Committee Reports::Report - Appropriation Accounts 1963 - 1964::10 March, 1966::Appendix

Qn. 404.


APPENDIX XXII.

STATEMENT OF EXPENDITURE ON NEW WORKS, ALTERATIONS AND ADDITIONS, 1963-64 (VOTE 9, SUBHEAD B).

Work
No.

Service and Description

Total
Estimate

Vote
1963-64

Expenditure

Observations

1963-64

To 31/3/63

To 31/3/64

 

 

£

£

£

s.

d.

£

s.

d.

£

s.

d.

 

 

President’s Establishment:

 

 

 

 

 

 

 

 

 

 

 

 

1

Áras an Uachtaráin—

 

 

 

 

 

 

 

 

 

 

 

 

 

Improvement of Planthouse Accommodation

...

...

...

...

11,300

4,750

3,073

12

0

3,186

9

6

6,260

1

6

In Progress

 

Total:

 

4,750

3,073

12

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Houses of the Oireachtas:

 

 

 

 

 

 

 

 

 

 

 

 

2

Leinster House—Extension

...

...

...

...

...

...

451,000

150,000

77,951

18

2

55,644

0

10

133,595

19

0

In progress

2A

Leinster House—Dáil Chamber: Improved Accoustics

...

...

5,000

4,378

4

11

1,555

9

2

5,933

14

1

Complted.

 

Total:

 

150,000

82,330

3

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of the Taoiseach:

 

 

 

 

 

 

 

 

 

 

 

 

3

State Apartments—Rebuilding of burnt-out Drawing Rooms and

 

 

 

 

 

 

 

 

 

 

 

 

 

former Bedroom Block

...

...

...

...

...

...

...

200,000

10,000

7,139

0

9

6,196

9

8

13,335

10

5

Planning completed.

 

 

 

10,000

7,139

0

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Finance:

 

 

 

 

 

 

 

 

 

 

 

 

4

Statue to Thomas Davis

...

...

...

...

...

...

15,000

1,000

800

6

9

364

1

8

1,164

8

5

In progress.

4A

Transfer of Staff to 64/5 Merrion Square

...

...

...

...

 

 

4,121

18

10

4,121

18

10

In progress.

5

Civil Service Dining Club—Provision of Kitchen equipment and

 

 

 

 

 

 

 

 

 

 

 

 

 

alterations to service section

...

...

...

...

...

...

3,675

3,000

2,599

6

2

2,599

6

2

In progress.

6

Central Heating Station—Renewal of Plant

...

...

...

...

50,000

45,000

34,100

0

0

88

10

0

34,188

10

0

In progress.

7

State Buildings, Upper Merrion Street, Kildare Street—New

 

 

 

 

 

 

 

 

 

 

 

 

 

Electricity Distribution System

...

...

...

...

...

5,500

4,000

1,150

0

0

97

1

7

1,247

1

7

Planning completed.

8

Revenue Commissioners, Dublin Castle—Rebuilding of Cross Block

115,000

55,000

57,635

13

0

38,132

12

8

95,768

5

8

In progress.

9

Revenue Commissioners, Dublin Castle—Stamping Branch, New

 

 

 

 

 

 

 

 

 

 

 

 

 

Premises

...

...

...

...

...

...

...

...

525,000

2,000

2,270

16

11

2,270

16

11

In planning.

10

Áras Brugha—Adaptations for Electronic Computer

...

...

10,000

6,000

21,521

2

5

5,293

12

7

26,814

15

0

In progress.

10A

55/56 Upper O’Connell Street, Dublin—Adaptation, etc.

...

...

7,500

6,102

0

4

3,139

0

11

9,241

1

3

Completed.

10B

19/22 Dame Street, Dublin—Adaptations, etc.

...

...

...

4,000

3,109

9

0

1,163

10

0

4,272

19

0

Completed.

11

Carrickarnan Customs Frontier Post—Office and Residence

...

15,000

1,000

1,552

15

4

11,975

0

2

13,527

15

6

Completed.

12

Dundalk, New Customs Road Station

...

...

...

...

...

22,000

1,200

307

7

6

307

7

6

Tender accepted.

13

Lifford Customs Post—Erection

...

...

...

...

...

...

10,500

7,000

10,189

8

11

10,189

8

11

In progress.

14

Wexford New Government Offices and Telephone Exchange

...

...

47,250

22,000

12,150

0

0

4,103

3

1

16,253

3

1

In progress.

15

Office of Public Works—Alterations

...

...

...

...

...

4,000

1,000

In planning.

16

Government Publications Sale Office—Additional Accommodation

...

4,000

3,500

In planning.

17

Ordnance Survey Office—Provision of Accommodation for Additional

 

 

 

 

 

 

 

 

 

 

 

 

 

Printing Machine

...

...

...

...

...

...

...

2,600

1,500

1,796

19

9

1,796

19

9

In progress.

18

Phoenix Park—Improvement of Water Supply

...

...

...

30,000

15,000

7,123

18

6

1,029

2

9

8,153

1

3

In progress.

19

Rotunda Gardens—Garden of Remembrance

 

 

 

 

 

 

 

 

 

 

 

 

(1)

Architectural Works

...

...

...

...

...

...

144,000

38,000

30,340

0

0

98,040

15

0

128,380

15

0

Practically complete.

19

Rotunda Gardens—Garden of Remembrance

 

 

 

 

 

 

 

 

 

 

 

 

(2)

Memorial Sculpture

...

...

...

...

...

...

 

1,000

Under consideration.

20

Dun Laoghaire Harbour—Mail Boat Pier

 

 

 

 

 

 

 

 

 

 

 

 

(1)

Improvements

...

...

...

...

...

...

208,300

10,000

15,717

0

0

175,681

12

4

191,398

12

4

In progress.

20

Dun Laoghaire Harbour—Car Ferry

 

 

 

 

 

 

 

 

 

 

 

 

(2)

Terminal

...

...

...

...

...

...

...

...

300,000

10,000

3,864

3

4

2,307

3

4

6,171

6

8

In progress.

 

Total:

 

227,200

214,181

9

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Justice:

 

 

 

 

 

 

 

 

 

 

 

 

21

Memorial to Gardaí who lost their lives in the performance of duty

...

10,000

10,000

2,084

0

0

2,084

0

0

In progress.

22

Garda Síochána Depot—Extension of Garage and Workshop

 

 

 

 

 

 

 

 

 

 

 

 

 

Accommodation

...

...

...

...

...

...

...

57,000

4,000

750

0

0

750

0

0

Planning completed.

23

New Garda Training Centre, Templemore, Adaptation etc. works

...

560,000

175,000

154,724

2

1

301,214

11

0

455,938

13

1

In progress.

24

Erection of New Garda Síochána Stations and major improvements

 

 

 

 

 

 

 

 

 

 

 

 

 

to existing stations

...

...

...

...

...

...

 

175,000

142,221

8

7

 

 

 

 

 

 

 

 

Dublin Metropolitan Division:

 

 

Detailed as follows.

 

 

 

 

 

 

 

 

Cabra—New Station

...

...

...

...

...

...

...

 

 

9,764

7

4

23,685

12

4

33,449

19

8

In progress.

 

Crumlin—New Divisional Headquarters

...

...

...

...

 

 

34,250

0

0

3,366

12

11

37,616

12

11

In progress.

 

County Dublin:

 

 

 

 

 

 

 

 

 

 

 

 

 

Clondalkin—New Station

...

...

...

...

...

...

 

 

2,144

15

2

2,144

15

2

In progress.

 

County Cavan:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballyconnell—New District Headquarters

...

...

...

 

 

9,568

0

0

342

17

8

9,910

17

8

In progress.

 

Cootehill

...

...

...

...

...

...

...

...

 

 

3,825

0

0

450

0

0

4,275

0

0

In progress.

 

Killeshandra

...

...

...

...

...

...

...

...

 

 

2,040

0

0

2,520

0

0

4,560

0

0

Completed.

 

Kingscourt

...

...

...

...

...

...

...

...

 

 

3,810

0

0

3,600

0

0

7,410

0

0

Completed.

 

Blacklion

...

...

...

...

...

...

...

...

 

 

360

0

0

360

0

0

In progress.

 

County Cork:

 

 

 

 

 

 

 

 

 

 

 

 

 

Bantry

...

...

...

...

...

...

...

...

 

 

1,412

0

0

8,665

10

3

10,077

10

3

In progress.

 

Castletownroche

...

...

...

...

...

...

...

 

 

1,530

0

0

1,530

0

0

In progress.

 

Donoughmore

...

...

...

...

...

...

...

 

 

3,870

0

0

3,870

0

0

In progress.

 

Kinsale

...

...

...

...

...

...

...

...

 

 

5,240

0

0

5,240

0

0

In progress.

 

Rosscarbery

...

...

...

...

...

...

...

...

 

 

2,250

0

0

2,250

0

0

In progress.

 

Youghal

...

...

...

...

...

...

...

...

 

 

7,740

0

0

7,740

0

0

In progress.

 

County Clare:

 

 

 

 

 

 

 

 

 

 

 

 

 

Inagh

...

...

...

...

...

...

...

...

 

 

339

12

6

339

12

6

In planning.

 

Labasheeda

...

...

...

...

...

...

...

...

 

 

360

0

0

273

17

6

633

17

6

In progress.

 

Shannon Airport

...

...

...

...

...

...

...

 

 

In planning.

 

County Donegal:

 

 

 

 

 

 

 

 

 

 

 

 

 

Burtonport

...

...

...

...

...

...

...

...

 

 

1,440

0

0

1,440

0

0

In progress.

 

Carndonagh

...

...

...

...

...

...

...

...

 

 

1,260

0

0

1,260

0

0

In progress.

 

Castlefin

...

...

...

...

...

...

...

...

 

 

2,880

0

0

3,420

0

0

6,300

0

0

In progress.

 

County Galway:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ahascragh

...

...

...

...

...

...

...

...

 

 

3,735

0

0

2,250

0

0

5,985

0

0

In progress.

 

Portumna

...

...

...

...

...

...

...

...

 

 

1,630

0

0

5,478

0

0

7,108

0

0

In progress.

 

Leenane

...

...

...

...

...

...

...

...

 

 

575

0

0

1,735

19

7

2,310

19

7

Completed.

 

County Kerry:

 

 

 

 

 

 

 

 

 

 

 

 

 

Kilgarvan

...

...

...

...

...

...

...

...

 

 

153

0

0

153

0

0

Tenders being examined (work on well boring completed).

 

County Leitrim:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballinamore

...

...

...

...

...

...

...

...

 

 

2,700

0

0

2,700

0

0

In progress.

 

Cloone

...

...

...

...

...

...

...

...

 

 

741

12

3

3,317

1

6

4,058

13

9

In progress.

 

County Louth:

 

 

 

 

 

 

 

 

 

 

 

 

 

Castlebellingham

...

...

...

...

...

...

...

 

 

4,185

0

0

1,890

0

0

6,075

0

0

In progress.

 

County Mayo:

 

 

 

 

 

 

 

 

 

 

 

 

 

Killala

...

...

...

...

...

...

...

...

 

 

5,005

0

0

2,880

0

0

7,885

0

0

In progress.

 

County Meath:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballivor

...

...

...

...

...

...

...

...

 

 

2,250

0

0

1,170

0

0

3,420

0

0

In progress.

 

Enfield

...

...

...

...

...

...

...

...

 

 

857

0

0

3,685

0

0

4,542

0

0

In progress.

 

Slane

...

...

...

...

...

...

...

...

 

 

4,703

0

0

450

0

0

5,153

0

0

In progress.

 

Crossakiel

...

...

...

...

...

...

...

...

 

 

237

0

0

237

0

0

In progress.

 

County Monaghan:

 

 

 

 

 

 

 

 

 

 

 

 

 

Clontibret

...

...

...

...

...

...

...

...

 

 

3,685

0

0

3,206

10

9

6,891

10

9

In progress.

 

Ballybay

...

...

...

...

...

...

...

...

 

 

2,340

0

0

2,340

0

0

In progress.

 

County Offaly:

 

 

 

 

 

 

 

 

 

 

 

 

 

Banagher

...

...

...

...

...

...

...

...

 

 

1,761

14

6

2,250

0

0

4,011

14

6

In progress.

 

County Roscommon:

 

 

 

 

 

 

 

 

 

 

 

 

 

Kilmore

...

...

...

...

...

...

...

 

 

292

0

0

292

0

0

Well boring completed.

 

Strokestown

...

...

...

...

...

...

...

...

 

 

3,150

0

0

1,170

0

0

4,320

0

0

In progress.

 

County Sligo:

 

 

 

 

 

 

 

 

 

 

 

 

 

Bunninadden

...

...

...

...

...

...

...

 

 

205

18

0

785

18

2

991

16

2

Completed.

 

Collooney

...

...

...

...

...

...

...

...

 

 

2,200

0

0

5,400

0

0

7,600

0

0

In progress.

 

Tubbercurry

...

...

...

...

...

...

...

...

 

 

1,710

0

0

1,710

0

0

In progress.

 

County Tipperary:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballingarry North

...

...

...

...

...

...

...

 

 

230

6

0

230

6

0

In progress.

 

Grangemockler

...

...

...

...

...

...

...

 

 

5

0

10

4,824

17

4

4,829

18

2

Completed.

 

County Waterford:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballymacarbery

...

...

...

...

...

...

...

 

 

340

0

0

1,302

15

0

1,642

15

0

Completed.

 

County Westmeath:

 

 

 

 

 

 

 

 

 

 

 

 

 

Rathowen

...

...

...

...

...

...

...

...

 

 

165

0

0

165

0

0

In progress.

 

Rochfortbridge

...

...

...

...

...

...

...

 

 

3,105

0

0

810

0

0

3,915

0

0

In progress.

 

County Wexford:

 

 

 

 

 

 

 

 

 

 

 

 

 

Blackwater

...

...

...

...

...

...

...

...

 

 

2,491

8

0

360

0

0

2,851

8

0

Completed.

 

Courtown Harbour

...

...

...

...

...

...

 

 

360

0

0

360

0

0

In progress.

 

Rathdrum

...

...

...

...

...

...

...

...

 

 

In planning.

25

Minor improvement schemes at Garda Stations:

 

25,000

24,627

8

3

 

 

 

 

 

 

 

 

 

 

 

 

 

(as under)

 

 

 

 

County Carlow:

 

 

 

 

 

 

 

 

 

 

 

 

27/48 of 61-2

Muine Beag

...

...

...

...

...

...

...

...

 

 

307

7

7

789

5

0

1,096

12

7

Completed.

 

County Cavan:

 

 

 

 

 

 

 

 

 

 

 

 

31

Mullagh

...

...

...

...

...

...

...

...

 

 

190

12

6

190

12

6

Completed.

22/52

Stradone

...

...

...

...

...

...

...

...

 

 

849

17

0

200

0

0

1,049

17

0

Completed.

 

County Clare:

 

 

 

 

 

 

 

 

 

 

 

 

17

Killaloe

...

...

...

...

...

...

...

...

 

 

185

1

1

185

1

1

In progress.

 

County Cork:

 

 

 

 

 

 

 

 

 

 

 

 

26

Ballydehob

...

...

...

...

...

...

...

...

 

 

523

14

0

523

14

0

Completed.

20

Cloyne

...

...

...

...

...

...

...

...

 

 

632

13

0

632

13

0

Completed.

22/33

Coachford

...

...

...

...

...

...

...

...

 

 

93

0

0

616

10

4

709

10

4

Completed.

56

Drimoleague

...

...

...

...

...

...

...

...

 

 

163

6

3

163

6

3

In progress.

51

Durrus

...

...

...

...

...

...

...

...

 

 

423

19

3

423

19

3

In progress.

70

Glengarriff

...

...

...

...

...

...

...

...

 

 

191

10

0

191

10

0

Completed.

52

Inishannon

...

...

...

...

...

...

...

...

 

 

394

12

4

394

12

4

Completed.

 

County Donegal:

 

 

 

 

 

 

 

 

 

 

 

 

23

Clogher

...

...

...

...

...

...

...

...

 

 

1,080

0

0

1,080

0

0

In progress.

22/29 of 62-3

Clonmany

...

...

...

...

...

...

...

...

 

 

1,660

0

0

1,660

0

0

In progress.

44

Killybegs

...

...

...

...

...

...

...

...

 

 

134

14

3

134

14

3

Completed.

65

Glencolumbkille

...

...

...

...

...

...

...

...

 

 

560

0

0

560

0

0

In progress.

72

Glenties

...

...

...

...

...

...

...

...

 

 

218

13

7

218

13

7

Completed.

22/40 of 62-3

Muff

...

...

...

...

...

...

...

...

 

 

130

1

2

900

0

0

1,030

1

2

Completed.

 

Dublin:

 

 

 

 

 

 

 

 

 

 

 

 

54

Blackrock

...

...

...

...

...

...

...

...

 

 

330

8

6

330

8

6

Completed.

22/45 of 62-3

Cabinteely

...

...

...

...

...

...

...

...

 

 

46

5

0

112

7

3

158

12

3

Completed.

34

Clontarf

...

...

...

...

...

...

...

...

 

 

188

0

10

188

0

10

Completed.

45

Dalkey

...

...

...

...

...

...

...

...

 

 

366

19

9

366

19

9

Completed.

24

Dun Laoghaire

...

...

...

...

...

...

...

 

 

793

15

7

793

15

7

Completed.

35

Finglas

...

...

...

...

...

...

...

...

 

 

390

19

7

390

19

7

Completed.

46

Harcourt Tce.

...

...

...

...

...

...

...

 

 

272

3

9

272

3

9

Completed.

58

Kilmainham

...

...

...

...

...

...

...

...

 

 

225

0

0

225

0

0

Completed.

22/60 of 62-3

Pearse Street New Mess Hall

...

...

...

...

...

 

 

134

11

2

293

15

6

428

6

8

Completed.

36

Santry

...

...

...

...

...

...

...

...

 

 

197

0

0

197

0

0

Completed.

50

Tallaght

...

...

...

...

...

...

...

...

 

 

474

6

10

474

6

10

In progress.

 

County Galway:

 

 

 

 

 

 

 

 

 

 

 

 

42/5 of 60-1

Kilronan

...

...

...

...

...

...

...

...

 

 

397

3

2

5

11

9

402

14

11

In progress.

27/34 of 61-2

Headford

...

...

...

...

...

...

...

...

 

 

472

19

2

504

6

9

977

5

11

Completed.

27/47 of 61-2

Rosmuc

...

...

...

...

...

...

...

...

 

 

1,300

0

0

50

14

6

1,350

14

6

In progress.

 

County Kildare:

 

 

 

 

 

 

 

 

 

 

 

 

22/20 of 62-3

Castledermot

...

...

...

...

...

...

...

...

 

 

405

0

0

636

11

0

1,041

11

0

Completed.

41

Celbridge

...

...

...

...

...

...

...

...

 

 

1,170

0

0

1,170

0

0

In progress.

 

County Kilkenny:

 

 

 

 

 

 

 

 

 

 

 

 

83

Stoneyford

...

...

...

...

...

...

...

...

 

 

197

12

9

197

12

9

In progress.

 

County Kerry:

 

 

 

 

 

 

 

 

 

 

 

 

40

Annascaul

...

...

...

...

...

...

...

...

 

 

551

5

8

551

5

8

Completed.

59

Ballybunion

...

...

...

...

...

...

...

...

 

 

343

9

0

343

9

0

Completed.

68

Ballyduff

...

...

...

...

...

...

...

...

 

 

98

15

0

98

15

0

Completed.

10

Brosna

...

...

...

...

...

...

...

...

 

 

554

15

11

554

15

11

Completed.

61

Moyvane

...

...

...

...

...

...

...

...

 

 

297

2

0

297

2

0

Completed.

71

Sneem

...

...

...

...

...

...

...

...

 

 

249

0

0

249

0

0

Completed.

91

Tarbert

...

...

...

...

...

...

...

...

 

 

93

0

0

93

0

0

In progress.

33

Waterville

...

...

...

...

...

...

...

...

 

 

445

12

0

445

12

0

Completed.

 

County Laois:

 

 

 

 

 

 

 

 

 

 

 

 

55

Ballinakill

...

...

...

...

...

...

...

...

 

 

132

0

0

132

0

0

Completed.

22/28 of 62-3

Ballylinan

...

...

...

...

...

...

...

...

 

 

112

4

0

600

0

0

712

4

0

Completed.

 

County Limerick:

 

 

 

 

 

 

 

 

 

 

 

 

27/37 of 61-2

Pallas

...

...

...

...

...

...

...

...

 

 

72

6

9

391

5

4

463

12

1

Completed.

 

County Meath:

 

 

 

 

 

 

 

 

 

 

 

 

6

Duleek

...

...

...

...

...

...

...

...

 

 

778

15

4

778

15

4

Completed.

37

Navan

...

...

...

...

...

...

...

...

 

 

534

5

8

534

5

8

Completed.

22/48 of 62-3

Oldcastle

...

...

...

...

...

...

...

...

 

 

900

0

0

180

0

0

1,080

0

0

Completed.

 

County Monaghan:

 

 

 

 

 

 

 

 

 

 

 

 

8

Newbliss

...

...

...

...

...

...

...

...

 

 

1,218

6

6

1,218

6

6

Completed.

 

County Offaly:

 

 

 

 

 

 

 

 

 

 

 

 

29

Rhode

...

...

...

...

...

...

...

...

 

 

630

0

0

630

0

0

In progress.

 

County Roscommon:

 

 

 

 

 

 

 

 

 

 

 

 

74

Athleague

...

...

...

...

...

...

...

...

 

 

107

15

0

107

15

0

Completed.

49

Boyle

...

...

...

...

...

...

...

...

 

 

180

0

0

180

0

0

Completed.

 

County Tipperary:

 

 

 

 

 

 

 

 

 

 

 

 

53

Clonmel

...

...

...

...

...

...

...

...

 

 

332

2

5

332

2

5

In progress.

 

County Waterford:

 

 

 

 

 

 

 

 

 

 

 

 

3

Tallow

...

...

...

...

...

...

...

...

 

 

512

15

0

512

15

0

Completed.

 

County Westmeath:

 

 

 

 

 

 

 

 

 

 

 

 

21 of 62/63 and 39

Ballymore

...

...

...

...

...

...

...

...

 

 

218

0

0

10

0

0

228

0

0

Well boring completed.

 

County Wicklow:

 

 

 

 

 

 

 

 

 

 

 

 

22/31 of 62-3

Greystones

...

...

...

...

...

...

...

...

 

 

451

3

8

990

0

0

1,441

3

8

Completed.

42

Shillelagh

...

...

...

...

...

...

...

...

 

 

373

13

5

373

13

5

Completed.

63

Wicklow

...

...

...

...

...

...

...

...

 

 

339

12

10

339

12

10

Completed.

26

Houses for married members of the Garda Síochána

...

...

 

250,000

300,000

0

0

101,254

0

0

401,254

0

0

In progress.

27

Courts of Justice—Renewal of Defective Stonework

...

...

50,000

5,000

4,945

14

5

4,945

14

5

Stage 1 completed.

28 (1)

Land Registry—Additional accommodation (Stage 1)

...

...

10,500

6,090

6,899

3

8

7,372

13

0

14,271

16

8

Stage 1 completed.

28 (2)

Land Registry—Fire Escape Staircase

...

...

...

...

2,500

2,000

1,762

1

9

3,791

12

6

5,553

14

3

In progrress.

 

Total:

 

652,000

633,068

4

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Education:

 

 

 

 

 

 

 

 

 

 

 

 

29

Talbot House—Fire Precaution Works

...

...

...

...

2,250

1,000

2,126

5

7

2,126

5

7

In progress.

30

National Schools—Grants for Building, Enlarging, Enclosing, etc.

...

1,900,000

2,325,993

5

0

2,325,993

5

0

 

31

Coláiste Moibhí—Fire Precaution Works

...

...

...

...

2,000

1,500

498

6

1

498

6

1

In progress.

32

National Library and National Museum—Renewal of Stonework

 

 

 

 

 

 

 

 

 

 

 

 

 

(Stage II)

...

...

...

...

...

...

...

...

30,000

3,000

4,033

0

0

45,137

10

10

49,170

10

10

Stage II completed.

33

Dublin Preventive Centre—Erection

...

...

...

...

...

150,000

5,000

In planning.

33A

Institute for Advanced Studies—Adaptations, etc. at 9/10 Burlington

 

 

 

 

 

 

 

 

 

 

 

 

 

Road, Dublin

...

...

...

...

...

...

...

...

6,421

18

2

5,601

16

1

12,023

14

3

Virtually completed.

34 (1)

National Gallery—Extension

...

...

...

...

...

...

315,000

10,000

2,933

8

2

2,411

5

4

5,344

13

6

Tenders under examination.

34 (2)

National Gallery—Fire Precaution Works

...

...

...

...

5,200

4,500

 

 

 

Amalgamated with No. 34 (1).

 

Total

 

1,925,000

2,342,006

3

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Lands:

 

 

 

 

 

 

 

 

 

 

 

 

35

21-29 and 31-33 Upper Merrion Street Improvement of Electrical

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation

...

...

...

...

...

...

...

...

14,300

4,000

2,825

13

9

2,825

13

9

In progress.

36

Avondale House—Adaptation as Forestry Training and Conference

 

 

 

 

 

 

 

 

 

 

 

 

 

Centre

...

...

...

...

...

...

...

...

32,000

7,000

In planning.

37

Galway Fisheries Research Station—Erection

...

...

...

150,000

500

In planning.

38

Major Fishery Harbours (Stage 1)

...

...

...

...

...

1,260,000

140,000

46,148

9

1

 

 

 

 

 

 

 

 

 

 

 

(as under)

 

 

 

 

 

 

 

 

 

 

Castletownbere ...

1,574

14

1

8,219

17

11

9,794

12

0

Tenders invited for dredging.

 

 

 

Dunmore East

25,859

6

2

11,522

4

5

37,381

10

7

In progress.

 

 

 

Galway ...

4,653

16

5

23,737

0

2

28,390

16

7

Report submitted to D Lands.

 

 

 

Howth ...

11,055

11

8

3,918

16

5

14,974

8

1

Consultant examining Report of trial borings.

 

 

 

Killybegs ...

2,660

7

5

7,624

4

6

10,284

11

11

Trial borings in progress.

 

 

 

Other expenditure

344

13

4

14,148

15

4

14,493

8

8

 

 

 

 

(general)

 

 

 

 

 

 

 

 

 

 

39

Works of Economic Development at other Fishery Harbours

...

...

81,400

43,000

34,424

7

3

 

 

 

 

 

 

 

 

 

 

 

(as under)

 

 

 

 

 

 

 

 

 

 

Aileen Reef

12

4

6

295

12

5

307

16

11

Completed.

 

 

 

Ballinaclash

11

0

0

11

0

0

Abandoned.

 

 

 

Ballyhack ...

1,000

0

0

1,000

0

0

Completed.

 

 

 

Ballynacarti

 

 

 

 

 

 

 

 

 

 

 

 

 

Slip ...

2,365

8

5

2,365

8

5

In progress.

 

 

 

Burtonport

311

18

11

4,568

7

5

4,880

6

4

Completed.

 

 

 

Clare Island

1,223

14

2

1,223

14

2

Trial borings completed.

 

 

 

Clogherhead

2,683

5

10

2,162

0

7

4,845

6

5

Works completed, Crane ordered.

 

 

 

Enniscrone Pier ...

2,660

13

0

2,660

13

0

Completed.

 

 

 

Greencastle ...

20,820

14

2

31,595

10

8

52,416

4

10

In progress.

 

 

 

Kilmore Quay

1,508

13

9

34

4

9

1,542

18

6

In planning.

 

 

 

Portaleen ...

1,125

0

0

1,225

0

0

Completed.

 

 

 

Renard Point

701

14

6

701

14

6

Trial borings completed.

 

Total

 

194,500

83,398

10

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Agriculture:

 

 

 

 

 

 

 

 

 

 

 

 

39a

69 Fitzwilliam Square, Dublin—Adaptations, etc.

...

...

...

2,600

2,742

0

2

800

10

0

3,542

10

2

Virtually completed.

40 (1)

Veterinary College, Ballsbridge—Extension

...

...

...

...

100,000

500

307

8

2

307

8

2

In planning.

40 (2)

Veterinary College, Ballsbridge—Improvements

...

...

...

20,000

2,500

3,874

1

10

15,281

2

8

19,155

4

6

Virtually completed.

40 (3)

Veterinary College, Ballsbridge—Pathological Anatomy Unit

...

11,900

5,500

6,165

0

0

1,989

12

0

8,154

12

0

In progress.

41

Botanic Gardens—New Fern House

...

...

...

...

...

10,000

6,000

2,160

0

0

179

8

0

2,339

8

0

In progress.

42 (1)

Abbotstown Farm—Experimental Animals Farmyard

...

...

66,000

19,000

16,593

1

8

35,458

12

11

52,051

14

7

In progress.

42 (2)

Abbotstown Farm—Foundation Stock Farmyard

...

...

...

92,000

35,000

41,319

16

7

24,018

7

7

65,338

4

2

In progress.

42 (3)

Abbotstown Farm—Residence for Director

...

...

...

...

5,800

1,000

630

0

0

3,198

3

6

3,828

3

6

In progress.

42 (4)

Abbotstown Farm—Veterinary Field Station

...

...

...

...

127,000

30,000

17,758

13

6

17,758

13

6

In progress.

43 (1)

Athenry Agricultural School—Improvement of Water Supply

...

12,000

3,000

137

19

9

1,233

12

7

1,371

12

4

In progress.

43 (2)

Athenry Agricultural School—New Building

...

...

...

...

110,000

40,000

33,750

0

0

53,558

16

9

87,308

16

9

In progress.

43 (3)

Athenry Agricultural School—Improvements to Turkey Hatchery

30,000

10,000

4,392

3

10

9,171

3

10

13,563

7

8

In progress.

44

Backweston Farm—New Farm Building

...

...

...

...

40,000

1,000

500

0

0

500

0

0

In planning.

45 (1)

Ballyhaise Agriculture School—Re-arrangement of Grinding Plant

...

2,100

1,500

433

12

6

433

12

6

Major schere abandoned.

45 (2)

Ballyhaise Agriculture School—Pig Progeny Testing Station

...

38,400

1,000

In planning.

46 (1)

Clonakilty Agricultural School—Fire Precaution Works

...

...

2,500

1,000

633

9

11

633

9

11

In progress.

46 (2)

Clonakilty Agricultural School—Improvement of Water Supply

...

17,000

10,000

11,701

0

0

1,306

0

11

13,007

0

11

In progress.

46 (3)

Clonakilty Agricultural School—New Building

...

...

...

110,000

45,000

42,200

0

0

39,999

16

2

82,199

16

2

In progress.

46 (4)

Clonakilty Agricultural School—Employee’s Cottage

...

...

2,500

1,000

In planning.

47 (1)

Munster Institute—Fire Precaution Works

...

...

...

...

2,500

1,500

488

11

1

236

11

2

725

2

3

In progress.

47 (2)

Munster Institute—New Poultry Plant

...

...

...

...

98,500

1,500

73

4

0

17,093

2

7

17,166

6

7

In progress.

47 (3)

Munster Institute—Reconstruction of Cattle Court and Calf Sheds

...

5,000

100

In planning.

47 (4)

Munster Institute—Extension of Pig Progeny Testing Station

...

46,000

5,000

819

6

3

819

6

3

Planning completed.

48

Thorndale—Detention Station for Imported Livestock

...

...

16,100

5,000

11,214

15

6

280

0

0

11,494

15

6

In progress.

 

Total

 

226,100

196,827

2

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Posts   Telegraphs:

 

 

 

 

 

 

 

 

 

 

 

 

49

Dublin—New Central Sorting Office

...

...

...

...

...

600,000

80,000

91,464

7

11

86,444

15

0

177,909

2

11

In progress.

50

Dublin—New District Sorting Office and Telephone Exchange,

 

 

 

 

 

 

 

 

 

 

 

 

 

Coolock-Raheny

...

...

...

...

...

...

...

13,500

2,000

2,336

6

2

13

10

0

2,349

16

2

In progress.

51

Dublin—New District Sorting Office and Telephone Exchange,

 

 

 

 

 

 

 

 

 

 

 

 

 

Finglas

...

...

...

...

...

...

...

16,300

9,000

10,769

0

0

4,005

19

10

14,774

19

10

In progress.

52

Dublin—New Warehousing etc. accommodation

...

...

...

190,000

15,000

3,403

16

7

3,403

16

7

In planning.

53

Dun Laoghaire—New Engineering Headquarters   & Garage

...

...

1,650

500

25

0

0

25

0

0

In planning.

54

Arklow Post Office—Improvements and New Telephone Exchange

12,850

7,500

6,606

11

6

847

12

1

7,454

3

7

In progress.

55

Ballinasloe—New Post Office and Telephone Exchange

...

...

24,500

15,000

13,597

0

0

512

13

3

14,109

13

3

In progress.

56

Carrick-on-Shannon Post Office—Improvements

...

...

...

20,000

1,000

4,242

3

10

17,655

19

9

21,898

3

7

Completed.

57

Ennis Post Office—Improvements and New Telephone Exchange

...

9,600

3,000

3,491

2

7

5,688

14

11

9,179

17

6

In progress.

58

Kilkenny—New Telephone Exchange and Area Engineering

 

 

 

 

 

 

 

 

 

 

 

 

 

Headquarters

...

...

...

...

...

...

...

...

1,250

500

In planning.

59

Limerick—New Engineering Stores and Garages

...

...

...

1,900

1,000

1,440

0

0

1,440

0

0

In progress.

60

Limerick Post Office—Improvements

...

...

...

...

...

21,700

11,000

13,291

0

0

6,893

5

0

20,184

5

0

In progress.

61

Wexford—New Area Engineering Headquarters

...

...

...

2,400

500

684

18

8

2,085

0

0

2,769

18

8

Completed.

62

Wicklow—New Post Office and Telephone Exchange

...

...

30,250

10,000

8,694

11

5

19,030

15

6

27,725

6

11

In progress.

63

Youghal—New Post Office and Telephone Exchange

...

...

...

16,250

10,000

4,341

0

0

3,096

11

9

7,437

11

9

In progress.

 

Total

 

166,000

164,386

18

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Defence:

 

 

 

 

 

 

 

 

 

 

 

 

64

School of Civil Defence—Improved Accommodation

...

...

...

25,500

15,000

17,927

0

0

4,217

19

9

22,144

19

9

In progress.

65

Curragh Camp—New Catholic Church

...

...

...

...

124,000

4,500

17

2

3

118,529

17

7

118,546

19

10

Completed.

 

Total

 

19,500

17,944

2

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of External Affairs:

 

 

 

 

 

 

 

 

 

 

 

 

66

Irish Embassy to Federation of Nigeria—Residences for Ambassadors

 

 

 

 

 

 

 

 

 

 

 

 

 

and Secretary

...

...

...

...

...

...

...

...

64,000

5,000

80

0

0

80

0

0

In planning.

67

Irish Embassy to Sweden—Improvements to Ambassador’s Residence

6,000

3,500

4,774

10

0

1,552

10

1

6,327

0

1

In progress.

 

Total

 

8,500

4,774

10

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Social Welfare:

 

 

 

 

 

 

 

 

 

 

 

 

68

Dublin—New Headquarters, Haddington Road

...

...

...

1,788,000

10,000

11,270

8

0

3,155

0

8

14,425

8

8

In planning.

69

Carrick-on-Shannon—New Employment Exchange

...

...

...

14,000

1,000

1,871

7

4

10,194

14

5

12,066

1

9

Completed.

70

Mullingar—New Employment Exchange

...

...

...

...

20,500

4,000

5,223

12

11

12,413

2

5

17,636

15

4

In progress.

 

Total

 

15,000

18,365

8

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Department of Health:

 

 

 

 

 

 

 

 

 

 

 

 

71

Central Mental Hospital, Dundrum—New Residence for Governor

...

7,600

1,500

1,341

5

11

6,231

7

0

7,572

12

11

Completed.

 

Total

 

1,500

1,341

5

11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

General:

 

 

 

 

 

 

 

 

 

 

 

 

72

Minor New Works not exceeding £2,000 each

...

...

...

...

 

25,000

32,872

10

3

 

 

 

 

 

 

 

73

Urgent and Unforseen Works

...

...

...

...

...

 

5,000

11,456

11

8

 

 

 

 

 

 

 

74

Minor Balances of Expenditure (not provided for above) on works of

 

 

 

 

 

 

 

 

 

 

 

 

 

prior years which may not be completed on 1st April, 1963

...

...

 

15,000

23,251

16

8

 

 

 

 

 

 

 

 

Total:

 

3,645,050

3,836,417

9

1

 

 

 

 

 

 

 

 

Deduct for works which may not be carried out during the year:

...

 

215,050

 

 

 

 

 

 

 

 

 

 

 

 

 

3,430,000

3,836,417

9

1

 

 

 

 

 

 

 

 

Add

 

 

 

 

 

 

 

 

 

 

 

 

 

Supplementary Estimate

...

...

...

...

...

...

 

450,000

 

 

 

 

 

 

 

 

 

 

 

Net Total:

 

£3,880,000

£3,836,417

9

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DETAILS OF WORK NO. 72—MINOR NEW WORKS NOT EXCEEDING £2,000.

Minor Work No.

Service and Description

Expenditure

Observations

1963/64

To 31/3/63

To 31/3/64

 

 

£

s.

d.

£

s.

d.

£

s.

d.

 

 

President’s Establishment:

 

 

 

 

 

 

 

 

 

 

70

Áras an Uachtaráin—Chapel Windows

...

...

...

...

...

...

87

0

0

87

0

0

In progress.

 

Department of an Taoiseach:

 

 

 

 

 

 

 

 

 

 

77/46 of 1962/63

Central Statistics Office—Heating Improvement

...

...

...

...

153

8

0

622

19

1

776

7

1

Completed.

 

Department of Finance:

 

 

 

 

 

 

 

 

 

 

77/49 of 1962/63

O. & M. Section—Adaptations, etc.

...

...

...

...

...

...

256

3

11

1,304

5

4

1,560

9

3

Completed.

 

Office of Revenue Commissioners:

 

 

 

 

 

 

 

 

 

 

82 70 of 1961/62

Dublin Castle, Stamping Branch—Improved Ventilation

...

...

...

248

10

0

53

12

2

302

2

2

Completed.

33

Dublin Castle, Companies Registration Office—Improved Heating

...

...

116

10

0

116

10

0

Completed.

46

Custom House, Dublin—Adaptations (“Long Room”)

...

...

...

116

8

1

116

8

1

Completed.

30

Áras Brugha, Dublin—Adaptations

...

...

...

...

...

...

488

9

0

488

9

0

Completed.

57

14/16 Lord Edward Street, Dublin—Adaptations

...

...

...

...

678

3

1

678

3

1

Completed.

77/52 of 1962/63

51 Lr. Baggot Street Dublin—Electrical Installation

...

...

...

...

52

17

7

621

9

4

674

6

11

Completed.

83

11/13 Upper O’Connell Street, Dublin—Alterations

...

...

...

...

1,367

3

8

1,367

3

8

In progress.

93

14/15 Upr. O’Connell Street, Dublin—Alterations, etc.

...

...

...

835

14

5

835

14

5

In progress.

77 70 of 1962/63

Limerick Government Offices—Improvements, etc.

...

...

...

...

1,176

3

5

242

8

3

1,418

11

8

Completed.

 

Office of Public Works:

 

 

 

 

 

 

 

 

 

 

77/8 of 1962/63

51 St. Stephen’s Green, Dublin—Dining Club Equipment

...

...

...

135

0

0

305

16

5

440

16

5

Completed.

42

51 St. Stephen’s Green, Dublin—Improved Lighting

...

...

...

...

163

3

3

163

3

3

In progress.

68

13/14 Earlsfort Terrace, Dublin—Adaptations (Cash Office)

...

...

...

176

2

0

176

2

0

Completed.

77/80 of 1962/63

Engineers Branch, Griffith Barracks—Heating & Equipment

...

...

391

5

7

 

15

2

392

0

9

Completed.

77/77 of 1962/63

Castlebar District Office—Improved Heating

...

...

...

...

6

0

0

110

17

2

116

17

2

Completed.

100

Cork Divisional Office—Adaptations

...

...

...

...

...

...

64

0

0

64

0

0

In progress.

34

Central Furniture Stores, Rathmines—Improved Drainage

...

...

...

321

13

3

321

13

3

Completed.

77/95 of 1962/63

Central Engineering Workshop—Partitioning

...

...

...

...

...

22

16

6

175

3

0

197

19

6

Completed.

77/6 of 1962/63

Phoenix Park—Extension at Chapelizod Gate Lodge

...

...

...

...

25

4

0

931

16

11

957

0

11

Completed.

77/18 of 1962/63

Phoenix Park—Improvement of Knockmary Lodge

...

...

...

...

80

0

0

389

17

4

469

17

4

In progress.

61

Phoenix Park—Extension of North Circular Road Gate Lodge

...

...

1,647

10

8

1,647

10

8

In progress.

74

Phoenix Park—Improvement at White’s Gate

...

...

...

...

...

38

7

6

38

7

6

In progress.

77/75 of 1962/63

Dunmore East Harbour—New Structure

...

...

...

...

...

2

16

5

771

4

7

774

1

0

Completed.

81

Dun Laoghaire Harbour—Improvements at Assistant Harbour Master’s House

64

3

3

64

3

3

In progress.

 

Attorney General’s Office:

 

 

 

 

 

 

 

 

 

 

92

Basement Storage—Adaptations

...

...

...

...

...

...

...

131

13

2

131

13

2

In progress.

 

Chief State Solicitor’s Office:

 

 

 

 

 

 

 

 

 

 

77/103 of 1962/63

Basement Storage—Improvements

...

...

...

...

...

...

157

15

8

98

3

9

255

19

5

In progress.

 

Stationery Office:

 

 

 

 

 

 

 

 

 

 

9

Provision of Turf Burner

...

...

...

...

...

...

...

...

35

0

0

35

0

0

In progress.

88

Improved Lighting

...

...

...

...

...

...

...

...

223

1

6

223

1

6

In progress.

 

Valuation Office:

 

 

 

 

 

 

 

 

 

 

77/4 of 1962/63

5/6 Ely Place Improved Heating, etc.

...

...

...

...

...

...

10

0

5

561

6

2

571

6

7

Completed.

56

Ordnance Survey Office—Improved Heating

...

...

...

...

...

435

12

0

435

12

0

Completed.

67

Ordnance Survey Office—Fire Detection System

...

...

...

...

270

0

0

270

0

0

Completed.

 

General:

 

 

 

 

 

 

 

 

 

 

32

Government Buildings, Dublin—Site Adaptations

...

...

...

...

710

0

0

710

0

0

Completed.

45

Government Buildings, Dublin—Military Billets

...

...

...

...

10

10

0

10

10

0

Temporarily suspended.

79

14 St. Stephen’s Green, Dublin—Adaptations

...

...

...

...

...

1,300

2

5

1,300

2

5

In progress.

97

Parnell Square, Dublin—Commemorative Plaque

...

...

...

...

130

0

0

130

0

0

Completed.

 

Department of Justice:

 

 

 

 

 

 

 

 

 

 

77/106 of 1962/63

Public Record Office—Provision of Book Lift

...

...

...

...

...

234

19

5

31

12

3

266

11

8

Completed.

77/39 of 1962/63

Garda Depot—Storage

...

...

...

...

...

...

...

...

67

3

4

285

19

6

353

2

10

Completed.

29

Courts of Justice—Improved Lighting

...

...

...

...

...

...

263

10

3

263

10

3

Completed.

66

Circuit Courts Office—Provision of Shelving

...

...

...

...

...

446

5

0

446

5

0

Completed.

64

Land Registry—Improved Heating

...

...

...

...

...

...

419

5

10

419

5

10

Completed.

 

Department of Local Government:

 

 

 

 

 

 

 

 

 

 

48

Custom House, Dublin—Improved Heating

...

...

...

...

...

158

9

1

158

9

1

In progress.

 

Department of Education:

 

 

 

 

 

 

 

 

 

 

77/76 of 1962/63

Headquarters—Alterations

...

...

...

...

...

...

...

2

8

4

137

15

7

140

3

11

Completed.

77/122 of 1962 63

Headquarters—Improvements (Room 13)

...

...

...

...

...

70

19

10

45

9

4

116

9

2

Completed.

77/58 of 1962/63

Technical Instruction Branch, Talbot House—Improved Storage

...

...

304

13

8

172

19

0

477

12

8

Completed.

77/115 of 1962/63

National Museum—Improved Lighting (Central Court)

...

...

...

...

365

16

5

11

4

3

377

0

8

In progress.

77/90 of 1962/63

National College of Art—Adaptations, etc. (Room 9)

...

...

...

...

257

3

3

479

15

0

736

18

3

Completed.

77/104 of 1962/63

Model School, St. Joseph’s—Partitioning, etc.

...

...

...

...

...

1,293

7

5

452

8

4

1,745

15

9

Completed.

20

Model School, Bailieboro’—Sanitary Improvements

...

...

...

...

945

0

0

945

0

0

Completed.

 

Department of Lands:

 

 

 

 

 

 

 

 

 

 

77/94 of 1962/63

Forestry Branch—Storage

...

...

...

...

...

...

...

...

5

4

2

73

15

6

78

19

8

In progress.

 

Department of Agriculture:

 

 

 

 

 

 

 

 

 

 

37

Government Buildings (West Block)—Partitioning (Room 13)

...

...

382

19

6

382

19

6

Completed.

50

Government Buildings—Adaptations (Room 041)

...

...

...

...

121

9

2

121

9

2

Completed.

77/63 of 1962/63

Botanic Gardens—Improved Water Supply

...

...

...

...

...

913

3

8

10

0

3

923

3

11

Completed.

28

Botanic Gardens—Improved Heating

...

...

...

...

...

...

307

4

0

307

4

0

Completed.

55

Botanic Gardens—Machinery, etc. Store

...

...

...

...

...

480

0

0

480

0

0

Completed.

36

Abbotstown Farm—Gate Lodge Fuel Store

...

...

...

...

...

242

16

8

242

16

8

Completed.

43

Abbotstown Farm—Sundry Minor Improvements

...

...

...

...

147

7

3

147

7

3

In progress.

40

Shantilly Field Station—Fencing

...

...

...

...

...

...

332

4

4

332

4

4

Completed.

77/84 of 1962/63

Thorndale Veterinary Laboratory—Fencing, etc.

...

...

...

...

32

13

4

540

13

9

573

7

1

Completed.

22

Munster Institute—Improve Ventilation (Trap Nest Houses)

...

...

552

5

9

552

5

9

Completed.

47

Munster Institute—Improvements in Superintendent’s House

...

...

...

137

7

6

137

7

6

In progress.

80

Munster Institute—Electrical Main

...

...

...

...

...

...

190

19

0

190

19

0

Completed.

35

Ballyhaise Agricultural College—Alterations (Incubator House)

...

...

278

3

6

278

3

6

Completed.

41

Ballyhaise Agricultural College—Improvements in Superintendent’s Quarters

181

16

0

181

16

0

Completed.

27

Clonakilty Agricultural School—Electrical Installation

...

...

...

550

0

0

550

0

0

Completed.

94

Bovine T.B. Office, Cavan—Adaptations

...

...

...

...

...

...

300

0

0

300

0

0

In progress.

54

Bovine T.B. Office, Sligo—Heating

...

...

...

...

...

...

239

10

6

239

10

6

Completed.

1

Bovine T.B. Office, Tipperary—Adaptations

...

...

...

...

...

335

12

9

335

12

9

Completed.

 

Department of Transport and Power:

 

 

 

 

 

 

 

 

 

 

77/101 of 1962/63

Kildare Street—Partitioning

...

...

...

...

...

...

...

109

14

9

107

16

10

217

11

7

Completed.

23

Valentia Observatory—Improved Heating & Lighting, etc.

...

...

...

309

16

2

309

16

2

Completed.

 

Department of Industry and Commerce:

 

 

 

 

 

 

 

 

 

 

76

Kildare Street—Car Park

...

...

...

...

...

...

...

...

6

10

0

6

10

0

In progress.

84

Kildare Street—Improved Heating

...

...

...

...

...

...

175

11

10

175

11

10

In progress.

77/60 of 1962/63

Patents Office—Improvements

...

...

...

...

...

...

...

1,043

3

5

14

2

0

1,057

5

5

Completed.

2

Patents Office—Improved Toilet Facilities

...

...

...

...

...

604

5

3

604

5

3

Completed.

105

Labour Court—Conference Rooms

...

...

...

...

...

...

...

516

0

8

516

0

8

In progress.

 

Department of Posts and Telegraphs:

 

 

 

 

 

 

 

 

 

 

25

General Post Office, Dublin—Signposting

...

...

...

...

...

142

6

0

142

6

0

Completed.

89

General Post Office, Dublin—Floor Covering (Electrical Workshops)

...

482

16

0

482

16

0

Completed.

38

St. John’s Road Depot—Improvements (Telephone & Switchboard Shops)

...

162

18

1

162

18

1

In progress.

78

St. John’s Road Depot—Store

...

...

...

...

...

...

...

231

18

9

231

18

9

Completed.

91

Clones P.O.—Improvements

...

...

...

...

...

...

...

148

0

0

148

0

0

Completed.

90/8 of 1960/61

Harold’s Cross P.O.—Garage

...

...

...

...

...

...

...

51

4

4

514

3

0

565

7

4

Completed.

49

James’ Street P.O.—Alterations

...

...

...

...

...

...

...

941

15

6

941

15

6

In progress.

72

Kildare P.O. and Residence—Improvements

...

...

...

...

...

887

0

0

887

0

0

In progress.

75

Letterkenny P.O.—Improvements

...

...

...

...

...

...

198

0

0

198

0

0

In progress.

77/9 of 1961/62

Longford P.O.—Improvements

...

...

...

...

...

...

...

91

0

0

822

7

3

913

7

3

Completed.

31

Mullingar P.O.—Adaptations

...

...

...

...

...

...

...

825

0

0

825

0

0

Completed.

51

Naas P.O.—Storage

...

...

...

...

...

...

...

...

249

8

7

249

8

7

Completed.

77

Navan P.O.—Toilet facilities

...

...

...

...

...

...

...

187

16

0

187

16

0

Completed.

44

Thurles P.O.—Sorting Fittings

...

...

...

...

...

...

...

343

10

0

343

10

0

Completed.

 

Department of Defence:

 

 

 

 

 

 

 

 

 

 

77/28 of 1962/63

G.H.Q.—Adaptations (Strongroom)

...

...

...

...

...

...

1

17

6

224

7

8

226

5

2

Completed.

95

G.H.Q.—Storage

...

...

...

...

...

...

...

...

666

16

11

666

16

11

In progress.

 

Department of External Affairs:

 

 

 

 

 

 

 

 

 

 

77/91 of 1962/63

Headquarters—Improvement of Lighting

...

...

...

...

...

69

15

4

8

11

8

78

7

0

In progress.

 

Department of Social Welfare:

 

 

 

 

 

 

 

 

 

 

73

Áras Mhic Dhiarmada—Storage

...

...

...

...

...

...

...

222

3

9

222

3

9

In progress.

 

Employment Exchanges:

 

 

 

 

 

 

 

 

 

 

39

Dublin—Gardiner Street—Improved Lighting

...

...

...

...

...

876

13

9

876

13

9

Completed.

77/41 of 1962/63

Limerick—Improved Lighting

...

...

...

...

...

...

...

630

0

0

80

9

5

710

9

5

In progress.

 

Total

...

£32,872

10

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO. 73—URGENT AND UNFORESEEN WORKS.

Work
No.

Service and Description

Expenditure

Observations

1962-63

To 31/3/63

To 31/3/64

 

 

£

s.

d.

£

s.

d.

£

s.

d.

 

 

Department of Finance:

 

 

 

 

 

 

 

 

 

 

 

Office of Revenue Commissioners:

 

 

 

 

 

 

 

 

 

 

3

Dublin—Griffith Barracks—Adaptation at West Block

...

...

...

1,627

14

11

1,627

14

11

In progress.

6

Clondergole Customs Frontier Post—Erection

...

...

...

...

...

2,099

7

0

2,099

7

0

In progress.

 

Valuation Office:

 

 

 

 

 

 

 

 

 

 

5

Ordnance Survey Office—Additional Accommodation

...

...

...

...

645

7

0

645

7

0

In progress.

 

Department of Justice:

 

 

 

 

 

 

 

 

 

 

8

26/27 Upper Pembroke Street—Adaptations, etc.

...

...

...

...

157

7

11

157

7

11

In progress.

 

Department of Education:

 

 

 

 

 

 

 

 

 

 

2

Central Model Schools, Marlboro Street—Adaptations, etc.

...

...

...

6,382

1

8

6,382

1

8

In progress.

 

Department of Agriculture:

 

 

 

 

 

 

 

 

 

 

1

Bovine T.B. Office, Limerick—Improvements and Adaptations

...

...

544

13

2

544

13

2

In progress.

 

Total:

 

£11,456

11

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NO. 74—MINOR BALANCES OF EXPENDITURE.

Prior Year Work No.

Service and Description

Expenditure

Observations

1963-64

To 31/3/63

To 31/3/64

 

 

£

s.

d.

£

s.

d.

£

s.

d.

 

 

Department of an taoiseach:

 

 

 

 

 

 

 

 

 

 

4 of 1961/62

Central Statistics Office—Accommodation for Census of Population Staff

...

43

14

7

26,120

3

6

26,163

18

1

Completed.

 

Department of Finance:

 

 

 

 

 

 

 

 

 

 

5 of 1961/62

Busts and Portraits of National Leaders

...

...

...

...

...

1,457

3

0

4,145

3

0

5,602

6

0

Completed.

9 of 1961/62

Economic Research Institute (73 Lower Baggot Street)—Adaptations

...

273

19

0

8,053

14

9

8,327

13

9

Completed.

78 6 of 1962/63

Revenue Commissioners, 21 Parliament Street, Dublin—Adaptations for

 

 

 

 

 

 

 

 

 

 

 

Claims Branch

...

...

...

...

...

...

...

...

713

11

9

2,889

17

10

3,613

19

2

Completed.

9B of 1961/62

Office of Public Works—Adaptations at 50-51 St. Stephen’s Green

...

...

10

0

0

2,340

9

9

2,350

9

9

In progress.

18A of 1962/63

River Shannon—Bailey Bridge, Offaly

...

...

...

...

...

...

192

10

0

2,144

0

0

2,336

10

0

Completed.

 

Department of Justice:

 

 

 

 

 

 

 

 

 

 

83 3 of 1961/62

 

 

 

 

 

 

 

 

 

 

 

26 of 1962/63

Land Registry—Fire Precaution Works

...

...

...

...

...

...

1,060

16

1

3,791

12

6

4,852

8

7

Completed.

 

Department of Local Government:

 

 

 

 

 

 

 

 

 

 

78 1 of 1962/63

121 Baggot Street, Dublin—Adaptations, etc. for Road Transport Section

...

1,678

19

1

4,709

14

6

6,388

13

7

Completed.

 

Department of Agriculture:

 

 

 

 

 

 

 

 

 

 

44 of 1962/63

Johnstown Castle—Improvement of Water Supply

...

...

...

...

1,303

10

6

20,493

5

5

21,796

15

11

Completed.

40 (1) of 1962/63

Abbotstown Farm—Artificial Insemination Experimental Station

...

...

36

0

0

20,695

2

6

20,731

2

6

Completed.

42 (1) of 1962/63

Ballyhaise Agricultural School—Employees’ Cottages

...

...

...

...

393

1

2

13,923

8

10

14,316

10

0

Completed.

45 (2) of 1962/63

Munster Institute—Improved Accommodation

...

...

...

...

...

2,265

11

4

17,251

3

2

19,516

14

6

Completed.

 

Department of Industry and Commerce:

 

 

 

 

 

 

 

 

 

 

78 3 of 1962/63

1, 7 and 8 Mount Street Crescent—Adaptations, etc. for An Foras Tionscail

 

 

 

 

 

 

 

 

 

 

 

and the Industrial Development Authority

...

...

...

...

...

2,890

3

3

6,033

6

2

8,923

9

5

In progress.

78 4 of 1962/63

21 Fitzwilliam Square, Dublin—Adaptations, etc. for An Cheard Comhairle

...

2,706

7

9

5,301

6

8

8,007

14

5

In progress.

 

Department of Transport and Power:

 

 

 

 

 

 

 

 

 

 

50 of 1961/62

Valentia Observatory—Alterations and Additions

...

...

...

...

1,395

0

0

65,742

12

0

67,137

12

0

Completed.

 

Department of Posts and Telegraphs:

 

 

 

 

 

 

 

 

 

 

51 of 1962/63

Dublin—G.P.O. Arcade—Conversion of Shop to Office Accommodation

...

605

0

0

5,449

3

0

6,054

3

0

Completed.

55 of 1961/62

Bandon—New Post Office and Telephone Exchange

...

...

...

...

 

19

10

1,425

17

8

1,426

17

6

Completed.

57 of 1962/63

Killarney Post Office—Improvements

...

...

...

...

...

...

553

17

1

2,130

16

1

2,684

13

2

Completed.

60 of 1962/63

Sligo Post Office—Improvements

...

...

...

...

...

...

...

2,416

6

4

5,231

5

4

7,647

11

8

Completed.

63 of 1962/63

Wexford Post Office—Improvements

...

...

...

...

...

...

222

5

0

5,210

3

7

5,432

8

7

Completed.

57 of 1961/62

Droichead Nua Post Office and Telephone Exchange

...

...

...

...

178

4

0

15,849

6

7

16,027

10

7

In progress.

56 1 of 1956/57

G.P.O. Dining Club—Improvements

...

...

...

...

...

...

488

3

0

1,967

18

11

2,456

1

11

Completed.

 

Department of Defence:

 

 

 

 

 

 

 

 

 

 

74 of 1961/62

Haulbowline—New Watermain

...

...

...

...

...

...

...

20

5

8

10,593

19

11

10,614

5

7

Completed.

69 of 1962/63

Arbour Hill—Detention Prison—Memorial to 1916 Leaders

...

...

...

528

0

0

25,827

0

3

26,355

0

3

Completed.

 

Department of Social Welfare:

 

 

 

 

 

 

 

 

 

 

75 of 1962/63

Tralee—New Employment Exchange

...

...

...

...

...

...

36

0

0

40,856

18

0

40,892

18

0

Completed.

 

Department of Health:

 

 

 

 

 

 

 

 

 

 

76 (1) of 1962/63

Central Mental Hospital, Dundrum—Fire Prevention and Control

...

...

1,782

8

3

4,968

13

8

6,751

1

11

Completed.

 

Total:

...

£23,251

16

8