235.34

6,385.34

Design completed.

29 (1) of 73/74

Scoil Eanna, Rathfarnham—Restoration of building

 

 

 

 

 

 

 

(Stage 1)

..

..

..

..

..

..

..

..

 

 

5,417.26

39,074.55

44,491.81

Completed.

 

Department of Education

 

 

 

 

 

 

55 of 73/4

Dublin Institute for Advanced Studies—(Accommodation)

 

 

1,807.74

190,519.06

192,326.80

Completed.

40A of 71/2

Coláiste Mhuire, 28 Parnell Square—Adaptations

..

 

 

846.00

13,000.00

13,846.00

do.

 

Department of Labour

 

 

 

 

 

 

53 of 71/2

Belmullet—New Government Offices

..

..

..

 

 

2,780.50

10,566.77

13,347.27

Completed.

 

Department of Agriculture and Fisheries

 

 

 

 

 

 

60/1 of 73/4

Abbotstown Farm—New Laboratory Block

..

..

 

 

509.21

150,929.58

151,438.79

do.

61 of 72/3

Dunmore East Harbour—Field Research Station

..

 

 

120.03

6,376.28

6,496.31

do.

66A of 73/4

Veterinary College, Ballsbridge—Extra Accommodation

 

 

149.97

6,248.44

6,398.41

do.

55 of 72/3

Abbotstown Farm—Experimental Animals

 

 

 

 

 

 

 

Accommodation

..

..

..

..

..

..

..

..

 

 

3,779.06

179,671.26

183,450.32

do.

 

Department of Posts and Telegraphs

 

 

 

 

 

 

79 of 73/4

Glenageary—New Sorting Office

..

..

..

..

 

 

781.56

61,526.56

62,308.12

do.

90A of 73/4

Kilmallock Post Office—Alterations and improvements

..

 

 

1,731.18

4,320.00

6,051.18

do.

80 of 73/4

Harmonstown Sorting Office—Extension

..

..

..

 

 

2,143.20

13,778.69

15,921.89

do.

86 of 73/4

Castlebar—Engineering Headquarters and Garage

..

 

 

580.20

4,075.00

4,655.20

Completed.

72 of 73/4

Blackrock Post Office—Modernisation

..

..

..

 

 

187.03

11,046.71

11,233.74

do.

95 of 73/4

Nenagh—New Post Office

..

..

..

..

 

 

7,336.53

80,252.65

87,589.18

do.

 

Department of Defence

 

 

 

 

 

 

81 of 72/3

Parkgate Street—Alterations

..

..

..

..

 

 

4.15

11,688.72

11,692.87

do.

99A of 73/74

Parkgate Street—Installation of Automatic Central

 

 

 

 

 

 

 

Heating

..

..

..

..

..

..

..

 

 

1,691.00

5,011.78

6,702.78

do.

 

Department of Social Welfare

 

 

 

 

 

 

102A of 73/74

Aras Mhic Dhiarmada—Computer

..

..

..

 

 

3,830.54

31,910.52

35,741.06

do.