APPENDIX 22
STATEMENT OF EXPENDITURE OF NEW WORKS, ALTERATIONS AND ADDITIONS, 1979 (VOTE 9: SUBHEAD E)
|
|
|
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
|
|
|
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
|
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
President |
|
|
|
|
|
|
|
|
|
1 |
Aras an Uachtaráin: Improvements |
.. |
.. |
.. |
— |
30,000.00 |
3,485.88 |
2,167.11 |
5,652.99 |
In progress |
|
|
|
|
|
|
|
3,485.88 |
|
|
|
|
Oireachtas |
|
|
|
|
|
|
|
|
|
2 |
Leinster House: Re-allocation of space and refurbishing |
|
70,000.00 |
20,000.00 |
17,336.80 |
47,568.74 |
64,905.54 |
Virtually completed |
|
|
|
|
|
|
|
17,336.80 |
|
|
|
|
Taoiseach |
|
|
|
|
|
|
|
|
|
3 |
Official Residence and State Guest House |
.. |
.. |
— |
20,000.00 |
16,773.46 |
— |
16,773.46 |
In progress |
4 |
Dublin Castle: Standby Generator |
.. |
.. |
.. |
100,000.00 |
80,000.00 |
126,137.10 |
— |
126,137.10 |
In progress |
|
|
|
|
|
|
|
142,910.56 |
|
|
|
|
Finance |
|
|
|
|
|
|
|
|
|
5 |
Government Buildings: Adaptations to North Block |
.. |
250,000.00 |
160,000.00 |
104,480.65 |
56,356.04 |
160,836.69 |
In progress |
6 |
Government Buildings: Adaptations to South Block |
.. |
535,000.00 |
15,000.00 |
14,430.67 |
529,599.30 |
544,029.97 |
Virtually completed |
7 |
Government Publications Sales Office: New Accommodation |
|
— |
1,000.00 |
— |
— |
— |
In planning |
8 |
Ordnance Survey: New Printing Building |
.. |
.. |
340,000.00 |
5,000.00 |
17,719.00 |
341,264.49 |
358,983.49 |
Completed |
9 |
Ordnance Survey: Improvement of Residential Quarters Stage II |
25,000.00 |
1,000.00 |
— |
— |
— |
In planning |
10 |
State Laboratory: Additional Accommodation |
.. |
.. |
800,000.00 |
205,000.00 |
5,395.37 |
27,732.19 |
33,127.56 |
In planning |
|
|
|
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
|
|
|
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
Finance (contd.) |
£ |
£ |
£ |
£ |
£ |
|
11 |
Stationery Office: Additional Accommodation |
.. |
.. |
— |
300,000.00 |
73,260.75 |
835.95 |
74,096.70 |
In planning |
12 |
Valuation Office: Additional Accommodation |
.. |
.. |
21,000.00 |
3,000.00 |
947.30 |
18,327.00 |
19,274.30 |
Completed |
13 |
Clare Island: Harbour Improvements |
.. |
.. |
.. |
233,000.00 |
192,000.00 |
— |
41,322.06 |
41,322.06 |
Original contract terminated; new arrangements to complete work under consideration |
|
|
|
|
|
|
|
216,233.74 |
|
|
|
|
Revenue Commissioners |
|
|
|
|
|
|
14 |
New Revenue Offices: Dublin Castle |
.. |
.. |
.. |
1,600,000.00 |
100,000.00 |
2,473.70 |
1,485,584.68 |
1,488,058.38 |
Completed |
15 |
Refurbishing of Premises at Lord Edward St. |
280,000.00 |
130,000.00 |
154,737.22 |
156,303.93 |
311,041.15 |
Virtually completed |
16 |
Blacklion Frontier Customs Post Stage II |
.. |
.. |
40,000.00 |
1,000.00 |
— |
— |
— |
In planning |
17 |
Burnfoot: New Customs Post |
.. |
.. |
.. |
40,000.00 |
10,000.00 |
— |
— |
— |
In planning |
18 |
Carrigans: New Frontier Customs Post Extension |
.. |
.. |
28,000.00 |
5,000.00 |
188.84 |
28,888.10 |
29,076.94 |
Completed |
19 |
Carrigans: New Customs Road Station |
.. |
.. |
30,000.00 |
10,000.00 |
32,848.70 |
— |
32,848.70 |
Virtually completed |
20 |
Clones (Clondergole): New Frontier Customs Post |
.. |
.. |
22,000.00 |
6,000.00 |
7,737.52 |
16,901.59 |
24,639.11 |
Completed |
21 |
Dundalk Customs Road Station: Enlargement |
.. |
.. |
70,000.00 |
25,000.00 |
— |
33,799.19 |
33,799.19 |
Completed |
22 |
Monaghan Customs Road Station: Enlargement |
.. |
.. |
— |
10,000.00 |
— |
— |
— |
In planning |
23 |
Muff: New Frontier Customs Post |
.. |
.. |
.. |
— |
8,000.00 |
— |
— |
— |
In planning |
|
|
|
|
|
|
|
197,985.98 |
|
|
|
|
Office of Public Works |
|
|
|
|
|
|
24 |
Scoil Eanna, Rathfarnham |
|
|
|
|
|
|
|
(1) Restoration of Buildings Stage II |
.. |
.. |
116,000.00 |
10,000.00 |
6,990.73 |
118,793.75 |
125,784.48 |
Virtually completed |
|
(2) Restoration of Buildings Stage III |
.. |
.. |
135,000.00 |
20,000.00 |
1,019.70 |
— |
1,019.70 |
In planning |
25 |
Scoil Eanna, Rathfarnham: Natural History Exhibition Centre, Garages, Stores, etc. |
28,000.00 |
5,000.00 |
13,551.64 |
39,963.76 |
53,515.40 |
Virtually completed |
26 |
Connemara National Park: Development Stage I |
.. |
.. |
130,000.00 |
50,000.00 |
62,806.01 |
21,582.62 |
84,388.63 |
In progress |
27 |
Dunmore Cave: Visitor Centre |
.. |
.. |
.. |
42,000.00 |
7,000.00 |
— |
37,210.51 |
37,210.51 |
Virtually completed |
28 |
Glenveagh National Park, Co. Donegal: Development |
— |
210,000.00 |
23,478.41 |
— |
23,478.41 |
In planning |
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
Office of Public Works (contd.) |
£ |
£ |
£ |
£ |
£ |
|
29 |
Glenveagh National Park. Co. Donegal: Road re-alignment |
135,000.00 |
45,000.00 |
14,192.00 |
45,000.00 |
59,192.00 |
In progress |
30 |
Killarney National Park (including B.V.M. Park): Visitor Facilities, |
|
|
|
|
|
|
|
etc., at Gearhameen |
.. |
.. |
.. |
48,000.00 |
4,000.00 |
2,759.85 |
44,710.36 |
47,470.21 |
Virtually completed |
31 |
Killarney National Park (including B.V.M. Park): Muckross House |
|
|
|
|
|
|
|
Sanitary Services |
.. |
.. |
.. |
.. |
135,000.00 |
50,000.00 |
6,794.13 |
44,840.87 |
51,635.00 |
In progress |
32 |
Phoenix Park Extension (Islandbridge Park): General |
|
|
|
|
|
|
|
Development |
.. |
.. |
.. |
.. |
.. |
— |
5,000.00 |
— |
43,058.88 |
43,058.88 |
Balance of work under review |
33 |
Phoenix Park: Public Toilets and Car Park at Knockmaroon |
47,000.00 |
34,000.00 |
— |
— |
— |
In planning |
33A |
Phoenix Park: Provision of Gatekeepers’ Huts |
.. |
.. |
— |
— |
7,758.36 |
— |
7,758.36 |
In progress |
33B |
Phoenix Park: General Development, Papal Visit |
.. |
.. |
— |
— |
17,518.19 |
— |
17,518.19 |
Virtually completed |
34 |
Shannon Navigation: New Harbour at Dromod |
.. |
.. |
35,000.00 |
15,000.00 |
33,498.31 |
1,445.39 |
34,943.70 |
In progress |
35 |
Shannon Navigation: New Quay at Drumsna |
.. |
.. |
30,000.00 |
6,000.00 |
301.37 |
— |
301.37 |
In planning |
36 |
Shannon Navigation: New Jetty at Hodson’s Bay |
.. |
.. |
55,000.00 |
25,000.00 |
13,765.00 |
27,435.95 |
41,200.95 |
In progress |
37 |
Shannon Navigation: Extension to Harbour at Lecarrow |
30,000.00 |
10,000.00 |
— |
— |
— |
Under consideration |
38 |
Shannon Navigation: New Harbour at Portumna Castle |
50,000.00 |
8,000.00 |
41,913.53 |
63,549.05 |
105,462.58 |
In progress |
38A |
Shannon Navigation: Lough Key, New Quay |
.. |
.. |
— |
— |
2,881.38 |
12,261.07 |
15,142.45 |
In progress |
39 |
Shannon Navigation: Dry Docks at Rooskey |
.. |
.. |
30,000.00 |
10,000.00 |
15,456.72 |
— |
15,456.72 |
In progress |
40 |
Shannon Navigation: Extension to Quay at Shannonbridge |
40,000.00 |
20,000.00 |
6,850.75 |
5,231.01 |
12,081.76 |
In progress |
41 |
Ballinamore and Ballyconnell Canal: Survey |
.. |
.. |
21,000.00 |
6,000.00 |
89.30 |
14,891.51 |
14,980.81 |
In progress |
42 |
National Monuments: Cahir Castle Visitor Centre |
.. |
.. |
48,500.00 |
10,000.00 |
— |
27,320.24 |
27,320.24 |
In progress |
43 |
National Monuments: Rock of Cashel Visitor Centre |
.. |
95,000.00 |
22,000.00 |
16,810.51 |
53,979.90 |
70,790.41 |
In progress |
44 |
National Monuments: New Depots |
.. |
.. |
.. |
— |
18,000.00 |
— |
— |
— |
Under consideration |
45 |
New Central Building Maintenance Workshop at the Botanic |
|
|
|
|
|
|
|
Gardens |
.. |
.. |
.. |
.. |
.. |
85,000.00 |
30,000.00 |
— |
— |
— |
Under consideration |
|
|
|
|
288,435.89 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
|
|
|
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Public Service |
|
|
|
|
|
|
46 |
Provision of Building for Computer: Stage II |
.. |
.. |
760,000.00 |
85,000.00 |
69,992.95 |
610,136.98 |
680,129.93 |
Virtually completed |
47 |
Central Computer Unit: Provision of Standby Generator |
67,000.00 |
10,000.00 |
12,698.18 |
53,053.80 |
65,751.98 |
Virtually completed |
48 |
New Premises for the Institute of Public Administration and Department of the Public Service Training Centre |
.. |
2,160,000.00 |
50,000.00 |
19,016.63 |
63,891.84 |
82,908.47 |
In planning |
49 |
15, Merrion Square.: Adaptations |
.. |
.. |
.. |
100,000.00 |
1,000.00 |
— |
15,103.32 |
15,103.32 |
In progress |
|
|
|
|
|
|
|
|
|
101,707.76 |
|
|
|
|
Justice |
|
|
|
|
|
|
50 |
Film Censor’s Office: Improvements |
.. |
.. |
.. |
21,000.00 |
10,000.00 |
18,440.45 |
9,090.00 |
27,530.45 |
Virtually completed |
51 |
Garda Headquarters: Additional Petrol Storage |
.. |
.. |
25,000.00 |
20,000.00 |
118.06 |
— |
118.06 |
In planning |
52 |
Garda Stations: Erection of New Building and Major Improvement |
|
|
|
|
|
|
|
Schemes |
.. |
.. |
.. |
.. |
— |
1,160,000.00 |
829,738.11 Detailed as follows: |
|
|
|
|
Dublin Metropolitan Division |
|
|
|
|
|
|
|
Coolock |
.. |
.. |
.. |
.. |
.. |
|
|
1,890.00 |
18,397.25 |
20,287.25 |
Completed |
|
Finglas |
.. |
.. |
.. |
.. |
.. |
|
|
16,266.04 |
119,406.67 |
135,672.71 |
Completed |
|
Kevin St. |
.. |
.. |
.. |
.. |
.. |
|
|
13,381.25 |
35,564.91 |
48,946.16 |
Virtually completed |
|
Raheny |
.. |
.. |
.. |
.. |
.. |
|
|
9,777.40 |
16,654.04 |
26,431.44 |
Virtually completed |
|
Store St. |
.. |
.. |
.. |
.. |
.. |
|
|
1,100.00 |
215,966.77 |
217,066.77 |
Completed |
|
Swords |
.. |
.. |
.. |
.. |
.. |
|
|
1,300.00 |
6,500.00 |
7,800.00 |
Virtually completed |
|
Terenure |
.. |
.. |
.. |
.. |
.. |
|
|
6,205.10 |
— |
6,205.10 |
In progress |
|
Co. Dublin |
|
|
|
|
|
|
|
Blanchardstown |
.. |
.. |
.. |
.. |
|
|
18,450.00 |
— |
18,450.00 |
In progress |
|
Clondalkin |
.. |
.. |
.. |
.. |
|
|
8,713.94 |
26,155.89 |
34,869.83 |
In progress |
|
Irishtown |
.. |
.. |
.. |
.. |
.. |
|
|
59,809.70 |
23,269.32 |
83,079.02 |
In progress |
|
Stepaside |
.. |
.. |
.. |
.. |
.. |
|
|
23,752.20 |
— |
23,752.20 |
In progress |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
Justice (Contd.) |
|
|
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Co. Cavan |
|
|
|
|
|
|
|
Ballinagh |
.. |
.. |
.. |
.. |
.. |
|
|
3,885.09 |
28,013.00 |
31,898.09 |
Completed |
|
Virginia |
.. |
.. |
.. |
.. |
.. |
|
|
5,617.63 |
27,232.41 |
32,850.04 |
Completed |
|
Co. Carlow |
|
|
|
|
|
|
|
Carlow |
.. |
.. |
.. |
.. |
.. |
|
|
19,080.00 |
— |
19,080.00 |
In progress |
|
Co. Clare |
|
|
|
|
|
|
|
Broadford |
.. |
.. |
.. |
.. |
|
|
172.79 |
28,286.16 |
28,458.95 |
Completed |
|
Killaloe |
.. |
.. |
.. |
.. |
.. |
|
|
1,715.98 |
2,126.00 |
3,841.98 |
In progress |
|
Sixmilebridge |
.. |
.. |
.. |
.. |
|
|
31,500.00 |
— |
31,500.00 |
In progress |
|
Co. Cork |
|
|
|
|
|
|
|
Bantry |
.. |
.. |
.. |
.. |
.. |
|
|
2,728.85 |
32,683.02 |
35,411.87 |
Completed |
|
Bridewell |
.. |
.. |
.. |
.. |
.. |
|
|
8,550.00 |
38,775.00 |
47,325.00 |
Virtually completed |
|
Carraignavar |
.. |
.. |
.. |
.. |
|
|
576.51 |
27,014.10 |
27,590.61 |
Completed |
|
Fermoy |
.. |
.. |
.. |
.. |
.. |
|
|
9,250.00 |
29,700.00 |
38,950.00 |
In progress |
|
Kanturk |
.. |
.. |
.. |
.. |
.. |
|
|
2,389.00 |
85,013.74 |
87,402.74 |
Virtually completed |
|
Mallow |
.. |
.. |
.. |
.. |
.. |
|
|
55,126.00 |
12,315.14 |
67,441.14 |
In progress |
|
Midleton |
.. |
.. |
.. |
.. |
.. |
|
|
2,018.00 |
— |
2,018.00 |
In progress |
|
Mitchelstown |
.. |
.. |
.. |
.. |
|
|
6,061.40 |
— |
6,061.40 |
In progress |
|
Co. Donegal |
|
|
|
|
|
|
|
Ballyshannon |
.. |
.. |
.. |
.. |
|
|
1,210.00 |
98,943.43 |
100,153.43 |
Completed |
|
Lifford |
.. |
.. |
.. |
.. |
.. |
|
|
141.00 |
19,531.65 |
19,672.65 |
Completed |
|
Co. Galway |
|
|
|
|
|
|
|
Kilcreest |
.. |
.. |
.. |
.. |
.. |
|
|
4,775.00 |
19,251.79 |
24,026.79 |
Virtually completed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
Justice (Contd.) |
|
|
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Co. Kerry |
|
|
|
|
|
|
|
Ardfert |
.. |
.. |
.. |
.. |
.. |
|
|
2,141.55 |
28,521.32 |
30,662.87 |
Completed |
|
Tralee |
.. |
.. |
.. |
.. |
.. |
|
|
1,912.16 |
82.50 |
1,994.66 |
In planning |
|
Co. Kildare |
|
|
|
|
|
|
|
Kildare |
.. |
.. |
.. |
.. |
.. |
|
|
39,907.37 |
7,998.52 |
47,905.89 |
In progress |
|
Kill |
.. |
.. |
.. |
.. |
.. |
|
|
50.16 |
16,638.83 |
16,688.99 |
Completed |
|
Naas |
.. |
.. |
.. |
.. |
.. |
|
|
631.20 |
39,210.07 |
39,841.27 |
Completed |
|
Co. Kilkenny |
|
|
|
|
|
|
|
Castlecomer |
.. |
.. |
.. |
.. |
|
|
4,000.00 |
3,000.00 |
7,000.00 |
In progress |
|
Graiguenamanagh |
.. |
.. |
.. |
.. |
|
|
540.00 |
450.00 |
990.00 |
In progress |
|
Co. Laois |
|
|
|
|
|
|
|
Portlaoise |
.. |
.. |
.. |
.. |
|
|
3,880.00 |
260,968.77 |
264,848.77 |
Virtually completed |
|
Co. Leitrim |
|
|
|
|
|
|
|
Carrick-on-Shannon |
.. |
.. |
.. |
.. |
|
|
10,725.00 |
— |
10,725.00 |
In progress |
|
Manorhamilton |
.. |
.. |
.. |
.. |
|
|
37,601.54 |
— |
37,601.54 |
In progress |
|
Co. Limerick |
|
|
|
|
|
|
|
Limerick City: Divisional Headquarters |
.. |
.. |
|
|
25,178.50 |
495,957.93 |
521,136.43 |
Virtually completed |
|
Askeaton |
.. |
.. |
.. |
.. |
.. |
|
|
22,064.00 |
22,500.00 |
44,564.00 |
In progress |
|
Newcastlewest |
.. |
.. |
.. |
.. |
|
|
3,079.79 |
65,208.49 |
68,288.28 |
Completed |
|
Co. Longford |
|
|
|
|
|
|
|
Drumlish |
.. |
.. |
.. |
.. |
.. |
|
|
5,700.00 |
30,914.00 |
36,614.00 |
Virtually completed |
|
Granard |
.. |
.. |
.. |
.. |
.. |
|
|
5,125.49 |
118,999.83 |
124,125.32 |
Virtually completed |
|
Co. Louth |
|
|
|
|
|
|
|
Dundalk |
.. |
.. |
.. |
.. |
.. |
|
|
90,882.02 |
59,363.06 |
150,245.08 |
In progress |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
Justice (Contd.) |
|
|
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Co. Mayo |
|
|
|
|
|
|
|
Kiltimagh |
.. |
.. |
.. |
.. |
.. |
|
|
9,500.00 |
26,220.00 |
35,720.00 |
Virtually completed |
|
Lahardane |
.. |
.. |
.. |
.. |
|
|
12,836.00 |
350.00 |
13,186.00 |
In progress |
|
Co. Meath |
|
|
|
|
|
|
|
Duleek |
.. |
.. |
.. |
.. |
.. |
|
|
9,477.20 |
27,129.00 |
36,606.20 |
In progress |
|
Enfield |
.. |
.. |
.. |
.. |
.. |
|
|
4,269.52 |
18,911.37 |
23,180.89 |
In progress |
|
Navan |
.. |
.. |
.. |
.. |
.. |
|
|
28,186.43 |
749.92 |
28,936.35 |
In progress |
|
Co. Monaghan |
|
|
|
|
|
|
|
Castleblayney |
.. |
.. |
.. |
.. |
|
|
9,127.52 |
49,856.40 |
58,983.92 |
Virtually completed |
|
Monaghan |
.. |
.. |
.. |
.. |
|
|
6,320.80 |
5,104.93 |
11,425.73 |
In planning |
|
Rockcorry |
.. |
.. |
.. |
.. |
|
|
17,550.00 |
2,710.00 |
20,260.00 |
In planning |
|
Co Roscommon |
|
|
|
|
|
|
|
Boyle |
.. |
.. |
.. |
.. |
.. |
|
|
97,885.88 |
15,728.85 |
113,614.73 |
In progress |
|
Castlerea |
.. |
.. |
.. |
.. |
.. |
|
|
4,292.19 |
101,740.33 |
106,032.52 |
Completed |
|
Loughglynn |
.. |
.. |
.. |
.. |
|
|
5,700.00 |
32,944.95 |
38,644.95 |
Completed |
|
Co. Sligo |
|
|
|
|
|
|
|
Cliffony |
.. |
.. |
.. |
.. |
.. |
|
|
374.74 |
27,262.59 |
27,637.33 |
Completed |
|
Easkey |
.. |
.. |
.. |
.. |
.. |
|
|
5,000.00 |
13,050.00 |
18,050.00 |
In progress |
|
Gurteen |
.. |
.. |
.. |
.. |
.. |
|
|
11,454.00 |
5,940.00 |
17,394.00 |
In progress |
|
Co. Tipperary |
|
|
|
|
|
|
|
Lorrha |
.. |
.. |
.. |
.. |
.. |
|
|
12,600.00 |
— |
12,600.00 |
In progress |
|
Newport |
.. |
.. |
.. |
.. |
.. |
|
|
103.30 |
26,058.55 |
26,161.85 |
Completed |
|
Templemore |
.. |
.. |
.. |
.. |
|
|
5,850.00 |
— |
5,850.00 |
In progress |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
Justice (Contd.) |
|
|
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Co. Waterford |
|
|
|
|
|
|
|
Portlaw |
.. |
.. |
.. |
.. |
.. |
|
|
900.00 |
13,019.75 |
13,919.75 |
Completed |
|
Co. Wexford |
|
|
|
|
|
|
|
Bunclody |
.. |
.. |
.. |
.. |
.. |
|
|
1,148.00 |
450.00 |
1,598.00 |
In progress |
|
Carrick-on-Bannow |
.. |
.. |
.. |
.. |
|
|
1,273.00 |
24,195.33 |
25,468.33 |
Completed |
|
Clonroche |
.. |
.. |
.. |
.. |
|
|
885.00 |
16,346.72 |
17,231.72 |
Completed |
|
Kiltealy |
.. |
.. |
.. |
.. |
.. |
|
|
1,621.87 |
28,398.02 |
30,019.89 |
Completed |
|
Taghmon |
.. |
.. |
.. |
.. |
.. |
|
|
13,509.00 |
18,000.00 |
31,509.00 |
In progress |
|
Co Wicklow |
|
|
|
|
|
|
|
Carnew |
.. |
.. |
.. |
.. |
.. |
|
|
1,012.000 |
450.00 |
1,462.00 |
In progress |
53 |
Garda Stations: Minor Stations: Minor Improvements Schemes |
|
160,000.00 |
170,021.43 Detailed as follows:— |
|
|
|
Sub. No. |
Dublin Metropolitan Division |
|
|
|
|
|
|
46 |
Bridewell |
.. |
.. |
.. |
.. |
.. |
|
|
394.34 |
— |
394.34 |
In progress |
61/77 of ’78 |
Donnybrook |
.. |
.. |
.. |
.. |
|
|
2,136.15 |
2,877.54 |
5,013.69 |
In progress |
17 |
Dublin Castle (Special Detective Unit): |
|
|
|
|
|
|
|
Provision of filing and other accommodation |
.. |
|
|
2,121.63 |
— |
2,121.63 |
Virtually Completed |
61/44 of ’78 |
Dublin Castle: Provision of gymnasium and parade room |
|
|
3,220.30 |
2,451.76 |
5,672.06 |
Virtually Completed |
61/60 of ’78 |
Dublin Castle: Provision of lockers for Crime Task Force |
|
|
39.97 |
493.91 |
533.88 |
Completed |
26 |
Garda Depot, Phoenix Park: Improvements to Accommodation |
|
|
|
|
|
|
|
for Commissioner’s Staff |
.. |
.. |
.. |
|
|
12,449.14 |
— |
12,449.14 |
Virtually Completed |
61/22 of ’78 |
Garda Headquarters Phoenix Park: Provision of toilet facilities |
|
|
299.27 |
6,266.22 |
6,565.49 |
Virtually Completed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
Justice (Contd.) |
|
|
|
|
|
£ |
£ |
£ |
£ |
£ |
|
76/50 of ’76 |
Garda Headquarters Phoenix Park: Provision of floor bases for |
|
|
|
|
|
|
|
precision instruments |
.. |
.. |
.. |
|
|
2,123.67 |
251.35 |
2,375.02 |
Completed |
61 |
Garda Headquarters: Provision of tarmacadam |
.. |
.. |
|
|
6,813.45 |
— |
6,813.45 |
In progress |
57 |
Harcourt Tce. |
.. |
.. |
.. |
.. |
|
|
1,115.10 |
— |
1,115.10 |
In progress |
9 |
Kevin St. |
.. |
.. |
.. |
.. |
.. |
|
|
3,609.29 |
— |
3,609.29 |
In progress |
59 |
Kilmainham |
.. |
.. |
.. |
.. |
|
|
2,291.66 |
— |
2,291.66 |
In progress |
45 |
Mountjoy |
.. |
.. |
.. |
.. |
.. |
|
|
354.07 |
— |
354.07 |
In progress |
61/47 of ’78 |
Pearse St. |
.. |
.. |
.. |
.. |
|
|
1,108.01 |
2,826.20 |
3,934.21 |
In progress |
61/86 of ’78 |
Santry |
.. |
.. |
.. |
.. |
.. |
|
|
677.57 |
737.15 |
1,414.72 |
In progress |
|
Co. Dublin |
|
|
|
|
|
|
38 |
Rathfarnham |
.. |
.. |
.. |
.. |
|
|
2,008.00 |
— |
2,008.00 |
In progress |
30 |
Skerries |
.. |
.. |
.. |
.. |
.. |
|
|
3,571.81 |
— |
3,571.81 |
In progress |
|
Co. Clare |
|
|
|
|
|
|
70/12 of ’75 |
Carrigaholt |
.. |
.. |
.. |
.. |
|
|
425.80 |
7,160.00 |
7,585.80 |
Completed |
|
Co. Cork |
|
|
|
|
|
|
2 |
Bantry |
.. |
.. |
.. |
.. |
.. |
|
|
1,597.68 |
— |
1,597.68 |
In progress |
28 |
Barrack St. |
.. |
.. |
.. |
.. |
|
|
1,283.36 |
— |
1,283.36 |
In progress |
54 |
Blarney |
.. |
.. |
.. |
.. |
.. |
|
|
2,250.00 |
— |
2,250.00 |
In progress |
61/8 of ’78 |
Drimoleague |
.. |
.. |
.. |
.. |
|
|
206.14 |
1,920.06 |
2,126.20 |
Completed |
21 |
Glanmire |
.. |
.. |
.. |
.. |
.. |
|
|
945.00 |
— |
945.00 |
In progress |
61/45 of ’78 |
MacCurtain St. |
.. |
.. |
.. |
.. |
|
|
328.57 |
1,621.44 |
1,950.01 |
Completed |
14 |
Macroom |
.. |
.. |
.. |
.. |
.. |
|
|
1,800.00 |
— |
1,800.00 |
In progress |
44 |
Shandon |
.. |
.. |
.. |
.. |
.. |
|
|
1,380.00 |
— |
1,380.00 |
In progress |
41 |
Tarelton |
.. |
.. |
.. |
.. |
.. |
|
|
1,800.00 |
— |
1,800.00 |
In progress |
50 |
Union Quay: Alterations |
.. |
.. |
.. |
|
|
3,731.83 |
— |
3,731.83 |
In progress |
66 |
Union Quay: Provision of new telecommunications centre |
|
|
781.75 |
— |
781.75 |
In progress |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
Observations |
|
Justice (Contd.) |
|
|
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Co. Donegal |
|
|
|
|
|
|
22 |
Buncrana |
.. |
.. |
.. |
.. |
.. |
|
|
8,100.00 |
— |
8,100.00 |
In progress |
76/58 of ’76 |
Bundoran |
.. |
.. |
.. |
.. |
.. |
|
|
11.99 |
2,025.00 |
2,036.99 |
Completed |
61/82 of ’78 |
Glencolmcille |
.. |
.. |
.. |
.. |
|
|
299.10 |
2,041.11 |
2,340.21 |
Completed |
61/62 of ’77 |
Pettigo |
.. |
.. |
.. |
.. |
.. |
|
|
1,550.96 |
1,620.00 |
3,170.96 |
Completed |
|
Co. Galway |
|
|
|
|
|
|
3 |
Rosmuc |
.. |
.. |
.. |
.. |
.. |
|
|
2,338.10 |
— |
2,338.10 |
In progress |
|
Co. Kerry |
|
|
|
|
|
|
4 |
Ballyduff |
.. |
.. |
.. |
.. |
.. |
|
|
1,700.00 |
— |
1,700.00 |
In progress |
18 |
Cahirciveen |
.. |
.. |
.. |
.. |
|
|
1,210.25 |
— |
1,210.25 |
In progress |
10 |
Castlegregory |
.. |
.. |
.. |
.. |
|
|
2,263.34 |
— |
2,263.34 |
In progress |
15 |
Dingle |
.. |
.. |
.. |
.. |
.. |
|
|
3,544.00 |
— |
3,544.00 |
In progress |
31 |
Killarney |
.. |
.. |
.. |
.. |
.. |
|
|
5,400.00 |
— |
5,400.00 |
In progress |
|
Co. Kildare |
|
|
|
|
|
|
61/39 of ’78 |
Kilcock |
.. |
.. |
.. |
.. |
.. |
|
|
416.00 |
3,679.54 |
4,095.54 |
Completed |
19 |
Monasterevan |
.. |
.. |
.. |
.. |
|
|
5,125.00 |
— |
5,125.00 |
In progress |
61/46 of ’78 |
Newbridge ... |
... |
... |
... |
... |
... |
|
|
824.00 |
395.00 |
1,219.00 |
In progress |
|
Co. Kilkenny |
|
|
|
|
|
|
61/36 of ’77 |
Ballyragget |
.. |
.. |
.. |
.. |
|
|
2,775.00 |
5,225.00 |
8,000.00 |
Completed |
|
Co. Laois |
|
|
|
|
|
|
13 |
Mountrath |
.. |
.. |
.. |
.. |
|
|
4,550.00 |
— |
4,550.00 |
In progress |
|
Co. Leitrim |
|
|
|
|
|
|
76/65 of ’76 |
Kinlough |
.. |
.. |
.. |
.. |
.. |
|
|
907.99 |
675.00 |
1,582.99 |
Completed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Justice (Contd.) |
|
|
|
|
|
|
|
Co. Limerick |
|
|
|
|
|
|
71 |
Bruff |
.. |
.. |
.. |
.. |
.. |
|
|
1,500.00 |
— |
1,500.00 |
In progress |
20 |
Castletown Conyers |
.. |
.. |
.. |
.. |
|
|
7,923.77 |
— |
7,923.77 |
In progress |
70/18 of ’75 |
Edward St. |
.. |
.. |
.. |
.. |
|
|
7,752.00 |
15,079.96 |
22,831.96 |
In progress |
61/26 of ’78 |
Mayorstown |
.. |
.. |
.. |
.. |
|
|
1,817.36 |
3,150.00 |
4,967.36 |
Virtually completed |
7 |
Shanagolden |
.. |
.. |
.. |
.. |
|
|
2,200.00 |
— |
2,200.00 |
In progress |
|
Co. Mayo |
|
|
|
|
|
|
61/30 of ’77 |
Ballinrobe |
.. |
.. |
.. |
.. |
|
|
2,543.20 |
4,230.00 |
6,773.20 |
In progress |
16 |
Bellacorick |
.. |
.. |
.. |
.. |
|
|
500.00 |
— |
500.00 |
In progress |
5 |
Claremorris |
.. |
.. |
.. |
.. |
|
|
1,196.08 |
— |
1,196.08 |
In progress |
|
Co. Meath |
|
|
|
|
|
|
61/37 of ’78 |
Slane |
.. |
.. |
.. |
.. |
.. |
|
|
1,550.00 |
900.00 |
2,450.00 |
Completed |
|
Co. Sligo |
|
|
|
|
|
|
27 |
Sligo |
.. |
.. |
.. |
.. |
.. |
|
|
4,080.51 |
— |
4,080.51 |
In progress |
|
Co. Tipperary |
|
|
|
|
|
|
8 |
Carrick-on-Suir |
.. |
.. |
.. |
.. |
|
|
6,840.00 |
— |
6,840.00 |
In progress |
61/56 of ’78 |
Clonmel |
.. |
.. |
.. |
.. |
.. |
|
|
301.00 |
3,600.00 |
3,901.00 |
Completed |
23 |
Templemore Training Centre |
.. |
.. |
.. |
|
|
1,444.16 |
— |
1,444.16 |
In progress |
12 |
Templemore |
.. |
.. |
.. |
.. |
|
|
2,747.94 |
— |
2,747.94 |
In progress |
|
Co. Westmeath |
|
|
|
|
|
|
24 |
Castlepollard |
.. |
.. |
.. |
.. |
|
|
3,600.00 |
— |
3,600.00 |
In progress |
|
Co. Wexford |
|
|
|
|
|
|
61/97 of ’78 |
Courtown Harbour |
.. |
.. |
.. |
.. |
|
|
4,367.26 |
9,000.00 |
13,367.26 |
Virtually completed |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Justice (Contd.) |
|
|
|
|
|
|
|
Co. Wicklow |
|
|
|
|
|
|
33 |
Bray |
.. |
.. |
.. |
.. |
.. |
|
|
6,745.08 |
— |
313.74 |
In progress |
42 |
Rathdrum |
.. |
.. |
.. |
.. |
|
|
313.74 |
— |
313.74 |
In progress |
|
General |
|
|
|
|
|
|
61/82 of ’77 |
Provision of Garda Protection Huts |
.. |
.. |
.. |
|
|
10,720.04 |
18,178.67 |
28,898.71 |
In progress |
54 |
Garda Training Centre, Templemore: |
|
|
|
|
|
|
|
Swimming Pool Improvements |
.. |
.. |
.. |
110,000.00 |
20,000.00 |
10,778.56 |
1,479.14 |
12,257.70 |
In planning |
55 |
Courts of Justice: Provision of Additional Accommodation |
— |
75,000.00 |
41,560.88 |
5,621.18 |
47,182.06 |
In planning |
56 |
Courts of Justice: Provision of Jury Room |
.. |
.. |
35,000.00 |
30,000.00 |
— |
— |
— |
In planning |
57 |
New Permanent Courts |
.. |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
Under consideration |
|
|
|
|
1,070,657.49 |
|
|
|
|
Environment |
|
|
|
|
|
|
58 |
Shannon: Erection of Vehicle Registration Unit |
.. |
.. |
— |
20,000.00 |
— |
— |
— |
Under consideration |
|
Education |
|
|
|
|
|
|
59 |
Athlone: New Offices |
.. |
.. |
.. |
.. |
1,150,000.00 |
30,000.00 |
36,730.39 |
1,089,904.04 |
1,126,634.43 |
Virtually completed |
60 |
National Library: Adaptation of Premises at Kildare St. |
500,000.00 |
25,000.00 |
9,551.03 |
24,471.18 |
34,022.21 |
In progress |
61 |
National Museum: Improvement of Lighting |
.. |
.. |
170,000.00 |
30,000.00 |
27,899.90 |
— |
27,899.90 |
In progress |
61A |
National Museum: Exhibition Installation |
.. |
.. |
— |
— |
28,976.83 |
— |
28,976.83 |
In progress |
62 |
National Museum: Additional Accommodation |
.. |
.. |
150,000.00 |
35,000.00 |
37,102.89 |
141,239.14 |
178,342.03 |
Virtually completed |
63 |
Royal Irish Academy, Dublin: Improvements |
.. |
.. |
60,000.00 |
30,000.00 |
68,400.00 |
30,600.00 |
99,000.00 |
In progress |
|
|
|
|
208,661.04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Fisheries and Forestry |
|
|
|
|
|
|
64 |
Abbotstown Farm: Accommodation for Scientific and Research |
|
|
|
|
|
|
|
Staff (Fisheries) |
.. |
.. |
.. |
.. |
326,000.00 |
15,000.00 |
12,667.60 |
261,615.41 |
274,283.01 |
Virtually completed |
65 |
Proposed Fisheries Research Station at Ballyglass, Co. Mayo |
— |
1,000.00 |
— |
— |
— |
Under consideration |
66 |
Dunmore East Fisheries Field Research Station |
.. |
.. |
22,000.00 |
2,000.00 |
— |
157.79 |
157.79 |
In planning |
|
|
|
|
12,667.60 |
|
|
|
|
Gaeltacht |
|
|
|
|
|
|
67 |
Galway: New Offices at Furbo |
.. |
.. |
.. |
350,000.00 |
245,000.00 |
262,864.96 |
50,765.93 |
313,630.89 |
In progress |
|
|
|
|
262,864.96 |
|
|
|
|
Agriculture |
|
|
|
|
|
|
68 |
New Office Block, Kildare Place: Fitting out, Furnishing, etc. |
1,760,000.00 |
35,000.00 |
16,098.68 |
1,721,634.45 |
1,737,733.13 |
Complete |
69 |
Drogheda: New Offices |
.. |
.. |
.. |
.. |
131,000.00 |
4,000.00 |
— |
126,474.75 |
126,474.75 |
Completed |
70 |
Abbotstown Farm: Accommodation for Stores |
.. |
.. |
52,000.00 |
15,000.00 |
— |
— |
— |
In planning |
71 |
Abbotstown Farm: New Butter, Seed and Meat Control Station |
1,750,000.00 |
5,000.00 |
— |
— |
— |
In planning |
72 |
Abbotstown Farm: Canteen Facilities |
.. |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
Under consideration |
73 |
Abbotstown Farm: Farm Manager’s Residence |
.. |
.. |
21,000.00 |
5,000.00 |
2,700.00 |
13,737.00 |
16,437.00 |
Virtually completed |
74 |
Abbotstown Farm: Grain Storage Complex |
.. |
.. |
80,000.00 |
60,000.00 |
37,080.00 |
693.63 |
37,773.63 |
In progress |
75 |
Abbotstown Farm: Loose Box Accommodation |
.. |
.. |
108,000.00 |
5,000.00 |
7,555.74 |
100,963.35 |
108,519.09 |
Virtually completed |
76 |
Abbotstown Farm: New Milking Parlour |
.. |
.. |
32,000.00 |
3,000.00 |
— |
28,922.37 |
28,922.37 |
Completed |
77 |
Abbotstown Farm: New Sewerage Scheme |
.. |
.. |
250,000.00 |
5,000.00 |
— |
— |
— |
In planning |
78 |
Abbotstown Farm: Rabies Unit |
.. |
.. |
.. |
30,000.00 |
15,000.00 |
— |
— |
— |
In planning |
79 |
Ballyhaise Agricultural College: New Accommodation |
260,000.00 |
167,000.00 |
171,635.09 |
13,412.00 |
185,047.09 |
In progress |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
|
Observations |
No. |
Service and Description |
Total Estimate |
Vote 1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
Agriculture |
£ |
£ |
£ |
£ |
£ |
|
80 |
Ballyhaise Agricultural College: New Water Supply: .. |
.. |
85,000.00 |
50,000.00 |
17,471.00 |
3,223.66 |
20,694.66 |
In progress |
81 |
Botanic Gardens: Developments (Herbarium etc.) |
.. |
.. |
850,000.00 |
5,000.00 |
— |
15,661.95 |
15,661.95 |
In planning |
82 |
Botanic Gardens: Staff Canteen |
.. |
.. |
.. |
50,000.00 |
5,000.00 |
10,263.42 |
36,664.50 |
46,927.92 |
In progress |
83 |
Clonakilty Agricultural College: Residence for Superintendent |
25,000.00 |
5,000.00 |
— |
— |
— |
Deferred |
84 |
Clonakilty Agricultural College: New Student Accommodation |
— |
1,000.00 |
— |
— |
— |
Under consideration |
85 |
Kildalton College: Residences for Director and Deputy Directors |
65,000.00 |
40,000.00 |
— |
2,007.61 |
2,007.61 |
In planning |
86 |
Kildalton College: New Water Supply |
.. |
.. |
.. |
80,000.00 |
1,000.00 |
— |
6,213.03 |
6,213.03 |
In planning |
87 |
Mellowes Agricultural College, Athenry: New Student |
|
|
|
|
|
|
|
Accommodation |
.. |
.. |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
Under consideration |
87A |
Mellowes Agricultural College, Athenry: Gate Lodge |
— |
— |
14,252.00 |
— |
14,252.00 |
In progress |
88 |
Thorndale: Extension to Brucellosis Laboratory |
.. |
.. |
125,000.00 |
15,000.00 |
26,892.21 |
90,838.99 |
117,731.20 |
Virtually completed |
89 |
Tully West, Co. Kildare: New Office Accommodation |
31,000.00 |
10,000.00 |
— |
25,657.13 |
25,657.13 |
Completed |
90 |
Tully West, Co. Kildare: Performance Testing Station for Beef |
|
|
|
|
|
|
|
Bulls |
.. |
.. |
.. |
.. |
.. |
83,000.00 |
1,000.00 |
205.50 |
87,608.35 |
87,813.85 |
Completed |
91 |
Regional Veterinary Laboratories at Cork, Kilkenny and Limerick: |
|
|
|
|
|
|
|
Provision of Incinerators |
.. |
.. |
.. |
30,000.00 |
25,000.00 |
66.00 |
— |
66.00 |
In planning |
92 |
Raphoe District Veterinary Office |
.. |
.. |
.. |
160,000.00 |
10,000.00 |
18,730.96 |
146,227.58 |
164,958.54 |
Completed |
|
|
|
|
322,950.60 |
|
|
|
|
Industry Commerce and Energy |
|
|
|
|
|
|
93 |
Geological Survey, Glencree: Provision of Storage Racks |
33,000.00 |
30,000.00 |
22,300.00 |
— |
22,300.00 |
In progress |
|
|
|
|
22,300.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Tourism and Transport |
|
|
|
|
|
|
94 |
Extension to Valentia Coast Radio Station |
.. |
.. |
30,000.00 |
5,000.00 |
— |
— |
— |
In planning |
95 |
Training School and Synoptic Reporting Station, Murrough, Co. |
|
|
|
|
|
|
|
Galway |
.. |
.. |
.. |
.. |
.. |
180,000.00 |
40,000.00 |
9,796.85 |
145,087.80 |
154,884.65 |
Virtually completed |
96 |
Claremorris New Meteorological Station |
.. |
.. |
29,500.00 |
2,000.00 |
1,295.00 |
23,627.00 |
24,922.00 |
Virtually completed |
97 |
Johnstown Castle: New Meteorological Station |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
In planning |
|
|
|
|
11,091.85 |
|
|
|
|
Posts and Telegraphs |
|
|
|
|
|
|
98 |
Athy Post Office: Improvements |
.. |
.. |
.. |
50,000.00 |
20,000.00 |
31,230.00 |
30,902.00 |
62,132.00 |
In progress |
99 |
Ballinlough (Cork): Adaptations to Sorting Office |
.. |
.. |
32,000.00 |
11,000.00 |
6,810.00 |
23,217.40 |
30,027.40 |
Virtually completed |
100 |
Ballinrobe Post Office: Alterations and Additions |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
Under consideration |
101 |
Ballyhaunis Post Office: Modernisation |
.. |
.. |
32,000.00 |
9,000.00 |
7,283.33 |
20,017.48 |
27,300.81 |
In progress |
102 |
Central Sorting Office, Dublin: Internal Alterations |
.. |
25,000.00 |
5,000.00 |
6,246.11 |
29,484.59 |
35,730.70 |
Virtually completed |
103 |
Central Sorting Office, Dublin: Temporary Parking for Postal |
|
|
|
|
|
|
|
Vehicles |
.. |
.. |
.. |
.. |
37,000.00 |
35,000.00 |
58,862.00 |
— |
58,862.00 |
In progress |
104 |
Castleblayney Post Office: Modernisation |
.. |
.. |
30,000.00 |
10,000.00 |
— |
— |
— |
Under consideration |
105 |
Clonmel New Post Office |
.. |
.. |
.. |
355,000.00 |
70,000.00 |
47,565.79 |
294,650.69 |
342,216.48 |
In progress |
106 |
Cobh Post Office: Modernisation |
.. |
.. |
.. |
41,000.00 |
8,000.00 |
9,909.24 |
32,443.58 |
42,352.82 |
Virtually completed |
107 |
Cork (Brian Boru St.) Sorting Office: Extension |
.. |
.. |
— |
1,000.00 |
816.00 |
— |
816.00 |
In planning |
108 |
Dungarvan New Post Office |
.. |
.. |
.. |
70,000.00 |
4,000.00 |
— |
64,433.14 |
64,433.14 |
Completed |
109 |
Enniscorthy Post Office: Improvements |
.. |
.. |
45,000.00 |
6,000.00 |
12,742.73 |
45,029.39 |
57,772.12 |
Completed |
110 |
Fairview New Sorting Office |
.. |
.. |
.. |
— |
1,000.00 |
2,233.73 |
99.86 |
2,333.59 |
In planning |
111 |
Fermoy New Post Office |
.. |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
Under consideration |
112 |
Finglas Sorting Office: Extension |
.. |
.. |
.. |
50,000.00 |
35,000.00 |
15,168.94 |
62.76 |
15,231.70 |
In progress |
113 |
Galway Post Office: Extension |
.. |
.. |
.. |
— |
1,000.00 |
383.86 |
— |
383.86 |
In planning |
114 |
Letterkenny Post Office Extension |
.. |
.. |
.. |
70,000.00 |
4,000.00 |
2,403.88 |
65,384.11 |
67,787.99 |
Virtually completed |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
Posts and Telegraphs (Contd.) |
£ |
£ |
£ |
£ |
£ |
|
115 |
Limerick Post Office: Improvements |
.. |
.. |
.. |
— |
1,000.00 |
3,589.46 |
1,841.73 |
5,431.19 |
In planning |
116 |
Longford New Post Office |
.. |
.. |
.. |
270,000.00 |
50,000.00 |
7,116.04 |
5,860.81 |
12,976.85 |
In progress |
117 |
Mullingar New Post Office |
.. |
.. |
.. |
480,000.00 |
80,000.00 |
3,410.92 |
52,700.44 |
56,111.36 |
Tenders under consideration |
118 |
Navan New Post Office |
.. |
.. |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
Under consideration |
119 |
New Ross Post Office: Improvements |
.. |
.. |
.. |
30,000.00 |
1,000.00 |
— |
— |
— |
In planning |
120 |
Phibsboro Post Office: Extension |
.. |
.. |
.. |
90,000.00 |
8,000.00 |
8,500.00 |
93,286.27 |
101,786.27 |
Completed |
121 |
Roscommon Post Office: Modernisation |
.. |
.. |
32,000.00 |
25,000.00 |
26,398.90 |
2,717.00 |
29,115.90 |
In progress |
122 |
Shannon New Post Office |
.. |
.. |
.. |
470,000.00 |
10,000.00 |
— |
30,166.41 |
30,166.41 |
Alternative proposals under consideration |
123 |
Thurles Post Office: Improvements Stage 11 |
.. |
.. |
— |
1,000.00 |
155.00 |
702.52 |
857.52 |
In planning |
124 |
Tipperary New Post Office |
.. |
.. |
.. |
240,000.00 |
100,000.00 |
145,124.94 |
74,136.37 |
219,261.31 |
In progress |
125 |
Waterford Post Office: Improvements |
.. |
.. |
.. |
70,000.00 |
1,000.00 |
— |
— |
— |
In planning |
126 |
Wexford New Post Office |
.. |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
Under consideration |
127 |
Area Engineering Headquarters |
.. |
.. |
.. |
— |
35,000.00 |
5,820.91 |
|
|
|
|
|
|
|
Detailed as follows: |
|
|
|
|
Letterkenny |
.. |
.. |
.. |
.. |
.. |
|
|
14.42 |
— |
14.42 |
In progress |
|
Mallow |
.. |
.. |
.. |
.. |
.. |
|
|
356.40 |
— |
356.40 |
In progress |
|
Monaghan |
.. |
.. |
.. |
.. |
.. |
|
|
1,163.90 |
1,021.00 |
2,184.90 |
In progress |
|
Tipperary |
.. |
.. |
.. |
.. |
.. |
|
|
60.19 |
164.13 |
224.32 |
In planning |
|
Tralee |
.. |
.. |
.. |
.. |
.. |
|
|
3,533.21 |
— |
3,533.21 |
In progress |
|
Walkinstown |
.. |
.. |
.. |
.. |
.. |
|
|
615.83 |
4,940.38 |
5,556.21 |
Completed |
|
Waterford |
.. |
.. |
.. |
.. |
.. |
|
|
76.96 |
— |
76.96 |
In progress |
128 |
Training Centres |
.. |
.. |
.. |
.. |
— |
40,000.00 |
2,137.75 |
|
|
|
|
|
|
|
Detailed as follows: |
|
|
|
|
Dundrum |
.. |
.. |
.. |
.. |
.. |
|
|
1,687.75 |
8,825.77 |
10,513.52 |
In planning |
|
Glandore Rd. |
.. |
.. |
.. |
.. |
|
|
450.00 |
— |
450.00 |
In progress |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
Posts and Telegraphs (Contd.) |
£ |
£ |
£ |
£ |
£ |
|
129 |
Warehousing and Garage Accommodation |
.. |
.. |
— |
38,000.00 |
21,991.89 |
|
|
|
|
|
|
|
Detailed as follows: |
|
|
|
|
Chapelizod |
.. |
.. |
.. |
.. |
.. |
|
|
17,774.41 |
— |
17,774.41 |
In progress |
|
Clondalkin Polefield |
.. |
.. |
.. |
.. |
|
|
4,217.48 |
— |
4,217.48 |
In planning |
|
|
|
|
425,901.42 |
|
|
|
|
Defence |
|
|
|
|
|
|
130 |
G.H.Q.: Improvement Works |
.. |
.. |
.. |
21,500.00 |
2,000.00 |
5,200.38 |
18,958.72 |
24,159.10 |
Virtually completed |
131 |
Infirmary Road: Provision of Additional Accommodation |
— |
5,000.00 |
14,678.33 |
— |
14,678.33 |
In planning |
132 |
Military Billets at Government Buildings: Adaptations |
135,000.00 |
20,000.00 |
23,702.05 |
103,209.00 |
126,911.05 |
In progress |
133 |
St. Bricin’s Hospital: Adaptations |
.. |
.. |
.. |
25,000.00 |
25,000.00 |
571.40 |
— |
571.40 |
In progress |
|
|
|
|
44,152.16 |
|
|
|
|
Foreign Affairs |
|
|
|
|
|
|
134 |
Embassy at Athens: Fitting out |
.. |
.. |
.. |
80,000.00 |
50,000.00 |
80,369.38 |
23,973.89 |
104,343.27 |
Virtually completed |
135 |
Embassy at Beirut: Fitting out |
.. |
.. |
.. |
— |
3,000.00 |
240.05 |
20,518.94 |
20,758.99 |
Suspended due to Civil War |
136 |
Embassy at Berne: Fitting out New Chancery |
.. |
.. |
26,000.00 |
1,000.00 |
104.30 |
27,598.24 |
27,702.54 |
Completed |
137 |
Embassy at Bonn: Fitting out New Chancery |
.. |
.. |
25,000.00 |
5,000.00 |
3,566.44 |
13,804.80 |
17,371.24 |
Virtually completed |
138 |
Embassy at Bonn: Improvements to Residence |
.. |
.. |
45,000.00 |
5,000.00 |
7,147.41 |
34,474.63 |
41,622.04 |
In progress |
139 |
Embassy at Canberra: Erection of New Chancery |
.. |
.. |
263,000.00 |
50,000.00 |
5,487.66 |
9,043.95 |
14,531.61 |
In planning |
140 |
Embassy at Cairo: Fitting out |
.. |
.. |
.. |
40,000.00 |
30,000.00 |
19,295.90 |
3,969.27 |
23,265.17 |
Virtually completed |
141 |
Consulate General, New York: Improvements |
.. |
.. |
32,000.00 |
2,000.00 |
540.87 |
32,804.15 |
33,345.02 |
Completed |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
Posts and Telegraphs (Contd.) |
£ |
£ |
£ |
£ |
£ |
|
142 |
Embassy at Copenhagen: Fitting out New Chancery |
.. |
— |
10,000.00 |
— |
— |
— |
In planning |
143 |
Embassy at Holy See: Security Works |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
In planning |
142A |
Embassy at Geneva: Fitting out of Residence |
.. |
.. |
— |
— |
6,396.10 |
— |
6,396.10 |
In planning |
144 |
Embassy at Jeddah (including Residence for First Secretary): |
|
|
|
|
|
|
|
Fittingout |
.. |
.. |
.. |
.. |
.. |
93,000.00 |
30,000.00 |
50,722.91 |
44,234.41 |
94,957.32 |
Virtually completed |
145 |
Embassy at Lagos: Improvements to Residence |
.. |
.. |
— |
26,000.00 |
2,406.25 |
— |
2,406.25 |
In planning |
146 |
Embassy at Lagos: Provision of Generator in the First Secretary’s |
|
|
|
|
|
|
|
Residence |
.. |
.. |
.. |
.. |
.. |
— |
10,000.00 |
— |
— |
— |
In planning |
147 |
Embassy at Lisbon: Fitting out New Chancery |
.. |
.. |
— |
5,000.00 |
— |
— |
— |
In planning |
147A |
Embassy at Lisbon: Fitting out of New Residence |
.. |
.. |
— |
— |
2,008.97 |
8,624.04 |
10,633.01 |
In progress |
148 |
Embassy at Nairobi: Fitting out |
.. |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
In planning |
149 |
Embassy at Ottawa: Extension of Residence |
.. |
.. |
70,000.00 |
50,000.00 |
51,812.54 |
1,384.42 |
53,196.96 |
In progress |
150 |
Embassy at Paris: Replacement of Lifts |
.. |
.. |
— |
1,000.00 |
101.25 |
— |
101.25 |
Deferred |
151 |
Embassy at Rome: Fitting out of New Chancery |
.. |
.. |
36,000.00 |
10,000.00 |
29,674.54 |
1,802.47 |
31,477.01 |
Virtually completed |
152 |
Embassy at Teheran: Fitting out |
.. |
.. |
.. |
48,000.00 |
20,000.00 |
6,060.72 |
36,695.41 |
42,756.13 |
In progress |
153 |
Embassy at Vienna: Fitting out |
.. |
.. |
.. |
115,000.00 |
50,000.00 |
104,036.86 |
41,904.57 |
145,941.43 |
In progress |
154 |
Accommodation for Presidency of E.E.C., 1979 |
.. |
.. |
135,000.00 |
95,000.00 |
260,259.71 |
6,977.37 |
267,237.08 |
Virtually completed |
154A |
Embassy at Washington Renovation of Residence |
.. |
.. |
— |
— |
79,796.77 |
— |
79,796.77 |
In progress |
|
|
|
|
710,028.63 |
|
|
|
|
Social Welfare |
|
|
|
|
|
|
155 |
Employment Exchanges Accommodation in Dublin Area |
— |
200,000.00 |
119,751.87 |
38,481.81 |
158,233.68 |
In progress |
156 |
Dun Laoghaire New Employment Exchange |
.. |
.. |
320,000.00 |
160,000.00 |
98,538.16 |
1,017.50 |
99,555.66 |
In progress |
157 |
Limerick Employment Exchange |
.. |
.. |
.. |
— |
1,000.00 |
— |
— |
— |
Under consideration |
158 |
Manorhamilton Employment Exchange: Erection of new building |
80,000.00 |
50,000.00 |
3,283.15 |
— |
3,283.15 |
In planning |
159 |
Newcastlewest New Employment Exchange |
.. |
.. |
— |
5,000.00 |
169.11 |
— |
169.11 |
Under consideration |
|
|
|
|
221,742.29 |
|
|
|
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
Foreign Affairs (Contd.) |
£ |
£ |
£ |
£ |
£ |
|
|
Sundry Departments |
|
|
|
|
|
|
160 |
New Buildings |
.. |
.. |
.. |
.. |
|
|
|
|
|
|
|
|
— |
3,150,000.00 |
2,685,058.41 |
|
|
|
|
|
|
|
Detailed as |
|
|
|
|
|
|
|
follows:— |
|
|
|
|
93-99 Lr. Leeson St., Dublin |
.. |
.. |
.. |
|
|
135,198.61 |
547,770.48 |
682,969.09 |
Virtually completed |
|
93-99 Lr. Leeson St., Dublin (Stage II) |
.. |
.. |
.. |
|
|
336,668.22 |
121,359.33 |
458,027.55 |
In progress |
|
Ship St. Barracks, Dublin Castle |
|
|
20.35 |
11,780.39 |
11,800.74 |
In planning |
|
Department of Defence New Headquarters, Infirmary Road, |
|
|
|
|
|
|
|
Dublin |
.. |
.. |
.. |
.. |
.. |
|
|
— |
145,658.37 |
145,658.37 |
In planning |
|
Blocks 8, 9 and 10 Dublin Castle |
.. |
.. |
.. |
|
|
37,547.93 |
71,160.25 |
108,708.18 |
In planning |
|
14-17 Upper Merrion St., Dublin |
.. |
.. |
.. |
|
|
29,783.43 |
18,511.13 |
48,294.56 |
In progress |
|
Beggar’s Bush, Haddington Rd., Dublin |
.. |
.. |
|
|
475,415.16 |
382,276.76 |
857,691.92 |
In progress |
|
Shelbourne Rd., Ballsbridge |
.. |
.. |
.. |
|
|
12,809.00 |
986,116.40 |
998,925.40 |
Virtually completed |
|
Proposed New Garda Headquarters Phoenix Park (Stage I) |
|
|
346,659.78 |
1,477,060.47 |
1,823,720.25 |
In progress |
|
13-14 Earlsfort Tce., Dublin |
.. |
.. |
.. |
|
|
58,880.04 |
744,701.75 |
803,581.79 |
Virtually completed |
|
Marlborough House Glasnevin |
.. |
.. |
.. |
|
|
515,026.63 |
981,000.74 |
1,496,027.37 |
In progress |
|
Waterford Government Offices |
.. |
.. |
.. |
|
|
277,265.76 |
147,826.59 |
425,092.35 |
In progress |
|
Cork Government Offices |
.. |
.. |
.. |
|
|
60,177.86 |
23,309.07 |
83,486.93 |
In planning |
|
Mullingar Government Offices |
.. |
.. |
.. |
|
|
214,183.03 |
109,904.49 |
324,087.52 |
In progress |
|
Portlaoise Government Offices |
.. |
.. |
.. |
|
|
50.97 |
31,024.94 |
31,075.91 |
Completed |
|
Navan Government Offices |
.. |
.. |
.. |
|
|
1,423.12 |
1,517.56 |
2,940.68 |
In planning |
|
Athlone Government Offices |
.. |
.. |
.. |
|
|
141,299.94 |
17,563.27 |
158,863.21 |
In progress |
|
Sligo Government Offices |
.. |
.. |
.. |
|
|
14,482.18 |
— |
14,482.18 |
In planning |
|
Sligo (Temporary) Government Offices |
.. |
.. |
|
|
19,323.00 |
— |
19,323.00 |
In progress |
|
Carrick-on-Shannon Government Offices |
.. |
.. |
|
|
8,843.40 |
— |
8,843.40 |
In planning |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
Foreign Affairs (Contd.) |
£ |
£ |
£ |
£ |
£ |
|
161 |
Fitting out of Premises for occupation |
.. |
.. |
— |
700,000.00 |
1,135,429.89 |
|
|
|
|
|
|
|
Detailed as |
|
|
|
|
|
|
|
follows:— |
|
|
|
|
Furniture for New Works |
.. |
.. |
.. |
|
|
78,769.86 |
93,140.47 |
171,910.33 |
In progress |
|
Oisin House |
.. |
.. |
.. |
.. |
|
|
5,958.94 |
173,931.92 |
179,890.86 |
Completed |
|
Earlsfort House |
.. |
.. |
.. |
.. |
|
|
7,367.58 |
291,975.10 |
299,342.68 |
Completed |
|
Ardee House, Rathmines |
.. |
.. |
.. |
|
|
21,250.84 |
145,399.76 |
166,650.60 |
Completed |
|
Lyon House (Revenue) O’Connell St. |
.. |
.. |
|
|
10,369.15 |
124,045.12 |
134,414.27 |
Completed |
|
Townsend St. (Social Welfare) |
.. |
.. |
.. |
|
|
17,742.91 |
245,248.55 |
262,991.46 |
Virtually completed |
|
Kildare Building (Setanta) |
.. |
.. |
.. |
|
|
7,736.57 |
400,890.39 |
408,626.96 |
Virtually completed |
|
Hawkins House, Dublin (1st and 2nd floor) |
.. |
.. |
|
|
202.46 |
4,660.28 |
4,862.74 |
Completed |
|
Molesworth Building (Setanta) |
.. |
.. |
.. |
|
|
22,247.14 |
440,538.85 |
462,785.99 |
In progress |
|
Nassau Building (Setanta) |
.. |
.. |
.. |
|
|
185,983.46 |
216,240.48 |
402,223.94 |
In progress |
|
72/76 St. Stephen’s Green |
.. |
.. |
.. |
|
|
17,671.91 |
54,858.20 |
72,530.11 |
In progress |
|
St. Martin’s House, Fitting out for Stationery Office |
.. |
|
|
9,090.33 |
8,866.17 |
17,956.50 |
Completed |
|
Galway Hynes Building (P. & T.) |
.. |
.. |
.. |
|
|
2,552.21 |
3,072.59 |
5,624.80 |
Virtually completed |
|
Cork Government Offices (Hibernian House) |
.. |
.. |
|
|
36,660.37 |
38,109.41 |
74,769.78 |
In progress |
|
Athlone Government Offices |
.. |
.. |
.. |
|
|
22,863.53 |
4,820.36 |
27,683.89 |
Virtually completed |
|
Ely Court, Ely Place |
.. |
.. |
.. |
.. |
.. |
|
|
114,982.33 |
2,821.57 |
117,803.90 |
Completed |
|
Park House, Dublin |
.. |
.. |
.. |
.. |
.. |
|
|
108,206.69 |
3,380.72 |
111,587.41 |
Completed |
|
Cumberland House, Dublin |
.. |
.. |
.. |
|
|
39,576.89 |
— |
39,576.89 |
In progress |
|
13-15 Hatch St., Dublin |
.. |
.. |
.. |
.. |
|
|
567.80 |
— |
567.80 |
In planning |
|
Baggot Bridge House, Baggot St., Dublin |
.. |
.. |
|
|
116,827.51 |
— |
116,827.51 |
Completed |
|
Gandon House, Dublin |
.. |
.. |
.. |
.. |
.. |
|
|
70,238.28 |
— |
70,238.28 |
In progress |
|
Shelbourne House |
.. |
.. |
.. |
.. |
.. |
|
|
19,038.48 |
— |
19,038.48 |
In progress |
|
Irish Life Centre Block 1 |
.. |
.. |
.. |
.. |
|
|
151,072.30 |
— |
151,072.30 |
In progress |
|
Irish Life Centre, Blocks 5 and 6 |
.. |
.. |
.. |
|
|
22,338.98 |
— |
22,338.98 |
In progress |
|
Hume House 1st, 2nd and 4th floors |
.. |
.. |
.. |
|
|
26,046.89 |
659.56 |
26,706.45 |
In progress |
|
Apollo House 2nd, 3rd and 4th floors |
.. |
.. |
|
|
7,672.39 |
— |
7,672.39 |
In planning |
|
Sackville Place (2nd floor) |
.. |
.. |
.. |
|
|
3,394.09 |
— |
3,394.09 |
In progress |
|
Connolly Hall, Cork (2nd and 3rd floors) |
.. |
.. |
|
|
9,000.00 |
— |
9,000.00 |
In progress |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Other Buildings |
|
|
|
|
|
|
162 |
Premises at Earlsfort Tce.: Adaptations for Concert Hall Purposes |
2,000,000.00 |
750,000.00 |
576,410.61 |
231,515.46 |
807,926.07 |
In proress |
162A |
State Memorial to Late President Kennedy |
.. |
.. |
— |
— |
33,800.00 |
137,167.84 |
170,967.84 |
Not proceeded with |
|
|
|
|
|
|
|
following government |
|
|
|
|
|
|
|
decision. See note 5 to |
|
|
|
|
|
|
|
Appropriation |
|
|
|
|
|
|
|
Account. |
163 |
Royal Hospital Kilmainham: Restoration and Provision of |
|
|
|
|
|
|
|
Conference Centre |
.. |
.. |
.. |
.. |
3,260,000.00 |
350,000.00 |
68,769.68 |
196,334.34 |
265,104.02 |
In planning |
163A |
Royal Hospital Kilmainham: Relocation of National Museum |
— |
— |
19,613.31 |
— |
19,613.31 |
In progress |
|
Artifacts at Daingean |
|
|
|
|
|
|
|
|
|
|
698,593.60 |
|
|
|
|
General |
|
|
|
|
|
|
164 |
Minor New Works not exceeding £20,000 each |
.. |
.. |
— |
465,000.00 |
309,280.34 |
|
|
Details appended |
165 |
Urgent and Unforeseen Works |
.. |
.. |
.. |
— |
5,000.00 |
45,994.33 |
|
|
Details appended |
166 |
Minor Balances of Expenditure (not provided for above) on works of prior years which may not be completed on 1st January 1979 |
— |
50,000.00 |
80,997.65 |
|
|
Details appended |
|
|
TOTAL |
11,586,000.00 |
9,236,468.87 |
|
|
|
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
President |
|
|
|
|
|
|
32 |
Aras an Uachtarain: Adaptation of Slater’s Shop |
|
|
2,149.18 |
— |
2,149.18 |
Completed |
34 |
Aras an Uachtarain: Provision of storage presses in pantry near |
|
|
|
|
|
|
|
kitchen |
.. |
.. |
.. |
.. |
.. |
|
|
261.72 |
— |
261.72 |
In progress |
9 |
Aras an Uachtarain: Improvements to staff sitting/dining room and |
|
|
|
|
|
|
|
toilets |
.. |
.. |
.. |
.. |
.. |
|
|
1,521.83 |
— |
1,521.83 |
Completed |
|
Oireachtas |
|
|
|
|
|
|
120 |
Leinster House: Construction of P. & T. cable duct at Kildare St. |
|
|
|
|
|
|
|
entrance |
.. |
.. |
.. |
.. |
|
|
2,833.34 |
— |
2,833.34 |
Completed |
|
Taoiseach |
|
|
|
|
|
|
185/196 of |
Central Statistics Office, Phibsboro Shopping Centre: Fitting out |
|
|
|
|
|
|
78 |
of 6th floor |
.. |
.. |
.. |
.. |
|
|
161.91 |
3,873.86 |
4,035.77 |
Completed |
24 |
Central Statistics Office, Earlsfort Tce.: Improvements to internal |
|
|
|
|
|
|
|
partitioning |
.. |
.. |
.. |
.. |
|
|
1,184.00 |
— |
1,184.00 |
Completed |
|
Finance |
|
|
|
|
|
|
185/135 |
Ordnance Survey Office, Phoenix Park: Installation of film |
|
|
|
|
|
|
of 78 |
processor |
.. |
.. |
.. |
.. |
.. |
|
|
1,578.61 |
2,859.70 |
4,438.31 |
Completed |
185/151 |
Ordnance Survey Office, Phoenix Park: Provision of dark room |
|
|
217.95 |
601.30 |
819.25 |
Completed |
of 78 |
|
|
|
|
|
|
185/159 |
Ordnance Survey Office, Phoenix Park: Removal of concrete plat |
|
|
|
|
|
|
of 78 |
forms at old printing building |
.. |
.. |
.. |
|
|
14,832.06 |
1,752.76 |
16,584.82 |
Completed |
185/184 |
Ordnance Survey Office, Phoenix Park: Installation of automatic |
|
|
|
|
|
|
of 78 |
drawing machine |
.. |
.. |
.. |
.. |
|
|
1,003.34 |
409.16 |
1,412.50 |
Completed |
60 |
Ordnance Survey Office, Phoenix Park: Improvements to P.A.B.X. |
|
|
|
|
|
|
|
switch room |
.. |
.. |
.. |
.. |
|
|
3,239.86 |
— |
3,239.86 |
Completed |
178/135 |
Ordnance Survey Office, Phoenix Park: Provision of map sales |
|
|
|
|
|
|
of 77 |
office and demolition of photography studio |
.. |
.. |
|
|
570.97 |
4,373.97 |
4,944.94 |
Completed |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
110 |
Ordnance Survey Office, Phoenix Park: Insulation of heating pipe |
|
|
|
|
|
|
|
work |
.. |
.. |
.. |
.. |
.. |
|
|
3,311.51 |
— |
3,311.51 |
Completed |
152 |
Ordnance Survey Office, Phoenix Park: Provision of dark room |
|
|
203.74 |
— |
203.74 |
In progress |
185/78 |
Valuation Office 5/6 Ely Place: Provision of storage accommodation |
|
|
|
|
|
|
of 78 |
in basement |
.. |
.. |
.. |
.. |
|
|
728.28 |
489.26 |
1,217.54 |
Completed |
185/153 |
Chief State Solicitor’s Office, Dublin Castle: Improvements |
|
|
|
|
|
|
of 78 |
|
|
338.37 |
524.11 |
862.48 |
Completed |
63 |
Civil Service Dining Club: Improvements to female toilets and rest |
|
|
|
|
|
|
|
room |
.. |
.. |
.. |
.. |
.. |
|
|
4,868.08 |
— |
4,868.08 |
In progress |
125 |
3 Exchange Court: Clearance of site |
.. |
.. |
.. |
|
|
9,268.92 |
200.00 |
9,468.92 |
Completed |
100 |
Dublin Castle: Conversion of gas lighting to electricity in Lower |
|
|
|
|
|
|
|
Castle yard |
.. |
.. |
.. |
.. |
|
|
786.71 |
— |
786.71 |
Completed |
102 |
Dublin Castle: Demolition of No. 1 Palace St. |
.. |
.. |
|
|
13,200.00 |
— |
13,200.00 |
In progress |
111 |
Dublin Castle: Provision of oil storage tanks |
.. |
.. |
|
|
763.24 |
— |
763.24 |
In progress |
|
Revenue Commissioners |
|
|
|
|
|
|
35 |
9-15 Upper O’Connell St.: Installation of computer equipment |
|
|
269.20 |
— |
269.20 |
In progress |
185/212 |
10 Upper O’Connell St.: Partitioning of Construction Industry |
|
|
|
|
|
|
of 78 |
Division on 1st floor |
.. |
.. |
.. |
.. |
|
|
470.35 |
463.68 |
934.03 |
Completed |
123 |
14-15 Upper O’Connell St.: Partitioning of 3rd floor |
.. |
|
|
1,496.13 |
— |
1,496.13 |
In progress |
185/202 |
Computer Centre, St. John’s Rd.: Improvements to canteen |
|
|
|
|
|
|
of 78 |
facilities |
.. |
.. |
.. |
.. |
.. |
|
|
427.49 |
141.01 |
568.50 |
Completed |
185/83 |
Computer Centre, St. John’s Rd.: Installation of micro-film |
|
|
|
|
|
|
of 78 |
processor |
.. |
.. |
.. |
.. |
.. |
|
|
66.60 |
1,376.42 |
1,443.02 |
Completed |
185/97 |
Castle House: Partitioning works to 5th floor |
.. |
.. |
|
|
67.30 |
2,049.94 |
2,117.24 |
Completed |
of 78 |
|
|
|
|
|
|
|
21 |
Wicklow House: Partitioning of 2nd floor |
.. |
.. |
|
|
2,290.42 |
— |
2,290.42 |
Completed |
90 |
Lyon House: Partitioning of 1st floor |
.. |
.. |
.. |
|
|
1,661.94 |
— |
1,661.94 |
In progress |
151/18 |
Customs … Excise Office, 15 Parnell Place, Cork: Electrical and |
|
|
|
|
|
|
of 75 |
heating installation |
.. |
.. |
.. |
.. |
|
|
244.70 |
2,281.59 |
2,526.29 |
Completed |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
Revenue Commissioners (Contd.) |
£ |
£ |
£ |
£ |
£ |
|
42 |
Ballyconnell Customs & Excise Post: Provision of caravan and |
|
|
|
|
|
|
|
toilet unit |
.. |
.. |
.. |
.. |
.. |
|
|
6,661.72 |
— |
6,661.72 |
In progress |
66 |
Castlefin Customs & Excise Station: Provision of caravan |
|
|
2,111.87 |
— |
2,111.87 |
Completed |
68 |
Greenore Customs & Excise Station: Improvements |
.. |
|
|
3,412.37 |
— |
3,412.37 |
Completed |
5 |
Carrickarnon Customs & Exise Post: Electrical Improvements |
|
|
1,827.86 |
— |
1,827.86 |
Completed |
121 |
Carrickarnon Customs & Excise Post: Erection of prefab |
|
|
8,550.00 |
— |
8,550.00 |
In progress |
47 |
Tullamore Customs & Excise Office: Improvements |
.. |
|
|
4,056.58 |
— |
4,056.58 |
Completed |
56 |
Castleblaney Customs & Excise Station: Extension |
.. |
|
|
6,175.00 |
— |
6,175.00 |
In progress |
|
Office of Public Works |
|
|
|
|
|
|
185/55 |
51, St. Stephen’s Green: Enclosing of staircases and installation of |
|
|
|
|
|
|
of 78 |
fire alarm system |
.. |
.. |
.. |
.. |
|
|
1,858.15 |
3,771.02 |
5,629.17 |
In progress |
185/163 |
51, St. Stephen’s Green: Extension of heating system |
.. |
|
|
625.87 |
381.66 |
1,007.53 |
Completed |
of 78 |
|
|
|
|
|
|
|
178/77 |
51, St. Stephen’s Green: Improvements to file storage rooms |
|
|
1,172.85 |
553.48 |
1,726.33 |
In progress |
of 77 |
|
|
|
|
|
|
|
185/191 |
Dunlaoghaire Harbour: Erection of gates |
.. |
.. |
|
|
7.31 |
903.00 |
910.31 |
Completed |
of 78 |
|
|
|
|
|
|
|
46 |
Archaeological Survey Office Mullingar: Additional |
|
|
|
|
|
|
|
Accommodation |
.. |
.. |
.. |
.. |
.. |
|
|
6,205.69 |
— |
6,205.69 |
In progress |
92 |
Kilkenny Castle: Provision of tea-room facilities |
.. |
.. |
|
|
5,653.79 |
— |
5,653.79 |
Completed |
178/192 |
Phoenix Park: Furry Glen Tree planting scheme |
.. |
.. |
|
|
3,038.01 |
215.63 |
3,253.64 |
Completed |
of 77 |
|
|
|
|
|
|
|
126 |
South Eastern Drainage Maintenance H.Q. Ballycrane, Co. Wex |
|
|
|
|
|
|
|
ford: Erection of new buildings |
.. |
.. |
.. |
|
|
8,208.84 |
— |
8,208.84 |
In progress |
3 |
St. Stephen’s Green Park: Erection of canteen |
.. |
.. |
|
|
8,382.58 |
— |
8,382.58 |
In progress |
|
Public Service |
|
|
|
|
|
|
185/93 |
Central Computer Unit, Inchicore: Provision of screen in foyer |
|
|
6.60 |
3,636.32 |
3,642.92 |
Completed |
of 78 |
|
|
|
|
|
|
|
105 |
Training Centre, Lansdowne House: Partitioning Works |
|
|
122.04 |
— |
122.04 |
In progress |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Justice |
|
|
|
|
|
|
185/124 |
Registry of Deeds: Improvements to Central Heating System |
|
|
1,376.21 |
146.69 |
1,522.90 |
Completed |
of 78 |
|
|
|
|
|
|
|
178/45 |
Registry of Deeds: Transfer of Indexing Section and installation of |
|
|
4,489.62 |
6,794.10 |
11,283.72 |
In progress |
of 77 |
lift |
.. |
.. |
.. |
.. |
.. |
|
|
|
|
|
|
185/182 |
Courts of Justice: Improvements to Restaurant |
.. |
.. |
|
|
1,801.62 |
1,051.97 |
2,853.59 |
Completed |
of 78 |
|
|
|
|
|
|
|
54 |
Courts of Justice: Improvements to accommodation of Registrar of |
|
|
|
|
|
|
|
Wards of Court |
.. |
.. |
.. |
.. |
|
|
1,193.33 |
— |
1,193.33 |
Completed |
65 |
Courts of Justice: Fitting out of rooms leased from Incorporated |
|
|
|
|
|
|
|
Law Society |
.. |
.. |
.. |
.. |
|
|
2,971.68 |
— |
2,971.68 |
In progress |
108 |
Courts of Justice: Fitting out of accommodation for Three High |
|
|
|
|
|
|
|
Court Judges |
.. |
.. |
.. |
.. |
|
|
4,421.96 |
— |
4,421.96 |
In progress |
136 |
Courts of Justice: Improvements to toilet facilities of Bar Council |
|
|
182.24 |
— |
182.24 |
In progress |
178/157 |
Four Courts: Improvements to Judge D’Arcy’s Room |
|
|
25.73 |
925.06 |
950.79 |
Completed |
of 77 |
|
|
|
|
|
|
|
115 |
Ormond House: Provision of window grilles, etc. |
.. |
.. |
|
|
5,200.85 |
— |
5,200.85 |
Completed |
135 |
Metropolitan District Court: Alterations to basements of Courts 4 |
|
|
|
|
|
|
|
and 6 |
.. |
.. |
.. |
.. |
.. |
|
|
192.02 |
— |
192.02 |
In progress |
80 |
Phibsboro Centre: Fitting out of accommodation for Association |
|
|
|
|
|
|
|
for Garda Sergeants and Inspectors |
.. |
.. |
|
|
7,171.83 |
— |
7,171.83 |
Completed |
|
Environment |
|
|
|
|
|
|
97 |
Gorey Driving Test Centre: Improvements |
.. |
.. |
|
|
1,368.32 |
— |
1,368.32 |
Completed |
61 |
O’Connell Bridge House: Partitioning of floors 2 and 8 |
|
|
1,274.11 |
— |
1,274.11 |
Completed |
|
Education |
|
|
|
|
|
|
44 |
Training College Building Marlboro St.: Improvements |
|
|
12,643.16 |
— |
12,643.16 |
In progress |
171/132 |
Training College Building Marlboro St.: Improvements |
|
|
808.63 |
2,555.91 |
3,364.54 |
Completed |
of 76 |
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Education (Contd.) |
|
|
|
|
|
|
178/109 |
Marlboro St.: Fire Precautionary Works |
.. |
.. |
|
|
97.52 |
1,002.87 |
1,100.39 |
Completed |
of ’77 |
|
|
|
|
|
|
|
12 |
National Gallery: Improvements to Conservation Department |
|
|
1,512.94 |
— |
1,512.94 |
In progress |
62 |
National Gallery: Application of protective film to roof lights |
|
|
1,808.68 |
— |
1,808.68 |
Completed |
99 |
National Gallery: Provision of store in basement |
.. |
.. |
|
|
557.40 |
— |
557.40 |
In progress |
185/160 |
Hawkins House: Alterations on 3rd floor |
.. |
.. |
|
|
86.75 |
4,233.96 |
4,320.71 |
Completed |
of ’78 |
|
|
|
|
|
|
|
|
Agriculture |
|
|
|
|
|
|
185/77 |
Abboststown Farm: Improvements |
.. |
.. |
.. |
|
|
5,059.36 |
1,872.77 |
6,932.13 |
Completed |
of ’78 |
|
|
|
|
|
|
|
106 |
Abboststown Farm: Extension to gate lodge |
.. |
.. |
|
|
7,200.00 |
— |
7,200.00 |
Completed |
64 |
Abbotstown Farm: Improvements to Laboratory (Tuberculosis |
|
|
|
|
|
|
|
Section) |
.. |
.. |
.. |
.. |
.. |
|
|
3,172.01 |
— |
3,172.01 |
In progress |
88 |
Abbotstown Farm: Provision of road to Leucosis Unit |
|
|
7,137.48 |
— |
7,137.48 |
Completed |
158 |
Abbotstown Farm: Provision of Leucosis Unit |
.. |
.. |
|
|
6,000.00 |
— |
6,000.00 |
In progress |
134 |
Abbotstown Farm: Alterations to sewerage line |
.. |
.. |
|
|
2,298.68 |
— |
2,298.68 |
In progress |
31 |
Abbotstown Farm: Conversion of loose boxes to boar pens |
|
|
1,613.00 |
— |
1,613.00 |
Completed |
103 |
Abbotstown Farm: Veterinary Research Laboratory: Provision of |
|
|
|
|
|
|
|
doorway into (old) grain loft |
.. |
.. |
.. |
|
|
978.00 |
— |
978.00 |
Completed |
178/93 |
Thorndale Veterinary Laboratory: Provision of Nissen hut |
|
|
18.04 |
4,342.10 |
4,360.14 |
Completed |
of ’77 |
|
|
|
|
|
|
|
89 |
Thorndale Veterinary Laboratory: Alterations and improvements |
|
|
2,008.41 |
— |
2,008.41 |
In progress |
185/92 |
Munster Institute Cork: Provision of office accommodation at for- |
|
|
|
|
|
|
of ’78 |
mer Superintendent’s House |
.. |
.. |
.. |
|
|
786.24 |
1,946.08 |
2,732.32 |
Completed |
178/42 |
Munster Institute Cork: Electrical Installation in breeding house |
|
|
847.85 |
2,322.00 |
3,169.85 |
Completed |
of ’77 |
|
|
|
|
|
|
|
11 |
Munster Institute Cork: Installation of central heating in Manager’s |
|
|
|
|
|
|
|
Residence, Pig Progeny Station |
.. |
.. |
.. |
|
|
2,216.56 |
— |
2,216.56 |
Completed |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Agriculture (Contd.) |
|
|
|
|
|
|
27 |
Tully Bull Performance Testing Station: Improvements |
|
|
1,158.75 |
— |
1,158.75 |
Completed |
107 |
Botanic Gardens: Provision of oil storage tanks |
.. |
.. |
|
|
1,011.04 |
— |
1,011.04 |
In progress |
20 |
Botanic Gardens: Installation of fire and alarm systems |
|
|
2,476.39 |
— |
2,476.39 |
In progress |
85 |
Butter Testing Station, Harcourt Tce., Improvements |
|
|
11,239.26 |
— |
11,239.26 |
In progress |
93 |
Agriculture House Dining Club: Provision of coat hanging facilities |
|
|
|
|
|
|
|
and umbrella stand |
.. |
.. |
.. |
.. |
|
|
39.36 |
— |
39.36 |
In progress |
26 |
Athlone Regional Veterinary Laboratory: Erection of garage |
|
|
2,832.50 |
— |
2,832.50 |
Virtually completed |
67 |
Limerick Regional Veterinary Laboratory: Improvements |
|
|
795.00 |
— |
795.00 |
In progress |
75 |
District Veterinary Office, Navan: Provision of tarmac |
|
|
3,400.00 |
— |
3,400.00 |
Completed |
50 |
Farm Development Nenagh: Improvements |
.. |
.. |
|
|
700.00 |
— |
700.00 |
In progress |
178/110 |
Farm Development Claremorris: Alterations to heating and lighting |
|
|
420.00 |
1,188.29 |
1,608.29 |
Completed |
of ’77 |
|
|
|
|
|
|
|
|
Labour |
|
|
|
|
|
|
185/117 |
National Manpower: Service Waterford: Partitioning and electrical |
|
|
|
|
|
|
of ’78 |
installation |
.. |
.. |
.. |
.. |
|
|
224.10 |
264.85 |
488.95 |
Completed |
109 |
National Manpower Service Sligo: Fitting out of accommodation |
|
|
1,353.80 |
— |
1,353.80 |
Completed |
98 |
Davitt House Mespil Rd., Dublin: Partitioning works in Rooms |
|
|
1,273.74 |
— |
1,273.74 |
Completed |
|
204 and 409 |
.. |
.. |
.. |
.. |
|
|
|
|
|
|
|
Posts and Telegraphs |
|
|
|
|
|
|
185/102 |
G.P.O. Dublin: Improvements arising from recruiting of post- |
|
|
|
|
|
|
of ’78 |
women |
.. |
.. |
.. |
.. |
.. |
|
|
1,208.75 |
624.95 |
1,833.70 |
In progress |
185/156 |
G.P.O. Dublin: Central Telegraph Office: Improvements to |
|
|
|
|
|
|
of ’78 |
delivery room |
.. |
.. |
.. |
.. |
.. |
|
|
1,756.17 |
3,444.74 |
5,200.91 |
Completed |
185/187 |
G.P.O. Dublin: Improvements to Rooms 432 and 441 etc. |
|
|
472.77 |
1,047.55 |
1,520.32 |
Completed |
of ’78 |
|
|
|
|
|
|
|
185/155 |
G.P.O. Dublin: Improvements to Room 169 |
.. |
.. |
|
|
424.47 |
66.67 |
491.14 |
Completed |
of ’78 |
|
|
|
|
|
|
|
Sub. |
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Posts and Telegraphs (Contd.) |
|
|
|
|
|
|
58 |
G.P.O. Dublin: Improvements to basement |
.. |
.. |
|
|
312.38 |
— |
312.38 |
In progress |
6 |
Lifford Post Office: Internal adaptations |
.. |
.. |
|
|
1,733.00 |
— |
1,733.00 |
Completed |
178/148 |
Kilkenny Area Stock Depot |
.. |
.. |
.. |
|
|
6.99 |
1,483.84 |
1,490.83 |
Completed |
of ’77 |
|
|
|
|
|
|
|
185/133 |
Tralee Area Stock Depot |
.. |
.. |
.. |
|
|
43.00 |
813.00 |
856.00 |
Completed |
of ’78 |
|
|
|
|
|
|
|
185/206 |
Arklow Area Stock Depot |
.. |
.. |
.. |
|
|
292.50 |
259.00 |
551.50 |
In progress |
of ’78 |
|
|
|
|
|
|
|
38 |
Glenageary Sorting Office: Provision of welfare facilities |
|
|
1,417.00 |
— |
1,417.00 |
Completed |
72 |
Thurles Post Office: Improvements |
.. |
.. |
.. |
|
|
6,000.000 |
— |
6,000.000 |
Completed |
|
Defence |
|
|
|
|
|
|
185/168 |
G.H.Q. Parkgate St.: Provision of partition in Personnel Section |
|
|
33.76 |
120.65 |
154.41 |
Completed |
of ’78 |
|
|
|
|
|
|
|
|
Foreign Affairs |
|
|
|
|
|
|
39 |
52, St. Stephen’s Green: Erection of partitions |
.. |
.. |
|
|
3,466.05 |
— |
3,466.05 |
Completed |
185/183 |
Iveagh House: Alterations to rooms 240A and 240B |
.. |
|
|
44.75 |
468.52 |
513.27 |
Completed |
of ’78 |
|
|
|
|
|
|
|
84 |
Iveagh House: Provision of document lift |
.. |
.. |
|
|
2,928.66 |
— |
2,928.66 |
Completed |
74 |
Mission to United Nations: Improvements |
.. |
.. |
|
|
1,863.68 |
— |
1,863.68 |
In progress |
185/233 |
Lagos Embasy: Provision of air-conditioning in reception |
|
|
2,807.74 |
2,522.45 |
5,330.19 |
Completed |
of ’78 |
|
|
|
|
|
|
|
|
Social Welfare |
|
|
|
|
|
|
96 |
Gorey Social Welfare Office: Improvements |
.. |
.. |
|
|
1,368.32 |
— |
1,368.32 |
Completed |
48 |
Tullamore Social Welfare Office: Improvements |
.. |
.. |
|
|
1,352.20 |
— |
1,352.20 |
Completed |
49 |
Nenagh Social Welfare Office: Improvements |
.. |
.. |
|
|
400.00 |
— |
400.00 |
Completed |
19 |
Ballyhaunis Social Welfare Office: Improvements |
.. |
.. |
|
|
2,447.14 |
— |
2,447.14 |
Completed |
55 |
Oisin House: Partitioning work on floors 2 and 3 |
.. |
.. |
|
|
3,242.83 |
— |
3,242.83 |
In progress |
178/91 |
Victoria St. Employment Exchange: Improvements |
|
|
355.90 |
1,915.92 |
2,271.82 |
Completed |
of ’77 |
|
|
|
|
|
|
|
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
101 |
Victoria St. Employment Exchange: Improvements |
.. |
|
|
10,400.00 |
— |
10,400.00 |
In progress |
178/107 |
Cobh Employment Exchange: Improvements |
.. |
.. |
|
|
2,713.79 |
4,387.50 |
7,101.29 |
Completed |
of ’77 |
|
|
|
|
|
|
|
10 |
Dundalk Employment Exchange: Installation of alarm system |
|
|
1,306.04 |
— |
1,306.04 |
In progress |
18 |
Gardiner St. Employment Exchange: Additional alarm system |
|
|
1,003.84 |
— |
1,003.84 |
Completed |
118 |
Werburgh St. Employment Exchange: Alterations to pay hatches |
|
|
1,873.31 |
— |
1,873.31 |
Completed |
112 |
Werburgh St. Employment Exchange: Provision of oil storage tank |
|
|
81.20 |
— |
81.20 |
In progress |
69 |
Phibsboro Tower: Provision of counter |
.. |
.. |
|
|
1,513.07 |
— |
1,513.07 |
Completed |
|
Health |
|
|
|
|
|
|
8 |
General Registrar’s Office, Custom House: Improvements to |
|
|
2,532.91 |
— |
2,532.91 |
Completed |
|
ground floor office |
.. |
.. |
.. |
.. |
|
|
|
|
|
|
178/152 of ’77 |
Custom House: Alterations |
.. |
.. |
.. |
|
|
339.07 |
3,495.95 |
3,835.02 |
Completed |
|
Office of Public Works |
|
|
|
|
|
|
1 |
Papal Visit |
.. |
.. |
.. |
.. |
.. |
|
|
45,994.33 |
— |
45,994.33 |
Completed |
DETAILS OF NO. 166—MINOR BALANCES OF EXPENDITURE
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Oireachtas |
|
|
|
|
|
|
2 (3) of ’78 |
Leinster House: Security works to windows |
.. |
.. |
|
|
2,046.74 |
23,447.88 |
25,494.62 |
Completed |
2 (1) of ’78 |
Leinster House: Installation of Standby Generator (in combination |
|
|
|
|
|
|
|
with No. 4) |
.. |
.. |
.. |
.. |
|
|
888.10 |
67,241.24 |
68,129.34 |
Completed |
|
Finance |
|
|
|
|
|
|
6A of ’78 |
Inishbofin, Co. Galway: Harbour Improvements |
.. |
.. |
|
|
3,757.43 |
6,207.48 |
9,964.91 |
Completed |
5A of ’78 |
Central Heating Station: Provision of grit arresters |
.. |
|
|
1,818.83 |
9,286.85 |
11,105.68 |
Completed |
4 of ’78 |
Government Buildings: Installation of Standby Generator (in com |
|
|
|
|
|
|
|
binationwith No. 2 (1)) |
.. |
.. |
.. |
|
|
888.10 |
65,793.69 |
66,681.79 |
Completed |
|
Revenue Commissioners |
|
|
|
|
|
|
13 (A) of ’78 |
Lyon House: Partitioning of 1st floor |
.. |
.. |
.. |
|
|
2,611.44 |
3,000.00 |
5,611.44 |
Completed |
|
Office of Public Works |
|
|
|
|
|
|
29 of ’78 |
Kilkenny Castle: Restoration of Picture Gallery Wing |
|
|
123.24 |
363,966.28 |
364,089.52 |
Completed |
42 of ’78 |
Shannon Navigation: Lanesboro New Wharf |
.. |
.. |
|
|
1,835.03 |
11,576.73 |
13,411.76 |
Completed |
45 of ’78 |
Shannon Navigation: Lough Allen Canal: Restoration |
|
|
307.86 |
48,662.94 |
48,970.80 |
Completed |
44 of ’78 |
Shannon Navigation: Albert Lock: New Jetty |
.. |
.. |
|
|
1,882.35 |
6,435.95 |
8,318.30 |
Completed |
39A of ’77 |
Shannon Navigation: Lough Key (Rockingham): New Quay |
|
|
508.06 |
331.80 |
839.86 |
Completed |
46 of ’78 |
Shannon Navigation: New Store at Rooskey |
.. |
.. |
|
|
190.65 |
11,784.56 |
11,975.21 |
Completed |
23 of ’78 |
Killarney National Park: Jarvey shelter and Jaunting (including |
|
|
|
|
|
|
|
B.V.M. Park) Car Park |
.. |
.. |
.. |
|
|
108.34 |
850.00 |
958.34 |
Completed |
|
Justice |
|
|
|
|
|
|
62A of ’78 |
Garda Headquarters: Improvements to Officers’ Mess |
|
|
25,109.62 |
16,967.32 |
42,076.94 |
Virtually completed |
62 of ’78 |
Garda Headquarters: Transport Garage and Stores: Extension and |
|
|
|
|
|
|
|
improvements |
.. |
.. |
.. |
.. |
|
|
166.43 |
5,106.14 |
5,272.57 |
Completed |
65A of ’78 |
Courts of Justice: Fitting out of Rented premises |
.. |
.. |
|
|
8,083.53 |
69,341.13 |
77,424.66 |
Completed |
|
|
|
|
Expenditure |
|
Work |
|
|
|
|
|
|
Observations |
|
Service and Description |
Total |
Vote |
|
|
|
|
No. |
|
|
|
|
|
|
|
|
|
Estimate |
1979 |
1979 |
To 31/12/78 |
To 31/12/79 |
|
|
|
£ |
£ |
£ |
£ |
£ |
|
|
Education |
|
|
|
|
|
|
71 of ’78 |
National Gallery: Alterations |
.. |
.. |
.. |
|
|
7,400.00 |
2,530.78 |
9,930.78 |
Completed |
|
Agriculture |
|
|
|
|
|
|
76 of ’78 |
Castlebar: New Offices |
.. |
.. |
.. |
|
|
1,522.88 |
1,311,290.40 |
1,312,813.28 |
Completed |
92 of ’78 |
Kildalton College; Improvements |
.. |
.. |
.. |
|
|
4,018.74 |
7,105.30 |
11,124.04 |
Completed |
80 of ’78 |
Abbotstown Farm: Incinerator |
.. |
.. |
.. |
|
|
3,294.00 |
37,890.75 |
41,184.75 |
Completed |
77A of ’78 |
Botanic Gardens: Provision of additional oil storage tanks |
|
|
46.31 |
— |
46.31 |
Work being carried out as Minor New Work under revised limits (No. 164 (107)) |
|
Industry Commerce and Energy |
|
|
|
|
|
|
102 of ’78 |
Geological Survey Office, Kildare St.: Improvements |
.. |
|
|
49.20 |
8,444.15 |
8,493.35 |
Completed |
|
Posts and Telegraphs |
|
|
|
|
|
|
145 of ’78 |
Monaghan Area Engineering Headquarters |
.. |
.. |
|
|
621.43 |
1,021.00 |
1,642.43 |
Completed |
141 of ’78 |
Enniscorthy: Improvement of accommodation for postal vans |
|
|
7,740.62 |
9,000.00 |
16,740.62 |
Completed |
|
Foreign Affairs |
|
|
|
|
|
|
171 of ’78 |
E.E.C. Mission, Brussels: Fitting out of new Residence |
|
|
900.28 |
13,219.15 |
14,119.43 |
Completed |
156 of ’76 |
Embassy at Luxembourg: Fitting out for occupation |
.. |
|
|
2,972.22 |
54,064.31 |
57,036.53 |
Completed |
161 of ’77 |
Embassy at London: Adaptations |
.. |
.. |
.. |
|
|
996.60 |
12,808.80 |
13,805.40 |
Completed |
162 of ’78 |
Embassy at Moscow (including staff residence): Fitting out for |
|
|
|
|
|
|
|
occupation |
.. |
.. |
.. |
.. |
|
|
545.62 |
140,956.01 |
141,501.63 |
Completed |
163A of ’78 |
Permanent Representative to the U.N. at Geneva: Fitting out of |
|
|
|
|
|
|
|
Residence |
.. |
.. |
.. |
.. |
|
|
64.00 |
6,604.23 |
6,668.23 |
Completed |
|
Social Welfare |
|
|
|
|
|
|
179 of ’78 |
Arklow Social Welfare Office: Provision of accommodation for |
|
|
|
|
|
|
|
Medical Referee |
.. |
.. |
.. |
.. |
|
|
500.00 |
4,767.85 |
5,267.85 |
Completed |
|