APPENDIX 6.
STATEMENT OF EXPENDITURE ON NEW WORKS, ALTERATIONS AND ADDITIONS 1973-74 (VOTE 8: SUBHEAD E).
Work No. |
Service and Description |
Total Estimate |
Vote 1973-74 |
Expenditure |
Observations |
1973-74 |
to 31/3/73 |
to 31/3/74 |
|
|
£ |
£ |
£ |
£ |
£ |
|
|
President |
|
|
|
|
|
|
1 A |
Aras an Uachtaráin—Improvements |
.. |
.. |
.. |
10,000 |
|
2,070.88 |
|
2,070.88 |
In Progress. |
|
|
|
|
2,070.88 |
|
|
|
|
Oireachtas |
|
|
|
|
|
|
1 (1) |
Leinster House: Provision of glass screen around front |
|
|
|
|
|
|
|
of the Public Gallery in the Dáil Chamber |
.. |
.. |
9,000 |
9,000 |
9,708.65 |
53.28 |
9,761.93 |
Completed. |
1 (2) |
Leinster House: Installation of Standby Generators |
.. |
28,000 |
15,000 |
|
|
|
Under consideration. |
|
|
|
|
9,708.65 |
|
|
|
|
Department of an Taoiseach |
|
|
|
|
|
|
2 |
State Apartments: Extension of automatic fire detection |
|
|
|
|
|
|
|
system |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
16,000 |
10 000 |
8,403.74 |
197.88 |
8,601.62 |
Completed. |
|
|
|
|
8,403.74 |
|
|
|
|
Department of Finance |
|
|
|
|
|
|
3 (1) |
Provision of Building for Computer—Stage 1 |
.. |
.. |
322,000 |
70,000 |
59,641.26 |
228,447.37 |
288,088.63 |
Virtually completed. |
3 (2) |
Provision of Building for computer—Stage 2 |
.. |
.. |
|
5,000 |
— |
— |
— |
In planning. |
4 |
Fitting out of new Office premises for occupation |
.. |
|
50,000 |
244,801.00 |
|
|
|
|
|
|
|
Detailed as follows: |
|
|
|
|
Arkle House, Lr. Mount Street |
.. |
.. |
.. |
.. |
|
|
4,742.21 |
12,916.04 |
17,658.25 |
Completed. |
|
Apollo House, Tara Street |
.. |
.. |
.. |
.. |
|
|
1,755.91 |
20,242.99 |
21,998.90 |
do. |
|
Phibsboro |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
382.38 |
32,436.89 |
32,819.27 |
do. |
|
Hynes Building, Galway |
.. |
.. |
.. |
.. |
|
|
639.63 |
17,947.55 |
18,587.18 |
do. |
|
Cumberland House |
.. |
.. |
.. |
.. |
.. |
|
|
1,266.17 |
36,797.10 |
38,063.27 |
do. |
|
39 Dawson Street |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
732.36 |
14,041.76 |
14,774.12 |
do. |
|
3 South Frederick Street |
.. |
.. |
.. |
.. |
.. |
|
|
246.04 |
6,341.28 |
6,587.32 |
do. |
|
Pearse House |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,275.98 |
40,337.70 |
44,613.68 |
In progress. |
|
O’Connell Bridge House Extension |
.. |
.. |
.. |
|
|
1,998.59 |
20,232.32 |
22,230.91 |
Virtually completed. |
|
52 St. Stephen’s Green |
.. |
.. |
.. |
.. |
.. |
|
|
29,127.04 |
46,443.99 |
75,571.03 |
In progress. |
|
Hume House (3rd and 4th Floors) |
.. |
.. |
.. |
|
|
2,684.51 |
8,084.74 |
10,769.25 |
Virtually completed. |
|
D’Olier House |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
35,686.08 |
36.81 |
35,722.89 |
In progress. |
|
Earlsfort House |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
130,440.23 |
— |
130,440.23 |
In progress. |
|
Grattan Court |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
21,818.54 |
— |
21,818.54 |
do. |
|
Hawkins House |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
9,005.33 |
— |
9,005.33 |
do. |
5 |
Revenue Commissioners: New Offices, Dublin Castle |
.. |
1,100,000 |
100,000 |
198,793.94 |
921,520.13 |
1,120,314.07 |
In progress. |
6 |
Revenue Commissioners: Provision of additional |
|
|
|
|
|
|
|
Computer Accommodation |
.. |
.. |
.. |
.. |
225,000 |
75,000 |
122,812.15 |
109,288.04 |
232,100.19 |
Virtually completed. |
7 |
Revenue Commissioners: Aras Brugha: Adaptations |
.. |
65,000 |
30,000 |
44,847.21 |
34,901.69 |
79,748.90 |
do. |
8 |
Revenue Commissioners: 11/13 Upper O’Connell St.— |
|
|
|
|
|
|
|
Adaptations |
.. |
.. |
.. |
.. |
.. |
.. |
25,000 |
6,000 |
12,266.22 |
49,729.92 |
61,996.14 |
Completed. |
9 |
Monaghan: New Customs Road Station |
.. |
.. |
.. |
|
5,000 |
1,260.91 |
— |
1,260.91 |
In planning. |
10 |
Carrigans: New Frontier Customs Post |
.. |
.. |
.. |
|
2,000 |
— |
— |
— |
Deferred. |
11 |
Blacklion: Frontier Customs Post Stage II |
.. |
.. |
|
1,000 |
— |
— |
— |
Under consideration. |
12 |
Dundalk Customs Road Station: Enlargement |
.. |
.. |
|
1,000 |
— |
— |
— |
Site to be acquired. |
13 |
New Office Block, Kildare Place: Fitting out, etc. |
.. |
1,000,000 |
550,000 |
612,939.36 |
237,442.36 |
850,381.72 |
Phased occupation in progress. |
14 |
Government Buildings: New Lifts |
.. |
.. |
.. |
30,000 |
10,000 |
— |
— |
— |
In planning. |
15 |
New Office Buildings, Dublin: Erection |
.. |
.. |
.. |
2,500,000 |
500,000 |
20,210.82 |
— |
20,210.82 |
do. |
16 |
15 Merrion Square: Adaptations |
.. |
.. |
.. |
.. |
|
16,000 |
1,590.60 |
1,499.63 |
3,090.23 |
In progress. |
17 |
Dublin Central Building Maintenance Workshops: |
|
|
|
|
|
|
|
Adaptations |
.. |
.. |
.. |
.. |
.. |
.. |
30,000 |
1,000 |
— |
— |
— |
In planning. |
18 (1) |
Ordnance Survey: New Printing Building |
.. |
.. |
180,000 |
25,000 |
3,784.26 |
— |
3,784.26 |
Tenders being examined. |
18 (2) |
Ordnance Survey: Improvement of Residential Quarters |
17,000 |
8,000 |
|
— |
|
In planning. |
19 |
Dundalk: New Government Offices |
.. |
.. |
.. |
|
7,000 |
10,819.90 |
|
10,819.90 |
Under consideration. |
20 |
Drogheda: New Government Offices |
.. |
.. |
.. |
116,000 |
65,000 |
66,574.75 |
34,141.04 |
100,715.79 |
Completed. |
21 |
Letterkenny: New Government Offices |
.. |
.. |
.. |
130,000 |
80,000 |
57,511.96 |
|
57,511.96 |
In progress. |
22 |
Mullingar: New Government Offices |
.. |
.. |
.. |
121,000 |
25,000 |
|
|
|
In planning. |
23 |
Roscommon: New Government Offices |
.. |
.. |
.. |
|
2,000 |
|
|
|
In planning. |
24 |
Tralee: New Government Offices |
.. |
.. |
.. |
.. |
25,000 |
20,000 |
23,550.07 |
2,700.00 |
26,250.07 |
Completed. |
25 |
Waterford: New Government Offices |
.. |
.. |
.. |
186,000 |
3,000 |
528.28 |
— |
528.28 |
In planning. |
26 |
New premises for Institute of Public Administration, and |
|
|
|
|
|
|
|
Department of Finance Training Centre |
.. |
.. |
|
75,000 |
49,190.09 |
1,759.06 |
50,949.15 |
In planning. |
27 |
State Memorial to late President Kennedy |
.. |
.. |
3,810,000 |
3,000 |
|
137,167.84 |
137,167.84 |
Under consideration. |
28 |
Memorial to Roger Casement in Glasnevin Cemetery |
.. |
4,000 |
1,000 |
80.00 |
2,494.25 |
2,574.25 |
Partly completed. |
29 (1) |
Scoil Eanna, Rathfarnham: Restoration of Building |
|
|
|
|
|
|
|
(Stage 1) |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
30,000 |
6,000 |
7,669.00 |
31,405.55 |
39,074.55 |
Virtually completed. |
29 (2) |
Scoil Eanna, Rathfarnham: Restoration of Buildings |
|
|
|
|
|
|
|
(Stage II) |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
5,000 |
— |
— |
— |
In planning. |
30 |
Royal Hospital, Kilmainham: Restoration (Stage II) |
.. |
|
20,000 |
509.67 |
|
509.67 |
do. |
31 |
Clare Island: Harbour Improvements |
.. |
.. |
.. |
83,000 |
62,000 |
22,256.00 |
— |
22,256.00 |
In progress. |
32 (1) |
Dun Laoghaire Harbour: Removal of Temporary Car |
|
|
|
|
|
|
|
Ferry Terminal |
.. |
.. |
.. |
.. |
.. |
.. |
10,000 |
8,000 |
1,305.92 |
1,235.92 |
2 541.84 |
In progress. |
32(2) |
Dun Laoghaire Harbour: Multi-purpose Ship Facilities |
250,000 |
130,000 |
2,392.18 |
|
2,392.18 |
Tenders under consideration. |
33 |
Inishbofin Island, Co. Galway: Harbour Improvements |
|
5,000 |
|
|
|
Under consideration. |
34(1) |
Bourn Vincent National Park: Improvement to |
|
|
|
|
|
|
|
Workshops |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
5,000 |
|
1,081.98 |
1,081.98 |
In progress. |
34(2) |
Bourn Vincent National Park: Public Toilets |
.. |
.. |
11,000 |
5,000 |
217.53 |
5,263.10 |
5,480.63 |
Part completed. |
34(3) |
Bourn Vincent National Park: Muckross House Sanitary |
|
|
|
|
|
|
|
Services |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
50,000 |
10,000 |
246.01 |
483.00 |
729.01 |
In planning. |
34(4) |
Bourn Vincent National Park: Roads Development |
.. |
|
5,000 |
556.72 |
|
556.72 |
In progress. |
35 |
Kenmare Estate Park, Killarney: Water Supply |
.. |
.. |
|
2,000 |
1,262.73 |
|
1,262.73 |
do. |
36 |
Kilkenny Castle: Restoration of Picture Gallery Wing |
.. |
100,000 |
20,000 |
15,000.00 |
60.00 |
15,060.00 |
do. |
37 |
Phoenix Park Extension: General Development Stage I |
.. |
80,000 |
30,000 |
25,946.52 |
13,555.86 |
39,502.38 |
do. |
37(A) |
Ballinamore and Ballyconnell Canal Survey |
.. |
.. |
8,000 |
|
2,861.91 |
3,017.74 |
5,879.65 |
do. |
38(1) |
Shannon Navigation: General Improvements |
.. |
.. |
100,000 |
25,000 |
27,121.55 |
48,647.11 |
75,768.66 |
do. |
38(2) |
Shannon Navigation: New Jetty at Hodson Bay |
.. |
40,000 |
17,000 |
373.94 |
— |
373.94 |
In planning. |
38(3) |
Shannon Navigation: Extension of Pier at Mountshannon |
13,000 |
6,000 |
6,171.31 |
— |
6,171.31 |
In progress. |
38(4) |
Shannon Navigation: General Study |
.. |
.. |
.. |
34,000 |
— |
6,028.33 |
— |
6,028.33 |
do. |
39 |
National Monuments: Dunmore Caves Visitor Centre, |
|
|
|
|
|
|
|
Kilkenny |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
16,000 |
16,000 |
300.55 |
282.75 |
583.30 |
do. |
40 |
National Monuments: Clonmacnoise Visitor Centre |
.. |
72,000 |
2,000 |
|
|
|
Site investigation in hands. |
41 |
National Monuments: Cashel Visitor Centre |
.. |
.. |
20,000 |
5,000 |
|
|
|
In planning. |
42 |
National Monuments: New Depot at Killarney |
.. |
.. |
|
2,000 |
|
|
|
Site investigation in hands |
|
|
|
|
1,651,422.61 |
|
|
|
43(1) |
Garda Headquarters: Technical Bureau: Improvements |
55,000 |
28,000 |
109.76 |
24,844.07 |
24,953.83 |
In progress. |
43(2) |
Garda Headquarters: Improved Accommodation for |
|
|
|
|
|
|
|
Commissioner’s Staff |
.. |
.. |
.. |
.. |
.. |
12,000 |
6,000 |
4,500.00 |
|
4,500.00 |
do. |
44 |
Garda Training Centre, Templemore: Adaptations etc. |
647,000 |
2,000 |
1,980.00 |
643,591.14 |
645,571.14 |
Completed. |
45 |
Erection of New Garda Stations |
.. |
.. |
.. |
|
350,000 |
199,543.71 |
|
|
|
|
|
|
|
Detailed as |
|
|
|
|
Dublin Metropolitan Division: |
|
|
follows |
|
|
|
|
Ballyfermot |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
145.21 |
56,109.10 |
56,254.31 |
Completed. |
|
Ballymun |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,550.46 |
26,132.68 |
29,683.14 |
do. |
|
Coolock |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
21,008.76 |
33,016.78 |
54,025.54 |
do. |
|
Kevin St. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
244.00 |
47,105.14 |
47,349.14 |
do. |
|
Raheny |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,460.64 |
46,580.30 |
49,040.94 |
do. |
|
Store St. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
35,349.85 |
18,232.85 |
53,582.70 |
In progress. |
|
Co. Cavan; |
|
|
|
|
|
|
|
Belturbet |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,627.87 |
6,120.00 |
8,747.87 |
Completed. |
|
Co. Cork: |
|
|
|
|
|
|
|
Skibbereen |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,886.45 |
|
2,886.45 |
In progress. |
|
Co. Donegal: |
|
|
|
|
|
|
|
Bunbeg |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,680.00 |
|
4,680.00 |
do. |
|
Burtonport |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
23.00 |
8,002.09 |
8,025.09 |
Completed. |
|
Raphoe |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
8,925.13 |
|
8,925.13 |
In progress. |
|
Co. Dublin: |
|
|
|
|
|
|
|
Blanchardstown |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
6,030.00 |
|
6,030.00 |
do. |
|
Howth |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
8,295.00 |
2,250.00 |
10,545.00 |
do. |
|
Co. Galway: |
|
|
|
|
|
|
|
Clifden |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,350.00 |
21,699.62 |
23,049.62 |
Completed. |
|
Rosmuc |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,170.00 |
|
1,170.00 |
In progress. |
|
Co. Kildare: |
|
|
|
|
|
|
|
Clane |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,465.52 |
9,700.00 |
11,165.52 |
Virtually completed |
|
Droichead Nua |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
69.00 |
20,843.85 |
20,912.85 |
Completed. |
|
Co. Kilkenny: |
|
|
|
|
|
|
|
Graiguenamanagh |
.. |
.. |
.. |
.. |
.. |
|
|
3,335.59 |
9,040.00 |
12,375.59 |
Completed. |
|
Co. Leitrim: |
|
|
|
|
|
|
|
Kiltyclogher |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
370.00 |
11,521.95 |
11,891.95 |
Completed. |
|
Co. Limerick: |
|
|
|
|
|
|
|
Askeaton |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,155.13 |
9,300.00 |
11,455.13 |
do. |
|
Limerick City |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,836.66 |
2,404.02 |
5,240.68 |
In planning. |
|
Co. Mayo: |
|
|
|
|
|
|
|
Newport |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
13,578.97 |
|
13,578.97 |
In progress. |
|
Co. Meath: |
|
|
|
|
|
|
|
Dunboyne |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
150.00 |
9,771.20 |
9,921.20 |
Completed |
|
Co. Roscommon: |
|
|
|
|
|
|
|
Knockcroghery |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,440.00 |
|
1,440.00 |
In progress. |
|
Co. Tipperary: |
|
|
|
|
|
|
|
Portroe |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
80.00 |
10,907.68 |
10,987.68 |
Completed. |
|
Co. Waterford: |
|
|
|
|
|
|
|
Portlaw |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
15.13 |
10,461.45 |
10,476.58 |
Completed. |
|
Waterford City |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
43,223.70 |
97,448.00 |
140,671.70 |
Virtually completed. |
|
Co. Westmeath: |
|
|
|
|
|
|
|
Ballynacargy |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,440.00 |
|
1,440.00 |
In progress. |
|
Ballinahown |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
5,400.00 |
|
5,400.00 |
do. |
|
Delvin |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,350.12 |
8,300.00 |
11,650.12 |
Virtually completed. |
|
Kinnegad |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,290.26 |
8,200.00 |
10,490.26 |
Completed. |
|
Moate |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,631.87 |
10,329.75 |
12,961.62 |
do. |
|
Multyfarnham |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
12,600.00 |
|
12,600.00 |
In progress. |
|
Co. Wexford: |
|
|
|
|
|
|
|
Bunclody |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,365.13 |
10,300.00 |
11,665.13 |
Completed. |
|
Co. Wicklow: |
|
|
|
|
|
|
|
Carnew |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
570.26 |
12,200.00 |
12,770.26 |
do. |
|
Enniskerry |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,430.00 |
796.00 |
3,226.00 |
In progress. |
46 |
Improvement Schemes at existing Garda Stations |
.. |
|
65,000 |
78,297.72 |
|
|
|
|
|
|
|
Detailed as follows: |
|
|
|
Sub. No. |
Dublin Metropolitan Division: |
|
|
|
|
|
|
51 |
Balyfermot—Provision of additional parking area. |
.. |
|
|
591.49 |
— |
591.49 |
Completed. |
40 |
Bridewell—Partitioning |
.. |
.. |
.. |
.. |
.. |
|
|
384.18 |
— |
384.18 |
do. |
43/37 of 72/73 |
Cabra—Erection of Dwarf Wall |
.. |
.. |
.. |
|
|
96.00 |
1,019.87 |
1,115.87 |
do. |
43/79 of 72/73 |
Clontarf—Provision of Interview Room |
.. |
.. |
|
|
22.00 |
271.82 |
293.82 |
do. |
43/35 of 72/73 |
Dublin Castle—Lighting and Adaptations, Special |
|
|
|
|
|
|
|
Detective Unit |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
207.61 |
2,502.48 |
2,710.09 |
In progress. |
43/57 of 72/73 |
Dublin Castle—Accommodation for Garda Task Force |
|
|
391.75 |
1,430.61 |
1,822.36 |
Completed. |
43/38 of 72/73 |
Dublin Castle—Detective Unit, Fire Precaution Works |
|
|
2,069.37 |
141.38 |
2,210.75 |
do. |
25 |
Dun Laoghaire |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
659.57 |
— |
659.57 |
do. |
28 |
Finglas |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
679.35 |
— |
679.35 |
do. |
43/26 of 72/73 |
Fitzgibbon St. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
640.00 |
6,749.75 |
7,389.75 |
Virtually completed. |
48 |
Fitzgibbon St.—Provision of new porch etc. |
.. |
.. |
|
|
797.00 |
— |
797.00 |
Completed. |
54 |
Fitzgibbon St.—Improvement to heating and lighting |
|
|
408.81 |
— |
408.81 |
In progress. |
43/69 of 72/73 |
Garda Depot—Adaptations to Room No. 14 |
.. |
.. |
|
|
243.98 |
534.86 |
778.84 |
Completed. |
29 |
Garda Depot—Storage Accommodation |
.. |
.. |
|
|
2,885.50 |
— |
2,885.50 |
In progress. |
43/36 of 72/73 |
Garda Depot—Central Heating, Lighting etc. |
.. |
|
|
134.92 |
2,064.81 |
2,199.73 |
Completed. |
43/40 of 72/73 |
Garda Depot—Provision of Accommodation for New |
|
|
|
|
|
|
|
Assistant Commissioner |
.. |
.. |
.. |
.. |
|
|
87.36 |
1,375.31 |
1,462.67 |
do. |
32/28 of 71/72 |
Garda Depot—Improvements to heating, lighting etc. |
|
|
117.00 |
2,565.22 |
2,682.22 |
do. |
41 |
Garda Depot—Improvements to heating |
.. |
.. |
|
|
2,538.02 |
— |
2,538.02 |
do. |
59 |
Garda Depot—Water heating etc. |
.. |
.. |
.. |
|
|
288.97 |
— |
288.97 |
do. |
43/55 of 72/73 |
Garda Depot—Adaptations, Canteen Stores |
.. |
|
|
1,263.10 |
601.23 |
1,864.33 |
do. |
43/51 of 72/73 |
Harcourt Tce.—Installation of Central Heating |
.. |
|
|
72.67 |
1,470.85 |
1,543.52 |
do. |
50 |
Kilmainham—Adaptations |
.. |
.. |
.. |
.. |
|
|
3,966.92 |
— |
3,966.92 |
In progress. |
30 |
Rathfarnham—Improvements |
.. |
.. |
.. |
.. |
|
|
602.27 |
— |
602.27 |
Completed. |
43/73 of 72/73 |
Tanaiste’s Residence—(Mr. Childers) Rathgar,— |
|
|
|
|
|
|
|
Provision of Shelters |
.. |
.. |
.. |
.. |
.. |
|
|
213.91 |
184.23 |
398.14 |
do. |
43/42 of 72/73 |
Whitehall—Central Heating |
.. |
.. |
.. |
.. |
|
|
98.64 |
1,291.51 |
1,390.15 |
do. |
|
Co. Carlow: |
|
|
|
|
|
|
23 |
Carlow |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,502.23 |
— |
1,502.23 |
do. |
|
Co. Clare: |
|
|
|
|
|
|
75 |
Ennis |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
585.00 |
— |
585.00 |
do. |
32/19 of 71/72 |
Kilkee |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
42.87 |
1,477.00 |
1,519.87 |
do. |
43/3 of 72/73 |
Lissycasey |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,701.06 |
2,070.00 |
3,771.06 |
do. |
73 |
Mountshannon |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
600.77 |
— |
600.77 |
In progress. |
|
Co. Cork: |
|
|
|
|
|
|
43/46 of 72/73 |
Bridewell |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
835.62 |
280.06 |
1,115.68 |
In progress. |
35 |
Cork Courthouse (Provision of Warrant Office) |
.. |
|
|
639.38 |
— |
639.38 |
do. |
52 |
Durrus |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
329.72 |
— |
329.72 |
Completed. |
24 |
McCurtain St.—Alterations |
.. |
.. |
.. |
.. |
|
|
1,482.08 |
— |
1,482.08 |
In progress. |
78 |
McCurtain St.—Virtually of Heating |
.. |
.. |
|
|
594.00 |
— |
594.00 |
do. |
32/34 of 71/72 |
Skibbereen |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
37.40 |
434.20 |
471.60 |
Completed. |
17 |
St. Lukes |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
579.91 |
— |
579.91 |
In progress. |
27/30 of 69/70 |
Union Quay—Sanitary accommodation |
.. |
.. |
|
|
16.25 |
348.42 |
364.67 |
Completed. |
31 |
Union Quay—Improvements to heating etc. |
.. |
.. |
|
|
304.16 |
— |
304.16 |
do. |
|
Co. Donegal: |
|
|
|
|
|
|
43/30 of 72/73 |
Dunkineely |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
403.62 |
800.00 |
1,203.62 |
do. |
60 |
Glenties |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
254.92 |
— |
254.92 |
do. |
|
Co. Dublin: |
|
|
|
|
|
|
53 |
Balbriggan |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
429.73 |
— |
429.73 |
do. |
32/60 of 71/72 |
Cabinteely |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4.55 |
504.80 |
509.35 |
do. |
43/58 of 72/73 |
Lucan |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
38.72 |
687.00 |
725.72 |
do. |
58 |
Lusk |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,800.00 |
— |
1,800.00 |
In progress. |
|
Co. Galway: |
|
|
|
|
|
|
43/20 of 72/73 |
Creggs |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
314.27 |
1,125.00 |
1,439.27 |
Completed. |
42 |
Glenamaddy |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
366.20 |
— |
366.20 |
do. |
9 |
Recess |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,485.00 |
— |
1,485.00 |
In progress. |
|
Co. Kerry: |
|
|
|
|
|
|
43/54 of 72/73 |
Beaufort |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
540.00 |
1,260.00 |
1,800.00 |
In progress. |
32/39 of 71/72 |
Farranfore |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,708.90 |
2,290.00 |
3,998.90 |
do. |
72 |
Tralee |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
64.65 |
— |
64.65 |
do. |
|
Co. Kilkenny: |
|
|
|
|
|
|
19 |
Thomastown |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,975.00 |
— |
3,975.00 |
Completed. |
|
Co. Laois: |
|
|
|
|
|
|
46 |
Portarlington |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
798.10 |
— |
798.10 |
do. |
45 |
Portlaoise |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,147.36 |
— |
1,147.36 |
do. |
|
Co. Leitrim: |
|
|
|
|
|
|
80 |
Carrick-on-Shannon |
.. |
.. |
.. |
.. |
.. |
|
|
300.86 |
— |
300.86 |
do. |
|
Co. Limerick |
|
|
|
|
|
|
43/33 of 72/73 |
Ballyneety |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,950.00 |
1,080.00 |
3,030.00 |
do. |
32/20 of 71/72 |
Kilfinane |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,310.00 |
146.89 |
1,456.89 |
do. |
16 |
Kilmeedy |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
900.00 |
— |
900.00 |
In progress. |
32 |
Mayorstone Park |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
160.00 |
— |
160.00 |
do. |
37 |
Tournafulla |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,150.00 |
— |
3,150.00 |
Completed. |
74 |
William St. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
300.00 |
— |
300.00 |
In progress. |
|
Co. Longford: |
|
|
|
|
|
|
21 |
Garda Houses Longford |
.. |
.. |
.. |
.. |
.. |
|
|
1,050.00 |
— |
1,050.00 |
In progress. |
34 |
Longford |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,115.00 |
— |
4,115.00 |
do. |
|
Co. Louth: |
|
|
|
|
|
|
39 |
Dundalk |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
489.80 |
— |
489.80 |
Completed. |
56 |
Drogheda |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
348.46 |
— |
348.46 |
do. |
|
Co. Mayo: |
|
|
|
|
|
|
10 |
Hollymount |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
641.70 |
— |
641.70 |
Completed. |
36 |
Swinford |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
323.91 |
— |
323.91 |
do. |
|
Co. Meath: |
|
|
|
|
|
|
86 |
Dunboyne |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
741.00 |
— |
741.00 |
In progress. |
33 |
Kilmessan |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,002.00 |
— |
3,002.00 |
Completed. |
43/29 of 72/73 |
Nobber |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
39.70 |
550.00 |
589.70 |
do. |
|
Co. Roscommon: |
|
|
|
|
|
|
13 |
Boyle |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
338.94 |
— |
338.94 |
do. |
55 |
Roscommon |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
521.24 |
— |
521.24 |
do. |
|
Co. Sligo: |
|
|
|
|
|
|
57 |
Sligo |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
9,000.00 |
— |
9,000.00 |
In progress. |
|
Co. Tipperary: |
|
|
|
|
|
|
6 |
Clonmel |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
720.00 |
— |
720.00 |
do. |
65 |
Dundrum |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
90.00 |
— |
90.00 |
do. |
14 |
Templemore |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
732.00 |
— |
732.00 |
Completed. |
22 |
Templemore Training Centre |
.. |
.. |
.. |
.. |
|
|
840.00 |
— |
840.00 |
do. |
|
Co. Westmeath: |
|
|
|
|
|
|
43/12 of 72/73 |
Athlone |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
48.63 |
1,852.70 |
1,901.33 |
Completed. |
18 |
Athlone Garda Houses |
.. |
.. |
.. |
.. |
.. |
|
|
876.00 |
— |
876.00 |
do. |
32/13 of 71/72 |
Ballymore |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
7.05 |
2,507.00 |
2,514.05 |
In progress. |
38 |
Mullingar |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,313.00 |
— |
1,313.00 |
Completed. |
77 |
Residence of Minister for Justice, Athlone |
.. |
.. |
|
|
386.00 |
— |
386.00 |
do. |
|
Co. Wexford: |
|
|
|
|
|
|
20 |
Enniscorthy |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
815.40 |
— |
815.40 |
Completed. |
27/24 of 69/70 |
Kilmore Quay |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
597.10 |
2,138.00 |
2,735.10 |
do. |
|
Co. Wicklow: |
|
|
|
|
|
|
32/47 of 71/72 |
Arklow |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
848.69 |
900.00 |
1,748.69 |
do. |
43/4 of 72/73 |
Bray |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
299.38 |
3,403.00 |
3,702.38 |
do. |
47 |
Provision of alternative accommodation for Garda |
|
|
|
|
|
|
|
Personnel at Dublin Castle |
.. |
.. |
.. |
.. |
75,000 |
7,000 |
9,917.92 |
54,286.03 |
64,203.95 |
In progress. |
48 |
Provision of accommodation for Female Clerical |
|
|
|
|
|
|
|
Assistants in Garda Stations |
.. |
.. |
.. |
.. |
9,000 |
3,000 |
1,643.11 |
5,073.62 |
6,716.73 |
do. |
49 |
Provision of temporary accommodation for Courts |
.. |
|
30.000 |
— |
— |
— |
Under consideration. |
50 |
Houses for Married Members of the Garda Siochana |
— |
7,000 |
7,000.00 |
1,135,547.00 |
1,142,547.00 |
|
|
|
|
|
302,992.22 |
|
|
|
51 |
Athlone—New Offices |
.. |
.. |
.. |
.. |
.. |
600,000 |
150,000 |
27,028.35 |
21,850.83 |
48,879.18 |
Tender accepted. |
52 |
Marlboro’ Street—Improvements to Heating |
.. |
.. |
18,000 |
4,000 |
— |
— |
— |
Under consideration |
52A |
Marlboro’ St. Schools—General Improvements |
.. |
.. |
100,000 |
— |
752.29 |
— |
752.29 |
In planning. |
53 |
National Museum—Improvement to Lighting |
.. |
.. |
— |
5,000 |
— |
— |
— |
Under consideration. |
54 |
Dublin Preventive Centre, Finglas |
.. |
.. |
.. |
400,000 |
4,000 |
40,619.88 |
389,490.54 |
430,110.42 |
In progress. |
55 |
Dublin Institute for Advanced Studies: Accommodation |
190,000 |
4,000 |
3,350.00 |
187,169.06 |
190,519.06 |
Completed. |
56 |
National Schools: Grants for Building, enlarging, |
|
|
|
|
|
|
|
enclosing etc. |
.. |
.. |
.. |
.. |
.. |
.. |
|
5,000,000 |
6,625,683.27 |
|
|
|
|
|
|
|
6,697,433.79 |
|
|
|
|
Department of lands |
|
|
|
|
|
|
57 |
Castlebar—New Offices |
.. |
.. |
.. |
.. |
.. |
700,000 |
200,000 |
119,358.75 |
64,406.14 |
183,764.89 |
In progress. |
|
|
|
|
119,358.75 |
|
|
|
|
Department of agriculture and fisheries |
|
|
|
|
|
|
58 (1) |
Botanic Gardens: Office and Toilet accommodation |
.. |
5,500 |
1,000 |
|
|
|
In planning. |
58 (2) |
Botanic Gardens: New Glasshouses |
.. |
.. |
.. |
8,000 |
5,000 |
|
|
|
Under consideration. |
59 |
Regional Veterinary and Dairy Produce Laboratories |
.. |
280,000 |
40,000 |
16,134.65 |
204,682.45 |
220,817.10 |
In progress. |
60 (1) |
Abbotstown Farm: New Laboratory Block |
.. |
.. |
143,000 |
3,000 |
11,292.95 |
139,636.63 |
150,929.58 |
Completed. |
60 (2) |
Abbotstown Farm: New Milking Parlour |
.. |
.. |
14,100 |
4,000 |
1.52 |
— |
1.52 |
In planning. |
61 |
Backweston Farm: New Farm Buildings |
.. |
.. |
.. |
60,000 |
5,000 |
— |
66,915.65 |
66,915.65 |
Virtually completed. |
62 |
Tully West, Co. Kildare—Performance Testing Station |
|
|
|
|
|
|
|
|
|
|
|
|
|
for Beef Bulls |
.. |
.. |
.. |
.. |
.. |
.. |
64,000 |
20,000 |
34,089.02 |
21,179.51 |
55,268.53 |
In progress. |
63 (1) |
Thorndale Butter Testing Station |
.. |
.. |
.. |
.. |
— |
5,000 |
|
— |
|
In planning. |
63 (2) |
Thorndale: Pig Progeny Testing Station |
.. |
.. |
.. |
8,500 |
1,000 |
5,863.20 |
— |
5,863.20 |
In progress. |
63 (3) |
Thorndale: Research Lab. Proposed Extension |
.. |
.. |
40,000 |
— |
— |
— |
— |
In planning. |
64 (1) |
Kildalton College: Adaptations |
.. |
.. |
.. |
.. |
— |
3,000 |
— |
— |
— |
do. |
64 (2) |
Kildalton College: New Water Supply |
.. |
.. |
.. |
31,000 |
2,000 |
250.95 |
530.00 |
780.95 |
do. |
65 |
Carlow District Veterinary Office |
.. |
.. |
.. |
.. |
65,000 |
15,000 |
44,165.25 |
— |
44,165.25 |
In progress. |
66 |
Veterinary College Ballsbridge: Accommodation for |
|
|
|
|
|
|
|
Haematology Unit |
.. |
.. |
.. |
.. |
.. |
5,400 |
3,000 |
— |
3,991.65 |
3,991.65 |
Completed. |
66 (A) |
Veterinary College Ballsbridge: Extra accommodation |
.. |
7,500 |
— |
6,248.44 |
— |
6,248.44 |
do. |
67 |
Provision of Storage Accommodation for Departmental |
|
|
|
|
|
|
|
Records, etc. |
.. |
.. |
.. |
.. |
.. |
.. |
75,000 |
50,000 |
60,890.76 |
— |
60,890.76 |
In progress. |
|
|
|
|
178,936.74 |
|
|
|
|
Department of transport and power |
|
|
|
|
|
|
68 |
Mullingar: New Meteorological Station |
.. |
.. |
.. |
8,000 |
7,000 |
13,026.68 |
|
13,026.68 |
Virtually completed. |
69 |
Claremorris: New Meteorological Station |
.. |
.. |
11,500 |
6,000 |
— |
— |
— |
In planning. |
|
|
|
|
13,026.68 |
|
|
|
|
Department of Posts and Telegraphs |
|
|
|
|
|
|
70 |
Aldboro’ House: Adaptations |
.. |
.. |
.. |
.. |
|
3,000 |
1,465.19 |
— |
1,465.19 |
Under consideration. |
71 |
Baldoyle: New Sorting Office |
.. |
.. |
.. |
.. |
38,000 |
3,000 |
2,109.05 |
— |
2,109.05 |
In progress. |
72 |
Blackrock Post Office: Modernisation |
.. |
.. |
.. |
11,500 |
2,000 |
2,748.96 |
8,297.75 |
11,046.71 |
Completed. |
73 |
Central Sorting Office: Ventilation |
.. |
.. |
.. |
120,000 |
35,000 |
4,784.53 |
— |
4,784.53 |
Tender accepted. |
74 |
Clondalkin Polefield: Resurfacing |
.. |
.. |
.. |
20,000 |
10,000 |
— |
— |
— |
In planning. |
75 |
Dundrum: Computer Building |
.. |
.. |
.. |
.. |
80,000 |
15,000 |
47,224.28 |
34,903.75 |
82,128.03 |
In progress. |
76 |
Dundrum: Engineering Training Centre |
.. |
.. |
.. |
37,500 |
2,000 |
5,184.00 |
— |
5,184.00 |
In planning. |
77 |
Fairview: New Sorting Office |
.. |
.. |
.. |
.. |
— |
10,000 |
— |
— |
— |
In planning. |
78 |
G.P.O.: New Lifts |
.. |
.. |
.. |
.. |
.. |
.. |
— |
4,000 |
— |
— |
— |
do. |
79 |
Glenageary: New Sorting Office |
.. |
.. |
.. |
.. |
55,000 |
7,000 |
7,750.82 |
53,775.74 |
61,526.56 |
Virtually completed. |
80 |
Harmonstown Sorting Office: Extension |
.. |
.. |
.. |
12,000 |
4,000 |
8,402.85 |
5,375.84 |
13,778.69 |
do. |
81 |
Phibsboro Post Office: Extension |
.. |
.. |
.. |
.. |
65,000 |
25,000 |
19,183.21 |
24,790.66 |
43,973.87 |
In progress. |
82 (1) |
St. John’s Road Depot: Warehouses, etc. |
.. |
.. |
320,000 |
8,000 |
3,569.32 |
313,679.96 |
317,249.28 |
do. |
82 (2) |
St. John’s Road Depot: New Paint Store |
.. |
.. |
8,000 |
7,000 |
— |
— |
— |
In planning. |
83 |
Stillorgan: New Sorting Office |
.. |
.. |
.. |
.. |
80,000 |
2,000 |
1,301.80 |
— |
1,301.80 |
Under consideration. |
84 |
Townsend Street; New Offices: Fitting out |
.. |
.. |
90,000 |
10,000 |
18,407.06 |
76,966.79 |
95,373.85 |
Virtually completed. |
85 |
Ballyhaunis Post Office: Modernisation |
.. |
.. |
.. |
8,500 |
4,000 |
— |
109.19 |
109.19 |
In planning. |
86 |
Castlebar: Engineering Headquarters and garage |
.. |
4,000 |
2,000 |
1,942.00 |
2,133.00 |
4,075.00 |
Completed. |
87 |
Cavan New Post Office |
.. |
.. |
.. |
.. |
.. |
80,000 |
5,000 |
7,497.54 |
74,733.31 |
82,230.85 |
do. |
88 |
Clonmel New Post Office |
.. |
.. |
.. |
.. |
.. |
58,500 |
5,000 |
3,000.00 |
1,388.25 |
4,388.25 |
In planning. |
89 |
Donegal New Post Office |
.. |
.. |
.. |
.. |
.. |
100,000 |
20,000 |
2,986.70 |
— |
2,986.70 |
do. |
90 |
Dungarvan New Post Office |
.. |
.. |
.. |
.. |
44,000 |
40,000 |
24,983.05 |
— |
24,983.05 |
In progress. |
90 (A) |
Kilmalcock Post Office: Alterations and improvements |
5,600 |
— |
4,320.00 |
— |
4,320.00 |
do. |
91 |
Letterkenny Post Office: Extension |
.. |
.. |
.. |
28,000 |
10,000 |
— |
— |
— |
Tenders under consideration. |
92 |
Listowel New Post Office |
.. |
.. |
.. |
.. |
.. |
42,000 |
28,000 |
5,715.00 |
— |
5,715.00 |
In progress. |
93 |
Longford New Post Office |
.. |
.. |
.. |
.. |
.. |
90,000 |
5,000 |
— |
— |
— |
In planning. |
94 |
Mullingar New Post Office |
.. |
.. |
.. |
.. |
.. |
50,000 |
5,000 |
— |
— |
— |
do. |
95 |
Nenagh New Post Office |
.. |
.. |
.. |
.. |
.. |
70,000 |
25,000 |
51,949.28 |
28,303.37 |
80,252.65 |
Virtually completed. |
96 |
Portlaoise New Post Office |
.. |
.. |
.. |
.. |
.. |
72,000 |
3,000 |
4,685.41 |
69,203.90 |
73,889.31 |
Completed. |
97 |
Shannon New Post Office |
.. |
.. |
.. |
.. |
.. |
|
38,000 |
1,060.43 |
— |
1,060.43 |
In planning. |
98 |
Tipperary New Post Office |
.. |
.. |
.. |
.. |
.. |
|
5,000 |
2,310.00 |
— |
2,310.00 |
In planning. |
99 |
Waterford Post Office: Improvements |
.. |
.. |
.. |
60,000 |
2,000 |
|
|
|
do. |
|
|
|
|
232,580.48 |
|
|
|
|
Department of defence |
|
|
|
|
|
|
99 (A) |
G.H.O., Parkgate St.—Virtually of Automatic Central |
|
|
|
|
|
|
|
Heating |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
6,900 |
|
5,011.78 |
|
5,011.78 |
In progress. |
|
|
|
|
5,011.78 |
|
|
|
|
Department of Foreign Affairs |
|
|
|
|
|
|
100 |
Ottawa Embassy: Extension and Improvement |
.. |
.. |
|
5,000 |
109.24 |
|
109.24 |
In planning. |
100 (A) |
Iveagh House: Provision of Strong Room |
.. |
.. |
12,000 |
|
9,457.98 |
|
9,457.98 |
In progress. |
100 (B) |
Tokyo Embassy: Fitting out for occupation |
.. |
.. |
|
|
26.64 |
|
26.64 |
do. |
100 (C) |
Luxembourg Embassy: Fitting out for occupation |
.. |
|
|
555.60 |
|
555.60 |
do. |
100D |
Embassy at Geneva: Fitting out for occupation |
.. |
|
|
4,973.75 |
|
4,973.75 |
In progress. |
101 |
Embassy to the Holy See: Adaptations |
.. |
.. |
.. |
30,000 |
15,000 |
46,431.50 |
|
46,431.50 |
do. |
102 |
Brussels E.E.C. Mission: Fitting out of New Offices |
.. |
27,000 |
5,000 |
12,371.59 |
9,198.44 |
21,570.03 |
do. |
|
|
|
|
73,926.30 |
|
|
|
|
Department of social welfare |
|
|
|
|
|
|
102 (A) |
Aras Mhic Dhiarmada—Computers |
.. |
.. |
.. |
37,000 |
|
31,910.52 |
|
31,910.52 |
In progress. |
|
|
|
|
31,910.52 |
|
|
|
|
General |
|
|
|
|
|
|
103 |
Minor New Works not exceeding £5,000 |
.. |
.. |
.. |
|
150,000 |
118,377.08 |
|
|
|
104 |
Urgent and Unforeseen Works |
.. |
.. |
.. |
.. |
|
5,000 |
|
|
|
|
105 |
Balances of Expenditure on works of prior years which |
|
|
|
|
|
|
|
might not have been completed on 1st April 1973 |
.. |
|
45,000 |
34,227.52 |
|
|
|
|
|
Original |
8,760,000 |
9,479,387.78 |
|
|
|
|
|
Supplemen. tary |
801,000 |
|
|
|
|
|
|
|
9,561,000 |
|
|
|
|
DETAILS OF NO. 103—MINOR NEW WORKS
Work No. |
Service and Description |
Total Estimate |
Vote 1973-74 |
Expenditure |
Observations |
1973-74 |
to 31/3/73 |
to 31/3/74 |
|
|
£ |
£ |
£ |
£ |
£ |
|
|
President |
|
|
|
|
|
|
88 |
Aras an Uachtaráin—Provision of Hard Tennis Court |
|
|
1,674.36 |
— |
1,674.36 |
Completed. |
|
Oireachtas |
|
|
|
|
|
|
33 |
Leinster House—Hut for Press messengers |
.. |
.. |
|
|
577.85 |
— |
577.85 |
do. |
84/42 of 72/73 |
Leinster House—Provision of closed circuit T.V. |
.. |
|
|
264.12 |
2,657.74 |
2,921.86 |
do. |
74/116 of 71/72 |
Leinster House—New Division Bell System |
.. |
.. |
|
|
9.25 |
1,819.68 |
1,828.93 |
do. |
|
Department of an Taoiseach |
|
|
|
|
|
|
74/77 of 71/72 |
Plaque at Mansion House, Dublin. (50th Anniversary of |
|
|
|
|
|
|
|
Truce) |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
13.67 |
297.82 |
311.49 |
Completed. |
64 |
Preparation of State Apartments for Presidential |
|
|
|
|
|
|
|
Inauguration |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,775.38 |
— |
1,775.38 |
do. |
74/90 of 71/72 |
Provision and Erection of 1916 Commemorative Plaques |
|
|
236.95 |
730.80 |
967.75 |
do. |
84/3 of 72/73 |
State Apartments, Dublin Castle—Fire protection |
.. |
|
|
112.84 |
1,178.95 |
1,291.79 |
do. |
|
Department of Finance |
|
|
|
|
|
|
82 |
72-76 St. Stephen’s Green—Adaptations |
.. |
.. |
|
|
4,150.25 |
— |
4,150.25 |
In progress. |
50 |
Valuation Office, Ely Place—Adaptations |
.. |
.. |
|
|
68.50 |
— |
68.50 |
do. |
84/125 of 72/73 |
7 Appian Way—Internal Adaptations |
.. |
.. |
.. |
|
|
93.30 |
824.99 |
918.29 |
Under consideration. |
48 |
Castlebar Government Offices—Resurfacing of yard |
.. |
|
|
2,070.00 |
— |
2,070.00 |
In progress. |
|
Revenue Commissioners |
|
|
|
|
|
|
70 |
Custom House, Dublin—Paving of East Courtyard |
.. |
|
|
640.00 |
— |
640.00 |
Completed. |
72 |
Custom House, Dublin—Floor tiling |
.. |
.. |
.. |
|
|
275.50 |
— |
275.50 |
do. |
84/59 of 72/73 |
Custom House, Dublin—Alterations and provision of |
|
|
|
|
|
|
|
counter in collectors’ office |
.. |
.. |
.. |
.. |
|
|
49.36 |
219.10 |
268.46 |
Completed. |
84/117 of 72/73 |
Custom House, Dublin—Accommodation for Messengers |
|
|
407.52 |
21.28 |
428.80 |
do. |
44 |
Custom House, Dublin—Adaptations, Room 110A |
.. |
|
|
0.34 |
— |
0.34 |
Deferred. |
78 |
Dublin Castle, Ship Street—Provision of water-heating |
|
|
|
|
|
|
|
boiler |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
792.28 |
— |
792.28 |
Completed. |
84/37 of 72/73 |
Dublin Castle Clock Tower—Installation of fluorescent |
|
|
|
|
|
|
|
lighting |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
887.36 |
164.66 |
1,052.02 |
do. |
84/71 of 72/73 |
Dublin Castle Clock Tower and Block M—Improvement |
|
|
|
|
|
|
|
of heating installation |
.. |
.. |
.. |
.. |
.. |
|
|
1,316.01 |
1,187.98 |
2,503.99 |
do. |
77 |
Carrigans Frontier Post—Provision of Caravan |
.. |
.. |
|
|
500.00 |
— |
500.00 |
do. |
4 |
Castlebar Tax Office—Adaptations and lighting |
|
|
|
|
|
|
|
improvements |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
192.33 |
— |
192.33 |
In progress. |
95 |
Castlebar Tax Office—Heating and electrical |
|
|
|
|
|
|
|
improvements |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
422.00 |
— |
422.00 |
Completed. |
26 |
Cobh Custom House—Heating and lighting improvements |
|
|
442.00 |
— |
442.00 |
do. |
160 |
Dún Laoghaire Harbour—New Clearing Station |
.. |
|
|
70.20 |
— |
70.20 |
In progress. |
18 |
Kilkenny Garda Station—Accommodation for Revenue |
|
|
|
|
|
|
|
staff |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,793.54 |
— |
1,793.54 |
do. |
17 |
Waterford Customs and Excise Office—Storage Heating |
|
|
600.00 |
— |
600.00 |
Completed. |
118 |
Wexford Tax Office—Adaptations |
.. |
.. |
.. |
|
|
784.70 |
— |
784.70 |
In progress. |
64/83 of 70/71 |
Archaeological Survey, Field Headquarters, Mullingar |
|
|
147.00 |
2,004.87 |
2,151.87 |
Completed. |
|
Office of public works |
|
|
|
|
|
|
94 |
Central Furniture Stores and Workshop, Rathmines— |
|
|
|
|
|
|
|
Heating improvements |
.. |
.. |
.. |
.. |
.. |
|
|
782.80 |
|
782.80 |
Completed. |
84/21 of 72/73 |
Phoenix Park, Knockmaroon Gate Lodge Provision of |
|
|
|
|
|
|
|
bathroom etc. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
76.66 |
1,519.89 |
1,596.55 |
do. |
159 |
Phoenix Park, Whitefields—Provision of Central Heating |
|
|
1,281.00 |
|
1,281.00 |
In progress. |
84/8 of 72/73 |
Phoenix Park, Staff room at G.A.A. pavilions |
.. |
|
|
26.42 |
30.06 |
56.48 |
do. |
30 |
Phoenix Park, Provision of children’s playground |
.. |
|
|
774.00 |
— |
774.00 |
do. |
101 |
Central Engineering Workshops—Improvements to |
|
|
|
|
|
|
|
porch etc. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
331.85 |
— |
331.85 |
Completed. |
84/27 of 72/73 |
Grangegorman Military Cemetery, Caretaker’s Lodge, |
|
|
|
|
|
|
|
Provision of bathroom etc. |
.. |
.. |
.. |
.. |
|
|
125.21 |
3,213.08 |
3,338.29 |
do. |
74/53 of 71/72 |
Bourn Vincent Memorial Park—Temporary office |
.. |
|
|
808.79 |
4,819.64 |
5,628.43 |
do. |
38 |
Bourn Vincent Memorial Park—Bus Park |
.. |
.. |
|
|
3,450.71 |
— |
3,450.71 |
In progress. |
84/92 of 72/73 |
Bourn Vincent Memorial Park—Electrical Heating of |
|
|
|
|
|
|
|
glass houses |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
717.72 |
45.10 |
762.82 |
In progress. |
39 |
Bourn Vincent Memorial Park—Layby |
.. |
.. |
.. |
|
|
178.79 |
— |
178.79 |
Completed. |
152 |
Survey of Kilkenny City and environs |
.. |
.. |
.. |
|
|
379.46 |
— |
379.46 |
do. |
84/98 of 72/73 |
R.D.S. Ballsbridge—Stand at Science Exhibition, |
|
|
|
|
|
|
|
February 1973 |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
669.53 |
1,111.85 |
1,781.38 |
do. |
127 |
City Hall, Cork—Stand at Science & Technology |
|
|
|
|
|
|
|
Exhibition, 1974 |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
515.00 |
— |
515.000 |
In progress. |
43 |
St. Enda’s, Rathfarnham—Jetty for children |
.. |
.. |
|
|
165.66 |
— |
165.66 |
Completed. |
32 |
St. Enda’s Rathfarnham—Terracing in walled garden |
.. |
|
|
819.00 |
— |
819.00 |
do. |
97 |
St. Stephen’s Green—Supt’s. residence. Provision of |
|
|
|
|
|
|
|
central heating |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
983.46 |
— |
983.46 |
In progress. |
|
General |
|
|
|
|
|
|
84/13 of 72/73 |
Portable Alarm Units for various Government Offices |
.. |
|
|
108.00 |
1,140.21 |
1,248.21 |
Completed. |
|
Department of Justice |
|
|
|
|
|
|
14 |
Custom House, Limerick—Welfare Office |
.. |
.. |
|
|
1,035.00 |
— |
1,035.00 |
In progress. |
99 |
District Courts—Amplification system |
.. |
.. |
.. |
|
|
684.74 |
— |
684.74 |
Completed. |
84/118 of 72/73 |
Four Courts—Court No. 3—Improvements to Justice’s |
|
|
|
|
|
|
|
chambers |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
543.60 |
244.81 |
788.41 |
do. |
42 |
Four Courts—Toilet accommodation |
.. |
.. |
.. |
|
|
1,491.52 |
|
1,491.52 |
In progress. |
65 |
Land Registry—Improved ventilation |
.. |
.. |
.. |
|
|
343.84 |
— |
343.84 |
Completed. |
84/23 of 72/73 |
Chancery Street Courts—Reconstruction of public toilets |
|
|
494.63 |
1,995.00 |
2,489.63 |
do. |
83 |
Phibsboro Tower—Accommodation for Garda |
|
|
|
|
|
|
|
Representative Body |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
674.85 |
— |
674.85 |
do. |
68 |
Dominick St., Galway—Welfare Centre |
.. |
.. |
.. |
|
|
379.60 |
— |
379.60 |
do. |
84/26 of 72/73 |
Custom House—Internal adaptations |
.. |
.. |
.. |
|
|
100.71 |
265.75 |
366.46 |
Completed. |
84/76 of 72/73 |
Custom House—Additional car parking |
.. |
.. |
.. |
|
|
2,483.48 |
1,723.66 |
4,207.14 |
do. |
19 |
Kilkenny Driving Test Centre |
.. |
.. |
.. |
.. |
|
|
1,182.36 |
— |
1,182.36 |
do. |
123 |
Parkgate Hall Driving Test Centre—Provision of public |
|
|
|
|
|
|
|
toilet |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
338.22 |
— |
338.22 |
In progress. |
|
Department of Education |
|
|
|
|
|
|
74/88 of 71/72 |
National College of Art—Improvements |
.. |
.. |
.. |
|
|
40.73 |
2,593.42 |
2,634.15 |
Completed. |
100 |
National Gallery—Provision of cold room in Restaurant |
|
|
3.65 |
— |
3.65 |
Under consideration. |
84/38 of 72/73 |
National Gallery—Extension and reconstruction of car |
|
|
|
|
|
|
|
park |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
593.60 |
1,556.95 |
2,150.55 |
Completed. |
74/32 of 71/72 |
National Library—Common Tea Room |
.. |
.. |
.. |
|
|
30.92 |
2,735.33 |
2,766.25 |
do. |
84/77 of 72/73 |
National Library—Accommodation for photographic |
|
|
|
|
|
|
|
equipment |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
678.34 |
487.04 |
1,165.38 |
do. |
107 |
Limerick Model School—Accommodation for |
|
|
|
|
|
|
|
Inspectorate |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
164.91 |
— |
164.91 |
In progress. |
54 |
Sligo former Technical School—Accommodation for |
|
|
|
|
|
|
|
Inspectorate |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,134.54 |
— |
2,134.54 |
do. |
84/63 of 72/73 |
Talbot House—Erection of partitions |
.. |
.. |
.. |
|
|
76.96 |
784.61 |
861.57 |
Completed. |
|
Department of lands |
|
|
|
|
|
|
84/22 of 72/73 |
93 Merrion Square—Alterations etc. |
.. |
.. |
.. |
|
|
499.27 |
466.86 |
966.13 |
Completed. |
84/41 of 72/73 |
Land Commission-rear of 23 Upper Merrion St., |
|
|
|
|
|
|
|
Storage, access and car park improvement |
.. |
.. |
|
|
47.33 |
693.62 |
740.95 |
In progress. |
25 |
Land Commission—23/24 Upper Merrion St.—Transfer |
|
|
|
|
|
|
|
of Court |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,241.01 |
— |
2,241.01 |
do. |
29 |
Kinnity Castle, Birr—Adaptations |
.. |
.. |
.. |
|
|
3,770.00 |
— |
3,770.00 |
do. |
|
Department of Agriculture and Fisheries |
|
|
|
|
|
|
84/102 of 72/73 |
Abbotstown Farm Research Laboratory—Installation of |
|
|
|
|
|
|
|
oil-fired central heating |
.. |
.. |
.. |
.. |
.. |
|
|
38.50 |
511.74 |
550.24 |
Completed. |
20 |
Abbotstown Farm Research Laboratory—Link Road |
|
|
|
|
|
|
|
and Car Park |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,862.25 |
— |
1,862.25 |
do. |
57 |
Abbotstown Farm Research Laboratory—Adaptation to |
|
|
|
|
|
|
|
pens |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
598.00 |
— |
598.00 |
do. |
76 |
Abbotstown Farm Research Laboratory—Adaptations to |
|
|
|
|
|
|
|
piggery |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
834.56 |
— |
834.56 |
In progress. |
79 |
Abbotstown Farm Research Laboratory—Provision of |
|
|
|
|
|
|
|
Store |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,307.97 |
— |
2,307.97 |
do. |
98 |
Abbotstown Farm Research Laboratory—Installation of |
|
|
|
|
|
|
|
Central Heating |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,280.41 |
— |
1,280.41 |
do. |
117 |
Abbotstown Farm Research Laboratory—Provision of |
|
|
|
|
|
|
|
A.I. Research Unit |
.. |
.. |
.. |
.. |
.. |
|
|
814.50 |
— |
814.50 |
do. |
109 |
Athlone Regional Veterinary Laboratory—Septic tank— |
|
|
|
|
|
|
|
drainage improvements |
.. |
.. |
.. |
.. |
.. |
|
|
350.00 |
— |
350.00 |
Completed. |
81 |
Ballsbridge Veterinary College—Improved toilet and |
|
|
|
|
|
|
|
canteen facilities |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,127.28 |
— |
3,127.28 |
In progress. |
84 |
Ballsbridge Veterinary College—Improvement of Teaching |
|
|
|
|
|
|
|
facilities |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,224.37 |
— |
3,224.37 |
do. |
74/83 of 71/72 |
Ballsbridge Veterinary College—Conversion of solid fuel |
|
|
|
|
|
|
|
boilers to gas etc. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
8.15 |
4,807.65 |
4,815.80 |
Completed. |
74/112 of 71/72 |
Ballsbridge Veterinary College—Adaptations to classroom |
|
|
9.97 |
478.18 |
488.15 |
do. |
80/133 of 69/70 |
Ballyhaise Agricultural College—Water supply to |
|
|
|
|
|
|
|
residences |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
430.00 |
917.97 |
1,347.97 |
do. |
105 |
Carlow District Veterinary Office—Heating installation |
|
|
395.70 |
— |
395.70 |
do. |
84/81 of 72/73 |
Chantilly Field Station—Roadway improvements and |
|
|
|
|
|
|
|
provision of teaching facilities (Physiology) |
.. |
.. |
|
|
587.99 |
689.47 |
1,277.46 |
Completed. |
104 |
Chantilly Field Station—Conversion of dining room to |
|
|
|
|
|
|
|
Physiology Laboratory |
.. |
.. |
.. |
.. |
.. |
|
|
983.56 |
— |
983.56 |
do. |
1 |
Chantilly Field Station—Improvements to Gate Lodge |
.. |
|
|
1,331.46 |
— |
1,331.46 |
do. |
90 |
Kildalton Abbey, Co. Kilkenny—Provision of cooking |
|
|
|
|
|
|
|
equipment |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,573.57 |
— |
1,573.57 |
In progress. |
116 |
St. Martins House—Partitioning |
.. |
.. |
.. |
.. |
|
|
316.84 |
— |
316.84 |
Completed. |
137 |
Ennis District Veterinary Office—Alterations |
.. |
.. |
|
|
300.00 |
— |
300.00 |
In progress. |
84/45 of 72/73 |
Mellowes Agricultural College—Superintendents |
|
|
|
|
|
|
|
Residence—Improvements |
.. |
.. |
.. |
.. |
.. |
|
|
1,886.94 |
1,530.00 |
3,416.94 |
do. |
84/95 of 72/73 |
Mellowes Agricultural College—Erection of building to |
|
|
|
|
|
|
|
house generator |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,529.00 |
25.00 |
2,554.00 |
do. |
84/93 of 72/73 |
Thorndale Laboratory—Improvement to labourers’ |
|
|
|
|
|
|
|
canteen |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
177.19 |
258.29 |
435.48 |
Completed. |
31 |
Thorndale Laboratory—Improvement of Entrance |
.. |
|
|
3,706.47 |
— |
3,706.47 |
do. |
35 |
Thorndale Laboratory—Cattle crush chute |
.. |
.. |
|
|
512.99 |
— |
512.99 |
In progress. |
84/49 of 72/73 |
Thorndale Laboratory—Directors’ House, installation of |
|
|
|
|
|
|
|
central heating |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
61.00 |
1,698.48 |
1,759.48 |
Completed. |
58 |
Thorndale Laboratory—Enlargement of office and |
|
|
|
|
|
|
|
provision of waiting room |
.. |
.. |
.. |
.. |
|
|
566.31 |
— |
566.31 |
In progress. |
135 |
Thorndale Laboratory—Provision of floor covering and |
|
|
|
|
|
|
|
acoustic tiling |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
738.56 |
— |
738.56 |
Completed. |
147 |
Thorndale Laboratory—Supply of Incinerators etc. |
.. |
|
|
752.85 |
— |
752.85 |
do. |
|
Department of Labour |
|
|
|
|
|
|
84/5 of 72/73 |
Ansley House—Accommodation for Factory Inspector |
|
|
1,826.02 |
1,743.21 |
3,569.23 |
Completed. |
84/51 of 72/73 |
Ansley House—Partitioning |
.. |
.. |
.. |
.. |
|
|
561.40 |
670.85 |
1,232.25 |
do. |
62 |
Ansley House—Installation of shower unit |
.. |
.. |
|
|
146.01 |
— |
146.01 |
do. |
69 |
Ansley House—Provision of tea room facilities |
.. |
.. |
|
|
645.01 |
— |
645.01 |
In progress. |
74/98 of 71/72 |
Waterford Manpower Office—Adaptations |
.. |
.. |
|
|
3,640.41 |
618.00 |
4,258.41 |
do. |
84/12 of 72/73 |
Ballybofey Manpower Office—Conversion of premises |
|
|
|
|
|
|
|
(Finn College) |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4.40 |
1,157.04 |
1,161.44 |
Completed. |
74/60 of 71/72 |
Cork—54 South Mall—Partitioning |
.. |
.. |
.. |
|
|
55.00 |
3,712.30 |
3,767.30 |
do. |
84/99 of 72/73 |
Hall at Magdalen Street, Drogheda—Adaptations |
.. |
|
|
822.27 |
2,036.21 |
2,858.48 |
do. |
74/80 of 71/72 |
Dún Laoghaire Employment Exchange—Security |
|
|
|
|
|
|
|
Improvements |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
809.00 |
12.13 |
821.13 |
do. |
27 |
Waterford Employment Exchange—Improvements |
.. |
|
|
467.60 |
— |
467.60 |
do. |
141 |
Werburgh St., Employment Exchange—Provision of |
|
|
|
|
|
|
|
protective grill and counter |
.. |
.. |
.. |
.. |
|
|
482.00 |
— |
482.00 |
In progress. |
|
Department of Industry and Commerce |
|
|
|
|
|
|
84/33 of 72/73 |
14 Hume Street, Geological Survey Office—Improvement |
|
|
|
|
|
|
|
Works |
.. |
.. |
.. |
.. |
.. |
.. |
.... |
|
|
34.15 |
831.48 |
865.63 |
Completed. |
84/86 of 72/73 |
Glencree former Reformatory—Adaptation works for |
|
|
|
|
|
|
|
Geological Survey Office |
.. |
.. |
.. |
.. |
.. |
|
|
537.26 |
2,911.00 |
3,448.26 |
do. |
|
Department of Transport and Power |
|
|
|
|
|
|
74/35 of 71/72 |
Cork Mercantile Marine Office—Improvements |
.. |
.. |
|
|
32.90 |
4,009.73 |
4,042.63 |
In progress. |
84/60 of 72/73 |
Valentia Radio Station—Improvements to Married |
|
|
|
|
|
|
|
Quarters |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,993.00 |
675.00 |
2,668.00 |
do. |
46 |
O’Connell Bridge House—Accommodation for Air |
|
|
|
|
|
|
|
Traffic Control |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
329.46 |
— |
329.46 |
Completed. |
|
Department of Posts and Telegraphs |
|
|
|
|
|
|
28 |
G.P.O. Dublin—Partitioning |
.. |
.. |
.. |
.. |
|
|
292.46 |
— |
292.46 |
Completed. |
153 |
G.P.O. Dublin—Improvements |
.. |
.. |
.. |
.. |
|
|
1,784.95 |
— |
1,784.95 |
In progress. |
63 |
St. John’s Road Depot—Provision of Store |
.. |
.. |
|
|
809.41 |
— |
809.41 |
do. |
51 |
Stores depot—Infirmary Road—Erection of pre-fab |
|
|
|
|
|
|
|
dining room accommodation |
.. |
.. |
.. |
.. |
|
|
348.41 |
— |
348.41 |
do. |
131 |
Sandwith St. Garage—Provision of parking area |
.. |
|
|
68.53 |
— |
68.53 |
do. |
84/72 of 72/73 |
Central Sorting Office Sherriff St—Dining Club |
|
|
|
|
|
|
|
improvements |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
586.50 |
8.30 |
594.80 |
do. |
84/28 of 72/73 |
Central Sorting Office Sherriff St.—Additional catwalks |
|
|
110.78 |
3,520.17 |
3,630.95 |
Completed. |
16 |
Central Sorting Office Sherriff St.—Garage area |
|
|
|
|
|
|
|
improvements |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,503.50 |
— |
1,503.50 |
do. |
84/48 of 72/73 |
Hammam Buildings, 11/13 Upr. O’Connell Street— |
|
|
|
|
|
|
|
Internal adaptations |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
157.85 |
2,921.64 |
3,079.49 |
do. |
84/50 of 72/73 |
Rathmines District Office—Extension to Sorting Office |
.. |
|
|
231.15 |
1,644.52 |
1,875.67 |
do. |
115 |
Ballina Post Office—New floor in Sorting Office etc. |
.. |
|
|
600.00 |
— |
600.00 |
In progress. |
74/138 of 71/72 |
Bandon Post Office—Improvements |
.. |
.. |
.. |
|
|
486.35 |
5,437.00 |
5,923.35 |
Completed. |
113 |
Clonmel Post Office—Partitioning |
.. |
.. |
.. |
|
|
410.00 |
— |
410.00 |
do. |
80/114 of 69/70 |
Cork Head Post Office—Improvements to dining club |
.. |
|
|
48.00 |
1,552.07 |
1,600.07 |
do. |
67 |
Drogheda Post Office—Provision of garages |
.. |
.. |
|
|
742.57 |
— |
742.57 |
do. |
55 |
Dundalk Post Office—Improvement of security |
|
|
|
|
|
|
|
arrangements |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
320.50 |
— |
320.50 |
do. |
61 |
Killarney Post Office—Adaptations |
.. |
.. |
.. |
|
|
1,172.95 |
— |
1,172.95 |
do. |
8 |
Limerick Post Office—Improvements |
.. |
.. |
.. |
|
|
711.60 |
— |
711.60 |
In progress. |
34 |
Longford Post Office—Adaptations |
.. |
.. |
.. |
|
|
425.00 |
— |
425.00 |
Completed. |
84/20 of 72/73 |
Roscommon Post Office—Modernisation of public office |
|
|
428.81 |
450.00 |
878.81 |
do. |
|
Department of Defence |
|
|
|
|
|
|
36 |
G.H.Q. Parkgate St.—National Control Centre—Im- |
|
|
|
|
|
|
|
provements |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,166.27 |
— |
1,166.27 |
Completed. |
84/46 of 72/73 |
G.H.Q. Parkgate St.—Erection of New Rear Entrance |
|
|
|
|
|
|
|
Porch |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
581.07 |
1,331.50 |
1,912.57 |
do. |
52 |
G.H.Q. Parkgate St.—Adaptations |
.. |
.. |
.. |
|
|
967.16 |
— |
967.16 |
In progress. |
73 |
G.H.Q. Parkgate St.—Improvements to toilets |
.. |
.. |
|
|
413.08 |
— |
413.08 |
do. |
103 |
G.H.Q. Parkgate St.—Installation of Intruder Alarm |
.. |
|
|
939.95 |
— |
939.95 |
Completed. |
126 |
G.H.Q. Parkgate St.—Electrical works |
.. |
.. |
.. |
|
|
310.47 |
— |
310.47 |
do. |
74/46 of 71/72 |
Colaiste Caoimhin—Improvements |
.. |
.. |
.. |
|
|
3,000.00 |
1,524.88 |
4,524.88 |
In progress. |
|
Department of Foreign Affairs |
|
|
|
|
|
|
102 |
Brussels Embassy—Fitting out of New Offices |
.. |
.. |
|
|
479.88 |
— |
479.88 |
In progress. |
|
Department of Social Welfare |
|
|
|
|
|
|
41 |
Granard Social Welfare Office—New Building |
.. |
.. |
|
|
1,710.00 |
— |
1,710.00 |
do. |
75 |
New Ross Social Welfare Office—Electrical works |
.. |
|
|
256.55 |
— |
256.55 |
Completed. |
|
Department of Health |
|
|
|
|
|
|
80/115 of 69/70 |
Custom House—Adaptations to Public Office |
.. |
.. |
|
|
394.12 |
275.20 |
669.32 |
do. |
84/84 of 72/73 |
Custom House—General Register Office—Adaptations |
.. |
|
|
632.45 |
1,113.37 |
1,745.82 |
do. |
DETAILS OF NO. 105—MINOR BALANCES OF EXPENDITURE
Work No. |
Service and Description |
Total Estimate |
Vote 1973-74 |
Expenditure |
Observations |
1973-74 |
to 31/3/73 |
to 31/3/74 |
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Oireachtas |
|
|
|
|
|
|
1(1) of 71/72 |
Leinster House—Extension and Alterations |
.. |
.. |
|
|
211.50 |
770,757.42 |
770,968.92 |
Completed. |
|
Department of an Taoiseach |
|
|
|
|
|
|
3A of 72/73 |
Dublin Castle State Apartments—Rebuilding of Drawing |
|
|
|
|
|
|
|
Room/Bedroom Block and Main Entrance |
.. |
.. |
|
|
4,492.61 |
523,407.29 |
527,899.90 |
do. |
|
Department of Finance |
|
|
|
|
|
|
5 of 72/73 |
4 Kildare St.—Improvements |
.. |
.. |
.. |
.. |
|
|
734.26 |
28,916.24 |
29,650.50 |
do. |
12 of 72/73 |
Ferryhill New Frontier Post, Co. Louth |
.. |
.. |
.. |
|
|
444.98 |
950.00 |
1,394.98 |
do. |
33 of 72/73 |
Kilkenny Castle—Garage and Store |
.. |
.. |
.. |
|
|
232.96 |
9,970.78 |
10,203.74 |
do. |
22 of 71/72 |
Office of Public Works, Structural Works and Alterations |
|
|
|
|
|
|
|
50/51 St. Stephen’s Green |
.. |
.. |
.. |
.. |
|
|
192.20 |
23,296.72 |
23,488.92 |
do. |
8 of 72/73 |
Revenue Commissioners Aras Brugha Computer—Fire |
|
|
|
|
|
|
|
Precautions and additional Air Conditioning |
.. |
.. |
|
|
220.00 |
24,684.48 |
24,904.48 |
do. |
65/1 of 70/71 |
Revenue Commissioners, Lifford Customs Post |
.. |
.. |
|
|
320.28 |
5,311.71 |
5,631.99 |
do. |
14A of 72/73 |
52 St. Stephen’s Green—Provision of Lift and Bridges |
.. |
|
|
5,998.34 |
15,990.00 |
21,988.34 |
do. |
13 of 70/71 |
Mullingar—New Government Offices |
.. |
.. |
.. |
|
|
299.50 |
10,516.24 |
10,815.74 |
do. |
|
Department of Justice |
|
|
|
|
|
|
46 of 72/73 |
Chancery St. Provision of additional accommodation for |
|
|
|
|
|
|
|
District Court Staff |
.. |
.. |
.. |
.. |
.. |
|
|
3,268.54 |
6,316.71 |
9,585.25 |
Completed. |
25A of 70/71 |
Land Reg.—Additional Accommodation Stage II |
.. |
|
|
936.97 |
270,298.39 |
271,235.36 |
do. |
28 of 71/72 |
Garda Siochana Depot, Phoenix Park—Improvement of |
|
|
|
|
|
|
|
Workshop Accommodation |
.. |
.. |
.. |
.. |
|
|
103.25 |
16,726.51 |
16,829.76 |
do. |
|
Department of agriculture and fisheries |
|
|
|
|
|
|
48A of 71/72 |
Ballyhaise Agricultural School—Sewerage Scheme |
.. |
|
|
630.08 |
15,405.22 |
16,035.30 |
Completed. |
61 of 72/73 |
Dunmore East Harbour: Field Research Station |
.. |
|
|
675.06 |
5,701.22 |
6,376.28 |
do. |
55 of 72/73 |
Abbotstown Farm—Experimental Animals |
|
|
|
|
|
|
|
Accommodation |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,649.14 |
175,022.12 |
179,671.26 |
do. |
56 of 72/73 |
Abbotstown Farm—New Post Mortem Unit |
.. |
.. |
|
|
3,956.15 |
33,829.65 |
37,785.80 |
do. |
|
Department of labour |
|
|
|
|
|
|
52 of 71/72 |
Clifden—New Employment Exchange |
.. |
.. |
.. |
|
|
675.00 |
19,192.50 |
19,867.50 |
do. |
53 of 71/72 |
Belmullet New Government Offices |
.. |
.. |
.. |
|
|
147.05 |
10,419.72 |
10,566.77 |
do. |
|
Department of posts and telegraphs |
|
|
|
|
|
|
77 of 67/68 |
Killarney—New Telephone Exchange and additional |
|
|
|
|
|
|
|
Sorting Office etc. |
.. |
.. |
.. |
.. |
.. |
|
|
79.74 |
848.08 |
927.82 |
do. |
|
Department of defence |
|
|
|
|
|
|
81 of 72/73 |
Parkgate Street—Alterations |
.. |
.. |
.. |
.. |
|
|
5,959.91 |
5,728.81 |
11,688.72 |
do. |
|