Committee Reports::Report - Appropriation Accounts 1961 - 1962::11 July, 1963::Appendix

APPENDIX XIV.

OFFICE OF PUBLIC WORKS.

STATEMENT OF EXPENDITURE ON NEW WORKS, ALTERATIONS AND ADDITIONS, 1961-62 (VOTE 9, SUBHEAD B).

Work No.

Service and Description

Total Estimate

Vote 1961-62

Expenditure

Observations

1961-62

To 31/3/61

To 31/3/62

 

 

£

£

£

s.

d.

£

s.

d.

£

s.

d.

 

 

President’s Establishment:

 

 

 

 

 

 

 

 

 

 

 

 

1

Áras an Uachtaráin—Improvement of Planthouse Accommodation

...

8,000

7,500

—

262

5

11

262

5

11

In progress.

 

Total:

 

 

£7,500

 

 

 

 

 

 

 

 

 

 

 

Oireachtas:

 

 

 

 

 

 

 

 

 

 

 

 

2

Leinster House—Extension

...

...

...

...

...

...

282,000

65,000

6,549

18

4

—

6,549

18

4

In progress.

 

Total:

 

 

£65,000

£6,549

18

4

 

 

 

 

 

 

 

 

Department of the Taoiseach:

 

 

 

 

 

 

 

 

 

 

 

 

3

State Apartments—Restoration of Burnt-Out Drawing Rooms

...

104,000

1,500

870

3

0

5,222

8

2

6,092

11

2

In planning.

4

Central Statistics Office: Accommodation for Census of Population

 

 

 

 

 

 

 

 

 

 

 

 

 

Staff

...

...

...

...

...

...

...

...

...

18,000

12,000

22,248

10

2

1,705

7

7

23,953

17

9

In progress.

 

Total:

 

 

£13,500

£23,118

13

2

 

 

 

 

 

 

 

 

Department of Finance:

 

 

 

 

 

 

 

 

 

 

 

 

5

Busts and Portraits of National Leaders

...

...

...

...

4,500

1,000

801

2

7

3,344

0

5

4,145

3

0

Completed.

6

Statue of Thomas Davis

...

...

...

...

...

...

6,500

1,000

150

0

0

—

150

0

0

In planning.

7

Government Buildings, North Block—Covering of Corridors and

 

 

 

 

 

 

 

 

 

 

 

 

 

Stairs with Linoleum

...

...

...

...

...

...

...

3,200

1,200

3,416

1

11

120

5

6

3,536

7

5

Completed.

 

State Buildings (Upper Merrion Street and Kildare Street)—New

 

 

 

 

 

 

 

 

 

 

 

 

 

electrical distribution system

...

...

...

...

...

...

6,300

6,000

97

1

7

—

97

1

7

In planning.

 

Economic Research Institute—Adaptations

...

...

...

...

6,500

3,500

4,461

7

2

1,764

18

5

6,226

5

7

In progress.

 

Office of Public Works:

 

 

 

 

 

 

 

 

 

 

 

 

9A

Adaptations at 8-9 Merrion Row

...

...

...

...

...

2,000

—

1,026

10

4

996

15

2

2,023

5

6

Completed.

9B

Adaptations at 50-51 St. Stephen’s Green

...

...

...

2,750

—

1,269

9

4

1,002

1

3

2,271

10

7

In progress.

 

Revenue Commissioners:

 

 

 

 

 

 

 

 

 

 

 

 

10

Dublin Castle—Rebuilding of Cross Block

...

...

...

111,000

45,000

12,386

14

9

4,499

13

0

16,886

7

9

In progress.

11

Stamping Branch—New premises

...

...

...

...

525,000

1,000

38

17

0

2,231

19

11

2,270

16

11

In planning.

11a

Cork Government Offices—Adaptations

...

...

...

...

1,310

—

969

18

0

—

969

18

0

In progress.

12

Bridgend Customs Frontier Post—Improvements

...

...

1,200

1,200

—

—

—

In planning.

12a

Cloghore Customs Frontier Post—Improvements

...

...

1,200

—

1,092

8

4

—

1,092

8

4

In progress.

13

Carrickarnon Customs Frontier Post—Office and Residence

...

13,000

6,500

1,111

9

6

487

10

8

1,599

0

2

In progress.

14

Wexford—New Government Offices and Telephone Exchange

...

33,000

2,000

3

3

0

—

3

3

0

In planning.

15

Stationery Office—Improvement of Electrical Installation

...

...

1,000

800

125

17

1

196

9

11

322

7

0

In progress.

16

Government Publications Sale Office—Additional Accommodation

3,000

500

—

—

—

In planning.

17

Ordnance Survey Office—Improvement of Storage Equipment

...

1,500

1,200

431

19

10

202

13

1

634

12

11

In progress.

18

Phoenix Park—Improvement of Water Supply

...

...

...

25,000

15,000

3

5

6

267

2

6

270

8

0

In planning.

19

Rotunda Gardens—Garden of Remembrance

...

...

...

...

144,000

40,000

36,346

9

3

4,362

5

9

40,708

15

0

In progress.

20

Dun Laoghaire Harbour, Mail Boat Pier—Improvements

...

...

164,600

63,000

23,423

15

9

93,130

13

0

116,554

8

9

In progress.

 

Total:

 

 

£188,900

£87,155

10

11

 

 

 

 

 

 

 

 

Department of Justice:

 

 

 

 

 

 

 

 

 

 

 

 

21

Courts of Justice—Renewal of Defective Stonework

...

...

...

50,000

7,000

1,730

2

0

1,754

18

10

3,485

0

10

In progress.

22

Public Record Office—Additional Storage

...

...

...

...

3,200

500

100

0

0

3,047

14

9

3,147

14

9

In progress.

23

Land Registry—Improvements

...

...

...

...

...

...

7,500

300

285

0

0

6,717

7

8

7,002

7

8

In progress.

24

New Garda Training Centre, Templemore—Adaptation, etc. works

...

Not yet made

150,000

93,506

5

3

—

93,506

5

3

In progress.

25

New Works, Alterations and Additions at specified Garda Síochána Stations:—

 

 

 

 

 

 

 

 

 

 

 

 

 

Dublin Metropolitan District:

 

 

 

 

 

 

 

 

 

 

 

 

 

Bridewell—Alterations

...

...

...

...

...

...

18,000

12,000

18,842

13

8

—

18,842

13

8

In progress.

 

Cabra—New Station

...

...

...

...

...

...

...

30,000

8,000

815

12

4

—

815

12

4

In progress.

 

Crumlin—New Divisional Headquarters

...

...

...

...

41,000

1,000

—

—

—

In planning.

 

Store Street—Alterations

...

...

...

...

...

...

6,500

3,000

—

—

—

In planning.

 

Divisional and District Headquarters outside Dublin:

 

 

 

 

 

 

 

 

 

 

 

 

 

Roscommon—New Divisional Headquarters

...

...

...

24,000

14,000

12,440

6

6

6,204

6

2

18,644

12

8

Completed.

 

Bantry—New District Headquarters

...

...

...

...

10,000

6,000

3,760

10

3

—

3,760

10

3

In progress.

 

New Stations as under:

200,000

48,000

 

 

 

 

 

 

 

 

 

 

 

Co. Cavan:

 

 

 

 

 

 

 

 

 

 

 

 

 

Cootehill

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Killeshandra

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Kingscourt

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Clare:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ardnacrusha

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Labasheeda

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Cork:

 

 

 

 

 

 

 

 

 

 

 

 

 

Castletownroche

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Donoughmore

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Kinsale

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Donegal:

 

 

 

 

 

 

 

 

 

 

 

 

 

Burtonport

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Carndonagh

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Castlefin

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Galway:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ahascragh

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Portumna

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Kerry:

 

 

 

 

 

 

 

 

 

 

 

 

 

Kilgarvan

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Leitrim:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballinamore

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Cloone

...

...

...

...

...

...

...

...

 

 

10

1

6

247

0

0

257

1

6

In planning.

 

Co. Louth:

 

 

 

 

 

 

 

 

 

 

 

 

 

Castlebellingham

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Mayo:

 

 

 

 

 

 

 

 

 

 

 

 

 

Killala

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Meath:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballivor

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Enfield

...

...

...

...

...

...

...

...

 

 

1,300

0

0

—

1,300

0

0

In progress.

 

Co. Monaghan:

 

 

 

 

 

 

 

 

 

 

 

 

 

Clontibret

...

...

...

...

...

...

...

...

 

 

146

10

9

—

146

10

9

In progress.

 

Offaly:

 

 

 

 

 

 

 

 

 

 

 

 

 

Banagher

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Roscommon:

 

 

 

 

 

 

 

 

 

 

 

 

 

Kilmore

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Strokestown

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Sligo:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballinafad

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Collooney

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Tipperary:

 

 

 

 

 

 

 

 

 

 

 

 

 

Grangemockler

...

...

...

...

...

...

...

 

 

3,420

0

0

32

15

10

3,452

15

10

In progress.

 

Co. Wexford:

 

 

 

 

 

 

 

 

 

 

 

 

 

Glynn

...

...

...

...

...

...

...

...

...

 

 

6,017

2

4

14

10

8

6,031

13

0

In progress.

 

Co. Wicklow:

 

 

 

 

 

 

 

 

 

 

 

 

 

Rathdrum

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Improvement Schemes as under:

14,000

8,000

 

 

 

 

 

 

 

 

 

 

 

Co. Cork:

 

 

 

 

 

 

 

 

 

 

 

 

 

Inchigeela

...

...

...

...

...

...

...

...

 

 

454

2

6

—

454

2

6

In progress.

 

Co. Donegal:

 

 

 

 

 

 

 

 

 

 

 

 

 

Buncrana

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Falcarragh

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Galway:

 

 

 

 

 

 

 

 

 

 

 

 

 

Leenane

...

...

...

...

...

...

...

...

 

 

80

11

11

51

5

5

131

17

4

In planning.

 

Co. Kerry:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballylongford

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Lauragh

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Limerick:

 

 

 

 

 

 

 

 

 

 

 

 

 

Bruff

...

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Sligo:

 

 

 

 

 

 

 

 

 

 

 

 

 

Bunninadden

...

...

...

...

...

...

...

 

 

461

18

2

—

461

18

2

In progress.

 

Co. Waterford:

 

 

 

 

 

 

 

 

 

 

 

 

 

Ballymacarbery

...

...

...

...

...

...

...

 

 

1,302

15

0

—

1,302

15

0

In progress.

 

Co. Wexford:

 

 

 

 

 

 

 

 

 

 

 

 

 

Blackwater

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Co. Wicklow:

 

 

 

 

 

 

 

 

 

 

 

 

 

Greystones

...

...

...

...

...

...

...

...

 

 

—

—

—

In planning.

 

Total for B. 25:

...

£343,500

£100,000

£49,052

4

11

 

 

 

 

 

 

 

26

New Works, Alterations and Additions at other Garda Síochána Stations:—

 

 

 

 

 

 

 

 

 

 

 

 

 

Garda Protection Huts—Áras an Uachtaráin

...

...

...

 

 

531

17

7

661

11

8

1,193

9

3

In progress.

 

Co. Donegal:

 

 

 

 

 

 

 

 

 

 

 

 

 

Mountcharles

...

...

...

...

...

...

...

 

 

1

9

1

—

1

9

1

Completed.

 

Glencolumbkille

...

...

...

...

...

...

...

 

 

 

12

6

—

 

12

6

Completed.

 

Ballybofey

...

...

...

...

...

...

...

...

 

 

 

16

7

—

 

16

7

Completed.

 

Rathmullan

...

...

...

...

...

...

...

...

 

 

650

0

0

—

650

0

0

In progress.

 

Co. Dublin:

 

 

 

 

 

 

 

 

 

 

 

 

 

Stepaside

...

...

...

...

...

...

...

...

 

 

649

16

2

1,001

11

8

1,651

7

10

Completed.

 

Dublin:

 

 

 

 

 

 

 

 

 

 

 

 

 

Fitzgibbon St.

...

...

...

...

...

...

...

 

 

767

0

0

—

767

0

0

Completed.

 

Parkgate Hall, Conyngham Road.

...

...

...

 

 

945

13

2

—

945

13

2

In progress.

 

Co. Galway:

 

 

 

 

 

 

 

 

 

 

 

 

 

Carna

...

...

...

...

...

...

...

...

...

 

 

102

12

1

9,744

12

5

9,847

4

6

Completed.

 

Oranmore

...

...

...

...

...

...

...

...

 

 

60

17

0

3

3

4

64

0

4

In planning.

 

Athenry

...

...

...

...

...

...

...

...

 

 

982

3

1

12,172

0

8

13,154

3

9

Completed.

 

Craughwell

...

...

...

...

...

...

...

...

 

 

452

10

0

—

452

10

0

Completed.

 

Co. Limerick:

 

 

 

 

 

 

 

 

 

 

 

 

 

Pallas

...

...

...

...

...

...

...

...

...

 

 

737

18

6

180

0

0

917

18

6

In progress.

 

Co. Louth:

 

 

 

 

 

 

 

 

 

 

 

 

 

Blackrock

...

...

...

...

...

...

...

...

 

 

3

11

0

—

3

11

0

Completed.

 

Co. Monaghan:

 

 

 

 

 

 

 

 

 

 

 

 

 

Newbliss

...

...

...

...

...

...

...

...

 

 

116

2

5

—

116

2

5

Completed.

 

Co. Sligo:

 

 

 

 

 

 

 

 

 

 

 

 

 

Sligo—Prison Cottages

...

...

...

...

...

...

 

 

630

0

0

—

630

0

0

In progress.

 

Co. Tipperary:

 

 

 

 

 

 

 

 

 

 

 

 

 

Cahir

...

...

...

...

...

...

...

...

...

 

 

804

3

2

1,886

19

8

2,691

2

10

Completed.

 

Nenagh

...

...

...

...

...

...

...

...

 

 

226

6

1

530

10

4

756

16

5

Completed.

 

Total for B. 26:

...

£5,000

£5,000

£7,663

8

5

 

 

 

 

 

 

 

27

Minor New Works at Garda Síochána Stations:—

 

 

 

 

 

 

 

 

 

 

 

 

 

Co. Carlow:

 

 

 

 

 

 

 

 

 

 

 

 

27/3

Carlow—Bathroom

...

...

...

...

...

...

...

 

 

544

11

7

—

544

11

7

Completed.

27/48

Muinebeag—Improvements

...

...

...

...

...

 

 

1

5

0

—

1

5

0

In progress.

 

Co. Cavan:

 

 

 

 

 

 

 

 

 

 

 

 

27/10

Ballinagh—Connect public water supply to water in married

 

 

 

 

 

 

 

 

 

 

 

 

 

quarters

...

...

...

...

...

...

...

...

 

 

77

0

0

—

77

0

0

Completed.

 

Co. Clare:

 

 

 

 

 

 

 

 

 

 

 

 

42/1

Corofin—Erect new scullery

...

...

...

...

...

 

 

3

13

7

161

10

0

165

3

7

Completed.

42/55

Kilmihill—Improvements

...

...

...

...

...

...

 

 

171

16

0

140

0

0

311

16

0

Completed.

 

Co. Cork:

 

 

 

 

 

 

 

 

 

 

 

 

27/28

Glantane—Sanitary facilities

...

...

...

...

...

 

 

743

1

6

—

743

1

6

Completed.

27/22

Castletownshend—Alter out-houses, fencing

...

...

...

 

 

175

0

0

—

175

0

0

Completed.

27/41

Togher—Sanitary facilities

...

...

...

...

...

 

 

130

7

9

—

130

7

9

Completed.

 

Co. Donegal:

 

 

 

 

 

 

 

 

 

 

 

 

27/21

Annagry—Married Quarters

...

...

...

...

...

 

 

250

0

0

—

250

0

0

In progress.

27/13

Milford—New fireplace and sanitary facilities

...

...

...

 

 

312

0

4

—

312

0

4

Completed.

27/17

Doochary—Provide Married Quarters

...

...

...

...

 

 

293

15

0

—

293

15

0

Completed.

 

Dublin:

 

 

 

 

 

 

 

 

 

 

 

 

42/47

Dublin Castle—Shelving, etc., Criminal Records Office

...

 

 

13

5

6

187

0

6

200

6

0

Completed.

42/60

Dublin Castle—Excavate site for lift and provide electric power

 

 

36

18

8

63

5

2

100

3

10

Completed.

27/29

Kilmainham—Adapt room in Sergeants’ Mess

...

...

...

 

 

140

1

11

—

140

1

11

In progress.

27/33

College Street—Improve canteen facilities

...

...

...

 

 

156

11

7

—

156

11

7

In progress.

42/44

Central Bridewell—Fire survey

...

...

...

...

...

 

 

98

19

0

176

1

10

275

0

10

Completed.

27/35

Clontarf—Surface yard

...

...

...

...

...

...

 

 

325

14

0

—

325

14

0

Completed.

27/50

Kevin St.—Convert garage to bicycle store and provide

 

 

 

 

 

 

 

 

 

 

 

 

 

alternative garage accommodation

...

...

...

...

...

 

 

427

8

4

—

427

8

4

In progress.

27/43

Donnybrook—Improve water supply

...

...

...

...

 

 

282

4

11

—

282

4

11

In progress.

 

Blackrock—Fire escape and additional sanitary facilities

...

 

 

74

7

6

344

5

8

418

13

2

In progress.

27/18

Dún Laoghaire—Improve electric light

...

...

...

...

 

 

189

17

6

—

189

17

6

Completed.

 

Co. Galway:

 

 

 

 

 

 

 

 

 

 

 

 

27/15

Corrandulla—Piped water supply

...

...

...

...

...

 

 

315

9

6

—

315

9

6

Completed.

27/32

Clifden—Sanitary facilities

...

...

...

...

...

...

 

 

 

16

0

—

 

16

0

In progress.

27/49

Ballymore—Improvements

...

...

...

...

...

 

 

2

1

1

—

2

1

1

In planning.

42/22

Glenamaddy—Kitchen in Married Quarters

...

...

...

 

 

8

1

2

171

5

0

179

6

2

Completed.

12/5

Kilronan—Water supply

...

...

...

...

...

...

 

 

3

10

0

2

1

9

5

11

9

In planning.

27/27

Eyrecourt—Sanitary facilities

...

...

...

...

...

 

 

419

0

0

—

419

0

0

Completed.

27/34

Headford—Sanitary facilities

...

...

...

...

...

 

 

24

6

9

—

24

6

9

In progress.

27/47

Rosmuc—Bathroom

...

...

...

...

...

...

 

 

50

14

6

—

50

14

6

In progress.

34/7

Letterfrack—Improvements

...

...

...

...

...

 

 

524

15

10

420

6

0

945

1

10

In progress.

of

 

 

 

 

 

 

 

 

 

 

 

 

 

59/60

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Co. Kildare:

 

 

 

 

 

 

 

 

 

 

 

 

27/16

Kilcock—Sanitary facilities

...

...

...

...

...

 

 

662

10

3

—

662

10

3

Completed.

 

Co. Kilkenny:

 

 

 

 

 

 

 

 

 

 

 

 

42/33

Goresbridge—Sanitary and ablution scheme

...

...

...

 

 

273

2

1

497

16

8

770

18

9

Completed.

 

Co. Leitrim:

 

 

 

 

 

 

 

 

 

 

 

 

42/7

Drumkeerin—Bathroom

...

...

...

...

...

...

 

 

370

4

0

1

11

8

371

15

8

Completed.

27/51

Keshcarrigan—Sanitary improvements

...

...

...

...

 

 

87

10

0

—

87

10

0

In progress.

 

Co. Limerick:

 

 

 

 

 

 

 

 

 

 

 

 

27/37

Pallasgreen (New Pallas)—Fire precautions

...

...

...

 

 

87

5

4

—

87

5

4

Completed.

27/57

Athea—Adaptations, sanitary facilities

...

...

...

...

 

 

1

5

0

—

1

5

0

In planning.

27/40

Glin—Sanitary and ablution facilities

...

...

...

...

 

 

333

3

10

—

333

3

10

Completed.

 

Co. Louth:

 

 

 

 

 

 

 

 

 

 

 

 

27/24

Louth—Sanitary facilities

...

...

...

...

...

...

 

 

469

0

0

—

469

0

0

Completed.

 

Co. Mayo:

 

 

 

 

 

 

 

 

 

 

 

 

27/11

Kerrykeel—Instal bathroom

...

...

...

...

...

 

 

172

5

8

—

172

5

8

Completed.

27/19

Bangor Erris—Water supply

...

...

...

...

...

 

 

425

0

0

—

425

0

0

Completed.

27/8

Blacksod—Alterations

...

...

...

...

...

...

 

 

338

6

7

—

338

6

7

In progress.

 

Co. Monaghan:

 

 

 

 

 

 

 

 

 

 

 

 

42/29

Monaghan—Ablution and sanitary facilities

...

...

...

 

 

56

7

4

493

1

7

549

8

11

Completed.

27/38

Castleblayney—Ablution and sanitary facilities

...

...

...

 

 

542

7

4

—

542

7

4

Completed.

 

Co. Meath:

 

 

 

 

 

 

 

 

 

 

 

 

27/39

Nobber—Improvements

...

...

...

...

...

...

 

 

475

17

6

—

475

17

6

In progress.

 

Co. Roscommon:

 

 

 

 

 

 

 

 

 

 

 

 

27/30

Cootehall—Alterations

...

...

...

...

...

...

 

 

600

0

0

—

600

0

0

Completed.

 

Co. Wicklow:

 

 

 

 

 

 

 

 

 

 

 

 

27/9

Bray—Improvements

...

...

...

...

...

...

 

 

401

0

0

—

401

0

0

Completed.

 

Total for B. 27:

...

£8,000

£8,000

£11,091

19

5

 

 

 

 

 

 

 

 

Total for Department of Justice:

...

 

£270,800

£163,429

0

0

 

 

 

 

 

 

 

 

Department of Education:

 

 

 

 

 

 

 

 

 

 

 

 

28

National Schools—Grants for Building, Enlarging, Enclosing, etc.

...

1,600,000

1,600,000

1,698,476

3

4

—

1,698,476

3

4

—

 

Institutions of Science and Art:

 

 

 

 

 

 

 

 

 

 

 

 

29

National Library—Improvement of goods lift

...

...

...

1,100

1,000

900

15

10

—

900

15

10

In progress.

30

National Library and National Museum—Renewal of defective

 

 

 

 

 

 

 

 

 

 

 

 

 

Stonework—Stage II

...

...

...

...

...

...

30,000

14,000

10,699

8

10

29,080

9

11

39,779

18

9

In progress.

30a

28 Marlboro Street—Adapt Gate Lodge

...

...

...

...

—

—

2,517

16

8

417

15

2

2,935

11

10

Completed

 

Reformatory and Industrial Schools:

 

 

 

 

 

 

 

 

 

 

 

 

31

Dublin: Preventive Centre—Erection

...

...

...

...

150,000

500

—

—

—

In planning.

 

Total:

...

 

£1,615,500

£1,712,594

4

8

 

 

 

 

 

 

 

 

Department of Lands:

 

 

 

 

 

 

 

 

 

 

 

 

32

21-24 Upper Merrion Street—Improvement of Electrical Installation

7,600

1,500

—

—

—

In planning.

 

Forestry Division:

 

 

 

 

 

 

 

 

 

 

 

 

33

Kinnitty Castle Training Centre—Additional Accommodation

 

 

 

 

 

 

 

 

 

 

 

 

 

for Trainees and Fire Precaution Works

...

...

...

8,500

7,000

6,214

6

1

38

0

0

6,252

6

1

In progress.

34

Shelton Abbey Forestry School—Accommodation for Additional

 

 

 

 

 

 

 

 

 

 

 

 

 

Trainees

...

...

...

...

...

...

...

...

5,100

2,500

2,994

11

8

699

7

5

3,693

19

1

In progress.

 

Fisheries Division:

 

 

 

 

 

 

 

 

 

 

 

 

35

Galway, Fisheries Research Station—Erection

...

...

...

Not yet made

5,000

—

—

—

In planning.

36

Major Fishery Harbours (Stage I)

...

...

...

...

1,260,000

120,000

10,941

13

9

262

15

5

11,204

9

2

In planning.

37

Works of Economic Development at other Fishery Harbours

62,000

35,000

20,110

17

3

5,867

6

3

25,978

3

6

In progress.

 

Total:

...

 

£171,000

£40,261

8

9

 

 

 

 

 

 

 

 

Department of Agriculture:

 

 

 

 

 

 

 

 

 

 

 

 

 

Veterinary College, Ballsbridge:

 

 

 

 

 

 

 

 

 

 

 

 

38 (1)

Improvements

...

...

...

...

...

...

...

Not yet made

10,000

9,578

0

3

—

9,578

0

3

In progress.

38 (2)

New Post Mortem Room

...

...

...

...

...

...

9,300

4,000

150

0

0

—

150

0

0

In planning.

39

Botanic Gardens—New Fern House

...

...

...

...

...

10,000

500

—

—

—

In planning.

 

Abbotstown Farm:

 

 

 

 

 

 

 

 

 

 

 

 

40 (1)

Artificial Insemination Experimental Station

...

...

...

23,500

2,500

1,423

6

10

19,132

8

2

20,555

15

0

In progress.

40 (2)

Experimental Animals Farmyard

...

...

...

...

...

41,000

14,000

14

0

10

11,046

6

1

11,060

6

11

In progress.

40 (3)

Foundation Stock Farmyard

...

...

...

...

...

60,000

10,000

216

10

7

17,267

16

6

17,484

7

1

In progress.

40 (4)

Residence for Director

...

...

...

...

...

...

5,000

3,000

6

8

5

671

15

1

678

3

6

In progress.

40 (5)

Residence for Farm Manager

...

...

...

...

...

3,500

3,000

7

7

2

140

0

0

147

7

2

In planning.

 

Athenry Agricultural School:

 

 

 

 

 

 

 

 

 

 

 

 

41 (1)

Fire Precaution Works

...

...

...

...

...

...

1,500

1,500

3

11

8

—

3

11

8

In planning.

41 (2)

Improvement of Water Supply

...

...

...

...

...

12,000

500

912

13

4

—

912

13

4

In planning.

41 (3)

New Building

...

...

...

...

...

...

...

110,000

36,000

19,231

5

4

56

6

5

19,287

11

9

In progress.

 

Ballyhaise Agricultural School:

 

 

 

 

 

 

 

 

 

 

 

 

42 (1)

Employees Cottages

...

...

...

...

...

...

13,000

4,000

3,713

12

2

7,350

16

8

11,064

8

10

In progress.

42 (2)

Re-arrangement of Grinding Plant

...

...

...

...

2,100

2,100

433

12

6

—

433

12

6

In progress.

 

Chantilly Veterinary Field Station:

 

 

 

 

 

 

 

 

 

 

 

 

43 (1)

Adaptations

...

...

...

...

...

...

...

...

4,150

200

—

1,664

8

10

1,664

8

10

Completed.

43 (2)

Fire Precaution Works

...

...

...

...

...

...

800

250

—

—

—

In planning.

 

Clonakilty Agricultural School:

 

 

 

 

 

 

 

 

 

 

 

 

44 (1)

Fire Precaution Works

...

...

...

...

...

...

1,250

1,250

—

633

9

11

633

9

11

Completed.

44 (2)

Improvement of Water Supply

...

...

...

...

...

12,250

3,000

400

0

0

152

8

0

552

8

0

In progress.

44 (3)

New Building

...

...

...

...

...

...

...

110,000

25,000

5,440

5

7

1,250

10

7

6,699

16

2

In progress.

45

Grange Stud and Dairy Farm—Additional Accommodation for

 

 

 

 

 

 

 

 

 

 

 

 

 

Livestock

...

...

...

...

...

...

...

...

7,000

400

379

9

10

7,370

13

2

7,750

3

0

Completed.

46

Johnstown Castle—Improvement of Water Supply

...

...

...

21,000

6,000

5,599

6

6

12,434

1

11

18,033

8

5

Completed.

 

Munster Institute:

 

 

 

 

 

 

 

 

 

 

 

 

47 (1)

Fire Precaution Works

...

...

...

...

...

...

2,500

2,500

209

0

3

—

209

0

3

In planning.

47 (2)

Improved Accommodation

...

...

...

...

...

...

20,000

11,500

8,562

15

5

6,728

7

9

15,291

3

2

In progress.

47 (3)

New Poultry Plant

...

...

...

...

...

...

...

98,500

2,000

3,445

8

10

13,647

13

9

17,093

2

7

In progress.

48

Cork: Egg and Poultry Inspection Accommodation

...

...

3,000

2,800

2,074

2

6

—

2,074

2

6

In progress.

49

Waterford, Bovine Tuberculosis and Portal Inspection Offices—

 

 

 

 

 

 

 

 

 

 

 

 

 

Adaptations

...

...

...

...

...

...

...

...

4,500

2,000

3,757

16

3

879

7

9

4,637

4

0

In progress.

 

Total:

...

 

£148,000

£65,558

14

3

 

 

 

 

 

 

 

 

Department of Transport and Power:

 

 

 

 

 

 

 

 

 

 

 

 

50

Valentia Observatory—Alterations and Additions

...

...

...

51,000

6,000

13,380

14

1

49,830

1

4

63,210

15

5

In progress.

 

Total:

...

 

£6,000

£13,380

14

1

 

 

 

 

 

 

 

 

Department of Posts and Telegraphs:

 

 

 

 

 

 

 

 

 

 

 

 

 

Dublin:

 

 

 

 

 

 

 

 

 

 

 

 

51

New Central Sorting Office

...

...

...

...

...

...

600,000

5,000

283

16

8

1,206

5

8

1,490

2

4

In progress.

52

New District Sorting Office and Telephone Exchange, Finglas

...

18,200

5,000

25

2

6

6

6

4

31

8

10

In planning.

53

Arklow Post Office—Improvements and New Telephone Exchange

12,850

1,000

—

—

—

In planning.

54

Ballinasloe—New Post Office and Telephone Exchange

...

...

24,500

1,000

—

—

—

In planning.

55

Bandon—New Telephone Exchange, Engineering Stores and Garages

1,500

1,000

1,030

4

10

—

1,030

4

10

In progress.

56

Carrick-on-Shannon Post Office—Improvements

...

...

...

18,200

10,000

9,500

2

10

676

3

3

10,176

6

1

In progress.

57

Droichead Nua—New Post Office and Telephone Exchange

...

15,750

1,200

1,106

12

11

14,575

13

4

15,682

6

3

In progress.

58

Ennis Post Office—Improvements and New Telephone Exchange

...

9,000

2,500

2,047

4

7

2

19

2

2,050

3

9

In progress.

59

Galway—New Post Office and Telephone Exchange

...

...

...

56,000

4,700

4,353

7

3

51,189

6

9

55,542

14

0

In progress.

60

Gorey Post Office—Improvements

...

...

...

...

...

2,250

250

1,346

3

11

1,226

16

3

2,573

0

2

In progress.

61

Killarney Post Office—Improvements

...

...

...

...

...

2,880

2,750

1,709

3

2

—

1,709

3

2

In progress.

62

Limerick—New Engineering Stores and Garages

...

...

...

1,600

700

—

—

—

In planning.

63

Limerick Post Office—Improvements

...

...

...

...

...

13,000

7,000

—

53

5

0

53

5

0

In progress.

64

Mallow Post Office—Improvements

...

...

...

...

...

3,350

3,000

1,654

4

7

—

1,654

4

7

In progress.

65

Sligo Post Office—Improvements

...

...

...

...

...

2,500

2,500

3,611

5

4

—

3,611

5

4

In progress.

66

Waterford Post Office—Improvements

...

...

...

...

1,500

1,500

662

8

0

—

662

8

0

In progress.

67

Wexford—New Area Engineering Headquarters

...

...

...

1,500

500

375

0

0

—

375

0

0

In planning.

67a

Wexford Post Office—Reconstruction Works

...

...

...

—

—

3,500

19

3

—

3,500

19

3

In progress.

68

Wicklow—New Post Office and Telephone Exchange

...

...

29,800

8,000

2,819

15

6

433

0

0

3,252

15

6

In progress.

69

Youghal—New Post Office and Telephone Exchange

...

...

13,000

3,000

—

—

—

In planning.

 

Total:

...

 

£60,600

£34,025

11

4

 

 

 

 

 

 

 

 

Department of Defence:

 

 

 

 

 

 

 

 

 

 

 

 

70

School of Civil Defence—Improved Accommodation

...

...

18,000

3,000

414

18

6

—

414

18

6

In planning.

71

Dublin, Cathal Brugha Barracks—Dining Hall and Cookhouse

...

47,000

10,000

500

0

0

—

500

0

0

In planning.

72

Curragh Camp—New Catholic Church

...

...

...

...

...

124,000

5,000

5

14

6

118,524

3

1

118,529

17

7

Completed.

73

Curragh Camp, Plunkett Barracks—Dining Hall and Cookhouse

...

70,000

7,000

4,902

10

1

64,546

12

1

69,449

2

2

In progress.

74

Haulbowline—New Watermain

...

...

...

...

...

...

7,250

2,750

Cr. 894

4

2

10,277

8

7

9,383

4

5

In progress.

75

Arbour Hill Detention Prison—Memorial to 1916 Leaders

...

...

29,000

1,500

1,243

8

6

23,767

11

9

25,011

0

3

In progress.

 

Total:

...

 

£29,250

£6,172

7

5

 

 

 

 

 

 

 

 

Department of Social Welfare:

 

 

 

 

 

 

 

 

 

 

 

 

76

Dublin—New Headquarters, Haddington Road

...

...

...

1,100,000

15,000

3

14

0

—

3

14

0

In planning.

77

Achill—New Employment Exchange

...

...

...

...

...

7,800

4,800

6,418

16

9

1,006

14

4

7,425

11

1

In progress.

78

Carrick-on-Shannon—New Employment Exchange

...

...

...

11,500

3,000

226

17

6

—

226

17

6

In planning.

79

Mullingar—New Employment Exchange

...

...

...

...

16,000

1,000

313

7

11

—

313

7

11

In planning.

80

Tralee—New Employment Exchange

...

...

...

...

...

42,500

15,000

14,048

13

1

23,659

6

8

37,707

19

9

In progress.

 

Total:

...

 

£38,800

£21,011

9

3

 

 

 

 

 

 

 

 

Department of Health:

 

 

 

 

 

 

 

 

 

 

 

 

 

Central Mental Hospital:

 

 

 

 

 

 

 

 

 

 

 

 

81 (1)

Fire Prevention and Control

...

...

...

...

...

5,050

2,500

463

11

4

3,667

16

2

4,131

7

6

In progress.

81 (2)

New Residence for Governor

...

...

...

...

...

5,200

2,000

111

7

0

—

111

7

0

In planning.

 

Total:

...

 

£4,500

£574

18

4

 

 

 

 

 

 

 

 

General:

 

 

 

 

 

 

 

 

 

 

 

 

82

Minor New Works not exceeding £700 each

...

...

...

...

16,000

16,000

21,164

17

5

—

—

Details below.

83

Urgent and Unforeseen Works

...

...

...

...

...

...

5,000

5,000

439

9

10

—

—

Details below.

84

Minor Balances of Expenditure (not provided for above) on works of

 

 

 

 

 

 

 

 

 

 

 

 

 

prior years which may not be completed on 1st April, 1961

...

25,000

25,000

12,057

18

6

—

—

Details below.

 

Totals:

...

 

£2,665,350

£2,207,494

16

3

 

 

 

 

 

 

 

 

Deduct for Works which may not be carried out during the year

...

 

165,350

 

 

 

 

 

 

 

 

 

 

 

Net Totals:

...

 

£2,500,000

£2,207,494

16

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DETAILS OF B.82—MINOR NEW WORKS

Work No.

Service and Description

Total Estimate

Vote 1961-62

Expenditure

Observations

1961-62

To 31/3/61

To 31/3/62

 

 

£

£

£

s.

d.

£

s.

d.

£

s.

d.

 

82

Minor New Works not exceeding £700 each

...

...

...

—

16,000

 

 

 

 

 

 

 

 

 

 

 

President’s Establishment:

 

 

 

 

 

 

 

 

 

 

 

 

90/96 of 60-61

Áras an Uachtaráin—Provide new bathroom

...

...

...

 

 

528

13

9

161

14

2

690

7

11

Completed.

 

Oireachtas:

 

 

 

 

 

 

 

 

 

 

 

 

 

Leinster House:

 

 

 

 

 

 

 

 

 

 

 

 

90/82 of 60-61

Installing ventilation fans in corridors

...

...

...

 

 

48

3

9

37

4

1

85

7

10

Completed.

32

Dáil Chamber—Acoustic tiling

...

...

...

...

...

 

 

32

0

0

—

32

0

0

In planning.

 

Department of an Taoiseach:

 

 

 

 

 

 

 

 

 

 

 

 

 

Central Statistics Office:

 

 

 

 

 

 

 

 

 

 

 

 

1

Partitioning

...

...

...

...

...

...

...

...

 

 

180

12

2

—

180

12

2

In progress.

57

Ladies Rest Room

...

...

...

...

...

...

...

 

 

194

9

1

—

194

9

1

Completed.

90/76 of 60-61

Pearse Memorial Plaque (G.P.O.)

...

...

...

...

...

 

 

152

3

2

313

6

8

465

9

10

Completed.

 

Department of Finance:

 

 

 

 

 

 

 

 

 

 

 

 

 

Revenue Commissioners:

 

 

 

 

 

 

 

 

 

 

 

 

90/61 of 60-61

14-16 Lord Edward Street—Improved central heating

...

...

 

 

 

18

3

279

0

0

279

18

3

Completed.

19

Donegal, St. Johnston Customs Station—Sanitary facilities and

 

 

 

 

 

 

 

 

 

 

 

 

 

Water Supply

...

...

...

...

...

...

...

 

 

196

1

6

—

196

1

6

Completed.

37

9-10 Upper O’Connell Street, Dublin—Partitioning in cash office

 

 

366

15

0

—

366

15

0

Completed.

90/35 of 60-61

Kinsale Custom House—Improvements at residence

...

...

 

 

7

13

0

262

17

0

270

10

0

Completed.

23

11-15 Upper O’Connell Street, Dublin—Improved ventilation,

 

 

 

 

 

 

 

 

 

 

 

 

 

Schedule A. Section

...

...

...

...

...

...

 

 

81

5

2

—

81

5

2

Completed.

42

14-15 Upper O’Connell Street, Dublin—Improved lighting

...

 

 

181

19

0

—

181

19

0

In progress.

48

11-15 Upper O’Connell Street, Dublin—Improved ventilation,

 

 

 

 

 

 

 

 

 

 

 

 

 

Schedule E. Section

...

...

...

...

...

...

 

 

184

12

9

—

184

12

9

Completed.

70

Dublin Castle—Improved ventilation

...

...

...

...

 

 

11

18

11

—

11

18

11

In progress.

85

Castlebar—Thermo Storage Heating

...

...

...

...

 

 

316

5

0

—

316

5

0

Completed.

4

Wexford—Toilet and Store

...

...

...

...

...

...

 

 

83

17

0

—

83

17

0

Completed.

16

Monaghan—Remodelling Customs Road Station

...

...

...

 

 

514

11

0

—

514

11

0

In progress.

76

Limerick Custom House—Thermo Storage Heating

...

...

 

 

208

4

1

—

208

4

1

Completed.

98

9-10 Upper O’Connell Street, Dublin—Adaptations for P.A.Y.E.

 

 

 

 

 

 

 

 

 

 

 

 

 

Staff

...

...

...

...

...

...

...

...

 

 

271

3

7

—

271

3

7

In progress.

90/34 of 60-61

Estate Duty Office, 21 St. Stephen’s Green—Water heater,

 

 

 

 

 

 

 

 

 

 

 

 

 

shelving, etc.

...

...

...

...

...

...

...

 

 

7

0

0

760

0

1

767

0

1

Completed.

 

Valuation Office:

 

 

 

 

 

 

 

 

 

 

 

 

39

5-6 Ely Place—Improved lighting and toilet facilities

...

...

 

 

31

17

0

—

31

17

0

Completed.

 

Ordnance Survey Office:

 

 

 

 

 

 

 

 

 

 

 

 

90/90 of 60-61

Alterations to photo Studio Buildings

...

...

...

...

 

 

336

19

7

318

7

11

655

7

6

In progress.

90/91 of 60-61

Kartolux Installation

...

...

...

...

...

...

 

 

186

19

11

75

13

7

262

13

6

In progress.

58

Sanitary facilities

...

...

...

...

...

...

...

 

 

34

19

8

—

34

19

8

In progress.

 

Office of Public Works:

 

 

 

 

 

 

 

 

 

 

 

 

 

51 St. Stephen’s Green, Dublin:

 

 

 

 

 

 

 

 

 

 

 

 

7

Adaptations in Lunch Club

...

...

...

...

...

 

 

80

5

0

—

80

5

0

Completed.

44

Adaptations in Drawing Office

...

...

...

...

...

 

 

685

4

7

—

685

4

7

In progress.

31

13/14 Earlsfort Terrace, Dublin—Improved ventilation

..

..

 

 

293

18

3

—

293

18

3

Completed.

90/52 of 60-61

19 Hume Street, Dublin—Electrical installation

...

...

...

 

 

28

15

0

207

16

5

236

11

5

Completed.

 

Phoenix Park:

 

 

 

 

 

 

 

 

 

 

 

 

90/67 of 60-61

School Residence, improvements

...

...

...

...

 

 

13

17

7

102

7

7

116

5

2

Completed.

90/64 of 60-61

Improvements at Spa Lodge East

...

...

...

...

 

 

280

18

4

138

2

6

419

0

10

Completed.

90/65 of 60-61

Improvements at Spa Lodge West

...

...

...

...

 

 

280

18

3

123

18

2

404

16

5

Completed.

79

Improvements at Ashview House

...

...

...

...

 

 

360

0

0

—

360

0

0

In progress.

90/9 of 60-61

Bourn Vincent Memorial Park—Cottage No. 3—Erect Annexe

 

 

 

6

5

52

12

3

52

18

8

Completed.

3

Garinish Island—Office, store and Men’s Room

...

...

...

 

 

631

18

6

—

631

18

6

In progress.

 

General.

 

 

 

 

 

 

 

 

 

 

 

 

62

Athlone Government Offices—Improved lighting

...

...

...

 

 

543

5

0

—

543

5

0

Completed.

81

Civil Service Dining Club, Earlsfort Terrace, Dublin—Improvements

 

 

176

4

8

—

176

4

8

Completed.

28

Dublin Castle—Block 17—Trial Borings

...

...

...

...

 

 

34

5

0

—

34

5

0

Completed.

97

1 Mount Street Crescent, Dublin—Renovations

...

...

...

 

 

17

5

0

—

17

5

0

In progress.

 

Department of Agriculture:

 

 

 

 

 

 

 

 

 

 

 

 

 

Government Buildings (South Block):

 

 

 

 

 

 

 

 

 

 

 

 

6

Shelving

...

...

...

...

...

...

...

...

 

 

104

2

7

—

104

2

7

Completed.

90/86 of 60-61

Machine Room, etc.

...

...

...

...

...

...

 

 

226

0

6

94

2

3

320

2

9

Completed.

90/72 of 60-61

Roscommon Bovine Tuberculosis Offices—Adaptations

...

...

 

 

361

11

8

235

13

9

597

5

5

Completed.

5

Ballyhaise Agricultural School—Auto drinking bowls

...

...

 

 

310

16

10

—

310

16

10

Completed.

90/79 of 60-61

Tipperary Bovine Tuberculosis Office—Adaptations, etc.

...

 

 

112

2

4

16

1

1

128

3

5

Completed.

82/17

Carlow Bovine Tuberculosis Office—Improved lighting and

 

 

 

 

 

 

 

 

 

 

 

 

 

heating

...

...

...

...

...

...

...

...

 

 

213

1

2

—

213

1

2

Completed.

90/59 of 60-61

16 Upper Merrion Street, Dublin—Improved lighting and heating

 

 

7

15

5

251

13

9

259

9

2

Completed.

90/56 of 60-61

9 Upper Mount Street, Dublin—Adaptations

...

...

...

 

 

1

3

4

67

8

7

68

11

11

Completed.

82/33

Athenry Agricultural School—Electricity Sub Station

...

...

 

 

196

0

0

—

196

0

0

Completed.

82/2

Backweston Farm—Electrical installation

...

...

...

 

 

208

15

4

—

208

15

4

Completed.

82/47

Munster Institute—Pig Progeny Testing Station—Partitioning

 

 

312

18

5

—

312

18

5

Completed.

82/55

Mullingar Bovine Tuberculosis Office—Improved heating and

 

 

 

 

 

 

 

 

 

 

 

 

 

lighting, etc.

...

...

...

...

...

...

...

 

 

108

0

2

—

108

0

2

Completed.

82/59

Abbotstown Farm—Fire precautions

...

...

...

...

 

 

191

3

5

—

191

3

5

In progress.

 

Botanic Gardens:

 

 

 

 

 

 

 

 

 

 

 

 

82/8

Soil warming cables

...

...

...

...

...

...

 

 

214

8

8

—

214

8

8

Completed.

82/83

Garage

...

...

...

...

...

...

...

...

 

 

170

6

11

—

170

6

11

In progress.

82/56

Galway Bovine Tuberculosis Office—Improved heating and

 

 

 

 

 

 

 

 

 

 

 

 

 

lighting

...

...

...

...

...

...

...

...

 

 

405

0

0

—

405

0

0

In progress.

82/49

Munster Institute—Poultry plant, fans and lighting points

...

 

 

477

13

7

—

477

13

7

In progress.

 

Department of Justice:

 

 

 

 

 

 

 

 

 

 

 

 

90/99 of 60-61

High Courts—Court for Registrar in Bankruptcy

...

...

 

 

201

13

5

9

11

7

211

5

0

Completed.

82/40

Dublin Castle—Renovation of rooms over Children’s Court

...

 

 

865

8

0

—

865

8

0

In progress.

82/43

Chief State Solicitor’s Office—Alterations

...

...

...

...

 

 

72

19

5

—

72

19

5

Completed.

82/53

Registry of Deeds—Shelving

...

...

...

...

...

 

 

218

0

4

—

218

0

4

Completed.

82/50

Garda Depot, Transport Stores—Fluorescent lighting

...

...

 

 

87

16

6

—

87

16

6

In progress.

82/103

Land Registry—Adaptations of Strong Room

...

...

...

 

 

56

12

7

—

56

12

7

In progress.

82/60

Police Huts

...

...

...

...

...

...

...

...

 

 

249

10

0

—

249

10

0

In progress.

 

Department of Education:

 

 

 

 

 

 

 

 

 

 

 

 

 

Technical Instruction Branch:

 

 

 

 

 

 

 

 

 

 

 

 

90/63 of 60-61

Toilet facilities

...

...

...

...

...

...

...

 

 

217

0

4

91

18

10

308

19

2

Completed.

82/34

Adaptations

...

...

...

...

...

...

...

 

 

156

7

2

—

156

7

2

In progress.

82/35

Alterations at Industrial Schools Section

...

...

...

 

 

321

16

8

—

321

16

8

In progress.

82/52

National College of Art—Improvements

...

...

...

...

 

 

182

13

1

—

182

13

1

In progress.

82/67

Tyrone House—Additional windows

...

...

...

...

 

 

224

0

0

—

224

0

0

In progress.

82/74

National Museum—Improved lighting

...

...

...

...

 

 

107

10

4

—

107

10

4

In progress.

82/87

National Gallery—Fire precaution works and burglar alarm

...

 

 

54

9

4

—

54

9

4

In progress.

 

Department of Lands:

 

 

 

 

 

 

 

 

 

 

 

 

90/80 of 60-61

Land Commission Luncheon Club—Improved cooking facilities, etc.

 

 

87

10

5

22

3

0

109

13

5

Completed.

82/26

Kilkenny Forestry Office—Partitions and decoration

...

...

 

 

21

9

6

—

21

9

6

In progress.

82/41

Sligo Forestry Office—Improvements

...

...

...

...

 

 

377

17

7

—

377

17

7

In progress.

82/90

Galway Forestry Office—Transfer of Offices

...

...

...

 

 

100

17

0

—

100

17

0

In progress.

 

Department of Industry and Commerce:

 

 

 

 

 

 

 

 

 

 

 

 

73/4 of 59-60

Kildare Street, Dublin—Adaptations

...

...

...

...

...

 

 

3

0

0

231

6

0

234

6

0

Completed.

82/46

44-45 Merrion Square—Toilet facilities

...

...

...

...

 

 

111

11

4

—

11

11

4

Completed.

82/80

Kildare Street—Partitioning

...

...

...

...

...

...

 

 

155

2

5

—

155

2

5

In progress.

 

Department of Transport and Power:

 

 

 

 

 

 

 

 

 

 

 

 

90/55 of 60-61

Meteorological Office, O’Connell Street, Dublin—Adaptations

...

 

 

716

17

7

890

6

11

1,607

4

6

Completed.

 

Department of Posts and Telegraphs:

 

 

 

 

 

 

 

 

 

 

 

 

90/8 of 60-61

P.O. Garage, Greenmount Lane, Harold’s Cross—Adaptations

 

 

44

13

10

469

9

2

514

3

0

Completed.

82/22

Carlow Post Office—Sanitary facilities

...

...

...

...

 

 

195

14

4

—

195

14

4

Completed.

82/25

Clonakilty Post Office—Widen gate provide fence, etc.

...

...

 

 

218

16

0

—

218

16

0

Completed.

82/45

General Post Office, Dublin, Public Office—Partitioning, etc.

...

 

 

713

2

1

—

713

2

1

In progress.

82/36

Pearse Street, Dublin Sorting Office—Refrigerator

...

...

 

 

146

5

0

—

146

5

0

Completed.

82/94

Pearse Street, Dublin—Partitioning, etc.

...

...

...

...

 

 

26

0

4

—

26

0

4

In progress.

82/64

Waterford Telephone Exchange—Alterations

...

...

...

 

 

114

13

10

—

114

13

10

Completed.

82/77

Wexford Post Office—Adaptations

...

...

...

...

...

 

 

213

4

8

—

213

4

8

In progress.

82/21

Bandon Post Office—Sanitary facilities

...

...

...

...

 

 

202

10

0

—

202

10

0

Completed.

 

General Post Office, Dublin:

 

 

 

 

 

 

 

 

 

 

 

 

82/89

Adaptations

...

...

...

...

...

...

...

 

 

 

15

4

—

 

15

4

Completed.

82/86

Partitioning

...

...

...

...

...

...

...

 

 

608

16

0

—

608

16

0

Completed.

82/78

Formation of Storeroom

...

...

...

...

...

...

 

 

135

0

0

—

135

0

0

Completed.

82/54

Aldboro House—Improvements at Gate Lodge

...

...

...

 

 

180

0

0

—

180

0

0

Completed.

82/92

Cork Sorting Office—Partitioning, etc.

...

...

...

...

 

 

182

16

1

—

182

16

1

In progress.

 

Department of Defence:

 

 

 

 

 

 

 

 

 

 

 

 

 

General Headquarters:

 

 

 

 

 

 

 

 

 

 

 

 

82/9

Ladies cloakroom

...

...

...

...

...

...

...

 

 

218

19

2

—

218

19

2

In progress.

82/68

Re-arrangement of accommodation

...

...

...

...

 

 

280

13

7

—

280

13

7

In progress.

82/66

Civil Defence Store, Newbridge—Surfacing approaches

...

...

 

 

59

0

0

—

59

0

0

Completed.

 

Department of External Affairs:

 

 

 

 

 

 

 

 

 

 

 

 

82/95

80 St. Stephen’s Green—Shelving

...

...

...

...

...

 

 

53

8

7

—

53

8

7

In progress.

82/102

Brussels Embassy—Partitioning

...

...

...

...

...

 

 

387

16

0

—

387

16

0

In progress.

 

Department of Social Welfare:

 

 

 

 

 

 

 

 

 

 

 

 

90/68 of 60-61

Werburgh Street Employment Exchange—Cycle shed

...

...

 

 

30

19

5

69

19

2

100

18

7

Completed.

90/70 of 60-61

Northumberland House Employment Exchange—Improved

 

 

 

 

 

 

 

 

 

 

 

 

 

electric lighting

...

...

...

...

...

...

...

 

 

80

3

0

90

4

5

170

7

5

In progress.

82/27

Áras Mhic Diarmada—Waste paper store

...

...

...

...

 

 

114

14

3

—

114

14

3

Completed.

82/24

Cork Employment Exchange—Improved heating

...

...

 

 

450

17

9

—

450

17

9

Completed.

82/38

Gardiner Street, Dublin, Employment Exchange—Adaptations

 

 

 

 

 

 

 

 

 

 

 

 

 

to counters

...

...

...

...

...

...

...

 

 

119

10

0

—

119

10

0

Completed.

 

Department of Health:

 

 

 

 

 

 

 

 

 

 

 

 

 

Custom House:

 

 

 

 

 

 

 

 

 

 

 

 

73/63 of 59-60

Supply furniture, decoration, transfers, consequent on

 

 

 

 

 

 

 

 

 

 

 

 

 

appointment of Registrar General

...

...

...

...

...

 

 

22

2

8

279

0

4

301

3

0

Completed.

90/48 of 60-61

Improvements and supplies for Minister’s room

...

...

 

 

566

18

3

323

4

5

890

2

8

In progress.

 

Total:

...

 

 

£21,164

17

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DETAILS OF B.83—URGENT AND UNFORESEEN WORKS

Work No.

Service and Description

Total Estimate

Vote 1961-62

Expenditure

Observations

1961-62

To 31/3/61

To 31/3/62

 

 

£

£

£

s.

d.

£

s.

d.

£

s.

d.

 

 

 

 

5,000

 

 

 

 

 

 

 

 

 

 

1

Valentia Observatory—Building for seismological instruments

...

 

 

7

16

0

—

7

16

0

In progress.

2

Garda Depot and Garda Offices, St. John’s Road—Adaptations

...

 

 

20

19

3

—

20

19

3

In progress.

3

Land Registry—Fire precautions

...

...

...

...

...

 

 

330

14

7

—

330

14

7

In progress.

4

Irish Embassy Lagos, Nigeria—Site investigation

...

...

...

 

 

80

0

0

—

80

0

0

In progress.

 

Total for Urgent and Unforeseen Works:

...

 

 

£439

9

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DETAILS OF B.84—MINOR BALANCES OF EXPENDITURE

Work No.

Service and Description

Total Estimate

Vote 1961-62

Expenditure

Observations

1961-62

To 31/3/61

To 31/3/62

 

 

£

£

£

s.

d.

£

s.

d.

£

s.

d.

 

 

 

 

25,000

 

 

 

 

 

 

 

 

 

 

 

Áras an Uachtaráin:

 

 

 

 

 

 

 

 

 

 

 

 

1 of 57-58

Improvements to East Wing

...

...

...

...

...

 

 

349

0

7

126,658

12

6

127,007

13

1

Completed.

 

Oireachtas:

 

 

 

 

 

 

 

 

 

 

 

 

2a of 60—61

Oireachtas Buildings—Alterations and Additions

...

...

 

 

21

4

8

38

9

6

59

14

2

In progress.

 

Department of the Taoiseach:

 

 

 

 

 

 

 

 

 

 

 

 

93/3 of 60-61

Central Statistics Office—Transfer dining club to new location—

 

 

 

 

 

 

 

 

 

 

 

 

 

Adapt former rooms for machine

...

...

...

...

 

 

1,469

0

5

2,252

17

1

3,721

17

6

In progress.

 

Department of Finance:

 

 

 

 

 

 

 

 

 

 

 

 

11 of 60-61

Ordnance Survey Office—Provision of Fundamental Bench

 

 

 

 

 

 

 

 

 

 

 

 

 

Marks

...

...

...

...

...

...

...

...

 

 

158

6

7

3,093

10

7

3,251

17

2

In progress.

9 of 60-61

Office of Public Works, New Central Furniture Stores and

 

 

 

 

 

 

 

 

 

 

 

 

 

Workshops—Adaptations

...

...

...

...

...

...

 

 

815

15

6

24,290

7

5

25,106

2

11

Completed.

15b of 60-61

Revenue Commissioners, 9-15 Upper O’Connell Street—

 

 

 

 

 

 

 

 

 

 

 

 

 

Adaptations

...

...

...

...

...

...

...

...

...

 

 

648

0

0

873

7

0

1,521

7

0

Completed.

9 of 59-60

Ordnance Survey Office—Improvement of lighting

...

...

 

 

273

0

3

2,447

10

4

2,720

10

7

Completed.

15a of 60-61

Revenue Commissioners, Stamping Branch—Instal fluorescent

 

 

 

 

 

 

 

 

 

 

 

 

 

lights

...

...

...

...

...

...

...

...

 

 

12

14

6

1,068

19

2

1,081

13

8

In progress.

 

Stationery Office:

 

 

 

 

 

 

 

 

 

 

 

 

14 of 60-61

Improvement of heating

...

...

...

...

...

...

 

 

280

0

0

1,996

0

0

2,276

0

0

Completed.

74/6 of 59-60

Adaptations on house formerly occupied by Col. Joyce

...

 

 

157

3

8

1,836

8

3

1,993

11

1

Completed.

5 of 58-59

Civil Service Dining Club, Earlsfort Terrace—Improvements

...

 

 

 

12

7

3,243

15

10

3,244

8

5

Completed.

14a of 59-60

Income Tax Commission, 73 Harcourt Street

...

...

...

 

 

245

15

0

1,789

6

10

2,035

1

10

Completed.

7 of 60-61

Government Buildings North Block—Improvement of Goods Lift

 

 

94

0

0

1,158

0

0

1,252

0

0

Completed.

 

Department of Agriculture:

 

 

 

 

 

 

 

 

 

 

 

 

32 (3) of 60-61

Johnstown Castle—Erection of new workshop

...

...

...

 

 

303

18

4

1,133

12

8

1,437

11

0

Completed.

22 (4) of 59-60

Ballyhaise Agricultural School—Improvement of water supply

...

 

 

94

0

0

875

9

3

969

9

3

Completed.

24 of 60-61

Government Buildings, South Block—Improvement of Goods Lift

 

 

91

0

0

1,123

0

0

1,214

0

0

Completed.

 

Department of Justice:

 

 

 

 

 

 

 

 

 

 

 

 

 

Garda Síochána Depot:

 

 

 

 

 

 

 

 

 

 

 

 

37 of 60-61

Improvements

...

...

...

...

...

...

...

 

 

454

18

9

659

7

8

1,114

6

5

Completed.

31 of 59-60

Improvement of electrical installation

...

...

...

...

 

 

15

0

0

3,220

4

0

3,235

4

0

In progress.

 

Department of Local Government:

 

 

 

 

 

 

 

 

 

 

 

 

43 of 60-61

Dublin Custom House—Improvement of heating

...

...

 

 

141

15

1

3,702

18

6

3,844

13

7

Completed.

 

Department of Education:

 

 

 

 

 

 

 

 

 

 

 

 

48 of 60-61

National Library—Improvement of Book Lift

...

...

...

 

 

149

11

2

1,341

0

0

1,490

11

2

Completed.

91/1 of 60-61

Coláiste Íde, Dingle—Electrical improvements

...

...

...

 

 

954

3

4

1,370

17

1

2,334

0

5

Completed.

45 of 60-61

Coláiste Bríde, Falcarragh—Fire precaution works

...

...

 

 

276

11

0

5,623

0

10

5,899

11

10

Completed.

47 of 60-61

Coláiste Iosagáin, Ballyvourney—Improvements

...

...

...

 

 

71

2

6

39,717

1

8

39,788

4

2

Completed.

37 of 58-59

Coláiste Moibhi—Adaptations

...

...

...

...

...

 

 

950

0

11

72,951

19

8

73,902

0

7

Completed.

 

Department of Lands:

 

 

 

 

 

 

 

 

 

 

 

 

52 of 60-61

Kinnitty Castle Training Centre—Accommodation

...

...

 

 

8

7

6

261

12

11

270

0

5

In progress.

 

Department of Transport and Power:

 

 

 

 

 

 

 

 

 

 

 

 

89a of 60-61

Government Offices, Kildare Street—Ministerial suite and

 

 

 

 

 

 

 

 

 

 

 

 

 

accommodation for displaced staff

...

...

...

...

 

 

127

16

0

8,794

15

0

8,922

11

0

Completed.

54 of 56-57

Kilkenny Meteorological Office

...

...

...

...

...

 

 

26

12

2

3,644

14

7

3,671

6

9

Completed.

 

Department of Posts and Telegraphs:

 

 

 

 

 

 

 

 

 

 

 

 

57a of 60-61

G.P.O.—Partitions in P.O. Savings Bank

...

...

...

...

 

 

700

19

0

1,086

0

0

1,786

19

0

In progress

65 of 60-61

Bray Post Office—Improvements

...

...

...

...

...

 

 

323

18

3

5,034

9

11

5,358

8

2

Completed.

91/2 of 60-61

G.P.O.—Installation and provision of filing equipment in Savings

 

 

 

 

 

 

 

 

 

 

 

 

 

Bank

...

...

...

...

...

...

...

...

 

 

74

11

0

3,106

11

5

3,181

2

5

Completed.

110 of 55-56

Limerick—New Telephone Exchange

...

...

...

...

 

 

56

16

0

1,662

13

4

1,719

9

4

Completed.

59 of 60-61

Dublin—New District Sorting Office, Crumlin

...

...

...

 

 

336

7

1

27,332

16

0

27,669

3

1

Completed.

64a of 60-61

Bantry Post Office—Improvements

...

...

...

...

 

 

18

10

0

610

9

10

628

19

10

Completed.

63 of 60-61

Dublin—Ballsbridge Post Office—Improvements

...

...

 

 

285

0

10

585

0

0

870

0

10

Completed.

58 of 60-61

Dublin—New District Sorting Office, Churchtown

...

...

 

 

68

17

8

17,240

9

1

17,309

6

9

Completed.

 

Department of Defence:

 

 

 

 

 

 

 

 

 

 

 

 

83 of 60-61

Haulbowline Dockyard—New Ordnance Pier

...

...

...

 

 

Cr. 60

14

3

19,706

2

9

19,645

8

6

Completed.

 

Department of Social Welfare:

 

 

 

 

 

 

 

 

 

 

 

 

85a of 60-61

Áras Mhic Diarmada—Adaptations

...

...

...

...

 

 

727

10

0

—

727

10

0

Completed.

 

Department of Health:

 

 

 

 

 

 

 

 

 

 

 

 

88 of 60-61

Central Mental Hospital—New Water Main

...

...

...

 

 

976

9

11

4,149

1

2

5,125

11

1

In progress.

88a of 60-61

Custom House—Demolition of Annexe

...

...

...

...

 

 

301

19

0

3,107

4

3

3,409

3

3

Completed.

72/1 of 59-60

Central Mental Hospital—Alterations and additions

...

...

 

 

58

3

6

30,856

17

8

30,915

1

2

Completed.

 

Total for Minor Balances:

...

 

 

£12,057

8

6