APPENDIX IX.
STATEMENT OF EXPENDITURE ON NEW WORKS, ALTERATIONS AND ADDITIONS 1959-60 (VOTE 9, SUBHEAD B.).
Work No. |
Service and Description |
Total Estimate |
Vote 1959-60 |
Expenditure |
Observations |
1959-60 |
To 31/3/59 |
To 31/3/60 |
|
|
£ |
£ |
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
President’s Establishment: |
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Áras an Uachtaráin—Improvement of Planthouse |
|
|
|
|
|
|
|
|
|
|
|
|
|
Accommodation |
... |
... |
... |
... |
... |
... |
... |
... |
5,200 |
5,200 |
250 |
0 |
0 |
12 |
5 |
11 |
262 |
5 |
11 |
In planning. |
|
Oireachtas: |
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Leinster House—Reconstruction of Loggias |
... |
... |
17,700 |
4,200 |
2,169 |
6 |
2 |
11,178 |
11 |
9 |
13,347 |
17 |
11 |
Completed. |
|
Department of the Taoiseach: |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
State Apartments—Restoration of Burnt-out Drawing |
|
|
|
|
|
|
|
|
|
|
|
|
|
Rooms |
... |
... |
... |
... |
... |
... |
... |
104,000 |
500 |
26 |
11 |
0 |
5,167 |
13 |
0 |
5,194 |
4 |
0 |
Restoration work in planning. |
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Busts and Portraits of National Leaders |
... |
... |
... |
4,500 |
1,500 |
921 |
11 |
1 |
319 |
1 |
10 |
1,240 |
12 |
11 |
Proceeding. |
|
Government Buildings, North Block: |
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Improvement of Passenger Lift |
... |
... |
... |
... |
1,200 |
1,100 |
— |
— |
— |
In progress. |
6 |
Covering of Corridors and Stairs with Linoleum |
... |
... |
3,200 |
3,200 |
— |
— |
— |
In planning. |
|
Office of Public Works: |
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Central Engineering Workshop and Stores |
... |
... |
63,900 |
3,950 |
2,379 |
16 |
0 |
26,305 |
10 |
7 |
28,685 |
6 |
7 |
In progress. |
8 |
New Central Furniture Storesand Workshops—Adaptations |
25,000 |
13,000 |
11,013 |
8 |
10 |
8,144 |
5 |
8 |
19,157 |
14 |
6 |
In progress |
8a |
Temporary Bailey Bridges over River Shannon |
... |
... |
— |
— |
6,575 |
15 |
1 |
— |
6,575 |
15 |
1 |
Erection completed. |
9 |
Ordnance Survey Office—Improvement of Lighting |
... |
3,000 |
3,000 |
2,170 |
11 |
6 |
— |
2,170 |
11 |
6 |
In progress. |
10 |
Ordnance Survey Office—Fundamental Bench marks |
... |
3,100 |
1,200 |
859 |
15 |
3 |
1,671 |
4 |
7 |
2,530 |
19 |
10 |
In progress. |
11 |
State Buildings, Upper Merrion Street—Kildare Street: |
|
|
|
|
|
|
|
|
|
|
|
|
|
New Electrical Distribution System |
... |
... |
... |
5,000 |
5,000 |
— |
— |
— |
In planning. |
12 |
Stationery Office—Improvement of Electrical Installation |
1,000 |
800 |
— |
185 |
14 |
6 |
185 |
14 |
6 |
In planning. |
13 |
Stationery Office—Improvement of Heating |
... |
... |
2,800 |
2,700 |
— |
— |
— |
In progress. |
14 |
Revenue Commissioners, Dublin Castle—Rebuilding of |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cross Block |
... |
... |
... |
... |
... |
... |
85,000 |
500 |
1,739 |
13 |
7 |
— |
1,739 |
13 |
7 |
Rebuilding works in planning. |
14a |
Revenue Commissioners, 73 Harcourt Street (Income Tax |
|
|
|
|
|
|
|
|
|
|
|
|
|
Commission) |
... |
... |
... |
... |
... |
... |
... |
— |
— |
85 |
13 |
5 |
— |
85 |
13 |
5 |
In progress. |
15 |
Revenue Commissioners, Stamping Branch—New Premises |
360,000 |
20,000 |
394 |
1 |
10 |
1,837 |
18 |
1 |
2,231 |
19 |
11 |
In planning. |
16 |
Carrickcarnan Customs Frontier Post—Office and Residence |
10,500 |
3,000 |
11 |
11 |
6 |
100 |
0 |
0 |
111 |
11 |
6 |
Deferred. |
|
Parks: |
|
|
|
|
|
|
|
|
|
|
|
|
17 |
Phoenix Park—Improvement of Water Supply |
... |
... |
25,000 |
5,000 |
— |
— |
— |
In planning. |
18 |
Rotunda Gardens—Garden of Remembrance |
... |
... |
40,000 |
5,000 |
722 |
11 |
6 |
1,720 |
1 |
8 |
2,442 |
13 |
2 |
Awaiting report on Bill of Quantities. |
|
Harbours: |
|
|
|
|
|
|
|
|
|
|
|
|
19 |
Buncrana Harbour—Improvements |
... |
... |
... |
1,050 |
250 |
— |
942 |
5 |
10 |
942 |
5 |
10 |
Completed. |
20 |
Dún Laoghaire Harbour, MailBoat Pier—Improvements |
... |
Not yet made |
26,000 |
20,206 |
5 |
7 |
33,329 |
19 |
5 |
53,536 |
5 |
0 |
In progress. |
|
|
|
95,200 |
47,080 |
15 |
2 |
|
|
|
|
|
|
|
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Abbotstown Farm: |
|
|
|
|
|
|
|
|
|
|
|
|
21 (1) |
Artificial Insemination Experimental Station |
... |
... |
21,000 |
10,000 |
6,937 |
10 |
11 |
— |
6,937 |
10 |
11 |
In progress. |
21 (2) |
Experimental Animals Farmyard |
... |
... |
... |
... |
41,000 |
5,000 |
996 |
2 |
10 |
8,780 |
15 |
9 |
9,776 |
18 |
7 |
Stage II in planning. |
21 (3) |
Foundation Stock Farmyard |
... |
... |
... |
... |
56,000 |
1,000 |
557 |
9 |
2 |
14,546 |
5 |
7 |
15,103 |
14 |
9 |
Stage II in plannin |
21 (4) |
Overhaul of Boundary Walls |
... |
... |
... |
... |
12,000 |
3,000 |
4,255 |
13 |
7 |
8,755 |
16 |
3 |
13,011 |
9 |
10 |
Completed. |
21 (5) |
Residence for Director |
... |
... |
... |
... |
... |
5,000 |
500 |
426 |
0 |
3 |
45 |
14 |
10 |
471 |
15 |
1 |
In planning. |
21 (6) |
Residence for Farm Manager |
... |
... |
... |
... |
... |
3,500 |
500 |
— |
— |
— |
In planning. |
|
Ballyhaise Agricultural School: |
|
|
|
|
|
|
|
|
|
|
|
|
22 (1) |
Additional accommodation for calves |
... |
... |
... |
2,000 |
1,800 |
1,660 |
12 |
10 |
|
3 |
0 |
1,660 |
15 |
10 |
Completed. |
22 (2) |
Bull Boxes |
... |
... |
... |
... |
... |
... |
... |
3,000 |
1,000 |
— |
11 |
13 |
1 |
11 |
13 |
1 |
Abandoned. |
22 (3) |
Employee’s Cottages |
... |
... |
... |
... |
... |
... |
14,000 |
7,600 |
8 |
16 |
8 |
— |
8 |
16 |
8 |
In progress. |
22 (4) |
Improvement of Water Supply |
... |
... |
... |
... |
900 |
900 |
474 |
14 |
6 |
— |
474 |
14 |
6 |
Completed. |
23 |
Chantilly Veterinary Field Station—Adaptations |
... |
... |
3,400 |
1,750 |
— |
1,664 |
8 |
10 |
1,664 |
8 |
10 |
Stage II in planning |
|
Clonakilty Agricultural School: |
|
|
|
|
|
|
|
|
|
|
|
|
24 (1) |
Fire Precaution Works |
... |
... |
... |
... |
... |
... |
1,000 |
1,000 |
630 |
1 |
11 |
— |
630 |
1 |
11 |
Completed. |
24 (2) |
Lunch Room and Sanitary Accommodation for Farm |
|
|
|
|
|
|
|
|
|
|
|
|
|
Workers |
... |
... |
... |
... |
... |
... |
... |
1,000 |
1,000 |
903 |
13 |
0 |
— |
903 |
13 |
|
Completed. |
24 (3) |
New Buildings |
... |
... |
... |
... |
... |
... |
... |
110,000 |
10,000 |
— |
— |
— |
In planning. |
|
Grange Farm: |
|
|
|
|
|
|
|
|
|
|
|
|
25 (1) |
Additional accommodation for Livestock (Stage I) |
... |
6,500 |
5,000 |
900 |
0 |
0 |
— |
900 |
0 |
0 |
In progress. |
25 (2) |
Lunch Room and Sanitary accommodation for Farm |
|
|
|
|
|
|
|
|
|
|
|
|
|
Workers |
... |
... |
... |
... |
... |
... |
... |
1,700 |
1,700 |
— |
— |
— |
Abandoned. |
|
Johnstown Castle: |
|
|
|
|
|
|
|
|
|
|
|
|
26 (1) |
Adaptations and Furnishing |
... |
... |
... |
... |
... |
206,950 |
2,000 |
1,973 |
18 |
10 |
201,625 |
13 |
8 |
203,599 |
12 |
6 |
Stage III in progress. |
26 (2) |
New Workshop |
... |
... |
... |
... |
... |
... |
... |
1,000 |
1,000 |
— |
— |
— |
In progress. |
26 (3) |
Improvement of Water Supply |
... |
... |
... |
... |
16,500 |
9,000 |
477 |
0 |
0 |
— |
477 |
0 |
0 |
In planning. |
26 (4) |
Lunchroom and Sanitary Accommodation for Farm |
|
|
|
|
|
|
|
|
|
|
|
|
|
Workers |
... |
... |
... |
... |
... |
... |
... |
2,750 |
1,500 |
697 |
5 |
6 |
1,407 |
6 |
5 |
2,104 |
11 |
11 |
Completed. |
|
Munster Institute: |
|
|
|
|
|
|
|
|
|
|
|
|
27 (1) |
Improved Accommodation |
... |
... |
... |
... |
... |
20,000 |
18,000 |
243 |
13 |
4 |
903 |
10 |
4 |
1,147 |
3 |
8 |
In planning. |
27 (2) |
New Poultry Plant |
... |
... |
... |
... |
... |
... |
98,500 |
8,000 |
8,899 |
16 |
11 |
1,334 |
18 |
3 |
10,234 |
15 |
2 |
In progress. |
|
|
|
£91,250 |
£30,042 |
10 |
3 |
|
|
|
|
|
|
|
|
Department of Justice: |
|
|
|
|
|
|
|
|
|
|
|
|
28 |
Land Registry—Improvements |
... |
... |
... |
... |
7,500 |
250 |
— |
6,308 |
17 |
8 |
6,308 |
17 |
8 |
In progress. |
29 |
Courts of Justice—Renewal of Defective Stonework |
... |
55,000 |
5,000 |
— |
— |
— |
In planning. |
|
Garda Síochána Depot: |
|
|
|
|
|
|
|
|
|
|
|
|
30 |
Extension of Garage and Workshop Accommodation |
... |
46,000 |
2,000 |
— |
— |
— |
In planning. |
31 |
Improvement of Electrical Installation |
... |
... |
... |
3,750 |
600 |
— |
3,220 |
4 |
0 |
3,220 |
4 |
0 |
Further works under considertion. |
32 |
New Works, Alterations and Additions at specified Garda |
|
|
|
|
|
|
|
|
|
|
|
|
|
Stations |
... |
... |
... |
... |
... |
... |
... |
|
53,000 |
14,757 |
16 |
10 |
— |
— |
Details below. |
33 |
New Works, Alterations and Additions at other Garda |
|
|
|
|
|
|
|
|
|
|
|
|
|
Stations |
... |
... |
... |
... |
... |
... |
... |
2,000 |
2,000 |
5,304 |
4 |
2 |
— |
— |
Details below. |
34 |
Minor New Works at Garda Stations |
... |
... |
... |
11,000 |
11,000 |
7,579 |
7 |
9 |
— |
— |
Details below. |
|
|
|
£73,850 |
£27,641 |
8 |
9 |
|
|
|
|
|
|
|
|
Department of Local Government: |
|
|
|
|
|
|
|
|
|
|
|
|
35 |
Dublin Custom House—Improvement of Heating |
... |
1,250 |
1,250 |
2,145 |
2 |
0 |
— |
2,145 |
2 |
0 |
In progress. |
|
|
|
£1,250 |
£2,145 |
2 |
0 |
|
|
|
|
|
|
|
|
Department of Education: |
|
|
|
|
|
|
|
|
|
|
|
|
36 |
Headquarters Offices—Improvement of Heating |
... |
... |
1,200 |
1,200 |
— |
— |
— |
In planning. |
37 |
Central Model Schools, Dublin—Provision of Electric |
|
|
|
|
|
|
|
|
|
|
|
|
|
Lighting and Improvement of Heating |
... |
... |
... |
2,150 |
1,150 |
2,175 |
4 |
1 |
— |
2,175 |
4 |
1 |
Completed. |
38 |
National Schools—Grants for Building, Enlarging, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Enclosing,etc. |
... |
... |
... |
... |
... |
... |
1,600,000 |
1,600,000 |
1,543,300 |
8 |
3 |
— |
— |
|
|
Preparatory Colleges: |
|
|
|
|
|
|
|
|
|
|
|
|
39 |
Coláiste Brighde—Fire Precaution Works |
... |
... |
... |
7,000 |
2,320 |
809 |
18 |
4 |
4,063 |
16 |
5 |
4,873 |
14 |
9 |
Mainly completed. |
40 |
Coláiste Íosagáin—Improvements |
... |
... |
... |
... |
43,000 |
8,000 |
2,936 |
17 |
1 |
32,010 |
2 |
7 |
34,946 |
19 |
8 |
Completed. |
|
Institutions of Science and Art: |
|
|
|
|
|
|
|
|
|
|
|
|
41 |
National Library—Improvement of Book Lift |
... |
... |
800 |
700 |
— |
— |
— |
In progress. |
42 |
National Library and National Museum—Renewal of |
|
|
|
|
|
|
|
|
|
|
|
|
|
Defective Stonework—Stages I and II |
... |
... |
... |
53,000 |
5,000 |
750 |
0 |
0 |
22,247 |
16 |
4 |
22,997 |
16 |
4 |
Stage II in progress. |
|
Reformatory and Industrial Schools: |
|
|
|
|
|
|
|
|
|
|
|
|
43 |
Dublin Place of Detention—New Premises |
... |
... |
72,000 |
2,500 |
— |
— |
— |
In planning. |
|
|
|
£1,620,870 |
£1,549,972 |
7 |
9 |
|
|
|
|
|
|
|
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
|
|
44 |
24 Upper Merrion Street—Improvement of Electrical |
|
|
|
|
|
|
|
|
|
|
|
|
|
Installation |
... |
... |
... |
... |
... |
... |
... |
1,500 |
1,500 |
— |
— |
— |
In planning. |
|
Forestry Division: |
|
|
|
|
|
|
|
|
|
|
|
|
45 |
Kinnitty Castle Training Centre—Additional |
|
|
|
|
|
|
|
|
|
|
|
|
|
Accommodation for Trainees |
... |
... |
... |
... |
... |
... |
4,000 |
4,000 |
— |
173 |
1 |
5 |
173 |
1 |
5 |
In planning. |
|
Fisheries Division: |
|
|
|
|
|
|
|
|
|
|
|
|
46 |
Glenties Fish Hatchery—New Residence for Manager |
... |
2,450 |
2,000 |
— |
— |
— |
In planning. |
|
Fishery Harbours: |
|
|
|
|
|
|
|
|
|
|
|
|
47 |
Works of Economic Development |
... |
... |
... |
... |
4,600 |
4,600 |
210 |
6 |
11 |
400 |
0 |
0 |
610 |
6 |
11 |
Dunnycove, Co. Cork— Completed. |
|
|
|
|
186 |
9 |
1 |
5,039 |
8 |
3 |
5,225 |
17 |
4 |
Magheraroarty, Co. Donegal— Completed. |
|
|
|
|
31 |
2 |
0 |
— |
31 |
2 |
0 |
Sundry |
47a |
Fishery Harbours Development |
... |
... |
... |
... |
— |
— |
19 |
3 |
11 |
— |
19 |
3 |
11 |
Killybegs Harbour. |
48 |
Surveys, etc. |
... |
... |
... |
... |
... |
... |
... |
Not yet made |
5,000 |
876 |
4 |
4 |
3,022 |
3 |
4 |
3,898 |
7 |
8 |
In progress. |
|
|
|
£17,100 |
£1,323 |
6 |
3 |
|
|
|
|
|
|
|
|
Department of Industry and Commerce: |
|
|
|
|
|
|
|
|
|
|
|
|
49 |
Valentia Observatory—Alterations and Additions |
... |
... |
48,000 |
10,000 |
2,495 |
2 |
10 |
32,691 |
0 |
1 |
35,186 |
2 |
11 |
In progess. |
49a |
Headquarters Office, Kildare Street |
... |
... |
... |
— |
— |
333 |
0 |
0 |
— |
333 |
0 |
0 |
Completed. |
|
|
|
£10,000 |
£2,828 |
2 |
10 |
|
|
|
|
|
|
|
|
Department of Posts and Telegraphs: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Dublin: |
|
|
|
|
|
|
|
|
|
|
|
|
50 |
New Central Sorting Office |
... |
... |
... |
... |
... |
600,000 |
2,000 |
— |
829 |
7 |
6 |
829 |
7 |
6 |
In planning. |
51 |
New District Sorting Office, Churchtown |
... |
... |
... |
17,500 |
15,700 |
11,454 |
5 |
11 |
278 |
0 |
0 |
11,732 |
5 |
11 |
Mainly completed. |
52 |
New District Sorting Office, Crumlin |
... |
... |
... |
27,000 |
22,500 |
24,329 |
16 |
8 |
752 |
15 |
7 |
25,082 |
12 |
3 |
Completed. |
53 |
Infirmary Road Depot—Replacement of Goods Lift |
... |
2,000 |
1,000 |
— |
— |
— |
In planning. |
53a |
Bantry Post Office—Improvements |
... |
... |
... |
— |
— |
3 |
10 |
6 |
— |
3 |
10 |
6 |
Tendersinvited. |
54 |
Bray Post Office—Improvements |
... |
... |
... |
2,250 |
1,200 |
1,692 |
9 |
6 |
252 |
17 |
6 |
1,945 |
7 |
0 |
Completed. |
55 |
Carrick-on-Shannon Post Office—Improvements |
... |
14,000 |
300 |
3 |
3 |
0 |
— |
3 |
3 |
0 |
In planning. |
56 |
Droichead Nua, New Post Office and Telephone Exchange |
... |
15,750 |
12,800 |
8,083 |
8 |
7 |
414 |
1 |
6 |
8,497 |
10 |
1 |
In progress |
57 |
Ennis Post Office—Improvements and New Telephone |
|
|
|
|
|
|
|
|
|
|
|
|
|
Exchange |
... |
... |
... |
... |
... |
... |
... |
8,500 |
500 |
— |
— |
— |
In planning. |
58 |
Galway, New Post Office and Telephone Exchange |
... |
55,000 |
12,500 |
11,865 |
2 |
0 |
33,672 |
11 |
2 |
45,537 |
13 |
2 |
In progress. |
59 |
Letterkenny, New Post Office and Telephone Exchange |
... |
32,400 |
13,100 |
10,938 |
6 |
9 |
17,629 |
7 |
11 |
28,567 |
14 |
8 |
Completed. |
60 |
Loughrea Post Office—Adaptations |
... |
... |
... |
... |
9,600 |
440 |
2,127 |
7 |
0 |
8,666 |
0 |
1 |
10,793 |
7 |
1 |
Completed. |
61 |
Wicklow, New Post Office and Telephone Exchange |
... |
26,500 |
1,000 |
— |
— |
— |
In planning. |
62 |
Post Offices, General—Supply of Steel Counter Fittings |
... |
3,650 |
3,650 |
— |
— |
— |
Underconsideration. |
|
|
|
£86,690 |
£70,497 |
9 |
11 |
|
|
|
|
|
|
|
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
|
|
63 |
Dublin, Cathal Brugha Barracks—Dining Hall and |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cookhouse |
... |
... |
... |
... |
... |
... |
... |
... |
47,000 |
5,000 |
— |
— |
— |
In planning. |
|
Baldonnel Aerodrome: |
|
|
|
|
|
|
|
|
|
|
|
|
64 |
Hangar Gates |
... |
... |
... |
... |
... |
... |
... |
32,000 |
12,000 |
10,987 |
17 |
7 |
18,376 |
2 |
4 |
29,363 |
19 |
11 |
In progress. |
65 |
Hard Surface Runways |
... |
... |
... |
... |
... |
459,000 |
2,000 |
1,396 |
4 |
3 |
456,671 |
8 |
3 |
458,067 |
12 |
6 |
Completed. |
|
Curragh Camp: |
|
|
|
|
|
|
|
|
|
|
|
|
66 |
New Catholic Church |
... |
... |
... |
... |
... |
122,000 |
17,000 |
10,701 |
0 |
3 |
106,575 |
16 |
7 |
117,276 |
16 |
10 |
Completed. |
67 |
Plunkett Barracks—Dining Hall and Cookhouse |
... |
... |
65,000 |
42,000 |
27,557 |
5 |
6 |
16,120 |
12 |
2 |
43,677 |
17 |
8 |
In progress. |
68 |
Haulbowline Dockyard—New Ordnance Pier |
... |
... |
16,000 |
10,000 |
12,185 |
10 |
1 |
4,655 |
12 |
2 |
16,841 |
2 |
3 |
In progress. |
69 |
Arbour HillDetention Prison—Memorial to 1916 Leaders |
29,000 |
2,000 |
313 |
18 |
9 |
22,946 |
1 |
2 |
23,259 |
19 |
11 |
In progress. |
|
|
|
£90,000 |
£63,141 |
16 |
5 |
|
|
|
|
|
|
|
|
Department of Social Welfare: |
|
|
|
|
|
|
|
|
|
|
|
|
70 |
Cavan, New Employment Exchange |
... |
... |
... |
13,000 |
5,000 |
4,632 |
3 |
1 |
7,415 |
8 |
1 |
12,047 |
11 |
2 |
Completed. |
71 |
Tralee, New Employment Exchange |
... |
... |
... |
34,000 |
16,000 |
5,427 |
18 |
9 |
17 |
18 |
2 |
5,445 |
16 |
11 |
In progress. |
|
|
|
£21,000 |
£10,060 |
1 |
10 |
|
|
|
|
|
|
|
|
Department of Health: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Dundrum Asylum: |
|
|
|
|
|
|
|
|
|
|
|
|
72(1) |
Alterations and Additions |
... |
... |
... |
... |
... |
28,000 |
1,400 |
925 |
3 |
8 |
29,719 |
5 |
0 |
30,644 |
8 |
8 |
Completed. |
72(2) |
Fire Prevention and Control |
... |
... |
... |
... |
... |
5,050 |
3,000 |
1,641 |
16 |
4 |
— |
1,641 |
16 |
4 |
In progress. |
72(3) |
New Water Main |
... |
... |
... |
... |
... |
... |
3,600 |
3,400 |
2,555 |
6 |
6 |
— |
2,555 |
6 |
6 |
In progress. |
|
|
|
£7,800 |
£5,122 |
6 |
6 |
|
|
|
|
|
|
|
|
General: |
|
|
|
|
|
|
|
|
|
|
|
|
73 |
Minor New Works not exceeding £700 each |
... |
... |
20,000 |
20,000 |
17,118 |
14 |
0 |
— |
— |
Details below. |
74 |
Urgent and Unforeseen Works |
... |
... |
... |
... |
5,000 |
5,000 |
4,550 |
2 |
6 |
— |
— |
Details below. |
75 |
Minor Balances of Expenditure (not provided for above) on works of prior years which may not be completed on |
|
|
|
|
|
|
|
|
|
|
|
|
|
1st April, 1960 |
... |
... |
... |
... |
... |
... |
25,000 |
25,000 |
14,305 |
11 |
1 |
— |
— |
Details below. |
|
Grand Total |
... |
... |
|
£2,174,910 |
|
|
|
|
|
|
|
|
|
|
|
Deduct for works which may not be carried out during the |
|
|
|
|
|
|
|
|
|
|
|
|
|
year |
... |
... |
... |
... |
... |
... |
... |
... |
|
64,910 |
|
|
|
|
|
|
|
|
|
|
|
NET TOTAL |
... |
... |
|
£2,110,000 |
£1,848,275 |
12 |
5 |
|
|
|
|
|
|
|
32 |
NEW WORKS, ALTERATIONS AND ADDITIONS AT SPECIFIED GARDA STATIONS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Dublin Metropolitan Area: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Áras an Uachtaráin—Police Huts |
... |
... |
... |
... |
1,800 |
1,800 |
11 |
11 |
8 |
— |
11 |
11 |
8 |
In progress. |
|
Co. Cork: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Kinsale—New Station |
... |
... |
... |
... |
... |
4,500 |
300 |
— |
— |
— |
In planning. |
|
Inchigeela—Improvements |
... |
... |
... |
... |
... |
850 |
850 |
— |
— |
— |
In planning. |
|
Co. Donegal: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Glencolmcille—Improvements |
... |
... |
... |
... |
1,750 |
1,750 |
— |
— |
— |
In planning. |
|
Co. Dublin: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Blanchardstown—Improvements |
... |
... |
... |
... |
1,200 |
950 |
728 |
19 |
7 |
400 |
0 |
0 |
1,128 |
19 |
7 |
Completed. |
|
Clondalkin—New Station |
... |
... |
... |
... |
... |
10,000 |
500 |
— |
— |
— |
In planning. |
|
Howth—Alterations |
... |
... |
... |
... |
... |
... |
800 |
800 |
806 |
18 |
5 |
— |
806 |
18 |
5 |
Completed. |
|
Tallaght—Improvements |
... |
... |
... |
... |
... |
1,500 |
1,400 |
1,254 |
9 |
6 |
— |
1,254 |
9 |
6 |
Completed. |
|
Co. Galway: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Athenry—New District Headquarters |
... |
... |
... |
12,600 |
11,500 |
10,014 |
12 |
8 |
2,119 |
17 |
1 |
12,134 |
9 |
9 |
Completed. |
|
Leenane—Improvements |
... |
... |
... |
... |
... |
1,550 |
1,500 |
12 |
18 |
8 |
— |
12 |
18 |
8 |
In planning. |
|
Co. Leitrim: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cloone—New Station |
... |
... |
... |
... |
... |
... |
7,000 |
6,000 |
— |
247 |
0 |
0 |
247 |
0 |
0 |
In planning. |
|
Co. Louth: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Drogheda—Improvements |
... |
... |
... |
... |
... |
2,500 |
2,350 |
1,360 |
8 |
3 |
— |
1,360 |
8 |
3 |
In progress. |
|
Co. Roscommon: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Roscommon—New Divisional Headquarters |
... |
... |
24,000 |
6,000 |
— |
— |
— |
In planning. |
|
Co. Sligo: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Ballinafad—New Station |
... |
... |
... |
... |
... |
6,500 |
2,000 |
— |
— |
— |
In planning. |
|
Collooney—New Station |
... |
... |
... |
... |
... |
7,000 |
6,000 |
— |
— |
— |
In planning. |
|
Co. Tipperary: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Cahir—Improvements |
... |
... |
... |
... |
... |
... |
2,200 |
2,100 |
553 |
2 |
0 |
— |
553 |
2 |
0 |
In progress. |
|
Grangemockler—New Station |
... |
... |
... |
... |
... |
6,700 |
6,400 |
14 |
16 |
1 |
4 |
6 |
3 |
19 |
2 |
4 |
In planning. |
|
Co. Wexford: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Glynn—New Station |
... |
... |
... |
... |
... |
7,000 |
500 |
— |
3 |
0 |
0 |
3 |
0 |
0 |
In planning. |
|
Co. Wicklow: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Greystones—Improvements |
... |
... |
... |
... |
... |
850 |
300 |
— |
— |
— |
In planning. |
|
|
£100,300 |
£53,000 |
£14,757 |
16 |
10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Work No. |
Service and Description |
Expenditure |
Observations |
1959-60 |
to 31/3/59 |
to 31/3/60 |
|
|
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
33 |
NEW WORKS, ETC., AT OTHER GARDA STATIONS: |
|
|
|
|
|
|
|
|
|
|
|
Co. Donegal: |
|
|
|
|
|
|
|
|
|
|
|
Kilmacrennan—New Station |
... |
... |
... |
... |
... |
... |
1,049 |
5 |
0 |
5,862 |
10 |
0 |
6,911 |
15 |
8 |
Completed. |
|
Carrigart—New Station |
... |
... |
... |
... |
... |
... |
... |
569 |
11 |
0 |
6,268 |
0 |
7 |
6,837 |
11 |
7 |
Completed. |
|
Pettigo—New Station |
... |
... |
... |
... |
... |
... |
... |
390 |
0 |
0 |
7,868 |
9 |
3 |
8,258 |
9 |
3 |
Completed. |
|
Co. Galway: |
|
|
|
|
|
|
|
|
|
|
|
Carna—New Station |
... |
... |
... |
... |
... |
... |
... |
1,726 |
14 |
10 |
7,479 |
3 |
1 |
9,205 |
17 |
11 |
Completed. |
|
Co. Kildare: |
|
|
|
|
|
|
|
|
|
|
|
Kildare—Improvements |
... |
... |
... |
... |
... |
... |
... |
45 |
0 |
0 |
1,439 |
8 |
10 |
1,484 |
8 |
10 |
Completed. |
|
Co. Monaghan: |
|
|
|
|
|
|
|
|
|
|
|
Newbliss—New Station |
... |
... |
... |
... |
... |
... |
... |
799 |
17 |
10 |
5,438 |
13 |
1 |
6,238 |
10 |
11 |
Completed. |
|
Offaly: |
|
|
|
|
|
|
|
|
|
|
|
Moneygall—Improvements |
... |
... |
... |
... |
... |
... |
144 |
3 |
0 |
666 |
17 |
10 |
811 |
0 |
10 |
Completed. |
|
Co. Sligo: |
|
|
|
|
|
|
|
|
|
|
|
Riverstown—Improvements |
... |
... |
... |
... |
... |
... |
579 |
12 |
6 |
— |
579 |
12 |
6 |
Completed. |
|
|
£5,304 |
4 |
2 |
|
|
|
|
|
|
|
|
MINOR NEW WORKS AT GARDA STATIONS: |
|
|
|
|
|
|
|
|
|
|
34 |
Co. Carlow: |
|
|
|
|
|
|
|
|
|
|
17 |
Leighlinbridge—New water supply |
... |
... |
... |
... |
... |
... |
444 |
6 |
4 |
— |
444 |
6 |
4 |
Completed. |
|
Co. Cork: |
|
|
|
|
|
|
|
|
|
|
33/59 |
MacCurtain Street, Cork—Improvements |
... |
... |
... |
... |
446 |
7 |
7 |
28 |
13 |
3 |
475 |
0 |
10 |
Completed. |
14 |
Boherbue—Improvements |
... |
... |
... |
... |
... |
... |
... |
425 |
0 |
0 |
— |
425 |
0 |
0 |
Completed. |
40/17 of 57/8 |
Buttevant—Improvements |
... |
... |
... |
... |
... |
... |
219 |
0 |
0 |
— |
219 |
0 |
0 |
Completed. |
10 |
Watergrasshill—Out-offices, etc. |
... |
... |
... |
... |
... |
510 |
5 |
0 |
— |
510 |
5 |
0 |
Completed. |
1 |
Bridewell, Cork—Alterations |
... |
... |
... |
... |
... |
... |
458 |
5 |
0 |
— |
458 |
5 |
0 |
Completed. |
42 |
Union Quay, Cork—Cubicles |
... |
... |
... |
... |
... |
... |
197 |
6 |
10 |
— |
197 |
6 |
10 |
Completed. |
|
Co. Donegal: |
|
|
|
|
|
|
|
|
|
|
7 |
Letterfrack—Improvements |
... |
... |
... |
... |
... |
... |
3 |
6 |
11 |
— |
3 |
6 |
11 |
In progress. |
6 |
Dunkineely—Improvements |
... |
... |
... |
... |
... |
... |
193 |
15 |
3 |
— |
193 |
15 |
3 |
Completed. |
|
Co. Dublin: |
|
|
|
|
|
|
|
|
|
|
33/44 |
College Street—Alterations |
... |
... |
... |
... |
... |
... |
66 |
0 |
0 |
594 |
1 |
3 |
660 |
1 |
3 |
Completed. |
33/50 |
Bridewell—Accommodation |
... |
... |
... |
... |
... |
... |
82 |
5 |
7 |
270 |
16 |
1 |
353 |
1 |
8 |
Completed. |
33/53 |
Mountjoy—Accommodation |
... |
... |
... |
... |
... |
... |
5 |
11 |
9 |
94 |
6 |
10 |
99 |
18 |
7 |
Completed. |
33/32 |
Store Street—Improvements |
... |
... |
... |
... |
... |
... |
16 |
3 |
10 |
537 |
16 |
9 |
554 |
0 |
7 |
Completed. |
21 |
Carriage Department—Improvements |
... |
... |
... |
... |
... |
154 |
16 |
4 |
— |
154 |
16 |
4 |
Completed. |
29 |
Chapelizod—Shed |
... |
... |
... |
... |
... |
... |
... |
... |
92 |
2 |
5 |
— |
92 |
2 |
5 |
Completed. |
41 |
College Street—Improvements |
... |
... |
... |
... |
... |
... |
167 |
0 |
2 |
— |
167 |
0 |
2 |
Completed. |
59 |
College Street—Additional Heating |
... |
... |
... |
... |
... |
147 |
12 |
5 |
— |
147 |
12 |
5 |
Completed. |
53 |
Dublin Castle—Improvements |
... |
... |
... |
... |
... |
... |
33 |
0 |
7 |
— |
33 |
0 |
7 |
In progress. |
|
Co. Galway: |
|
|
|
|
|
|
|
|
|
|
22 |
Mountbellew—Improvements |
... |
... |
... |
... |
... |
... |
456 |
3 |
4 |
— |
456 |
3 |
4 |
Completed. |
|
Co. Kilkenny: |
|
|
|
|
|
|
|
|
|
|
24 |
Innistioge—Water |
... |
... |
... |
... |
... |
... |
... |
... |
177 |
17 |
6 |
— |
177 |
17 |
6 |
Completed. |
|
Co. Limerick: |
|
|
|
|
|
|
|
|
|
|
33/22 |
Pallaskenry—Improvements |
... |
... |
... |
... |
... |
... |
12 |
2 |
6 |
350 |
0 |
0 |
362 |
2 |
6 |
Completed. |
33/24 |
Ballylanders—Improvements |
... |
... |
... |
... |
... |
... |
65 |
0 |
0 |
75 |
0 |
0 |
140 |
0 |
0 |
Completed. |
|
Co. Longford: |
|
|
|
|
|
|
|
|
|
|
33/36 |
Granard—Improvements |
... |
... |
... |
... |
... |
... |
... |
357 |
11 |
1 |
315 |
0 |
0 |
672 |
11 |
1 |
Completed. |
26 |
Edgeworthstown—Improvements |
... |
... |
... |
... |
... |
... |
244 |
14 |
6 |
— |
244 |
14 |
6 |
Completed. |
|
Co. Monaghan: |
|
|
|
|
|
|
|
|
|
|
3 |
Corrinashigagh—Improvements |
... |
... |
... |
... |
... |
... |
145 |
0 |
0 |
— |
145 |
0 |
0 |
Completed. |
25 |
Monaghan—Fire Precautions |
... |
... |
... |
... |
... |
... |
464 |
2 |
4 |
— |
464 |
2 |
4 |
Completed. |
|
Offaly: |
|
|
|
|
|
|
|
|
|
|
11 |
Ferbane—New Bathroom, etc. |
... |
... |
... |
... |
... |
... |
313 |
2 |
6 |
— |
313 |
2 |
6 |
Completed. |
|
Co. Roscommon: |
|
|
|
|
|
|
|
|
|
|
2 |
Ballinlough—New Bathroom, etc. |
... |
... |
... |
... |
... |
329 |
18 |
0 |
— |
329 |
18 |
0 |
Completed. |
15 |
Elphin—New Bathroom, etc. |
... |
... |
... |
... |
... |
... |
315 |
0 |
0 |
— |
315 |
0 |
0 |
Completed. |
|
Co. Sligo: |
|
|
|
|
|
|
|
|
|
|
13 |
Cliffoney—Improvements |
... |
... |
... |
... |
... |
... |
... |
179 |
13 |
11 |
— |
179 |
13 |
11 |
Completed. |
|
Co. Waterford: |
|
|
|
|
|
|
|
|
|
|
8 |
Stradbally—Accommodation |
... |
... |
... |
... |
... |
... |
392 |
0 |
10 |
— |
392 |
0 |
10 |
Completed. |
|
Co. Westmeath: |
|
|
|
|
|
|
|
|
|
|
28 |
Castlepollard—Improvements |
... |
... |
... |
... |
... |
... |
200 |
0 |
0 |
— |
200 |
0 |
0 |
Completed. |
|
Co. Wicklow: |
|
|
|
|
|
|
|
|
|
|
18 |
Tinahely—Improvements |
... |
... |
... |
... |
... |
... |
264 |
15 |
3 |
— |
264 |
15 |
3 |
Completed. |
|
|
£7,579 |
7 |
9 |
|
|
|
|
|
|
|
|
DETAILS OF B.73—MINOR NEW WORKS |
|
|
|
|
|
|
|
|
|
|
|
Oireachtas: |
|
|
|
|
|
|
|
|
|
|
1 |
Inauguration of President |
... |
... |
... |
... |
... |
... |
... |
777 |
2 |
2 |
— |
777 |
2 |
2 |
Completed. |
|
Department of the Taoiseach: |
|
|
|
|
|
|
|
|
|
|
74/68 |
State Apartments—Alterations |
... |
... |
... |
... |
... |
... |
705 |
8 |
1 |
116 |
5 |
6 |
821 |
13 |
7 |
Completed. |
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
82 |
Government Buildings, North Block—Partitioning—Room 123 |
... |
91 |
4 |
4 |
— |
91 |
4 |
4 |
Completed. |
37 |
Government Buildings, Athlone—Hot Water |
... |
... |
... |
... |
83 |
13 |
6 |
— |
83 |
13 |
6 |
Completed. |
38 |
Government Buildings, Limerick—Heating |
... |
... |
... |
... |
363 |
8 |
10 |
— |
363 |
8 |
10 |
Completed. |
40 |
Government Buildings, Tuam—Heating |
... |
... |
... |
... |
... |
161 |
12 |
10 |
— |
161 |
12 |
10 |
Completed. |
|
Office of Public Works: |
|
|
|
|
|
|
|
|
|
|
74/80 |
Accommodation |
... |
... |
... |
... |
... |
... |
... |
... |
82 |
11 |
0 |
69 |
2 |
10 |
151 |
13 |
10 |
Completed. |
53 |
Accommodation |
... |
... |
... |
... |
... |
... |
... |
... |
364 |
13 |
6 |
— |
364 |
13 |
6 |
Completed. |
46 |
New racksin Registry |
... |
... |
... |
... |
... |
... |
... |
435 |
16 |
0 |
— |
435 |
16 |
0 |
Completed. |
45 |
Earlsfort Terrace Workshop |
... |
... |
... |
... |
... |
... |
257 |
18 |
7 |
— |
257 |
18 |
7 |
Completed. |
|
Office of Public Works (contd.): |
|
|
|
|
|
|
|
|
|
|
74/77 |
Central Engineering Workshop—Paving |
... |
... |
... |
... |
215 |
5 |
11 |
246 |
3 |
10 |
461 |
9 |
9 |
Completed. |
62 |
Alterations |
... |
... |
... |
... |
... |
... |
... |
... |
320 |
0 |
0 |
— |
320 |
0 |
0 |
Completed. |
59 |
Stationery Office—FuelShed |
... |
... |
... |
... |
... |
... |
207 |
0 |
6 |
— |
207 |
0 |
6 |
Completed. |
|
Ordnance Survey Office: |
|
|
|
|
|
|
|
|
|
|
66 |
Refrigeration Cabinets |
... |
... |
... |
... |
... |
... |
... |
404 |
11 |
2 |
— |
404 |
11 |
2 |
Completed. |
30 |
Fire Escape |
... |
... |
... |
... |
... |
... |
... |
... |
453 |
9 |
1 |
— |
453 |
9 |
1 |
Completed. |
74 |
Printing Room |
... |
... |
... |
... |
... |
... |
... |
... |
249 |
8 |
9 |
— |
249 |
8 |
9 |
Completed. |
74/84 |
Special Employment Schemes Office—Partitioning |
... |
... |
... |
156 |
0 |
11 |
7 |
5 |
2 |
163 |
6 |
1 |
Completed. |
|
Revenue Commissioners: |
|
|
|
|
|
|
|
|
|
|
71 |
Dublin Castle—Accommodation |
... |
... |
... |
... |
... |
... |
239 |
0 |
6 |
— |
239 |
0 |
6 |
Completed. |
92 |
Adaptations |
... |
... |
... |
... |
... |
... |
... |
... |
271 |
1 |
11 |
— |
271 |
1 |
11 |
Completed. |
86 |
Shelving, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
231 |
3 |
0 |
— |
231 |
3 |
0 |
Completed. |
32 |
14/15 Upper O’Connell Street, Dublin—Storage |
... |
... |
... |
158 |
7 |
5 |
— |
158 |
7 |
5 |
Completed. |
39 |
Custom House—Alterations to fans |
... |
... |
... |
... |
... |
71 |
1 |
10 |
— |
71 |
1 |
10 |
In progress. |
87 |
Aras Brugha, Dublin—Shelving |
... |
... |
... |
... |
... |
... |
75 |
14 |
8 |
— |
75 |
14 |
8 |
In progress. |
60 |
Estate Duty Office—Accommodation |
... |
... |
... |
... |
... |
124 |
15 |
9 |
— |
124 |
15 |
9 |
Completed. |
55 |
Limerick Office—Thermal Storage Heaters |
... |
... |
... |
... |
360 |
0 |
0 |
— |
360 |
0 |
0 |
Completed. |
24 |
Frontier Post, Ferryhill—Alterations |
... |
... |
... |
... |
... |
354 |
13 |
7 |
— |
354 |
13 |
7 |
Completed. |
|
Phoenix Park: |
|
|
|
|
|
|
|
|
|
|
74/89 |
Teacher’s Residence—Improvements |
... |
... |
... |
... |
... |
120 |
11 |
9 |
6 |
13 |
8 |
127 |
5 |
5 |
Completed. |
73 |
Rose Cottage—Improvements |
... |
... |
... |
... |
... |
... |
161 |
5 |
0 |
— |
161 |
5 |
0 |
Completed. |
89 |
Turnstiles |
... |
... |
... |
... |
... |
... |
... |
... |
141 |
17 |
0 |
98 |
18 |
6 |
240 |
15 |
6 |
Completed. |
52 |
Dunmore East Harbour—Lighting |
... |
... |
... |
... |
... |
95 |
0 |
0 |
— |
95 |
0 |
0 |
Completed. |
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
74/53 |
Abbotstown Farm—Water to Residences |
... |
... |
... |
... |
117 |
3 |
1 |
237 |
16 |
2 |
354 |
19 |
3 |
Completed. |
84 |
Athenry Agricultural College |
|
|
|
|
|
|
|
|
|
|
84 |
Ballyhaise Agricultural College Food Mixers |
... |
... |
487 |
7 |
0 |
— |
487 |
7 |
0 |
Completed. |
84 |
Clonakilty Agricultural College |
|
|
|
|
|
|
|
|
|
|
49 |
Ballyhaise Agricultural College—Petrol Storage |
... |
... |
... |
361 |
14 |
6 |
— |
361 |
14 |
6 |
Completed. |
79 |
Chantilly Farm Lodge—Bathroom, etc. |
... |
... |
... |
... |
73 |
9 |
1 |
— |
73 |
9 |
1 |
Completed. |
95/30 of 1957/58 |
Derrybrennan ExperimentalStation—Lighting, etc. |
... |
... |
... |
62 |
4 |
9 |
198 |
9 |
0 |
260 |
13 |
9 |
Completed. |
51 |
Drogheda Bovine T.B.Station—Thermal Storage Heaters |
... |
... |
162 |
17 |
8 |
— |
162 |
17 |
8 |
Completed. |
|
Johnstown Castle: |
|
|
|
|
|
|
|
|
|
|
68 |
Wiring ducts |
... |
... |
... |
... |
... |
... |
... |
... |
231 |
18 |
7 |
— |
231 |
18 |
7 |
Completed. |
74/30 |
Bathroom, etc. |
... |
... |
... |
... |
... |
... |
... |
... |
112 |
10 |
0 |
320 |
0 |
0 |
432 |
10 |
0 |
Completed. |
12 |
Grain Dryer |
... |
... |
... |
... |
... |
... |
... |
... |
13 |
6 |
10 |
— |
13 |
6 |
10 |
In progress. |
56 |
Mullingar Bovine T.B. Office—Heating |
... |
... |
... |
... |
... |
113 |
3 |
3 |
— |
113 |
3 |
3 |
Completed. |
47 |
Naas Bovine T.B. Office—Heating |
... |
... |
... |
... |
... |
167 |
6 |
6 |
— |
167 |
6 |
6 |
Completed. |
|
Veterinary College, Ballsbridge: |
|
|
|
|
|
|
|
|
|
|
74/58 |
Insectiary |
... |
... |
... |
... |
... |
... |
... |
... |
... |
60 |
18 |
1 |
284 |
12 |
0 |
345 |
10 |
1 |
Completed. |
73 |
Coldroom |
... |
... |
... |
... |
... |
... |
... |
... |
... |
360 |
0 |
0 |
— |
360 |
0 |
0 |
Completed. |
99 |
Veterinary Laboratory, Thorndale |
... |
... |
... |
... |
... |
96 |
19 |
7 |
— |
96 |
19 |
7 |
In progress. |
|
DEPARTMENT OF JUSTICE: |
|
|
|
|
|
|
|
|
|
|
69 |
Government Buildings, North Block—Alterations |
... |
... |
... |
130 |
15 |
8 |
— |
130 |
15 |
8 |
Completed. |
74/81 |
Four Courts, Official Asslgnee’s Office—Alteration |
... |
... |
... |
79 |
6 |
8 |
226 |
2 |
6 |
305 |
9 |
2 |
Completed. |
54 |
District Courts—Adaptations |
... |
... |
... |
... |
... |
... |
290 |
19 |
4 |
— |
290 |
19 |
4 |
Completed. |
70 |
State Paper Office—Lighting, etc. |
... |
... |
... |
... |
... |
240 |
19 |
0 |
— |
240 |
19 |
0 |
Completed. |
|
Garda Depot: |
|
|
|
|
|
|
|
|
|
|
92 |
Accommodation for Women Police |
... |
... |
... |
... |
... |
177 |
19 |
6 |
403 |
11 |
9 |
581 |
11 |
3 |
Completed. |
61 |
Office Accommodation |
... |
... |
... |
... |
... |
... |
... |
177 |
7 |
5 |
— |
177 |
7 |
5 |
Completed. |
95 |
Toilet Facilities |
... |
... |
... |
... |
... |
... |
... |
... |
22 |
0 |
7 |
— |
22 |
0 |
7 |
In progress. |
|
Department of Education: |
|
|
|
|
|
|
|
|
|
|
74/67 |
National College of Art—Electrical Extension |
... |
... |
... |
... |
204 |
15 |
6 |
14 |
4 |
6 |
219 |
0 |
0 |
Completed. |
74/79 |
National Gallery—Heating |
... |
... |
... |
... |
... |
... |
90 |
15 |
5 |
95 |
12 |
2 |
186 |
7 |
7 |
Completed. |
74/11 |
National Museum—Storage |
... |
... |
... |
... |
... |
... |
72 |
7 |
1 |
411 |
0 |
3 |
483 |
7 |
4 |
Completed. |
33 |
National Museum—Lighting |
... |
... |
... |
... |
... |
... |
83 |
2 |
2 |
— |
83 |
2 |
2 |
Completed. |
31 |
Secondary Education—Hot Water |
... |
... |
... |
... |
... |
343 |
9 |
1 |
— |
343 |
9 |
1 |
Completed. |
58 |
Tyrone House—Hot Water |
... |
... |
... |
... |
... |
... |
257 |
1 |
8 |
— |
257 |
1 |
8 |
Completed. |
88 |
Tyrone House—Electric Heating, Accounts Branch |
... |
... |
... |
118 |
11 |
2 |
— |
118 |
11 |
2 |
Completed. |
93 |
West Dublin Model School—Improvement of Heating |
... |
... |
362 |
11 |
0 |
— |
362 |
11 |
0 |
Completed. |
6 |
Geneological Office—Accommodation |
... |
... |
... |
... |
... |
317 |
2 |
1 |
— |
317 |
2 |
1 |
Completed. |
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
74/71 |
Merrion Street—New Lift, Lunch Club |
... |
... |
... |
... |
... |
459 |
5 |
1 |
66 |
19 |
1 |
526 |
4 |
2 |
Completed. |
74/64 |
Merrion Street—Toilets |
... |
... |
... |
... |
... |
... |
... |
28 |
18 |
1 |
127 |
1 |
0 |
155 |
19 |
1 |
Completed. |
2 |
Merrion Street—Heating |
... |
... |
... |
... |
... |
... |
... |
44 |
18 |
3 |
— |
44 |
18 |
3 |
In progress. |
35 |
Merrion Street (Forestry)—New Research Laboratory |
... |
... |
189 |
0 |
11 |
— |
189 |
0 |
11 |
Completed. |
20 |
Shelton Abbey (Forestry)—Chlorination Plant |
... |
... |
... |
250 |
0 |
0 |
— |
250 |
0 |
0 |
Completed. |
81 |
Fisheries Branch—Heating |
... |
... |
... |
... |
... |
... |
13 |
16 |
8 |
— |
13 |
16 |
8 |
In progress. |
|
Department of Industry and Commerce: |
|
|
|
|
|
|
|
|
|
|
4 |
Kildare Street—Accommodation |
... |
... |
... |
... |
... |
221 |
2 |
7 |
— |
221 |
2 |
7 |
Completed. |
|
Department of Posts and Telegraphs: |
|
|
|
|
|
|
|
|
|
|
18 |
Dublin, South Anne Street P.O.—Lino Tiling Walls |
... |
... |
... |
249 |
12 |
2 |
— |
249 |
12 |
2 |
Completed. |
74/87 |
Athlone P.O.—Alterations |
... |
... |
... |
... |
... |
... |
50 |
0 |
0 |
488 |
6 |
2 |
538 |
6 |
2 |
Completed. |
13 |
Mullingar Post Office—Improvements |
... |
... |
... |
... |
... |
250 |
0 |
0 |
— |
250 |
0 |
0 |
Completed. |
74/86 |
Engineers, Harolds Cross—Adaptations |
... |
... |
... |
... |
40 |
2 |
8 |
7 |
8 |
5 |
47 |
11 |
1 |
In progress. |
95/48 of 57/58 |
Engineers, Cork—Adaptations, etc. |
... |
... |
... |
... |
... |
24 |
16 |
5 |
117 |
0 |
9 |
141 |
17 |
2 |
Completed. |
27 |
Malin Head Wireless Station—Renewal of Fencing |
... |
... |
... |
299 |
5 |
0 |
— |
299 |
5 |
0 |
Completed. |
90 |
P.O. Factory, St. John’s Road—Improvements |
... |
... |
... |
358 |
18 |
9 |
— |
358 |
18 |
9 |
Completed. |
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
34 |
Coláiste Caoimhín—Accommodation |
... |
... |
... |
... |
... |
363 |
8 |
11 |
— |
363 |
8 |
11 |
Completed. |
83 |
Parkgate Street—Shelvingin Basement |
... |
... |
... |
... |
... |
162 |
19 |
8 |
— |
162 |
19 |
8 |
Completed. |
|
Department of External Affairs: |
|
|
|
|
|
|
|
|
|
|
74/57 |
Iveagh House—Doors |
... |
... |
... |
... |
... |
... |
... |
53 |
9 |
3 |
29 |
2 |
11 |
82 |
12 |
2 |
In progress. |
67 |
Department of External Affairs—Adaptations, etc. |
... |
... |
... |
124 |
5 |
3 |
— |
124 |
5 |
3 |
Completed. |
74/78 |
London Embassy—Garage |
... |
... |
... |
... |
... |
... |
... |
260 |
12 |
0 |
11 |
17 |
0 |
272 |
9 |
0 |
Completed. |
|
Department of Social Welfare: |
|
|
|
|
|
|
|
|
|
|
19 |
Cork Employment Exchange—Improvements |
... |
... |
... |
... |
19 |
15 |
6 |
— |
19 |
15 |
6 |
In progress. |
48 |
Claddagh Employment Exchange—Improvements |
... |
... |
... |
144 |
11 |
0 |
— |
144 |
11 |
0 |
Completed. |
|
Department of Health: |
|
|
|
|
|
|
|
|
|
|
|
Custom House: |
|
|
|
|
|
|
|
|
|
|
3 |
Shelving |
... |
... |
... |
... |
... |
... |
... |
... |
... |
105 |
17 |
0 |
— |
105 |
17 |
0 |
Completed. |
63 |
Accommodation |
... |
... |
... |
... |
... |
... |
... |
... |
157 |
10 |
3 |
— |
157 |
10 |
3 |
Completed. |
57 |
Heating |
... |
... |
... |
... |
... |
... |
... |
... |
... |
122 |
8 |
9 |
— |
122 |
8 |
9 |
Completed. |
|
|
£17,118 |
14 |
0 |
|
|
|
|
|
|
|
|
DETAILS OF B.74—URGENT AND UNFORESEEN WORKS: |
|
|
|
|
|
|
|
|
|
|
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
1 |
Waterford Bovine T.B.etc. Offices—Adaptations |
... |
... |
... |
324 |
18 |
3 |
— |
324 |
18 |
3 |
In progress. |
|
Oireachtas: |
|
|
|
|
|
|
|
|
|
|
2 |
Leinster House—Accommodation, (Reporters, etc.) |
... |
... |
... |
666 |
4 |
2 |
— |
666 |
4 |
2 |
Completed. |
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
3 |
Merrion Street—Improvements |
... |
... |
... |
... |
... |
... |
1,386 |
11 |
2 |
— |
1,386 |
11 |
2 |
In progress. |
6 |
Stationery Office |
... |
... |
... |
... |
... |
... |
... |
... |
30 |
19 |
6 |
— |
30 |
19 |
6 |
In progress. |
|
Department of Transport and Power: |
|
|
|
|
|
|
|
|
|
|
4 |
Kildare Street—Accommodation |
... |
... |
... |
... |
... |
2,006 |
1 |
5 |
— |
2,006 |
1 |
5 |
In progress. |
|
Department of Health: |
|
|
|
|
|
|
|
|
|
|
5 |
Custom House Annexe—(1) Removal and (2) Adaptation works arising out of the transfer of staffs to 1 Beresford Place and 42 Upper Mount Street. |
135 |
8 |
0 |
— |
135 |
8 |
0 |
In progress. |
|
DETAILS OF B.75—MINOR BALANCES OF EXPENDITURE: |
|
|
|
|
|
|
|
|
|
|
|
Department of the Taoiseach: |
|
|
|
|
|
|
|
|
|
|
3 of 1957/8 |
Central Statistics Office—Improvements |
... |
... |
... |
... |
85 |
17 |
5 |
4,563 |
12 |
6 |
4,649 |
9 |
11 |
Completed. |
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
75/4 |
Phoenix Park, Papal Nunciature—Lift |
... |
... |
... |
... |
... |
534 |
6 |
2 |
400 |
18 |
7 |
935 |
4 |
9 |
Completed. |
15 |
Phoenix Park—Additional Football Pavilions |
... |
... |
... |
... |
764 |
10 |
11 |
9,427 |
17 |
5 |
10,192 |
8 |
4 |
Completed. |
17 |
St. Stephen’s Green—New glasshouse, etc. |
... |
... |
... |
... |
524 |
9 |
10 |
7,814 |
18 |
6 |
8,339 |
8 |
4 |
Completed. |
|
Revenue Commissioners: |
|
|
|
|
|
|
|
|
|
|
12a |
Áras Brugha—Alterations |
... |
... |
... |
... |
... |
... |
... |
669 |
19 |
0 |
1,492 |
1 |
1 |
2,162 |
0 |
1 |
Completed. |
141/1 of 1955/6. |
11/15 Upper O’Connell Street—Alterations and Improvements |
... |
261 |
3 |
9 |
7,329 |
2 |
10 |
7,590 |
6 |
7 |
Completed. |
14a |
Wexford—Accommodation |
... |
... |
... |
... |
... |
... |
507 |
11 |
10 |
599 |
15 |
0 |
1,107 |
6 |
10 |
Completed. |
5 |
CivilService Dining Club—Improvements |
... |
... |
... |
... |
162 |
16 |
6 |
2,797 |
11 |
6 |
2,960 |
8 |
0 |
Completed. |
10 |
Stationery Office—Shelving |
... |
... |
... |
... |
... |
... |
62 |
1 |
11 |
1,316 |
0 |
1 |
1,378 |
2 |
0 |
Completed. |
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
|
Abbotstown Farm: |
|
|
|
|
|
|
|
|
|
|
23/4 of 1957/8 |
Veterinary Research Laboratory—Furnishing |
... |
... |
... |
... |
178 |
4 |
0 |
1,710 |
18 |
9 |
1,889 |
2 |
9 |
Completed. |
25 of 1955/6 |
E.S.B. Transformer Station |
... |
... |
... |
... |
... |
... |
51 |
9 |
6 |
988 |
0 |
0 |
1,039 |
9 |
6 |
Completed. |
22(4) |
Ballyhaise Agricultural School—Grain Storage |
... |
... |
... |
... |
1,099 |
1 |
3 |
936 |
17 |
4 |
2,035 |
18 |
7 |
Completed. |
26 (4) |
Johnstown Castle—Potting Shed, Glasshouse, etc. |
... |
... |
... |
1,564 |
16 |
9 |
2,472 |
6 |
3 |
4,037 |
3 |
0 |
In progress. |
20 |
Government Buildings—Improvement of Lift |
... |
... |
... |
... |
71 |
16 |
9 |
886 |
6 |
9 |
958 |
3 |
6 |
Completed. |
22 (2) of 1957/8 |
Botanic Gardens—Water Supply |
... |
... |
... |
... |
... |
... |
126 |
10 |
2 |
10,469 |
7 |
0 |
10,595 |
17 |
2 |
Completed. |
29A of 1956/7 |
Seed Testing Station |
... |
... |
... |
... |
... |
... |
... |
3 |
10 |
0 |
314 |
5 |
2 |
317 |
15 |
2 |
Completed. |
27 (2) |
Munster Institute—Water Supply |
... |
... |
... |
... |
... |
574 |
8 |
2 |
867 |
4 |
1 |
1,441 |
12 |
3 |
Completed. |
32 of 1957/8 |
Veterinary College |
... |
... |
... |
... |
... |
... |
... |
... |
89 |
6 |
10 |
126,966 |
3 |
8 |
127,055 |
10 |
6 |
Completed. |
|
Department of Education: |
|
|
|
|
|
|
|
|
|
|
40 |
Reformatory School, Daingean—Improvement of Heating |
... |
... |
203 |
12 |
10 |
2,029 |
16 |
6 |
2,233 |
9 |
4 |
Completed. |
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
41 |
Merrion Square—Cloakroom Improvements |
... |
... |
... |
... |
336 |
13 |
8 |
1,654 |
15 |
1 |
1,991 |
8 |
9 |
Completed. |
96/3 of 1957/8 |
Forestry, Kilkenny—Adaptions |
... |
... |
... |
... |
... |
... |
300 |
4 |
0 |
144 |
0 |
7 |
444 |
4 |
7 |
Completed. |
44 |
Kinnitty Castle—Installation of Heating |
... |
... |
... |
... |
561 |
12 |
8 |
1,467 |
14 |
5 |
2,029 |
7 |
1 |
Completed. |
51/1 of 1956/7 |
Shelton Abbey |
... |
... |
... |
... |
... |
... |
... |
... |
149 |
0 |
11 |
109,688 |
3 |
9 |
109,837 |
4 |
8 |
Completed. |
30 of 1956/7 |
Kilmore Quay—Dredging |
... |
... |
... |
... |
... |
... |
... |
538 |
3 |
11 |
1,575 |
0 |
0 |
2,113 |
3 |
11 |
Completed. |
|
Department of Industry and Commerce: |
|
|
|
|
|
|
|
|
|
|
45 |
Industrial Development Authority—Heating |
... |
... |
... |
... |
407 |
14 |
1 |
144 |
3 |
4 |
551 |
17 |
5 |
Completed. |
46a |
Geological Survey Office—Heating |
... |
... |
... |
... |
... |
251 |
11 |
4 |
740 |
8 |
4 |
991 |
19 |
8 |
Completed. |
54 of 1956/7 |
Kilkenny Meteorological Station |
... |
... |
... |
... |
... |
... |
136 |
4 |
9 |
3,508 |
9 |
10 |
3,644 |
14 |
7 |
Completed. |
|
Department of Posts and Telegraphs: |
|
|
|
|
|
|
|
|
|
|
64 of 1956/7 |
Drogheda Post Office and Telephone Exchange |
... |
... |
... |
5 |
9 |
0 |
52,421 |
19 |
7 |
52,427 |
8 |
7 |
Completed. |
47a |
G.P.O.—Improvements Public Office |
... |
... |
... |
... |
... |
1,410 |
14 |
0 |
1,640 |
3 |
6 |
3,050 |
17 |
6 |
Completed. |
48a |
G.P.O.—Accommodation |
... |
... |
... |
... |
... |
... |
... |
115 |
7 |
3 |
414 |
14 |
0 |
530 |
1 |
3 |
Completed. |
71 of 1956/7 |
Monaghan Post Office—New Telephone Exchange, etc. |
... |
... |
2 |
19 |
9 |
8,381 |
9 |
2 |
8,384 |
8 |
11 |
Completed. |
60 of 1957/8 |
CootehillPost Office and Telephone Exchange |
... |
... |
... |
... |
16 |
16 |
11 |
13,955 |
9 |
5 |
13,972 |
6 |
4 |
Completed. |
64 of 1957/8 |
Kildare Post Office—Improvements |
... |
... |
... |
... |
... |
250 |
18 |
6 |
686 |
7 |
11 |
937 |
6 |
5 |
Completed. |
110 of 1955/6 |
Limerick—New Telephone Exchange |
... |
... |
... |
... |
... |
2 |
3 |
4 |
1,660 |
10 |
0 |
1,662 |
13 |
4 |
Completed. |
68 of 1957/8 |
Naas Post Office and Telephone Exchange |
... |
... |
... |
... |
420 |
0 |
0 |
13,910 |
17 |
6 |
14,330 |
17 |
6 |
Completed. |
60 of 1958/9 |
Broadcasting: Cork—New Studios |
... |
... |
... |
... |
... |
469 |
13 |
7 |
24,289 |
11 |
7 |
24,759 |
5 |
2 |
Completed. |
59A of 1958/9 |
Broadcasting: G.P.O.—Improved Insulation etc. |
... |
... |
... |
68 |
0 |
0 |
666 |
8 |
0 |
734 |
8 |
0 |
Completed. |
59B of 1958/9 |
Broadcasting: Portobello—Fire Precautions etc. |
... |
... |
... |
161 |
12 |
8 |
932 |
10 |
8 |
1,094 |
3 |
4 |
Completed. |
50 of 1958/9 |
P.O. Stores: St. John’s Road |
... |
... |
... |
... |
... |
... |
50 |
15 |
3 |
60,194 |
17 |
8 |
60,245 |
12 |
11 |
Completed. |
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
76 of 1957/8 |
Cork, Collins Barracks—Hospital Lift |
... |
... |
... |
... |
... |
293 |
3 |
7 |
3,516 |
8 |
8 |
3,809 |
12 |
3 |
Completed. |
153 of 1954/5 |
Haulbowline Dockyard—New Jetty |
... |
... |
... |
... |
... |
50 |
0 |
0 |
85,436 |
11 |
8 |
85,486 |
11 |
8 |
Completed. |
131 of 1955/56 |
Curragh Camp, Kildare |
... |
... |
... |
... |
... |
... |
506 |
0 |
3 |
68,917 |
15 |
9 |
69,423 |
16 |
0 |
Completed. |
|
Department of Social Welfare: |
|
|
|
|
|
|
|
|
|
|
67 of 1958/9 |
Áras Mhic Dhiarmada—Improvement of Sprinkler and Fire Alarm |
|
|
|
|
|
|
|
|
|
|
|
System |
... |
... |
... |
... |
... |
... |
... |
... |
... |
264 |
18 |
1 |
211 |
2 |
10 |
476 |
0 |
11 |
Completed. |
|
|
£14,305 |
11 |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|