APPENDIX VIII.
STATEMENT OF EXPENDITURE, ON NEW WORKS, ALTERATIONS AND ADDITIONS, 1953-54 (VOTE 9, SUBHEAD B).
	Work No.  | 
	Service and Description  | 
	Total Estimate  | 
	Vote 1953-54  | 
	Expenditure  | 
	Observations  | 
 
	1953-54  | 
	to 31/3/53  | 
	to 31/3/54  | 
 
	   | 
	   | 
	£  | 
	£  | 
	£  | 
	s.  | 
	d.  | 
	£  | 
	s.  | 
	d.  | 
	£  | 
	s.  | 
	d.  | 
	   | 
 
	   | 
	President’s Establishment:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	1  | 
	Aras an Uachtaráin—Improvements and furnishing  | 
	...  | 
	115,000  | 
	25,000  | 
	1,825  | 
	5  | 
	0  | 
	55,823  | 
	15  | 
	10  | 
	57,649  | 
	0  | 
	10  | 
	In progress.  | 
 
	   | 
	   | 
	   | 
	£25,000  | 
	£1,825  | 
	5  | 
	0  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Houses of the Oireachtas:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	2  | 
	Electric Indicator System  | 
	...  | 
	...  | 
	...  | 
	...  | 
	2,000  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Deferred.  | 
 
	   | 
	   | 
	   | 
	£1,000  | 
	—  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Finance:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	3  | 
	2/3 Merrion Square—Central heating  | 
	...  | 
	...  | 
	...  | 
	2,000  | 
	1,100  | 
	463  | 
	5  | 
	5  | 
	719  | 
	14  | 
	1  | 
	1,182  | 
	19  | 
	6  | 
	In progress.  | 
 
	4  | 
	Dublin Custom House—Staff Restaurant  | 
	...  | 
	...  | 
	10,200  | 
	1,600  | 
	210  | 
	6  | 
	9  | 
	8,715  | 
	18  | 
	8  | 
	8,926  | 
	5  | 
	5  | 
	In progress.  | 
 
	4a  | 
	Sligo Custom House—Heating Installations  | 
	...  | 
	...  | 
	—  | 
	—  | 
	1,618  | 
	5  | 
	6  | 
	—  | 
	1,618  | 
	5  | 
	6  | 
	Completed.  | 
 
	5  | 
	Waterford Government Offices—Erection  | 
	...  | 
	...  | 
	184,000*  | 
	1,000  | 
	105  | 
	14  | 
	7  | 
	17,816  | 
	17  | 
	7  | 
	17,922  | 
	12  | 
	2  | 
	Project partly completed.  | 
 
	6  | 
	Office of Public Works—Additional Sanitary  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Accommodation  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	950  | 
	950  | 
	469  | 
	16  | 
	9  | 
	—  | 
	469  | 
	16  | 
	9  | 
	In progress.  | 
 
	7  | 
	Office of Public Works—Cork District Workshop  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Reconstruction  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	Not yet made  | 
	1,500  | 
	4  | 
	5  | 
	3  | 
	—  | 
	4  | 
	5  | 
	3  | 
	In progress.  | 
 
	8  | 
	Office of Public Works—New Central Engineering  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Workshop and Stores  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	128,000  | 
	15,000  | 
	5,233  | 
	13  | 
	2  | 
	2,645  | 
	14  | 
	9  | 
	7,879  | 
	7  | 
	11  | 
	In progress.  | 
 
	9  | 
	Valuation Office—Thermal Storage Heating and Electric  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Water Heaters  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	4,825  | 
	4,825  | 
	2,370  | 
	18  | 
	0  | 
	—  | 
	2,370  | 
	18  | 
	   | 
	In progress.  | 
 
	10  | 
	Ordnance Survey Office—Married Quarters,  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	5,200  | 
	2,700  | 
	—  | 
	—  | 
	—  | 
	Abandoned.  | 
 
	11  | 
	Ordnance Survey Office—Printing Room and Paper  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Stores—Thermal Storage Heating  | 
	...  | 
	...  | 
	...  | 
	700  | 
	700  | 
	522  | 
	9  | 
	11  | 
	—  | 
	522  | 
	9  | 
	11  | 
	Completed.  | 
 
	   | 
	Parks:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	12  | 
	Phoenix Park, People’s Gardens—New Shelter  | 
	...  | 
	...  | 
	2,500  | 
	1,500  | 
	—  | 
	—  | 
	—  | 
	Plans in preparation.  | 
 
	13  | 
	Rotunda Gardens—Garden of Remembrance  | 
	...  | 
	...  | 
	30,000  | 
	1,700  | 
	—  | 
	600  | 
	1  | 
	8  | 
	600  | 
	1  | 
	8  | 
	Plans in preparation.  | 
 
	14  | 
	St. Stephen’s Green—New Shelter  | 
	...  | 
	...  | 
	...  | 
	1,200  | 
	1,200  | 
	—  | 
	—  | 
	—  | 
	Not commenced.  | 
 
	   | 
	Harbours:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	15  | 
	Buncrana Harbour—Improvements  | 
	...  | 
	...  | 
	...  | 
	1,050  | 
	575  | 
	—  | 
	475  | 
	0  | 
	0  | 
	475  | 
	0  | 
	0  | 
	Project partly completed.  | 
 
	16  | 
	Dún Laoghaire Harbour—Additional Customs and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Sanitary Accommodation  | 
	...  | 
	...  | 
	...  | 
	...  | 
	36,200  | 
	500  | 
	740  | 
	9  | 
	2  | 
	36,108  | 
	17  | 
	2  | 
	36,849  | 
	6  | 
	4  | 
	Completed.  | 
 
	   | 
	   | 
	   | 
	£34,850  | 
	£11,739  | 
	4  | 
	6  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Agriculture:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	17  | 
	Government Buildings, South Block—Ruboleum for  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Corridors and Stairs  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	3,250  | 
	3,250  | 
	2,477  | 
	12  | 
	5  | 
	—  | 
	2,477  | 
	12  | 
	5  | 
	In progress.  | 
 
	18  | 
	Botanic Gardens—Additional Seats  | 
	...  | 
	...  | 
	...  | 
	560  | 
	115  | 
	—  | 
	—  | 
	—  | 
	D/Finance sanction awaited.  | 
 
	19  | 
	Botanic Gardens—Improvement of Water Supply  | 
	...  | 
	10,050  | 
	1,000  | 
	—  | 
	395  | 
	3  | 
	11  | 
	395  | 
	3  | 
	11  | 
	Progress interrupted by negotiations (since completed) with Dublin Corporation.  | 
 
	20  | 
	Abbotstown Farm—Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	21,910  | 
	2,950  | 
	4,850  | 
	0  | 
	1  | 
	634  | 
	9  | 
	3  | 
	5,484  | 
	9  | 
	4  | 
	In progress.  | 
 
	21  | 
	Athenry Agricultural School—Hard-surfacing to Yards  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	and Avenues  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	2,000  | 
	300  | 
	953  | 
	13  | 
	5  | 
	1,268  | 
	16  | 
	3  | 
	2,222  | 
	9  | 
	8  | 
	In progress.  | 
 
	22  | 
	Athenry Agricultural School—New Grain Stores,  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Boiler-house and Carpenter’s Shop  | 
	...  | 
	...  | 
	...  | 
	...  | 
	5,000  | 
	4,000  | 
	2,263  | 
	2  | 
	10  | 
	   | 
	4  | 
	8  | 
	2,263  | 
	7  | 
	6  | 
	In progress.  | 
 
	23  | 
	Athenry Agricultural School—New Hay Barn  | 
	...  | 
	...  | 
	1,000  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Tenders invited.  | 
 
	24  | 
	Athenry Agricultural School—New Machinery Store  | 
	...  | 
	2,000  | 
	2,000  | 
	1,846  | 
	3  | 
	1  | 
	—  | 
	1,846  | 
	3  | 
	1  | 
	Completed.  | 
 
	25  | 
	Athenry Agricultural School—Newford Yard—Electric  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Lighting  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	300  | 
	300  | 
	186  | 
	10  | 
	0  | 
	—  | 
	186  | 
	10  | 
	0  | 
	Work completed.  | 
 
	26  | 
	Athenry Agricultural School—Petrol Storage  | 
	...  | 
	...  | 
	460  | 
	460  | 
	—  | 
	—  | 
	—  | 
	Under consideration.  | 
 
	27  | 
	Athenry Agricultural School—Provision of Electric Power  | 
	2,000  | 
	300  | 
	306  | 
	17  | 
	3  | 
	1,462  | 
	9  | 
	9  | 
	1,769  | 
	7  | 
	0  | 
	In progress.  | 
 
	28  | 
	Ballyhaise Agricultural School—Artificial Insemination  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Centre  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	690  | 
	440  | 
	549  | 
	16  | 
	6  | 
	23  | 
	0  | 
	0  | 
	572  | 
	16  | 
	6  | 
	Completed.  | 
 
	29  | 
	Ballyhaise Agricultural School—Improved Common Room  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Facilities  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	1,600  | 
	1,600  | 
	47  | 
	4  | 
	8  | 
	—  | 
	47  | 
	4  | 
	8  | 
	Reconsidered with other works.  | 
 
	30  | 
	Ballyhaise Agricultural School—Improved Cooking  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Equipment  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	650  | 
	500  | 
	10  | 
	13  | 
	2  | 
	179  | 
	16  | 
	4  | 
	190  | 
	9  | 
	6  | 
	Tenders for further equipment under consideration.  | 
 
	31  | 
	Ballyhaise Agricultural School—Petrol Storage  | 
	...  | 
	...  | 
	520  | 
	520  | 
	—  | 
	—  | 
	—  | 
	Project under review.  | 
 
	32  | 
	Ballyhaise Agricultural School—Poultry Plant—  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Extension  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	9,000  | 
	3,000  | 
	—  | 
	—  | 
	—  | 
	Revised plans in preparation.  | 
 
	33  | 
	Clonakilty Agricultural School—New Buildings  | 
	...  | 
	...  | 
	75,000  | 
	1,000  | 
	5  | 
	0  | 
	0  | 
	725  | 
	18  | 
	1  | 
	730  | 
	18  | 
	1  | 
	Sketch plans prepared.  | 
 
	34  | 
	Clonakilty Agricultural School—Petrol Storage  | 
	...  | 
	...  | 
	1,160  | 
	1,040  | 
	—  | 
	—  | 
	—  | 
	Revised requirements under consideration.  | 
 
	35  | 
	Clonakilty Agricultural School—Poultry Plant—  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Extension  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	5,100  | 
	5,000  | 
	10  | 
	3  | 
	6  | 
	—  | 
	10  | 
	3  | 
	6  | 
	Contract placed. Work in progress.  | 
 
	36  | 
	Clonakilty Agricultural School—Provision of Cold Room  | 
	460  | 
	460  | 
	410  | 
	0  | 
	3  | 
	—  | 
	410  | 
	0  | 
	3  | 
	Completed.  | 
 
	37  | 
	Grange Stud and Dairy Farm—Adaptations  | 
	...  | 
	...  | 
	38,100  | 
	16,700  | 
	5,435  | 
	9  | 
	10  | 
	20,315  | 
	9  | 
	0  | 
	25,750  | 
	18  | 
	10  | 
	In progress.  | 
 
	38  | 
	Johnstown Castle—Adaptations and Renovations  | 
	...  | 
	146,200  | 
	10,850  | 
	8,463  | 
	9  | 
	2  | 
	124,062  | 
	13  | 
	4  | 
	132,526  | 
	2  | 
	6  | 
	In progress.  | 
 
	39  | 
	Munster Institute—Electric Lighting and Equipment  | 
	...  | 
	1,920  | 
	1,200  | 
	83  | 
	18  | 
	9  | 
	—  | 
	83  | 
	18  | 
	9  | 
	Awaiting plan and specification.  | 
 
	40  | 
	Munster Institute—Improved Accommodation  | 
	...  | 
	...  | 
	72,000  | 
	6,000  | 
	494  | 
	14  | 
	3  | 
	704  | 
	8  | 
	11  | 
	1,199  | 
	3  | 
	2  | 
	In progress.  | 
 
	41  | 
	Munster Institute—Petrol Storage  | 
	...  | 
	...  | 
	...  | 
	820  | 
	820  | 
	—  | 
	—  | 
	—  | 
	Revised requirements under consideration.  | 
 
	42  | 
	Veterinary College—Improvements  | 
	...  | 
	...  | 
	...  | 
	127,000  | 
	20,000  | 
	33  | 
	5  | 
	7  | 
	77,031  | 
	7  | 
	11  | 
	77,064  | 
	13  | 
	6  | 
	In progress.  | 
 
	   | 
	Fishery, etc. Harbours:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	43  | 
	Dredging operations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	21,000  | 
	21,000  | 
	4,065  | 
	18  | 
	5  | 
	22  | 
	13  | 
	1  | 
	4,088  | 
	11  | 
	6  | 
	In progress.  | 
 
	44  | 
	Works of Economic Development  | 
	...  | 
	...  | 
	...  | 
	10,500  | 
	10,500  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Ballymacaw  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	   | 
	   | 
	754  | 
	8  | 
	10  | 
	9  | 
	7  | 
	0  | 
	763  | 
	15  | 
	10  | 
	Completed.  | 
 
	   | 
	Bloodyforeland  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	   | 
	   | 
	22  | 
	8  | 
	8  | 
	77  | 
	8  | 
	8  | 
	99  | 
	17  | 
	4  | 
	Completed.  | 
 
	   | 
	Castletownshend  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	   | 
	   | 
	198  | 
	0  | 
	0  | 
	—  | 
	198  | 
	0  | 
	0  | 
	Completed.  | 
 
	   | 
	Portaleen  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	   | 
	   | 
	9  | 
	10  | 
	2  | 
	89  | 
	16  | 
	7  | 
	99  | 
	6  | 
	9  | 
	Major Works still under consideration.  | 
 
	   | 
	   | 
	   | 
	£116,305  | 
	£33,478  | 
	0  | 
	10  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Justice:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	45  | 
	Courts of Justice, Law Library—Improvement of  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Ventilation  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	1,660  | 
	1,660  | 
	1,580  | 
	0  | 
	11  | 
	292  | 
	15  | 
	9  | 
	1,872  | 
	16  | 
	8  | 
	Completed.  | 
 
	46  | 
	Dublin Castle, Chief State Solicitor’s Office—Thermal  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Storage Heating  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	1,300  | 
	1,300  | 
	1,269  | 
	5  | 
	11  | 
	—  | 
	1,269  | 
	5  | 
	11  | 
	Completed.  | 
 
	47  | 
	Gárda Síochána Depot—Accommodation for Recruits  | 
	...  | 
	Not yet made  | 
	500  | 
	1,411  | 
	15  | 
	10  | 
	7,791  | 
	15  | 
	10  | 
	9,203  | 
	11  | 
	8  | 
	In progress.  | 
 
	48  | 
	Gárda Síochána Depot—Additional Garage and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Workshop Accommodation  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	42,000  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Planning in progress.  | 
 
	49  | 
	Gárda Síochána Depot—Additional Storage  | 
	...  | 
	...  | 
	1,200  | 
	1,200  | 
	39  | 
	17  | 
	0  | 
	—  | 
	39  | 
	17  | 
	0  | 
	Planning in progress.  | 
 
	50  | 
	Gárda Síochána Depot—New Electrical Distribution  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	System  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	1,550  | 
	1,550  | 
	1,450  | 
	0  | 
	0  | 
	53  | 
	12  | 
	0  | 
	1,503  | 
	12  | 
	0  | 
	In progress.  | 
 
	50a  | 
	Gárda Síochána Depot—Supply of kitchen equipment  | 
	—  | 
	—  | 
	516  | 
	17  | 
	0  | 
	—  | 
	516  | 
	17  | 
	0  | 
	Completed.  | 
 
	51  | 
	Metropolitan District Courts—Acoustical Improvements  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	and Removal of Galleries  | 
	...  | 
	...  | 
	...  | 
	...  | 
	1,200  | 
	400  | 
	1,296  | 
	10  | 
	6  | 
	532  | 
	15  | 
	10  | 
	1,829  | 
	6  | 
	4  | 
	Completed.  | 
 
	52  | 
	Land Registry—Improved Accommodation  | 
	...  | 
	...  | 
	6,150  | 
	3,000  | 
	3,065  | 
	16  | 
	2  | 
	1,508  | 
	2  | 
	10  | 
	4,573  | 
	19  | 
	0  | 
	In progress.  | 
 
	53  | 
	Gárda Síochána Barracks (to be specified)—New Works,  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Alterations and Additions  | 
	...  | 
	...  | 
	...  | 
	...  | 
	96,000  | 
	96,000  | 
	7,578  | 
	17  | 
	2  | 
	—  | 
	—  | 
	See details at back.  | 
 
	54  | 
	New Works, Alterations and Additions at other Gárda  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Síochána Barracks  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	5,000  | 
	5,000  | 
	452  | 
	12  | 
	7  | 
	—  | 
	—  | 
	See details at back.  | 
 
	55  | 
	Minor New Works at Gárda Síochána Barracks  | 
	...  | 
	...  | 
	4,000  | 
	4,000  | 
	3,133  | 
	18  | 
	9  | 
	—  | 
	—  | 
	See details at back.  | 
 
	   | 
	   | 
	   | 
	£115,610  | 
	£21,795  | 
	11  | 
	10  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Education:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	56  | 
	Tyrone House—Improvement of Lighting  | 
	...  | 
	...  | 
	1,000  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Postponed.  | 
 
	57  | 
	Talbot House—Central Heating  | 
	...  | 
	...  | 
	...  | 
	2,900  | 
	2,500  | 
	2,301  | 
	19  | 
	7  | 
	—  | 
	2,301  | 
	19  | 
	7  | 
	Completed.  | 
 
	58  | 
	29 Marlboro’ Street—Improvements and Thermal Storage  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Heating  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	3,500  | 
	2,000  | 
	3,676  | 
	14  | 
	1  | 
	631  | 
	13  | 
	5  | 
	4,308  | 
	7  | 
	6  | 
	Completed.  | 
 
	59  | 
	21 Fitzwilliam Square—Thermal Storage Heating  | 
	850  | 
	850  | 
	722  | 
	12  | 
	2  | 
	—  | 
	722  | 
	12  | 
	2  | 
	Completed.  | 
 
	60  | 
	Central Model Schools—Central Heating and Electric  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Lighting  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	4,650  | 
	4,000  | 
	—  | 
	—  | 
	—  | 
	Abandoned.  | 
 
	60a  | 
	Central Model Schools—Erection of Italian Statuary  | 
	...  | 
	—  | 
	—  | 
	685  | 
	19  | 
	11  | 
	—  | 
	685  | 
	19  | 
	11  | 
	Completed.  | 
 
	61  | 
	Dunmanway Model School—Improvements  | 
	...  | 
	...  | 
	1,950  | 
	1,950  | 
	3  | 
	12  | 
	8  | 
	—  | 
	3  | 
	12  | 
	8  | 
	Held up by way-leave negotiations.  | 
 
	62  | 
	National Schools—Grants for Building, Enlarging, etc.  | 
	730,000  | 
	730,000  | 
	1,071,053  | 
	9  | 
	8  | 
	—  | 
	1,071,053  | 
	9  | 
	8  | 
	   | 
 
	   | 
	Preparatory Colleges:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	63  | 
	Coláiste Iosagáin—Remedying of damp  | 
	...  | 
	...  | 
	...  | 
	20,000  | 
	5,000  | 
	—  | 
	—  | 
	—  | 
	Quantities in preparation.  | 
 
	64  | 
	Coláiste Móibhí—Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	75,000  | 
	20,000  | 
	53  | 
	17  | 
	7  | 
	15,561  | 
	7  | 
	3  | 
	15,615  | 
	4  | 
	10  | 
	Tender accepted.  | 
 
	   | 
	Institutions of Science and Art  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	65  | 
	National Library—Provision of Shelving  | 
	...  | 
	...  | 
	1,000  | 
	900  | 
	19  | 
	14  | 
	0  | 
	26  | 
	12  | 
	2  | 
	46  | 
	6  | 
	2  | 
	In progress.  | 
 
	66  | 
	National Library and National Museum—Renewal of  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Defective Stonework  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	70,000  | 
	7,000  | 
	—  | 
	—  | 
	—  | 
	Tenders invited.  | 
 
	67  | 
	National Gallery—New Lift  | 
	...  | 
	...  | 
	...  | 
	...  | 
	3,200  | 
	500  | 
	11  | 
	7  | 
	6  | 
	—  | 
	11  | 
	7  | 
	6  | 
	Tenders under consideration.  | 
 
	   | 
	Reformatory and Industrial Schools:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	68  | 
	Reformatory School, Daingean—Adaptations  | 
	...  | 
	...  | 
	70,700  | 
	4,600  | 
	9,082  | 
	5  | 
	6  | 
	47,709  | 
	10  | 
	9  | 
	56,791  | 
	16  | 
	3  | 
	Completed.  | 
 
	   | 
	   | 
	   | 
	£780,300  | 
	£1,087,611  | 
	12  | 
	8  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Lands:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	69  | 
	Gaeltacht Services, 64/65 Merrion Square—Adaptation of  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Store  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	3,000  | 
	3,000  | 
	—  | 
	—  | 
	—  | 
	Tenders invited.  | 
 
	70  | 
	Gaeltacht Services—Central Depot and Rural Centres—  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Improved Fire-Fighting Facilities  | 
	...  | 
	...  | 
	...  | 
	10,425  | 
	4,500  | 
	142  | 
	13  | 
	0  | 
	—  | 
	142  | 
	13  | 
	0  | 
	In progress.  | 
 
	71  | 
	Gaeltacht Services—Ardara Tweed Mart—Improvements  | 
	3,500  | 
	2,300  | 
	2,810  | 
	10  | 
	11  | 
	171  | 
	18  | 
	1  | 
	2,982  | 
	9  | 
	0  | 
	Virtually completed.  | 
 
	72  | 
	Gaeltacht Services—Bruckless Lace Centre—Extension  | 
	5,000  | 
	1,000  | 
	5  | 
	18  | 
	5  | 
	—  | 
	5  | 
	18  | 
	5  | 
	Finance sanction awaited.  | 
 
	73  | 
	Gaeltacht Services—Bruckless Lace Centre—Well and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Pump  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	500  | 
	300  | 
	85  | 
	2  | 
	6  | 
	—  | 
	85  | 
	2  | 
	6  | 
	In progress.  | 
 
	74  | 
	Gaeltacht Services—Crolly Toy Factory—Improvement  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	of Heating  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	1,110  | 
	650  | 
	274  | 
	5  | 
	1  | 
	857  | 
	13  | 
	2  | 
	1,131  | 
	18  | 
	3  | 
	Completed.  | 
 
	75  | 
	Gaeltacht Services—Crolly Toy Factory—Water Supply, Cycle Shed and Improved Sanitary Accommodation  | 
	2,000  | 
	1,500  | 
	1,607  | 
	10  | 
	0  | 
	—  | 
	1,607  | 
	10  | 
	0  | 
	In progress.  | 
 
	76  | 
	Gaeltacht Services—Elly Bay Toy Factory—Water  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Supply and Improved Sanitary Accommodation  | 
	...  | 
	1,200  | 
	500  | 
	368  | 
	3  | 
	0  | 
	1,061  | 
	6  | 
	2  | 
	1,429  | 
	9  | 
	2  | 
	Completed.  | 
 
	77  | 
	Gaeltacht Services—Glencolumbkille—New Tweed Mart  | 
	12,500  | 
	1,000  | 
	14  | 
	17  | 
	3  | 
	—  | 
	14  | 
	17  | 
	3  | 
	Contract placed.  | 
 
	78  | 
	Gaeltacht Services—Kilcar—New Spinning Factory  | 
	...  | 
	58,000  | 
	1,000  | 
	489  | 
	12  | 
	6  | 
	56,545  | 
	19  | 
	1  | 
	57,035  | 
	11  | 
	7  | 
	In progress.  | 
 
	79  | 
	Gaeltacht Services—Roundstone Knitting Centre—  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Extension  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	1,300  | 
	1,300  | 
	1,025  | 
	3  | 
	10  | 
	12  | 
	8  | 
	11  | 
	1,037  | 
	12  | 
	9  | 
	In progress.  | 
 
	80  | 
	Gaeltacht Services—Spiddal Toy Factory—Spraying Shed  | 
	500  | 
	500  | 
	—  | 
	—  | 
	—  | 
	Plans in preparation.  | 
 
	81  | 
	Gaeltacht Services—Tourmakeady Knitting Centre—  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	6,000  | 
	1,700  | 
	1,853  | 
	9  | 
	3  | 
	3,365  | 
	3  | 
	1  | 
	5,218  | 
	12  | 
	4  | 
	In progress.  | 
 
	82  | 
	Forestry School, Shelton Abbey—Adaptations  | 
	...  | 
	...  | 
	48,330  | 
	19,000  | 
	12,293  | 
	15  | 
	1  | 
	536  | 
	4  | 
	7  | 
	12,829  | 
	19  | 
	8  | 
	In progress.  | 
 
	82a  | 
	Kinnity Castle—Adaptation as Forestry Centre and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Furnishing  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	—  | 
	—  | 
	12  | 
	3  | 
	9  | 
	—  | 
	12  | 
	3  | 
	9  | 
	In progress.  | 
 
	   | 
	   | 
	   | 
	£38,250  | 
	£20,983  | 
	4  | 
	7  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Industry and Commerce:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	83  | 
	Additional Telegraphic Weather Reporting Stations  | 
	15,000  | 
	5,000  | 
	12  | 
	2  | 
	1  | 
	1,829  | 
	4  | 
	4  | 
	1,841  | 
	6  | 
	5  | 
	Works and plans in progress.  | 
 
	84  | 
	Rosslare, New Meteorological Observing Station and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Training Centre  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	17,600  | 
	8,000  | 
	330  | 
	11  | 
	2  | 
	   | 
	9  | 
	3  | 
	331  | 
	0  | 
	5  | 
	In progress.  | 
 
	85  | 
	Valentia Observatory—Adaptations and Additions  | 
	...  | 
	58,000  | 
	5,000  | 
	652  | 
	13  | 
	0  | 
	4,796  | 
	5  | 
	1  | 
	5,448  | 
	18  | 
	1  | 
	Revised Contract Drawings approved.  | 
 
	   | 
	   | 
	   | 
	£18,000  | 
	£995  | 
	6  | 
	3  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Posts and Telegraphs:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	86  | 
	Dublin New Central Sorting Office  | 
	...  | 
	...  | 
	...  | 
	Not yet made  | 
	1,000  | 
	59  | 
	10  | 
	9  | 
	—  | 
	59  | 
	10  | 
	9  | 
	Planning in progress.  | 
 
	86a  | 
	G.P.O.—Bicycle Shelters  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	—  | 
	—  | 
	855  | 
	14  | 
	0  | 
	11  | 
	4  | 
	0  | 
	866  | 
	18  | 
	0  | 
	Completed.  | 
 
	87  | 
	Post Office Stores Depot, St. John’s Road—Adaptations  | 
	700  | 
	700  | 
	22  | 
	0  | 
	6  | 
	—  | 
	22  | 
	0  | 
	6  | 
	In progress.  | 
 
	88  | 
	Post Office Stores, Infirmary Road—Thermal Storage  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Heating  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	3,500  | 
	500  | 
	2,028  | 
	11  | 
	4  | 
	866  | 
	7  | 
	6  | 
	2,894  | 
	18  | 
	10  | 
	Completed.  | 
 
	89  | 
	Athenry New Post Office and Telephone Exchange  | 
	...  | 
	18,500*  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Revised sketch plans ready.  | 
 
	90  | 
	Ballina Post Office—Additional Accommodation  | 
	...  | 
	10,400*  | 
	4,000  | 
	570  | 
	11  | 
	5  | 
	—  | 
	570  | 
	11  | 
	5  | 
	Tender accepted.  | 
 
	91  | 
	Bray Post Office—Alterations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	500  | 
	500  | 
	—  | 
	—  | 
	—  | 
	Plans and Specification awaited.  | 
 
	92  | 
	Carrick-on-Suir Post Office—Adaptations  | 
	...  | 
	...  | 
	1,000  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Revised plans under consideration.  | 
 
	93  | 
	Clonmel Post Office—Extension  | 
	...  | 
	...  | 
	...  | 
	1,760  | 
	500  | 
	1,367  | 
	1  | 
	3  | 
	263  | 
	1  | 
	8  | 
	1,630  | 
	2  | 
	11  | 
	Completed.  | 
 
	93a  | 
	Enniscorthy Post Office  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	—  | 
	—  | 
	461  | 
	11  | 
	0  | 
	—  | 
	461  | 
	11  | 
	0  | 
	Completed.  | 
 
	94  | 
	Cootehill New Post Office and Telephone Exchange  | 
	...  | 
	14,500*  | 
	6,000  | 
	—  | 
	—  | 
	—  | 
	Planning in progress.  | 
 
	95  | 
	Drogheda—New Post Office and Telephone Exchange  | 
	46,200*  | 
	18,000  | 
	5,934  | 
	0  | 
	11  | 
	10,043  | 
	12  | 
	10  | 
	15,977  | 
	13  | 
	9  | 
	In progress.  | 
 
	96  | 
	Dundalk Post Office—Improvements  | 
	...  | 
	...  | 
	...  | 
	7,500  | 
	3,000  | 
	—  | 
	—  | 
	—  | 
	Bills of Quantities awaited.  | 
 
	97  | 
	Dún Laoghaire Post Office—Adaptations  | 
	...  | 
	...  | 
	2,000  | 
	2,000  | 
	1,174  | 
	13  | 
	2  | 
	—  | 
	1,174  | 
	13  | 
	2  | 
	In progress.  | 
 
	98  | 
	Galway—New Post Office and Telephone Exchange  | 
	...  | 
	66,000*  | 
	825  | 
	61  | 
	15  | 
	0  | 
	—  | 
	61  | 
	15  | 
	0  | 
	Demolition plans approved.  | 
 
	99  | 
	Killarney—New Telephone Exchange and Garage  | 
	...  | 
	1,800*  | 
	500  | 
	—  | 
	—  | 
	—  | 
	Suspended.  | 
 
	100  | 
	Kilkenny Post Office—Extension  | 
	...  | 
	...  | 
	...  | 
	28,000*  | 
	2,000  | 
	—  | 
	—  | 
	—  | 
	Quantity surveyor appointed.  | 
 
	101  | 
	Kilrush—New Post Office and Telephone Exchange  | 
	...  | 
	18,000*  | 
	10,000  | 
	77  | 
	7  | 
	8  | 
	240  | 
	0  | 
	0  | 
	317  | 
	7  | 
	8  | 
	In progress.  | 
 
	102  | 
	Limerick—New Telephone Exchange  | 
	...  | 
	...  | 
	...  | 
	1,900*  | 
	500  | 
	31  | 
	7  | 
	9  | 
	1  | 
	0  | 
	6  | 
	32  | 
	8  | 
	3  | 
	In progress.  | 
 
	103  | 
	Monaghan Post Office—Additions  | 
	...  | 
	...  | 
	...  | 
	7,000*  | 
	5,000  | 
	20  | 
	8  | 
	1  | 
	—  | 
	20  | 
	8  | 
	1  | 
	In progress.  | 
 
	104  | 
	Naas Post Office—Garages and Stores  | 
	...  | 
	...  | 
	1,250*  | 
	600  | 
	—  | 
	—  | 
	—  | 
	Working drawings prepared.  | 
 
	105  | 
	Naas Post Office—New Post Office  | 
	...  | 
	...  | 
	...  | 
	8,500  | 
	3,000  | 
	—  | 
	—  | 
	—  | 
	Quantities awaited.  | 
 
	106  | 
	Portlaoighise Post Office—Improvements  | 
	...  | 
	...  | 
	1,050  | 
	200  | 
	849  | 
	12  | 
	1  | 
	650  | 
	13  | 
	9  | 
	1,500  | 
	5  | 
	10  | 
	In progress.  | 
 
	107  | 
	Rathluirc—New Post Office and Telephone Exchange  | 
	14,000*  | 
	6,000  | 
	1,085  | 
	6  | 
	0  | 
	—  | 
	1,085  | 
	6  | 
	0  | 
	In progress.  | 
 
	108  | 
	Tralee Post Office—Extension  | 
	...  | 
	...  | 
	...  | 
	...  | 
	6,700  | 
	6,000  | 
	75  | 
	16  | 
	11  | 
	—  | 
	75  | 
	16  | 
	11  | 
	In progress.  | 
 
	109  | 
	Improved Sorting Equipment at Post Offices  | 
	...  | 
	...  | 
	18,400  | 
	7,000  | 
	1,980  | 
	0  | 
	0  | 
	7,763  | 
	10  | 
	11  | 
	9,743  | 
	10  | 
	11  | 
	In progress.  | 
 
	   | 
	Wireless Broadcasting:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	110  | 
	Dublin, Phoenix Hall—Adaptations  | 
	...  | 
	...  | 
	...  | 
	6,500  | 
	500  | 
	325  | 
	13  | 
	6  | 
	4,572  | 
	7  | 
	6  | 
	4,898  | 
	1  | 
	0  | 
	Partly completed. Planning for further works in progress.  | 
 
	110a  | 
	Radio Éireann, G.P.O.—Adaptations  | 
	...  | 
	...  | 
	...  | 
	—  | 
	—  | 
	1,626  | 
	3  | 
	11  | 
	—  | 
	1,626  | 
	3  | 
	11  | 
	Completed.  | 
 
	111  | 
	Athlone Broadcasting Station—Extension  | 
	...  | 
	...  | 
	7,310  | 
	6,000  | 
	192  | 
	10  | 
	7  | 
	—  | 
	192  | 
	10  | 
	7  | 
	Tenders under consideration.  | 
 
	112  | 
	Cork, New Studios  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	16,000  | 
	2,000  | 
	98  | 
	15  | 
	0  | 
	—  | 
	98  | 
	15  | 
	0  | 
	In progress.  | 
 
	   | 
	   | 
	   | 
	£88,325  | 
	£18,898  | 
	10  | 
	10  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Defence:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	113  | 
	Dublin, Coláiste Caoimhin—Improvement of Heating  | 
	...  | 
	2,500  | 
	650  | 
	652  | 
	14  | 
	1  | 
	1,712  | 
	0  | 
	5  | 
	2,364  | 
	14  | 
	6  | 
	Completed.  | 
 
	114  | 
	Dublin—Cathal Brugha Barracks—Dining Hall and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Cookhouse  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	Not yet made  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Planning in progress.  | 
 
	115  | 
	Dublin—Cathal Brugha Barracks—Laundry and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Bath-house  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	7,000  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Cancelled.  | 
 
	116  | 
	Baldonnel Camp—Hangar Gates  | 
	...  | 
	...  | 
	...  | 
	18,700  | 
	17,700  | 
	15,699  | 
	4  | 
	10  | 
	12  | 
	13  | 
	0  | 
	15,711  | 
	17  | 
	10  | 
	Completed.  | 
 
	117  | 
	Baldonnel Camp—Hard Surface Runways  | 
	...  | 
	...  | 
	517,000  | 
	50,000  | 
	3,302  | 
	8  | 
	0  | 
	2,904  | 
	8  | 
	10  | 
	6,206  | 
	16  | 
	10  | 
	In progress.  | 
 
	118  | 
	Cork, Michael Collins Barracks—Lift in Hospital  | 
	...  | 
	Not yet made  | 
	500  | 
	—  | 
	—  | 
	—  | 
	Revised plans under consideration.  | 
 
	119  | 
	Curragh Camp—Catholic Church  | 
	...  | 
	...  | 
	...  | 
	...  | 
	100,000  | 
	7,000  | 
	20  | 
	0  | 
	0  | 
	—  | 
	20  | 
	0  | 
	0  | 
	Quantity Surveyor about to be appointed.  | 
 
	120  | 
	Curragh Camp—Renewal of Electrical Installation  | 
	...  | 
	40,000  | 
	10,000  | 
	—  | 
	—  | 
	—  | 
	Under consideration.  | 
 
	121  | 
	Curragh Camp—Connolly Barracks—Dining Hall and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Cookhouse  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	63,300  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Planning in progress.  | 
 
	122  | 
	Curragh Camp—Plunkett Barracks—Dining Hall and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Cookhouse  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	59,700  | 
	1,000  | 
	—  | 
	—  | 
	—  | 
	Planning in progress.  | 
 
	123  | 
	Curragh Camp—National School—Central Heating  | 
	...  | 
	2,500  | 
	500  | 
	—  | 
	—  | 
	—  | 
	Under consideration.  | 
 
	124  | 
	Curragh Camp—Signal Stores and Workshops  | 
	...  | 
	Not yet made  | 
	500  | 
	—  | 
	—  | 
	—  | 
	Plans in preparation.  | 
 
	125  | 
	Haulbowline Dockyard—New Jetty  | 
	...  | 
	...  | 
	...  | 
	85,000  | 
	5,000  | 
	9,527  | 
	13  | 
	2  | 
	71,926  | 
	19  | 
	3  | 
	81,454  | 
	12  | 
	5  | 
	Completed.  | 
 
	126  | 
	Kilworth Camp—Officers’ Mess  | 
	...  | 
	...  | 
	...  | 
	...  | 
	15,590  | 
	11,000  | 
	12,352  | 
	9  | 
	5  | 
	2,260  | 
	10  | 
	1  | 
	14,612  | 
	19  | 
	6  | 
	Completed.  | 
 
	127  | 
	Arbour Hill Detention Prison—Memorial to 1916 Leaders  | 
	12,500  | 
	500  | 
	33  | 
	18  | 
	5  | 
	—  | 
	33  | 
	18  | 
	5  | 
	Planning in progress.  | 
 
	   | 
	   | 
	   | 
	£107,350  | 
	£41,588  | 
	7  | 
	11  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of External Affairs:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	128  | 
	London Embassy—Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	108,000  | 
	9,000  | 
	10,283  | 
	0  | 
	4  | 
	101,511  | 
	11  | 
	0  | 
	111,794  | 
	11  | 
	4  | 
	Completed.  | 
 
	   | 
	   | 
	   | 
	£9,000  | 
	£10,283  | 
	0  | 
	4  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Social Welfare:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	129  | 
	Ballina—New Employment Exchange  | 
	...  | 
	...  | 
	...  | 
	22,000  | 
	500  | 
	—  | 
	—  | 
	—  | 
	Quantity surveyor appointed.  | 
 
	130  | 
	Sligo Employment Exchange—Extension of Central  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Heating  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	700  | 
	700  | 
	10  | 
	11  | 
	2  | 
	—  | 
	10  | 
	11  | 
	2  | 
	Deferred to end of heatingseason.  | 
 
	131  | 
	Waterford—New Employment Exchange  | 
	...  | 
	...  | 
	37,940  | 
	1,810  | 
	3,338  | 
	1  | 
	10  | 
	33,949  | 
	16  | 
	6  | 
	37,287  | 
	18  | 
	4  | 
	Completed.  | 
 
	132  | 
	Westport—New Employment Exchange  | 
	...  | 
	...  | 
	8,400  | 
	2,000  | 
	13  | 
	8  | 
	6  | 
	—  | 
	13  | 
	8  | 
	6  | 
	Tenders invited.  | 
 
	   | 
	   | 
	   | 
	£5,010  | 
	£3,362  | 
	1  | 
	6  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Health:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	133  | 
	Dundrum Asylum—Alterations and Additions  | 
	...  | 
	...  | 
	19,920  | 
	5,570  | 
	6,326  | 
	1  | 
	4  | 
	13,172  | 
	10  | 
	10  | 
	19,498  | 
	12  | 
	2  | 
	In progress.  | 
 
	   | 
	   | 
	   | 
	£5,570  | 
	£6,326  | 
	1  | 
	4  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	General  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	134  | 
	Minor New Works not exceeding £400 each  | 
	...  | 
	...  | 
	12,000  | 
	12,000  | 
	8,285  | 
	11  | 
	10  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	See details at back.  | 
 
	135  | 
	Urgent and Unforeseen Works  | 
	...  | 
	...  | 
	...  | 
	...  | 
	25,000  | 
	25,000  | 
	13,691  | 
	10  | 
	4  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	See details at back.  | 
 
	136  | 
	Minor Balances of Expenditure on Works of Prior Years  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	which may not be completed by 1st April, 1953  | 
	...  | 
	15,000  | 
	15,000  | 
	19,429  | 
	7  | 
	1  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	See details at back.  | 
 
	   | 
	   | 
	   | 
	£1,396,570  | 
	£1,300,292  | 
	16  | 
	10  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Deduct for Works which may not be carried out during the year  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	   | 
	66,570  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	   | 
	   | 
	£1,330,000  | 
	£1,300,292  | 
	16  | 
	10  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   
	 | 
 
 
	Work No.  | 
	Service and Description  | 
	Expenditure  | 
	Observations  | 
 
	1953-54  | 
	to 31/3/53  | 
	to 31/3/54  | 
 
	   | 
	   | 
	£  | 
	s.  | 
	d.  | 
	£  | 
	s.  | 
	d.  | 
	£  | 
	s.  | 
	d.  | 
	   | 
 
	   | 
	No. 53—GARDA SÍOCHÁNA BARRACKS  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Hackettstown, Co. Carlow—Improvements  | 
	...  | 
	...  | 
	...  | 
	650  | 
	0  | 
	11  | 
	—  | 
	650  | 
	0  | 
	11  | 
	Completed.  | 
 
	   | 
	Newmarket-on-Fergus, Co. Clare—New Barracks  | 
	...  | 
	...  | 
	13  | 
	1  | 
	1  | 
	11  | 
	16  | 
	1  | 
	24  | 
	17  | 
	2  | 
	Preliminary work.  | 
 
	   | 
	Watergrasshill, Co. Cork—New Barracks  | 
	...  | 
	...  | 
	...  | 
	3  | 
	16  | 
	6  | 
	—  | 
	3  | 
	16  | 
	6  | 
	Under consideration.  | 
 
	   | 
	Bundoran, Co. Donegal—New Barracks  | 
	...  | 
	...  | 
	...  | 
	842  | 
	10  | 
	4  | 
	5,912  | 
	14  | 
	10  | 
	6,755  | 
	5  | 
	2  | 
	Completed.  | 
 
	   | 
	Dún Laoghaire, Co. Dublin—Additional accommodation  | 
	...  | 
	698  | 
	18  | 
	11  | 
	—  | 
	698  | 
	18  | 
	11  | 
	Completed.  | 
 
	   | 
	Harcourt Terrace, Dublin—Boundary Wall and Cycle Shed  | 
	...  | 
	132  | 
	5  | 
	6  | 
	732  | 
	1  | 
	6  | 
	864  | 
	7  | 
	0  | 
	Completed.  | 
 
	   | 
	Ardrahan, Co. Galway—Improvement Works  | 
	...  | 
	...  | 
	...  | 
	12  | 
	16  | 
	11  | 
	—  | 
	12  | 
	16  | 
	11  | 
	Under consideration.  | 
 
	   | 
	Mountrath, Co. Laois—New Barracks  | 
	...  | 
	...  | 
	...  | 
	...  | 
	14  | 
	0  | 
	6  | 
	—  | 
	14  | 
	0  | 
	6  | 
	In progress.  | 
 
	   | 
	Sligo—Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	650  | 
	0  | 
	0  | 
	11  | 
	13  | 
	1  | 
	661  | 
	13  | 
	1  | 
	In progress.  | 
 
	   | 
	Thurles, Co. Tipperary—New Divisional Headquarters  | 
	...  | 
	517  | 
	18  | 
	9  | 
	   | 
	5  | 
	11  | 
	518  | 
	4  | 
	8  | 
	In progress.  | 
 
	   | 
	New Ross, Co. Wexford—New Barracks  | 
	...  | 
	...  | 
	...  | 
	3,461  | 
	8  | 
	4  | 
	17,334  | 
	10  | 
	9  | 
	20,795  | 
	19  | 
	1  | 
	Completed.  | 
 
	   | 
	Arklow, Co. Wicklow—Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	369  | 
	17  | 
	6  | 
	—  | 
	369  | 
	17  | 
	6  | 
	In progress.  | 
 
	   | 
	Baltinglass, Co. Wicklow—New Barracks  | 
	...  | 
	...  | 
	...  | 
	212  | 
	1  | 
	11  | 
	—  | 
	212  | 
	1  | 
	11  | 
	In progress.  | 
 
	   | 
	   | 
	£7,578  | 
	17  | 
	2  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	No. 54—NEW WORKS, ALTERATIONS AND ADDITIONS AT OTHER GARDA SÍOCHÁNA BARRACKS  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	1  | 
	Union Quay, Cork—Provision and Installation of Petrol Pump  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	and Storage Tank  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	452  | 
	12  | 
	7  | 
	—  | 
	452  | 
	12  | 
	7  | 
	Completed.  | 
 
	   | 
	No. 55—MINOR NEW WORKS AT GARDA SÍOCHÁNA BARRACKS  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	1  | 
	Knock, Co. Clare—Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	185  | 
	10  | 
	0  | 
	—  | 
	185  | 
	10  | 
	0  | 
	In progress.  | 
 
	2  | 
	Pallaskenry, Co. Limerick—Improvements  | 
	...  | 
	...  | 
	...  | 
	61  | 
	5  | 
	4  | 
	—  | 
	61  | 
	5  | 
	4  | 
	In progress.  | 
 
	4  | 
	Bridewell, Dublin—Additional Storage Accommodation  | 
	...  | 
	317  | 
	6  | 
	4  | 
	—  | 
	317  | 
	6  | 
	4  | 
	Completed.  | 
 
	8  | 
	Donnybrook, Dublin—Improvements to Cooking Facilities  | 
	...  | 
	120  | 
	9  | 
	0  | 
	—  | 
	120  | 
	9  | 
	0  | 
	In progress.  | 
 
	9  | 
	Green Street, Dublin—Installation of Storage Heaters  | 
	...  | 
	98  | 
	12  | 
	8  | 
	—  | 
	98  | 
	12  | 
	8  | 
	Completed.  | 
 
	10  | 
	Ballymote, Co. Sligo—Erection of Fuel Store, etc.  | 
	...  | 
	...  | 
	173  | 
	14  | 
	0  | 
	—  | 
	173  | 
	14  | 
	0  | 
	Completed.  | 
 
	12  | 
	Cavan—Sanitary Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	37  | 
	15  | 
	0  | 
	—  | 
	37  | 
	15  | 
	0  | 
	In progress.  | 
 
	13  | 
	Gárda Depot—Shelving for Store  | 
	...  | 
	...  | 
	...  | 
	...  | 
	90  | 
	14  | 
	1  | 
	—  | 
	90  | 
	14  | 
	1  | 
	In progress.  | 
 
	14  | 
	Chapelizod—Provision of Range, etc.  | 
	...  | 
	...  | 
	...  | 
	...  | 
	166  | 
	18  | 
	6  | 
	—  | 
	166  | 
	18  | 
	6  | 
	Completed.  | 
 
	16  | 
	Tramore—Improved Ablution Facilities  | 
	...  | 
	...  | 
	...  | 
	88  | 
	15  | 
	11  | 
	—  | 
	88  | 
	15  | 
	11  | 
	In progress.  | 
 
	18  | 
	Ballyragget, Co. Kilkenny—New Bathroom, etc.  | 
	...  | 
	...  | 
	325  | 
	0  | 
	0  | 
	—  | 
	325  | 
	0  | 
	0  | 
	In progress.  | 
 
	21  | 
	Dromahair, Co. Leitrim—Bathroom and Sanitary Facilities  | 
	320  | 
	0  | 
	0  | 
	—  | 
	320  | 
	0  | 
	0  | 
	In progress.  | 
 
	24  | 
	Newport, Co. Mayo—Alterations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	234  | 
	0  | 
	0  | 
	—  | 
	234  | 
	0  | 
	0  | 
	In progress.  | 
 
	26  | 
	Drumshanbo, Co. Leitrim—Provision of Bath  | 
	...  | 
	...  | 
	150  | 
	0  | 
	0  | 
	—  | 
	150  | 
	0  | 
	0  | 
	Completed.  | 
 
	27  | 
	Kevin Street—Improvements to Kitchen Accommodation  | 
	...  | 
	122  | 
	4  | 
	0  | 
	—  | 
	122  | 
	4  | 
	0  | 
	In progress.  | 
 
	39 of 1951/52  | 
	Dún Laoghaire—Provision of Independent Boiler and Drying  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Room  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	32  | 
	18  | 
	0  | 
	401  | 
	9  | 
	11  | 
	434  | 
	7  | 
	11  | 
	Completed.  | 
 
	40/2 of 1952/53  | 
	Rathmines—Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	181  | 
	17  | 
	0  | 
	25  | 
	4  | 
	8  | 
	207  | 
	1  | 
	8  | 
	Completed.  | 
 
	40/15 of 1952/53  | 
	Kinlough—Sanitary, etc. Works  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	125  | 
	5  | 
	10  | 
	235  | 
	0  | 
	0  | 
	360  | 
	5  | 
	10  | 
	Completed.  | 
 
	40/17 of 1952/53  | 
	Dublin Castle Detective Branch—Improvements  | 
	...  | 
	...  | 
	114  | 
	5  | 
	4  | 
	233  | 
	15  | 
	1  | 
	348  | 
	0  | 
	5  | 
	Completed.  | 
 
	40/22 of 1952/53  | 
	Bridewell—Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	187  | 
	7  | 
	9  | 
	147  | 
	16  | 
	8  | 
	335  | 
	4  | 
	5  | 
	Completed.  | 
 
	   | 
	   | 
	£3,133  | 
	18  | 
	9  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	No. 134—MINOR NEW WORKS  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	President’s Establishment:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/52 of 1952/53  | 
	Áras an Uachtaráin—Improvements at Butler’s House  | 
	...  | 
	136  | 
	10  | 
	0  | 
	218  | 
	2  | 
	2  | 
	354  | 
	12  | 
	2  | 
	Completed.  | 
 
	   | 
	Houses of the Oireachtas:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/45 of 1952/53  | 
	Library—Improvement of Lighting  | 
	...  | 
	...  | 
	...  | 
	...  | 
	162  | 
	19  | 
	5  | 
	2  | 
	2  | 
	5  | 
	165  | 
	1  | 
	10  | 
	In progress.  | 
 
	111/48 of 1952/53  | 
	Entrance—Provision of Seats  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	129  | 
	3  | 
	3  | 
	30  | 
	15  | 
	0  | 
	159  | 
	18  | 
	3  | 
	Completed.  | 
 
	18  | 
	Oireachtas Restaurant—Cashier’s Enclosure  | 
	...  | 
	...  | 
	171  | 
	18  | 
	7  | 
	—  | 
	171  | 
	18  | 
	7  | 
	Completed.  | 
 
	   | 
	Department of An Taoiseach:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	56  | 
	Central Statistics Office—Improvement of electricity supply,  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	etc.  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	154  | 
	9  | 
	8  | 
	—  | 
	154  | 
	9  | 
	8  | 
	Completed.  | 
 
	   | 
	Department of Finance:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Office of Public Works:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	91/52 of 1951/52  | 
	Headquarters—Votes Division—Improved Heating  | 
	...  | 
	   | 
	8  | 
	6  | 
	261  | 
	12  | 
	0  | 
	262  | 
	0  | 
	6  | 
	Completed.  | 
 
	91/61 of 1951/52  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111 of 1952/53  | 
	Dún Laoghaire, Harbour Master’s Office—Improvements  | 
	33  | 
	10  | 
	0  | 
	330  | 
	15  | 
	2  | 
	364  | 
	5  | 
	2  | 
	Completed.  | 
 
	111/32 of 1952/53  | 
	Headquarters—Provision of Plugs for Dictating Machines  | 
	53  | 
	14  | 
	3  | 
	66  | 
	14  | 
	0  | 
	120  | 
	8  | 
	3  | 
	Completed.  | 
 
	111/59 of 1952/53  | 
	Headquarters—Sub-division of Room  | 
	...  | 
	...  | 
	...  | 
	102  | 
	19  | 
	7  | 
	63  | 
	0  | 
	10  | 
	166  | 
	0  | 
	5  | 
	Completed.  | 
 
	32  | 
	Central Heating Station—Installation of Mona Jet Burners  | 
	37  | 
	17  | 
	5  | 
	—  | 
	37  | 
	17  | 
	5  | 
	In progress.  | 
 
	   | 
	Revenue Commissioners:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/18 of 1952/53  | 
	Dublin Castle, Companies Branch—Improvements  | 
	...  | 
	1  | 
	2  | 
	6  | 
	142  | 
	17  | 
	6  | 
	144  | 
	0  | 
	0  | 
	Completed.  | 
 
	111/28 of 1952/53  | 
	Dublin Castle, Adjudication Branch—Erection of Partitions  | 
	19  | 
	13  | 
	1  | 
	113  | 
	2  | 
	2  | 
	132  | 
	15  | 
	3  | 
	Completed.  | 
 
	111/51 of 1952/53  | 
	Tralee Custom House—Provision of Thermal Storage  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Heaters  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	223  | 
	17  | 
	6  | 
	143  | 
	12  | 
	0  | 
	367  | 
	9  | 
	6  | 
	Completed.  | 
 
	5  | 
	Estate Duty Office—Shelving and Lighting  | 
	...  | 
	...  | 
	151  | 
	7  | 
	7  | 
	—  | 
	151  | 
	7  | 
	7  | 
	In progress.  | 
 
	8  | 
	Dublin Castle, Block 18—Counters and Screens  | 
	...  | 
	224  | 
	2  | 
	7  | 
	—  | 
	224  | 
	2  | 
	7  | 
	Completed.  | 
 
	   | 
	Stationery Office:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	28  | 
	Stationery Office—Grill at premises of Cahill & Co.  | 
	...  | 
	...  | 
	174  | 
	15  | 
	0  | 
	—  | 
	174  | 
	15  | 
	0  | 
	Completed.  | 
 
	   | 
	Valuation Office:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	7  | 
	Ordnance Survey Office—Accommodation for Deputy  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Assistant Director  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	76  | 
	9  | 
	8  | 
	—  | 
	76  | 
	9  | 
	8  | 
	Virtually completed.  | 
 
	44  | 
	Valuation Office—Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	86  | 
	1  | 
	4  | 
	—  | 
	86  | 
	1  | 
	4  | 
	In progress.  | 
 
	   | 
	General:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	2  | 
	State Apartments—Improved Heating  | 
	...  | 
	...  | 
	...  | 
	194  | 
	0  | 
	0  | 
	—  | 
	194  | 
	0  | 
	0  | 
	Completed.  | 
 
	20  | 
	Ballygeary Coastguard Station—Provision of flush lavs.,  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	etc.  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	237  | 
	2  | 
	6  | 
	—  | 
	237  | 
	2  | 
	6  | 
	Completed.  | 
 
	25  | 
	Department of Finance—Improvements, etc. to lighting in  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Rooms 03-06.  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	9  | 
	3  | 
	4  | 
	—  | 
	9  | 
	3  | 
	4  | 
	Abandoned.  | 
 
	30  | 
	Department of Finance—Soundproofing partition  | 
	...  | 
	...  | 
	68  | 
	19  | 
	8  | 
	—  | 
	68  | 
	19  | 
	8  | 
	Completed.  | 
 
	   | 
	Department of Agriculture:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/6 of 1952/53  | 
	Ballyhaise Agricultural College—Improvements to Dairy  | 
	...  | 
	25  | 
	0  | 
	0  | 
	236  | 
	17  | 
	0  | 
	261  | 
	17  | 
	0  | 
	Completed.  | 
 
	111/23 of 1952/53  | 
	Ballyhaise Agricultural College—Tarmacadam Surfacing  | 
	...  | 
	76  | 
	13  | 
	0  | 
	173  | 
	7  | 
	0  | 
	250  | 
	0  | 
	0  | 
	Completed.  | 
 
	111/12 of 1952/53  | 
	Munster Institute—Improvements at Gardener’s Cottage  | 
	...  | 
	37  | 
	17  | 
	6  | 
	352  | 
	5  | 
	6  | 
	390  | 
	3  | 
	0  | 
	Completed.  | 
 
	11  | 
	Botanic Gardens—Petrol Storage  | 
	...  | 
	...  | 
	...  | 
	...  | 
	189  | 
	11  | 
	11  | 
	—  | 
	189  | 
	11  | 
	11  | 
	Completed.  | 
 
	13  | 
	Botanic Gardens—Gatekeeper’s Residence  | 
	...  | 
	...  | 
	...  | 
	197  | 
	5  | 
	0  | 
	—  | 
	197  | 
	5  | 
	0  | 
	Completed.  | 
 
	17  | 
	Athenry Agricultural School—Kitchen Equipment  | 
	...  | 
	...  | 
	266  | 
	12  | 
	4  | 
	—  | 
	266  | 
	12  | 
	4  | 
	Completed.  | 
 
	19  | 
	Athenry Agricultural School—Accommodation for domestic  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Staff  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	115  | 
	8  | 
	11  | 
	—  | 
	115  | 
	8  | 
	11  | 
	Completed.  | 
 
	21  | 
	Ballyhaise Agricultural School—Erection of farm gates  | 
	...  | 
	208  | 
	0  | 
	0  | 
	—  | 
	208  | 
	0  | 
	0  | 
	In progress.  | 
 
	39  | 
	Botanic Gardens—Provision of Concrete Frames  | 
	...  | 
	...  | 
	125  | 
	6  | 
	10  | 
	—  | 
	125  | 
	6  | 
	10  | 
	Completed.  | 
 
	   | 
	Department of Justice:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/55 of 1952/53  | 
	District Courts—Adaptation of Room for Court Clerk  | 
	...  | 
	138  | 
	17  | 
	11  | 
	161  | 
	8  | 
	4  | 
	300  | 
	6  | 
	3  | 
	Completed.  | 
 
	14  | 
	Public Records Office—Shelving  | 
	...  | 
	...  | 
	...  | 
	...  | 
	357  | 
	2  | 
	6  | 
	—  | 
	357  | 
	2  | 
	6  | 
	Completed.  | 
 
	31  | 
	Public Records Office—Transfer of Photostat Equipment, etc.  | 
	227  | 
	5  | 
	3  | 
	—  | 
	227  | 
	5  | 
	3  | 
	Completed.  | 
 
	   | 
	Department of Education:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/21 of 1952/53  | 
	National Library—Provision of Shelving  | 
	...  | 
	...  | 
	...  | 
	15  | 
	13  | 
	8  | 
	233  | 
	0  | 
	0  | 
	248  | 
	13  | 
	8  | 
	Completed.  | 
 
	24  | 
	College of Art—Sundry Improvements  | 
	...  | 
	...  | 
	...  | 
	483  | 
	4  | 
	4  | 
	—  | 
	483  | 
	4  | 
	4  | 
	Completed.  | 
 
	37  | 
	Irish Manuscripts Commission, 73 Merrion Square—Supply of  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	furniture, etc.  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	132  | 
	19  | 
	11  | 
	—  | 
	132  | 
	19  | 
	11  | 
	Completed.  | 
 
	40  | 
	National Education Office, Marlboro’ Street—Erection of Shed  | 
	202  | 
	19  | 
	4  | 
	—  | 
	202  | 
	19  | 
	4  | 
	Completed.  | 
 
	   | 
	Department of Lands:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/43 of 1952/53  | 
	61 Merrion Square—Alterations, etc. to Rooms on 1st and  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	3rd floors  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	158  | 
	4  | 
	0  | 
	209  | 
	16  | 
	5  | 
	368  | 
	0  | 
	5  | 
	Completed.  | 
 
	9  | 
	Avondale House—Extension of pipes, hydrants, etc.  | 
	...  | 
	185  | 
	4  | 
	6  | 
	—  | 
	185  | 
	4  | 
	6  | 
	Completed.  | 
 
	15  | 
	Land Commission—Mullingar—Improvements  | 
	...  | 
	...  | 
	330  | 
	9  | 
	3  | 
	—  | 
	330  | 
	9  | 
	3  | 
	Completed.  | 
 
	   | 
	Gaeltacht Services Branch  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	29  | 
	Dunlop House—Erection of partition, etc.  | 
	...  | 
	...  | 
	59  | 
	17  | 
	1  | 
	—  | 
	59  | 
	17  | 
	1  | 
	In progress.  | 
 
	42  | 
	Falcarragh Knitting Centre—Septic Tank  | 
	...  | 
	...  | 
	75  | 
	0  | 
	0  | 
	—  | 
	75  | 
	0  | 
	0  | 
	In progress.  | 
 
	   | 
	Department of Industry and Commerce:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/53 of 1952/53  | 
	Industrial and Commercial Property Registration Office,  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	44 Merrion Square—Provision of Shelving  | 
	...  | 
	...  | 
	193  | 
	11  | 
	1  | 
	99  | 
	12  | 
	3  | 
	293  | 
	3  | 
	4  | 
	Completed.  | 
 
	111/58 of 1952/53  | 
	Kildare Street—Provision of Shelving  | 
	...  | 
	...  | 
	...  | 
	425  | 
	4  | 
	3  | 
	4  | 
	11  | 
	10  | 
	429  | 
	16  | 
	1  | 
	Completed.  | 
 
	111/62 of 1952/53  | 
	Gas, Weights and Measures Office—Dublin Castle—Electrical  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Installation  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	2  | 
	7  | 
	0  | 
	356  | 
	4  | 
	5  | 
	358  | 
	11  | 
	5  | 
	Completed.  | 
 
	4  | 
	Kildare Street—Installation of Capacitors  | 
	...  | 
	...  | 
	...  | 
	2  | 
	16  | 
	4  | 
	—  | 
	2  | 
	16  | 
	4  | 
	Completed.  | 
 
	22  | 
	Kildare Street—Provision of electric fires  | 
	...  | 
	...  | 
	...  | 
	10  | 
	6  | 
	3  | 
	—  | 
	10  | 
	6  | 
	3  | 
	In progress.  | 
 
	   | 
	Department of Posts and Telegraphs:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	91/54 of 1951/52  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111 of 1952/53  | 
	St. Mary’s Abbey Stores—Adaptations, etc.  | 
	...  | 
	...  | 
	83  | 
	1  | 
	3  | 
	207  | 
	18  | 
	4  | 
	290  | 
	19  | 
	7  | 
	Completed.  | 
 
	111/2 of 1952/53  | 
	Galway Post Office—Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	175  | 
	0  | 
	0  | 
	58  | 
	4  | 
	2  | 
	233  | 
	4  | 
	2  | 
	Completed.  | 
 
	111/13 of 1952/53  | 
	Four Courts, Dublin—Provision of Storage Accommodation  | 
	20  | 
	4  | 
	10  | 
	238  | 
	0  | 
	3  | 
	258  | 
	5  | 
	1  | 
	Completed.  | 
 
	111/31 of 1952/53  | 
	Clifden Post Office—Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	209  | 
	15  | 
	9  | 
	120  | 
	0  | 
	0  | 
	329  | 
	15  | 
	9  | 
	In progress.  | 
 
	111/39 of 1952/53  | 
	Pearse Street Sorting Office—Provision of Enclosure Porch  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	and Strong-Room  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	2  | 
	4  | 
	3  | 
	192  | 
	3  | 
	4  | 
	194  | 
	7  | 
	7  | 
	Completed.  | 
 
	1  | 
	G.P.O., Dublin—Public Office Improvements  | 
	...  | 
	...  | 
	87  | 
	0  | 
	3  | 
	—  | 
	87  | 
	0  | 
	3  | 
	In progress.  | 
 
	6  | 
	St. John’s Road Depot—Improved Lighting  | 
	...  | 
	...  | 
	115  | 
	8  | 
	7  | 
	—  | 
	115  | 
	8  | 
	7  | 
	Completed.  | 
 
	12  | 
	Post Office Factory—Roof Extractors  | 
	...  | 
	...  | 
	...  | 
	143  | 
	8  | 
	1  | 
	—  | 
	143  | 
	8  | 
	1  | 
	Completed.  | 
 
	26  | 
	G.P.O., Dublin—Storage of Oil Drums  | 
	...  | 
	...  | 
	...  | 
	92  | 
	10  | 
	0  | 
	—  | 
	92  | 
	10  | 
	0  | 
	In progress.  | 
 
	38  | 
	Post Office Savings Bank—Typing Pool—Removal of Glazed  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	partition, etc.  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	52  | 
	3  | 
	0  | 
	—  | 
	52  | 
	3  | 
	0  | 
	In progress.  | 
 
	41  | 
	Greystones Telephone Exchange—Erection  | 
	...  | 
	...  | 
	...  | 
	125  | 
	16  | 
	5  | 
	—  | 
	125  | 
	16  | 
	5  | 
	In progress.  | 
 
	   | 
	Department of Defence:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	91/42 of 1951/52  | 
	Parkgate Street—Provision of Extract Fans  | 
	...  | 
	...  | 
	67  | 
	3  | 
	3  | 
	107  | 
	13  | 
	7  | 
	174  | 
	16  | 
	10  | 
	Completed.  | 
 
	111 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/35 of 1952/53  | 
	Marlboro’ Hall—Alterations at Luncheon Club  | 
	...  | 
	...  | 
	2  | 
	2  | 
	7  | 
	116  | 
	4  | 
	0  | 
	118  | 
	6  | 
	7  | 
	Completed.  | 
 
	23  | 
	Civil Defence School—Provision of Storage Heaters, etc., in  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Syndicate Rooms  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	105  | 
	15  | 
	5  | 
	—  | 
	105  | 
	15  | 
	5  | 
	Completed.  | 
 
	   | 
	Department of Social Welfare:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/56 of 1952/53  | 
	Victoria Street, Dublin Employment Exchange—  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Improvements  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	136  | 
	0  | 
	9  | 
	97  | 
	6  | 
	5  | 
	233  | 
	7  | 
	2  | 
	Completed.  | 
 
	43  | 
	B llina Employment Exchange—Adaptations  | 
	...  | 
	...  | 
	144  | 
	0  | 
	0  | 
	—  | 
	144  | 
	0  | 
	0  | 
	Completed.  | 
 
	58  | 
	Manorhamilton Employment Exchange—Storage Heating, etc.  | 
	8  | 
	19  | 
	4  | 
	—  | 
	8  | 
	19  | 
	4  | 
	In progress.  | 
 
	   | 
	Department of Health:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	111/46 of 1952/53  | 
	Dublin Custom House—Alterations to Annexe  | 
	...  | 
	...  | 
	21  | 
	14  | 
	6  | 
	184  | 
	16  | 
	8  | 
	206  | 
	11  | 
	2  | 
	Completed.  | 
 
	   | 
	   | 
	£8,285  | 
	11  | 
	10  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	No. 135—URGENT AND UNFORESEEN WORKS  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Finance:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	7  | 
	An Tostal, 1954—Floral Decoration of Government Buildings  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	in Dublin  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	417  | 
	11  | 
	8  | 
	—  | 
	417  | 
	11  | 
	8  | 
	In progress.  | 
 
	13  | 
	Dublin Castle—Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	1,267  | 
	8  | 
	0  | 
	—  | 
	1,267  | 
	8  | 
	0  | 
	In progress.  | 
 
	17  | 
	Benchers of Kings Inns, Four Courts—Provision of New  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Quarters  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	35  | 
	14  | 
	2  | 
	—  | 
	35  | 
	14  | 
	2  | 
	In progress.  | 
 
	   | 
	Office of Public Works:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	18  | 
	Surveys of Greatman’s Bay and Cashla Bay  | 
	...  | 
	...  | 
	675  | 
	6  | 
	7  | 
	—  | 
	675  | 
	6  | 
	7  | 
	In progress.  | 
 
	   | 
	Revenue Commissioners:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	1  | 
	Dublin Castle—Improved Sanitary Accommodation in  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Block 10  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	792  | 
	17  | 
	2  | 
	—  | 
	792  | 
	17  | 
	2  | 
	Completed.  | 
 
	11  | 
	Áras Brugha—Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	3,003  | 
	13  | 
	0  | 
	—  | 
	3,003  | 
	13  | 
	0  | 
	In progress.  | 
 
	15  | 
	Waterford Income Tax Offices—Adaptations  | 
	...  | 
	...  | 
	800  | 
	0  | 
	0  | 
	—  | 
	800  | 
	0  | 
	0  | 
	Completed.  | 
 
	   | 
	Department of Justice:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	8  | 
	Royal Hospital, Adjutant General’s Office and Deputy  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Master’s House—Provision of Sleeping Accommodation  | 
	...  | 
	641  | 
	15  | 
	3  | 
	—  | 
	641  | 
	15  | 
	3  | 
	Completed.  | 
 
	9  | 
	Courts of Justice—Re-allocation of Accommodation  | 
	...  | 
	1,640  | 
	16  | 
	2  | 
	—  | 
	1,640  | 
	16  | 
	2  | 
	In progress.  | 
 
	   | 
	Department of Education:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	2  | 
	Technical Instruction Branch—Alterations to Room  | 
	...  | 
	238  | 
	7  | 
	2  | 
	—  | 
	238  | 
	7  | 
	2  | 
	In progress.  | 
 
	5  | 
	Training College Block, N.E. Buildings—Improvement of  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Artificial Lighting, etc.  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	595  | 
	15  | 
	11  | 
	—  | 
	595  | 
	15  | 
	11  | 
	In progress.  | 
 
	10  | 
	School Buildings Section—Adaptations  | 
	...  | 
	...  | 
	...  | 
	769  | 
	13  | 
	4  | 
	—  | 
	769  | 
	13  | 
	4  | 
	In progress.  | 
 
	   | 
	Department of Lands:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	14  | 
	Forestry Branch—Transfer to 21/22 Merrion Street  | 
	...  | 
	508  | 
	11  | 
	5  | 
	—  | 
	508  | 
	11  | 
	5  | 
	In progress.  | 
 
	   | 
	Department of Industry and Commerce:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	4  | 
	Fair Trade Commission—Adaptations  | 
	...  | 
	...  | 
	...  | 
	1,739  | 
	4  | 
	4  | 
	—  | 
	1,739  | 
	4  | 
	4  | 
	Completed.  | 
 
	   | 
	Department of Posts and Telegraphs:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	12  | 
	An Tostal, Sundry Post Offices—Floral Decorations  | 
	...  | 
	1  | 
	4  | 
	0  | 
	—  | 
	1  | 
	4  | 
	0  | 
	In progress.  | 
 
	   | 
	Department of External Affairs:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	6  | 
	Iveagh House—Installation of Jet Burners  | 
	...  | 
	...  | 
	...  | 
	563  | 
	12  | 
	2  | 
	—  | 
	563  | 
	12  | 
	2  | 
	Completed.  | 
 
	   | 
	   | 
	£13,691  | 
	10  | 
	4  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	No. 136—MINOR BALANCES OF EXPENDITURE  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Houses of the Oireachtas:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	3 of 1952/53  | 
	Restaurant—Alteration and Improvement  | 
	...  | 
	...  | 
	...  | 
	1,716  | 
	16  | 
	7  | 
	2,443  | 
	13  | 
	4  | 
	4,160  | 
	9  | 
	11  | 
	Completed.  | 
 
	   | 
	Department of An Taoiseach:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	92/6 of 1951/52  | 
	Central Statistics Office, Dublin Castle—Improvements  | 
	...  | 
	   | 
	3  | 
	9  | 
	1,140  | 
	12  | 
	8  | 
	1,140  | 
	16  | 
	5  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Finance:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Office of Public Works:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	92/13 of 1951/52  | 
	10 Hume Street—Electric Storage Heating  | 
	...  | 
	...  | 
	   | 
	19  | 
	0  | 
	682  | 
	19  | 
	11  | 
	683  | 
	18  | 
	11  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	92/15 of 1951/52  | 
	51 St. Stephen’s Green—Engineers’ Branch, New Office  | 
	...  | 
	73  | 
	14  | 
	0  | 
	610  | 
	16  | 
	6  | 
	684  | 
	10  | 
	6  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	112/12 of 1952/53  | 
	Earlsfort Terrace Workshop—Adaptation of former Stable  | 
	169  | 
	2  | 
	3  | 
	1,477  | 
	17  | 
	7  | 
	1,646  | 
	19  | 
	10  | 
	Completed.  | 
 
	   | 
	Revenue Commissioners:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	4 of 1951/52  | 
	Dublin Castle—Renovations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	191  | 
	17  | 
	5  | 
	5,024  | 
	4  | 
	7  | 
	5,216  | 
	2  | 
	0  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	112/2 of 1952/53  | 
	C. & E. Dublin Castle—Adaptations, etc.  | 
	...  | 
	...  | 
	17  | 
	6  | 
	3  | 
	572  | 
	6  | 
	7  | 
	589  | 
	12  | 
	10  | 
	Completed.  | 
 
	112/22 of 1952/53  | 
	Accountant General’s Office—Structural and Electrical work  | 
	531  | 
	12  | 
	4  | 
	184  | 
	7  | 
	2  | 
	715  | 
	19  | 
	6  | 
	In progress.  | 
 
	   | 
	Stationery Office:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	112/21 of 1952/53  | 
	Beggars Bush Barracks—Provision of Canteen  | 
	...  | 
	...  | 
	250  | 
	9  | 
	8  | 
	49  | 
	13  | 
	1  | 
	300  | 
	2  | 
	9  | 
	Completed.  | 
 
	   | 
	Valuation Office:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	11 of 1952/53  | 
	Ordnance Survey Office—Improved Ablution Facilities  | 
	...  | 
	159  | 
	18  | 
	0  | 
	461  | 
	7  | 
	6  | 
	621  | 
	5  | 
	6  | 
	Completed.  | 
 
	112/20 of 1952/53  | 
	Ordnance Survey Office—Installation of Machines, etc.  | 
	...  | 
	506  | 
	4  | 
	11  | 
	192  | 
	19  | 
	2  | 
	699  | 
	4  | 
	1  | 
	Completed.  | 
 
	   | 
	General:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	5 of 1951/52  | 
	Dublin Custom House—Improvement of layout of Grounds  | 
	75  | 
	7  | 
	5  | 
	8,564  | 
	14  | 
	2  | 
	8,640  | 
	1  | 
	7  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	3 of 1951/52  | 
	Dublin, Iveagh House—Office Accommodation and Staff  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	113 of 1952/53  | 
	Restaurant  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	338  | 
	17  | 
	5  | 
	95,452  | 
	18  | 
	2  | 
	95,791  | 
	15  | 
	7  | 
	Completed.  | 
 
	13 of 1952/53  | 
	Phoenix Park—Shelter for Relief Gatekeepers  | 
	...  | 
	...  | 
	219  | 
	18  | 
	8  | 
	2,425  | 
	7  | 
	7  | 
	2,645  | 
	6  | 
	3  | 
	In progress.  | 
 
	112/24 of 1952/53  | 
	State Apartments—Provision of Catering Facilities  | 
	...  | 
	606  | 
	13  | 
	1  | 
	561  | 
	12  | 
	10  | 
	1,168  | 
	5  | 
	11  | 
	Completed.  | 
 
	112/25 of 1952/53  | 
	An Tostal—Floodlighting of Government Buildings  | 
	...  | 
	2,504  | 
	6  | 
	10  | 
	3  | 
	14  | 
	9  | 
	2,508  | 
	1  | 
	7  | 
	Completed.  | 
 
	   | 
	Department of Agriculture:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	140/4 of 1950/51  | 
	Government Buildings—Provision of improved  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	113 of 1952/53  | 
	accommodation for Typing Staff, etc.  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	12  | 
	15  | 
	0  | 
	2,785  | 
	5  | 
	7  | 
	2,798  | 
	0  | 
	7  | 
	Completed.  | 
 
	21a of 1952/53  | 
	Athenry Agricultural School—Reconstruction of “Laing’s  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	House”  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	43  | 
	16  | 
	6  | 
	480  | 
	0  | 
	0  | 
	523  | 
	16  | 
	6  | 
	Completed.  | 
 
	25 of 1952/53  | 
	Ballyhaise Agricultural School—E.S.B. Supply  | 
	...  | 
	...  | 
	71  | 
	0  | 
	2  | 
	4,764  | 
	1  | 
	5  | 
	4,835  | 
	1  | 
	7  | 
	Completed.  | 
 
	   | 
	Department of Justice:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	233/1 of 1949/50  | 
	Garda Síochána—Headquarters—Transfer to Depot  | 
	...  | 
	...  | 
	2  | 
	7  | 
	6  | 
	18,820  | 
	3  | 
	9  | 
	18,822  | 
	11  | 
	3  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	112/23 of 1952/53  | 
	Adoption Board, 45 St. Stephen’s Green—Structural  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Alterations, etc.  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	330  | 
	18  | 
	11  | 
	218  | 
	5  | 
	2  | 
	549  | 
	4  | 
	1  | 
	Completed.  | 
 
	   | 
	Department of Education:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	40a of 1951/52  | 
	Headquarters Office—Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	296  | 
	5  | 
	1  | 
	2,335  | 
	3  | 
	3  | 
	2,631  | 
	8  | 
	4  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	49 of 1952/53  | 
	National Museum—Internal Passage between Divisions  | 
	...  | 
	424  | 
	19  | 
	7  | 
	1,078  | 
	10  | 
	0  | 
	1,503  | 
	9  | 
	7  | 
	Completed.  | 
 
	   | 
	Department of Lands:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	50a of 1952/53  | 
	Department of Lands—Luncheon Club Alterations  | 
	...  | 
	...  | 
	17  | 
	13  | 
	6  | 
	888  | 
	18  | 
	10  | 
	906  | 
	12  | 
	4  | 
	Completed.  | 
 
	   | 
	Gaeltacht Services Branch:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	61 of 1952/53  | 
	Tourmakeady Knitting Centre—Residence for Technical  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Staff  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	91  | 
	0  | 
	0  | 
	516  | 
	0  | 
	6  | 
	607  | 
	0  | 
	6  | 
	Completed.  | 
 
	   | 
	Department of Industry and Commerce:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	112 of 1950/51  | 
	Industrial Development Authority—Adaptations  | 
	...  | 
	...  | 
	16  | 
	12  | 
	6  | 
	2,526  | 
	17  | 
	1  | 
	2,543  | 
	9  | 
	7  | 
	Completed.  | 
 
	93 of 1951/52  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of Posts and Telegraphs:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	92/18 of 1951/52  | 
	Cahirciveen Post Office—Adaptations  | 
	...  | 
	...  | 
	...  | 
	38  | 
	18  | 
	2  | 
	752  | 
	10  | 
	0  | 
	791  | 
	8  | 
	2  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	92/19 of 1951/52  | 
	Glencree Former Reformatory—Adaptations for Stores  | 
	...  | 
	199  | 
	11  | 
	9  | 
	726  | 
	6  | 
	0  | 
	925  | 
	17  | 
	9  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	54 of 1951/52  | 
	Dublin, Pearse Street Sorting Office—Extension  | 
	...  | 
	...  | 
	490  | 
	8  | 
	9  | 
	4,387  | 
	0  | 
	10  | 
	4,877  | 
	9  | 
	7  | 
	Completed.  | 
 
	68 of 1952/53  | 
	Dublin, New Post Office—St. Andrew Street  | 
	...  | 
	...  | 
	1,941  | 
	2  | 
	0  | 
	33,697  | 
	18  | 
	3  | 
	35,639  | 
	0  | 
	3  | 
	Completed.  | 
 
	69 of 1952/53  | 
	Dublin, Engineering Branch, Distillery Road—Adaptations  | 
	164  | 
	7  | 
	8  | 
	2,622  | 
	3  | 
	0  | 
	2,786  | 
	10  | 
	8  | 
	Completed.  | 
 
	71 of 1952/53  | 
	Dublin, Post Office Factory—Rebuilding  | 
	...  | 
	...  | 
	...  | 
	2,535  | 
	8  | 
	5  | 
	49,432  | 
	9  | 
	10  | 
	51,967  | 
	18  | 
	3  | 
	Completed.  | 
 
	76 of 1952/53  | 
	Birr Post Office—Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	95  | 
	13  | 
	10  | 
	922  | 
	19  | 
	11  | 
	1,018  | 
	13  | 
	9  | 
	Completed.  | 
 
	77 of 1952/53  | 
	Cahir Post Office—Adaptations  | 
	...  | 
	...  | 
	...  | 
	...  | 
	768  | 
	11  | 
	1  | 
	12  | 
	3  | 
	11  | 
	780  | 
	15  | 
	0  | 
	Completed.  | 
 
	79 of 1952/53  | 
	Cork Head Post Office—Improvements  | 
	...  | 
	...  | 
	...  | 
	904  | 
	15  | 
	0  | 
	20,618  | 
	16  | 
	2  | 
	21,523  | 
	11  | 
	2  | 
	Completed.  | 
 
	87a of 1952/53  | 
	Droichead Nua Post Office—Adaptation of Premises  | 
	...  | 
	...  | 
	1  | 
	19  | 
	0  | 
	618  | 
	1  | 
	1  | 
	620  | 
	0  | 
	1  | 
	Completed.  | 
 
	   | 
	Wireless Broadcasting:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	88 of 1952/53  | 
	Dublin, G.P.O.—Studio and Office Accommodation  | 
	...  | 
	2,291  | 
	8  | 
	9  | 
	16,327  | 
	10  | 
	0  | 
	18,618  | 
	18  | 
	9  | 
	In progress.  | 
 
	   | 
	Department of Defence:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	140/16 of 1950/51  | 
	School of Defence—Adaptations, etc.  | 
	...  | 
	...  | 
	...  | 
	17  | 
	5  | 
	0  | 
	1,777  | 
	13  | 
	11  | 
	1,794  | 
	18  | 
	11  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Department of External Affairs:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	103 of 1952/53  | 
	Berne Legation—Adaptation and Furnishing  | 
	...  | 
	...  | 
	426  | 
	17  | 
	5  | 
	5,060  | 
	5  | 
	4  | 
	5,487  | 
	2  | 
	9  | 
	In progress.  | 
 
	104 of 1952/53  | 
	Bonn Legation—Adaptation and Furnishing  | 
	...  | 
	...  | 
	534  | 
	16  | 
	5  | 
	10,572  | 
	5  | 
	6  | 
	11,107  | 
	1  | 
	11  | 
	In progress.  | 
 
	   | 
	Department of Health:  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	109 of 1952/53  | 
	Dublin, Head Office, Custom House—Improved Typing  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	Accommodation  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	...  | 
	192  | 
	17  | 
	3  | 
	1,148  | 
	19  | 
	3  | 
	1,341  | 
	16  | 
	6  | 
	Completed.  | 
 
	112/10 of 1952/53  | 
	General Register Office—Improvements, etc.  | 
	...  | 
	...  | 
	70  | 
	0  | 
	3  | 
	812  | 
	7  | 
	11  | 
	882  | 
	8  | 
	2  | 
	Completed.  | 
 
	89 of 1951/52  | 
	Dundrum Asylum—Improved Cooking Facilities  | 
	...  | 
	...  | 
	84  | 
	10  | 
	0  | 
	1,924  | 
	7  | 
	10  | 
	2,008  | 
	17  | 
	10  | 
	Completed.  | 
 
	113 of 1952/53  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
	   | 
	   | 
	£19,429  | 
	7  | 
	1  | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
	   | 
 
 
* Excluding amount chargeable to Telephone Capital Account.  
*Excluding amount chargeable to Telephone Capital Account.  
*Excluding amount chargeable to Telephone Capital Account.  
		
        
       |