Committee Reports::Interim and Final Report - Appropriation Accounts 1978 - 1979::17 November, 1983::Appendix

APPENDIX 22

STATEMENT OF EXPENDITURE OF NEW WORKS, ALTERATIONS AND ADDITIONS, 1979 (VOTE 9: SUBHEAD E)

 

 

 

 

 

 

 

Expenditure

 

Work No.

Service and Description

 

 

 

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

 

 

 

 

£

£

£

£

£

 

 

President 

 

 

 

 

 

 

 

 

 

1

Aras an Uachtaráin: Improvements

..

..

..

30,000.00

3,485.88

2,167.11

5,652.99

In progress

 

 

 

 

 

 

 

3,485.88

 

 

 

 

Oireachtas 

 

 

 

 

 

 

 

 

 

2

Leinster House: Re-allocation of space and refurbishing

 

70,000.00

20,000.00

17,336.80

47,568.74

64,905.54

Virtually completed

 

 

 

 

 

 

 

17,336.80

 

 

 

 

Taoiseach 

 

 

 

 

 

 

 

 

 

3

Official Residence and State Guest House

..

..

20,000.00

16,773.46

16,773.46

In progress

4

Dublin Castle: Standby Generator

..

..

..

100,000.00

80,000.00

126,137.10

126,137.10

In progress

 

 

 

 

 

 

 

142,910.56

 

 

 

 

Finance 

 

 

 

 

 

 

 

 

 

5

Government Buildings: Adaptations to North Block

..

250,000.00

160,000.00

104,480.65

56,356.04

160,836.69

In progress

6

Government Buildings: Adaptations to South Block

..

535,000.00

15,000.00

14,430.67

529,599.30

544,029.97

Virtually completed

7

Government Publications Sales Office: New Accommodation

 

1,000.00

In planning

8

Ordnance Survey: New Printing Building

..

..

340,000.00

5,000.00

17,719.00

341,264.49

358,983.49

Completed

9

Ordnance Survey: Improvement of Residential Quarters Stage II

25,000.00

1,000.00

In planning

10

State Laboratory: Additional Accommodation

..

..

800,000.00

205,000.00

5,395.37

27,732.19

33,127.56

In planning

 


 

 

 

 

 

 

 

Expenditure

 

Work No.

Service and Description

 

 

 

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

Finance (contd.) 

£

£

£

£

£

 

11

Stationery Office: Additional Accommodation

..

..

300,000.00

73,260.75

835.95

74,096.70

In planning

12

Valuation Office: Additional Accommodation

..

..

21,000.00

3,000.00

947.30

18,327.00

19,274.30

Completed

13

Clare Island: Harbour Improvements

..

..

..

233,000.00

192,000.00

41,322.06

41,322.06

Original contract terminated; new arrangements to complete work under consideration

 

 

 

 

 

 

 

216,233.74

 

 

 

 

Revenue Commissioners 

 

 

 

 

 

 

14

New Revenue Offices: Dublin Castle

..

..

..

1,600,000.00

100,000.00

2,473.70

1,485,584.68

1,488,058.38

Completed

15

Refurbishing of Premises at Lord Edward St.

280,000.00

130,000.00

154,737.22

156,303.93

311,041.15

Virtually completed

16

Blacklion Frontier Customs Post Stage II

..

..

40,000.00

1,000.00

In planning

17

Burnfoot: New Customs Post

..

..

..

40,000.00

10,000.00

In planning

18

Carrigans: New Frontier Customs Post Extension

..

..

28,000.00

5,000.00

188.84

28,888.10

29,076.94

Completed

19

Carrigans: New Customs Road Station

..

..

30,000.00

10,000.00

32,848.70

32,848.70

Virtually completed

20

Clones (Clondergole): New Frontier Customs Post

..

..

22,000.00

6,000.00

7,737.52

16,901.59

24,639.11

Completed

21

Dundalk Customs Road Station: Enlargement

..

..

70,000.00

25,000.00

33,799.19

33,799.19

Completed

22

Monaghan Customs Road Station: Enlargement

..

..

10,000.00

In planning

23

Muff: New Frontier Customs Post

..

..

..

8,000.00

In planning

 

 

 

 

 

 

 

197,985.98

 

 

 

 

Office of Public Works 

 

 

 

 

 

 

24

Scoil Eanna, Rathfarnham

 

 

 

 

 

 

 

(1) Restoration of Buildings Stage II

..

..

116,000.00

10,000.00

6,990.73

118,793.75

125,784.48

Virtually completed

 

(2) Restoration of Buildings Stage III

..

..

135,000.00

20,000.00

1,019.70

1,019.70

In planning

25

Scoil Eanna, Rathfarnham: Natural History Exhibition Centre, Garages, Stores, etc.

28,000.00

5,000.00

13,551.64

39,963.76

53,515.40

Virtually completed

26

Connemara National Park: Development Stage I

..

..

130,000.00

50,000.00

62,806.01

21,582.62

84,388.63

In progress

27

Dunmore Cave: Visitor Centre

..

..

..

42,000.00

7,000.00

37,210.51

37,210.51

Virtually completed

28

Glenveagh National Park, Co. Donegal: Development

210,000.00

23,478.41

23,478.41

In planning

 


 

 

 

 

Expenditure

 

Work No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

Office of Public Works (contd.) 

£

£

£

£

£

 

29

Glenveagh National Park. Co. Donegal: Road re-alignment

135,000.00

45,000.00

14,192.00

45,000.00

59,192.00

In progress

30

Killarney National Park (including B.V.M. Park): Visitor Facilities,

 

 

 

 

 

 

 

etc., at Gearhameen

..

..

..

48,000.00

4,000.00

2,759.85

44,710.36

47,470.21

Virtually completed

31

Killarney National Park (including B.V.M. Park): Muckross House

 

 

 

 

 

 

 

Sanitary Services

..

..

..

..

135,000.00

50,000.00

6,794.13

44,840.87

51,635.00

In progress

32

Phoenix Park Extension (Islandbridge Park): General

 

 

 

 

 

 

 

Development

..

..

..

..

..

5,000.00

43,058.88

43,058.88

Balance of work under review

33

Phoenix Park: Public Toilets and Car Park at Knockmaroon

47,000.00

34,000.00

In planning

33A

Phoenix Park: Provision of Gatekeepers’ Huts

..

..

7,758.36

7,758.36

In progress

33B

Phoenix Park: General Development, Papal Visit

..

..

17,518.19

17,518.19

Virtually completed

34

Shannon Navigation: New Harbour at Dromod

..

..

35,000.00

15,000.00

33,498.31

1,445.39

34,943.70

In progress

35

Shannon Navigation: New Quay at Drumsna

..

..

30,000.00

6,000.00

301.37

301.37

In planning

36

Shannon Navigation: New Jetty at Hodson’s Bay

..

..

55,000.00

25,000.00

13,765.00

27,435.95

41,200.95

In progress

37

Shannon Navigation: Extension to Harbour at Lecarrow

30,000.00

10,000.00

Under consideration

38

Shannon Navigation: New Harbour at Portumna Castle

50,000.00

8,000.00

41,913.53

63,549.05

105,462.58

In progress

38A

Shannon Navigation: Lough Key, New Quay

..

..

2,881.38

12,261.07

15,142.45

In progress

39

Shannon Navigation: Dry Docks at Rooskey

..

..

30,000.00

10,000.00

15,456.72

15,456.72

In progress

40

Shannon Navigation: Extension to Quay at Shannonbridge

40,000.00

20,000.00

6,850.75

5,231.01

12,081.76

In progress

41

Ballinamore and Ballyconnell Canal: Survey

..

..

21,000.00

6,000.00

89.30

14,891.51

14,980.81

In progress

42

National Monuments: Cahir Castle Visitor Centre

..

..

48,500.00

10,000.00

27,320.24

27,320.24

In progress

43

National Monuments: Rock of Cashel Visitor Centre

..

95,000.00

22,000.00

16,810.51

53,979.90

70,790.41

In progress

44

National Monuments: New Depots

..

..

..

18,000.00

Under consideration

45

New Central Building Maintenance Workshop at the Botanic

 

 

 

 

 

 

 

Gardens

..

..

..

..

..

85,000.00

30,000.00

Under consideration

 

 

 

 

288,435.89

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

Expenditure

 

Work No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

 

 

 

 

 

 

£

£

£

£

£

 

 

Public Service 

 

 

 

 

 

 

46

Provision of Building for Computer: Stage II

..

..

760,000.00

85,000.00

69,992.95

610,136.98

680,129.93

Virtually completed

47

Central Computer Unit: Provision of Standby Generator

67,000.00

10,000.00

12,698.18

53,053.80

65,751.98

Virtually completed

48

New Premises for the Institute of Public Administration and Department of the Public Service Training Centre

..

2,160,000.00

50,000.00

19,016.63

63,891.84

82,908.47

In planning

49

15, Merrion Square.: Adaptations

..

..

..

100,000.00

1,000.00

15,103.32

15,103.32

In progress

 

 

 

 

 

 

 

 

 

101,707.76

 

 

 

 

Justice 

 

 

 

 

 

 

50

Film Censor’s Office: Improvements

..

..

..

21,000.00

10,000.00

18,440.45

9,090.00

27,530.45

Virtually completed

51

Garda Headquarters: Additional Petrol Storage

..

..

25,000.00

20,000.00

118.06

118.06

In planning

52

Garda Stations: Erection of New Building and Major Improvement

 

 

 

 

 

 

 

Schemes

..

..

..

..

1,160,000.00

829,738.11
Detailed as follows:

 

 

 

 

Dublin Metropolitan Division 

 

 

 

 

 

 

 

Coolock

..

..

..

..

..

 

 

1,890.00

18,397.25

20,287.25

Completed

 

Finglas

..

..

..

..

..

 

 

16,266.04

119,406.67

135,672.71

Completed

 

Kevin St.

..

..

..

..

..

 

 

13,381.25

35,564.91

48,946.16

Virtually completed

 

Raheny

..

..

..

..

..

 

 

9,777.40

16,654.04

26,431.44

Virtually completed

 

Store St.

..

..

..

..

..

 

 

1,100.00

215,966.77

217,066.77

Completed

 

Swords

..

..

..

..

..

 

 

1,300.00

6,500.00

7,800.00

Virtually completed

 

Terenure

..

..

..

..

..

 

 

6,205.10

6,205.10

In progress

 

Co. Dublin 

 

 

 

 

 

 

 

Blanchardstown

..

..

..

..

 

 

18,450.00

18,450.00

In progress

 

Clondalkin

..

..

..

..

 

 

8,713.94

26,155.89

34,869.83

In progress

 

Irishtown

..

..

..

..

..

 

 

59,809.70

23,269.32

83,079.02

In progress

 

Stepaside

..

..

..

..

..

 

 

23,752.20

23,752.20

In progress

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

Expenditure

 

Work No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

Justice (Contd.) 

 

 

 

 

 

£

£

£

£

£

 

 

Co. Cavan 

 

 

 

 

 

 

 

Ballinagh

..

..

..

..

..

 

 

3,885.09

28,013.00

31,898.09

Completed

 

Virginia

..

..

..

..

..

 

 

5,617.63

27,232.41

32,850.04

Completed

 

Co. Carlow 

 

 

 

 

 

 

 

Carlow

..

..

..

..

..

 

 

19,080.00

19,080.00

In progress

 

Co. Clare 

 

 

 

 

 

 

 

Broadford

..

..

..

..

 

 

172.79

28,286.16

28,458.95

Completed

 

Killaloe

..

..

..

..

..

 

 

1,715.98

2,126.00

3,841.98

In progress

 

Sixmilebridge

..

..

..

..

 

 

31,500.00

31,500.00

In progress

 

Co. Cork 

 

 

 

 

 

 

 

Bantry

..

..

..

..

..

 

 

2,728.85

32,683.02

35,411.87

Completed

 

Bridewell

..

..

..

..

..

 

 

8,550.00

38,775.00

47,325.00

Virtually completed

 

Carraignavar

..

..

..

..

 

 

576.51

27,014.10

27,590.61

Completed

 

Fermoy

..

..

..

..

..

 

 

9,250.00

29,700.00

38,950.00

In progress

 

Kanturk

..

..

..

..

..

 

 

2,389.00

85,013.74

87,402.74

Virtually completed

 

Mallow

..

..

..

..

..

 

 

55,126.00

12,315.14

67,441.14

In progress

 

Midleton

..

..

..

..

..

 

 

2,018.00

2,018.00

In progress

 

Mitchelstown

..

..

..

..

 

 

6,061.40

6,061.40

In progress

 

Co. Donegal 

 

 

 

 

 

 

 

Ballyshannon

..

..

..

..

 

 

1,210.00

98,943.43

100,153.43

Completed

 

Lifford

..

..

..

..

..

 

 

141.00

19,531.65

19,672.65

Completed

 

Co. Galway 

 

 

 

 

 

 

 

Kilcreest

..

..

..

..

..

 

 

4,775.00

19,251.79

24,026.79

Virtually completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

Expenditure

 

Work No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

Justice (Contd.) 

 

 

 

 

 

£

£

£

£

£

 

 

Co. Kerry 

 

 

 

 

 

 

 

Ardfert

..

..

..

..

..

 

 

2,141.55

28,521.32

30,662.87

Completed

 

Tralee

..

..

..

..

..

 

 

1,912.16

82.50

1,994.66

In planning

 

Co. Kildare 

 

 

 

 

 

 

 

Kildare

..

..

..

..

..

 

 

39,907.37

7,998.52

47,905.89

In progress

 

Kill

..

..

..

..

..

 

 

50.16

16,638.83

16,688.99

Completed

 

Naas

..

..

..

..

..

 

 

631.20

39,210.07

39,841.27

Completed

 

Co. Kilkenny 

 

 

 

 

 

 

 

Castlecomer

..

..

..

..

 

 

4,000.00

3,000.00

7,000.00

In progress

 

Graiguenamanagh

..

..

..

..

 

 

540.00

450.00

990.00

In progress

 

Co. Laois 

 

 

 

 

 

 

 

Portlaoise

..

..

..

..

 

 

3,880.00

260,968.77

264,848.77

Virtually completed

 

Co. Leitrim 

 

 

 

 

 

 

 

Carrick-on-Shannon

..

..

..

..

 

 

10,725.00

10,725.00

In progress

 

Manorhamilton

..

..

..

..

 

 

37,601.54

37,601.54

In progress

 

Co. Limerick 

 

 

 

 

 

 

 

Limerick City: Divisional Headquarters

..

..

 

 

25,178.50

495,957.93

521,136.43

Virtually completed

 

Askeaton

..

..

..

..

..

 

 

22,064.00

22,500.00

44,564.00

In progress

 

Newcastlewest

..

..

..

..

 

 

3,079.79

65,208.49

68,288.28

Completed

 

Co. Longford 

 

 

 

 

 

 

 

Drumlish

..

..

..

..

..

 

 

5,700.00

30,914.00

36,614.00

Virtually completed

 

Granard

..

..

..

..

..

 

 

5,125.49

118,999.83

124,125.32

Virtually completed

 

Co. Louth 

 

 

 

 

 

 

 

Dundalk

..

..

..

..

..

 

 

90,882.02

59,363.06

150,245.08

In progress

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

Expenditure

 

Work No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

Justice (Contd.) 

 

 

 

 

 

£

£

£

£

£

 

 

Co. Mayo 

 

 

 

 

 

 

 

Kiltimagh

..

..

..

..

..

 

 

9,500.00

26,220.00

35,720.00

Virtually completed

 

Lahardane

..

..

..

..

 

 

12,836.00

350.00

13,186.00

In progress

 

Co. Meath 

 

 

 

 

 

 

 

Duleek

..

..

..

..

..

 

 

9,477.20

27,129.00

36,606.20

In progress

 

Enfield

..

..

..

..

..

 

 

4,269.52

18,911.37

23,180.89

In progress

 

Navan

..

..

..

..

..

 

 

28,186.43

749.92

28,936.35

In progress

 

Co. Monaghan

 

 

 

 

 

 

 

Castleblayney

..

..

..

..

 

 

9,127.52

49,856.40

58,983.92

Virtually completed

 

Monaghan

..

..

..

..

 

 

6,320.80

5,104.93

11,425.73

In planning

 

Rockcorry

..

..

..

..

 

 

17,550.00

2,710.00

20,260.00

In planning

 

Co Roscommon 

 

 

 

 

 

 

 

Boyle

..

..

..

..

..

 

 

97,885.88

15,728.85

113,614.73

In progress

 

Castlerea

..

..

..

..

..

 

 

4,292.19

101,740.33

106,032.52

Completed

 

Loughglynn

..

..

..

..

 

 

5,700.00

32,944.95

38,644.95

Completed

 

Co. Sligo 

 

 

 

 

 

 

 

Cliffony

..

..

..

..

..

 

 

374.74

27,262.59

27,637.33

Completed

 

Easkey

..

..

..

..

..

 

 

5,000.00

13,050.00

18,050.00

In progress

 


 

Gurteen

..

..

..

..

..

 

 

11,454.00

5,940.00

17,394.00

In progress

 

Co. Tipperary 

 

 

 

 

 

 

 

Lorrha

..

..

..

..

..

 

 

12,600.00

12,600.00

In progress

 

Newport

..

..

..

..

..

 

 

103.30

26,058.55

26,161.85

Completed

 

Templemore

..

..

..

..

 

 

5,850.00

5,850.00

In progress

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

Expenditure

 

Work No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

Justice (Contd.) 

 

 

 

 

 

£

£

£

£

£

 

 

Co. Waterford 

 

 

 

 

 

 

 

Portlaw

..

..

..

..

..

 

 

900.00

13,019.75

13,919.75

Completed

 

Co. Wexford 

 

 

 

 

 

 

 

Bunclody

..

..

..

..

..

 

 

1,148.00

450.00

1,598.00

In progress

 

Carrick-on-Bannow

..

..

..

..

 

 

1,273.00

24,195.33

25,468.33

Completed

 

Clonroche

..

..

..

..

 

 

885.00

16,346.72

17,231.72

Completed

 

Kiltealy

..

..

..

..

..

 

 

1,621.87

28,398.02

30,019.89

Completed

 

Taghmon

..

..

..

..

..

 

 

13,509.00

18,000.00

31,509.00

In progress

 

Co Wicklow 

 

 

 

 

 

 

 

Carnew

..

..

..

..

..

 

 

1,012.000

450.00

1,462.00

In progress

53

Garda Stations: Minor Stations: Minor Improvements Schemes

 

160,000.00

170,021.43
Detailed as follows:—

 

 

 

Sub. No.

Dublin Metropolitan Division 

 

 

 

 

 

 

46

Bridewell

..

..

..

..

..

 

 

394.34

394.34

In progress

61/77 of ’78

Donnybrook

..

..

..

..

 

 

2,136.15

2,877.54

5,013.69

In progress

17

Dublin Castle (Special Detective Unit):

 

 

 

 

 

 

 

Provision of filing and other accommodation

..

 

 

2,121.63

2,121.63

Virtually Completed

61/44 of ’78

Dublin Castle: Provision of gymnasium and parade room

 

 

3,220.30

2,451.76

5,672.06

Virtually Completed

61/60 of ’78

Dublin Castle: Provision of lockers for Crime Task Force

 

 

39.97

493.91

533.88

Completed

26

Garda Depot, Phoenix Park: Improvements to Accommodation

 

 

 

 

 

 

 

for Commissioner’s Staff

..

..

..

 

 

12,449.14

12,449.14

Virtually Completed

61/22 of ’78

Garda Headquarters Phoenix Park: Provision of toilet facilities

 

 

299.27

6,266.22

6,565.49

Virtually Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

Expenditure

 

Work No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

Justice (Contd.) 

 

 

 

 

 

£

£

£

£

£

 

76/50 of ’76

Garda Headquarters Phoenix Park: Provision of floor bases for

 

 

 

 

 

 

 

precision instruments

..

..

..

 

 

2,123.67

251.35

2,375.02

Completed

61

Garda Headquarters: Provision of tarmacadam

..

..

 

 

6,813.45

6,813.45

In progress

57

Harcourt Tce.

..

..

..

..

 

 

1,115.10

1,115.10

In progress

9

Kevin St.

..

..

..

..

..

 

 

3,609.29

3,609.29

In progress

59

Kilmainham

..

..

..

..

 

 

2,291.66

2,291.66

In progress

45

Mountjoy

..

..

..

..

..

 

 

354.07

354.07

In progress

61/47 of ’78

Pearse St.

..

..

..

..

 

 

1,108.01

2,826.20

3,934.21

In progress

61/86 of ’78

Santry

..

..

..

..

..

 

 

677.57

737.15

1,414.72

In progress

 

Co. Dublin 

 

 

 

 

 

 

38

Rathfarnham

..

..

..

..

 

 

2,008.00

2,008.00

In progress

30

Skerries

..

..

..

..

..

 

 

3,571.81

3,571.81

In progress

 

Co. Clare 

 

 

 

 

 

 

70/12 of ’75

Carrigaholt

..

..

..

..

 

 

425.80

7,160.00

7,585.80

Completed

 

Co. Cork 

 

 

 

 

 

 

2

Bantry

..

..

..

..

..

 

 

1,597.68

1,597.68

In progress

28

Barrack St.

..

..

..

..

 

 

1,283.36

1,283.36

In progress

54

Blarney

..

..

..

..

..

 

 

2,250.00

2,250.00

In progress

61/8 of ’78

Drimoleague

..

..

..

..

 

 

206.14

1,920.06

2,126.20

Completed

21

Glanmire

..

..

..

..

..

 

 

945.00

945.00

In progress

61/45 of ’78

MacCurtain St.

..

..

..

..

 

 

328.57

1,621.44

1,950.01

Completed

14

Macroom

..

..

..

..

..

 

 

1,800.00

1,800.00

In progress

44

Shandon

..

..

..

..

..

 

 

1,380.00

1,380.00

In progress

41

Tarelton

..

..

..

..

..

 

 

1,800.00

1,800.00

In progress

50

Union Quay: Alterations

..

..

..

 

 

3,731.83

3,731.83

In progress

66

Union Quay: Provision of new telecommunications centre

 

 

781.75

781.75

In progress

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

Expenditure

 

Work No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

Observations

 

Justice (Contd.) 

 

 

 

 

 

£

£

£

£

£

 

 

Co. Donegal 

 

 

 

 

 

 

22

Buncrana

..

..

..

..

..

 

 

8,100.00

8,100.00

In progress

76/58 of ’76

Bundoran

..

..

..

..

..

 

 

11.99

2,025.00

2,036.99

Completed

61/82 of ’78

Glencolmcille

..

..

..

..

 

 

299.10

2,041.11

2,340.21

Completed

61/62 of ’77

Pettigo

..

..

..

..

..

 

 

1,550.96

1,620.00

3,170.96

Completed

 

Co. Galway 

 

 

 

 

 

 

3

Rosmuc

..

..

..

..

..

 

 

2,338.10

2,338.10

In progress

 

Co. Kerry 

 

 

 

 

 

 

4

Ballyduff

..

..

..

..

..

 

 

1,700.00

1,700.00

In progress

18

Cahirciveen

..

..

..

..

 

 

1,210.25

1,210.25

In progress

10

Castlegregory

..

..

..

..

 

 

2,263.34

2,263.34

In progress

15

Dingle

..

..

..

..

..

 

 

3,544.00

3,544.00

In progress

31

Killarney

..

..

..

..

..

 

 

5,400.00

5,400.00

In progress

 

Co. Kildare 

 

 

 

 

 

 

61/39 of ’78

Kilcock

..

..

..

..

..

 

 

416.00

3,679.54

4,095.54

Completed

19

Monasterevan

..

..

..

..

 

 

5,125.00

5,125.00

In progress

61/46 of ’78

Newbridge ...

...

...

...

...

...

 

 

824.00

395.00

1,219.00

In progress

 

Co. Kilkenny 

 

 

 

 

 

 

61/36 of ’77

Ballyragget

..

..

..

..

 

 

2,775.00

5,225.00

8,000.00

Completed

 

Co. Laois 

 

 

 

 

 

 

13

Mountrath

..

..

..

..

 

 

4,550.00

4,550.00

In progress

 

Co. Leitrim 

 

 

 

 

 

 

76/65 of ’76

Kinlough

..

..

..

..

..

 

 

907.99

675.00

1,582.99

Completed

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Justice (Contd.) 

 

 

 

 

 

 

 

Co. Limerick 

 

 

 

 

 

 

71

Bruff

..

..

..

..

..

 

 

1,500.00

1,500.00

In progress

20

Castletown Conyers

..

..

..

..

 

 

7,923.77

7,923.77

In progress

70/18 of ’75

Edward St.

..

..

..

..

 

 

7,752.00

15,079.96

22,831.96

In progress

61/26 of ’78

Mayorstown

..

..

..

..

 

 

1,817.36

3,150.00

4,967.36

Virtually completed

7

Shanagolden

..

..

..

..

 

 

2,200.00

2,200.00

In progress

 

Co. Mayo 

 

 

 

 

 

 

61/30 of ’77

Ballinrobe

..

..

..

..

 

 

2,543.20

4,230.00

6,773.20

In progress

16

Bellacorick

..

..

..

..

 

 

500.00

500.00

In progress

5

Claremorris

..

..

..

..

 

 

1,196.08

1,196.08

In progress

 

Co. Meath 

 

 

 

 

 

 

61/37 of ’78

Slane

..

..

..

..

..

 

 

1,550.00

900.00

2,450.00

Completed

 

Co. Sligo 

 

 

 

 

 

 

27

Sligo

..

..

..

..

..

 

 

4,080.51

4,080.51

In progress

 

Co. Tipperary 

 

 

 

 

 

 

8

Carrick-on-Suir

..

..

..

..

 

 

6,840.00

6,840.00

In progress

61/56 of ’78

Clonmel

..

..

..

..

..

 

 

301.00

3,600.00

3,901.00

Completed

23

Templemore Training Centre

..

..

..

 

 

1,444.16

1,444.16

In progress

12

Templemore

..

..

..

..

 

 

2,747.94

2,747.94

In progress

 

Co. Westmeath 

 

 

 

 

 

 

24

Castlepollard

..

..

..

..

 

 

3,600.00

3,600.00

In progress

 

Co. Wexford 

 

 

 

 

 

 

61/97 of ’78

Courtown Harbour

..

..

..

..

 

 

4,367.26

9,000.00

13,367.26

Virtually completed

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Justice (Contd.) 

 

 

 

 

 

 

 

Co. Wicklow 

 

 

 

 

 

 

33

Bray

..

..

..

..

..

 

 

6,745.08

313.74

In progress

42

Rathdrum

..

..

..

..

 

 

313.74

313.74

In progress

 

General 

 

 

 

 

 

 

61/82 of ’77

Provision of Garda Protection Huts

..

..

..

 

 

10,720.04

18,178.67

28,898.71

In progress

54

Garda Training Centre, Templemore:

 

 

 

 

 

 

 

Swimming Pool Improvements

..

..

..

110,000.00

20,000.00

10,778.56

1,479.14

12,257.70

In planning

55

Courts of Justice: Provision of Additional Accommodation

75,000.00

41,560.88

5,621.18

47,182.06

In planning

56

Courts of Justice: Provision of Jury Room

..

..

35,000.00

30,000.00

In planning

57

New Permanent Courts

..

..

..

1,000.00

Under consideration

 

 

 

 

1,070,657.49

 

 

 

 

Environment 

 

 

 

 

 

 

58

Shannon: Erection of Vehicle Registration Unit

..

..

20,000.00

Under consideration

 

Education 

 

 

 

 

 

 

59

Athlone: New Offices

..

..

..

..

1,150,000.00

30,000.00

36,730.39

1,089,904.04

1,126,634.43

Virtually completed

60

National Library: Adaptation of Premises at Kildare St.

500,000.00

25,000.00

9,551.03

24,471.18

34,022.21

In progress

61

National Museum: Improvement of Lighting

..

..

170,000.00

30,000.00

27,899.90

27,899.90

In progress

61A

National Museum: Exhibition Installation

..

..

28,976.83

28,976.83

In progress

62

National Museum: Additional Accommodation

..

..

150,000.00

35,000.00

37,102.89

141,239.14

178,342.03

Virtually completed

63

Royal Irish Academy, Dublin: Improvements

..

..

60,000.00

30,000.00

68,400.00

30,600.00

99,000.00

In progress

 

 

 

 

208,661.04

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Fisheries and Forestry 

 

 

 

 

 

 

64

Abbotstown Farm: Accommodation for Scientific and Research

 

 

 

 

 

 

 

Staff (Fisheries)

..

..

..

..

326,000.00

15,000.00

12,667.60

261,615.41

274,283.01

Virtually completed

65

Proposed Fisheries Research Station at Ballyglass, Co. Mayo

1,000.00

Under consideration

66

Dunmore East Fisheries Field Research Station

..

..

22,000.00

2,000.00

157.79

157.79

In planning

 

 

 

 

12,667.60

 

 

 

 

Gaeltacht 

 

 

 

 

 

 

67

Galway: New Offices at Furbo

..

..

..

350,000.00

245,000.00

262,864.96

50,765.93

313,630.89

In progress

 

 

 

 

262,864.96

 

 

 

 

 Agriculture 

 

 

 

 

 

 

68

New Office Block, Kildare Place: Fitting out, Furnishing, etc.

1,760,000.00

35,000.00

16,098.68

1,721,634.45

1,737,733.13

Complete

69

Drogheda: New Offices

..

..

..

..

131,000.00

4,000.00

126,474.75

126,474.75

Completed

70

Abbotstown Farm: Accommodation for Stores

..

..

52,000.00

15,000.00

In planning

71

Abbotstown Farm: New Butter, Seed and Meat Control Station

1,750,000.00

5,000.00

In planning

72

Abbotstown Farm: Canteen Facilities

..

..

..

1,000.00

Under consideration

73

Abbotstown Farm: Farm Manager’s Residence

..

..

21,000.00

5,000.00

2,700.00

13,737.00

16,437.00

Virtually completed

74

Abbotstown Farm: Grain Storage Complex

..

..

80,000.00

60,000.00

37,080.00

693.63

37,773.63

In progress

75

Abbotstown Farm: Loose Box Accommodation

..

..

108,000.00

5,000.00

7,555.74

100,963.35

108,519.09

Virtually completed

76

Abbotstown Farm: New Milking Parlour

..

..

32,000.00

3,000.00

28,922.37

28,922.37

Completed

77

Abbotstown Farm: New Sewerage Scheme

..

..

250,000.00

5,000.00

In planning

78

Abbotstown Farm: Rabies Unit

..

..

..

30,000.00

15,000.00

In planning

79

Ballyhaise Agricultural College: New Accommodation

260,000.00

167,000.00

171,635.09

13,412.00

185,047.09

In progress

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

 

Observations

No.

Service and Description

Total Estimate

Vote 1979

1979

To 31/12/78

To 31/12/79

 

 

Agriculture

£

£

£

£

£

 

80

Ballyhaise Agricultural College: New Water Supply: ..

..

85,000.00

50,000.00

17,471.00

3,223.66

20,694.66

In progress

81

Botanic Gardens: Developments (Herbarium etc.)

..

..

850,000.00

5,000.00

15,661.95

15,661.95

In planning

82

Botanic Gardens: Staff Canteen

..

..

..

50,000.00

5,000.00

10,263.42

36,664.50

46,927.92

In progress

83

Clonakilty Agricultural College: Residence for Superintendent

25,000.00

5,000.00

Deferred

84

Clonakilty Agricultural College: New Student Accommodation

1,000.00

Under consideration

85

Kildalton College: Residences for Director and Deputy Directors

65,000.00

40,000.00

2,007.61

2,007.61

In planning

86

Kildalton College: New Water Supply

..

..

..

80,000.00

1,000.00

6,213.03

6,213.03

In planning

87

Mellowes Agricultural College, Athenry: New Student

 

 

 

 

 

 

 

Accommodation

..

..

..

..

1,000.00

Under consideration

87A

Mellowes Agricultural College, Athenry: Gate Lodge

14,252.00

14,252.00

In progress

88

Thorndale: Extension to Brucellosis Laboratory

..

..

125,000.00

15,000.00

26,892.21

90,838.99

117,731.20

Virtually completed

89

Tully West, Co. Kildare: New Office Accommodation

31,000.00

10,000.00

25,657.13

25,657.13

Completed

90

Tully West, Co. Kildare: Performance Testing Station for Beef

 

 

 

 

 

 

 

Bulls

..

..

..

..

..

83,000.00

1,000.00

205.50

87,608.35

87,813.85

Completed

91

Regional Veterinary Laboratories at Cork, Kilkenny and Limerick:

 

 

 

 

 

 

 

Provision of Incinerators

..

..

..

30,000.00

25,000.00

66.00

66.00

In planning

92

Raphoe District Veterinary Office

..

..

..

160,000.00

10,000.00

18,730.96

146,227.58

164,958.54

Completed

 

 

 

 

322,950.60

 

 

 

 

Industry Commerce and Energy 

 

 

 

 

 

 

93

Geological Survey, Glencree: Provision of Storage Racks

33,000.00

30,000.00

22,300.00

22,300.00

In progress

 

 

 

 

22,300.00

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Tourism and Transport 

 

 

 

 

 

 

94

Extension to Valentia Coast Radio Station

..

..

30,000.00

5,000.00

In planning

95

Training School and Synoptic Reporting Station, Murrough, Co.

 

 

 

 

 

 

 

Galway

..

..

..

..

..

180,000.00

40,000.00

9,796.85

145,087.80

154,884.65

Virtually completed

96

Claremorris New Meteorological Station

..

..

29,500.00

2,000.00

1,295.00

23,627.00

24,922.00

Virtually completed

97

Johnstown Castle: New Meteorological Station

..

..

1,000.00

In planning

 

 

 

 

11,091.85

 

 

 

 

Posts and Telegraphs 

 

 

 

 

 

 

98

Athy Post Office: Improvements

..

..

..

50,000.00

20,000.00

31,230.00

30,902.00

62,132.00

In progress

99

Ballinlough (Cork): Adaptations to Sorting Office

..

..

32,000.00

11,000.00

6,810.00

23,217.40

30,027.40

Virtually completed

100

Ballinrobe Post Office: Alterations and Additions

..

..

1,000.00

Under consideration

101

Ballyhaunis Post Office: Modernisation

..

..

32,000.00

9,000.00

7,283.33

20,017.48

27,300.81

In progress

102

Central Sorting Office, Dublin: Internal Alterations

..

25,000.00

5,000.00

6,246.11

29,484.59

35,730.70

Virtually completed

103

Central Sorting Office, Dublin: Temporary Parking for Postal

 

 

 

 

 

 

 

Vehicles

..

..

..

..

37,000.00

35,000.00

58,862.00

58,862.00

In progress

104

Castleblayney Post Office: Modernisation

..

..

30,000.00

10,000.00

Under consideration

105

Clonmel New Post Office

..

..

..

355,000.00

70,000.00

47,565.79

294,650.69

342,216.48

In progress

106

Cobh Post Office: Modernisation

..

..

..

41,000.00

8,000.00

9,909.24

32,443.58

42,352.82

Virtually completed

107

Cork (Brian Boru St.) Sorting Office: Extension

..

..

1,000.00

816.00

816.00

In planning

108

Dungarvan New Post Office

..

..

..

70,000.00

4,000.00

64,433.14

64,433.14

Completed

109

Enniscorthy Post Office: Improvements

..

..

45,000.00

6,000.00

12,742.73

45,029.39

57,772.12

Completed

110

Fairview New Sorting Office

..

..

..

1,000.00

2,233.73

99.86

2,333.59

In planning

111

Fermoy New Post Office

..

..

..

1,000.00

Under consideration

112

Finglas Sorting Office: Extension

..

..

..

50,000.00

35,000.00

15,168.94

62.76

15,231.70

In progress

113

Galway Post Office: Extension

..

..

..

1,000.00

383.86

383.86

In planning

114

Letterkenny Post Office Extension

..

..

..

70,000.00

4,000.00

2,403.88

65,384.11

67,787.99

Virtually completed


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

Posts and Telegraphs (Contd.) 

£

£

£

£

£

 

115

Limerick Post Office: Improvements

..

..

..

1,000.00

3,589.46

1,841.73

5,431.19

In planning

116

Longford New Post Office

..

..

..

270,000.00

50,000.00

7,116.04

5,860.81

12,976.85

In progress

117

Mullingar New Post Office

..

..

..

480,000.00

80,000.00

3,410.92

52,700.44

56,111.36

Tenders under consideration

118

Navan New Post Office

..

..

..

..

1,000.00

Under consideration

119

New Ross Post Office: Improvements

..

..

..

30,000.00

1,000.00

In planning

120

Phibsboro Post Office: Extension

..

..

..

90,000.00

8,000.00

8,500.00

93,286.27

101,786.27

Completed

121

Roscommon Post Office: Modernisation

..

..

32,000.00

25,000.00

26,398.90

2,717.00

29,115.90

In progress

122

Shannon New Post Office

..

..

..

470,000.00

10,000.00

30,166.41

30,166.41

Alternative proposals under consideration

123

Thurles Post Office: Improvements Stage 11

..

..

1,000.00

155.00

702.52

857.52

In planning

124

Tipperary New Post Office

..

..

..

240,000.00

100,000.00

145,124.94

74,136.37

219,261.31

In progress

125

Waterford Post Office: Improvements

..

..

..

70,000.00

1,000.00

In planning

126

Wexford New Post Office

..

..

..

1,000.00

Under consideration

127

Area Engineering Headquarters

..

..

..

35,000.00

5,820.91

 

 

 

 

 

 

 

Detailed as follows:

 

 

 

 

Letterkenny

..

..

..

..

..

 

 

14.42

14.42

In progress

 

Mallow

..

..

..

..

..

 

 

356.40

356.40

In progress

 

Monaghan

..

..

..

..

..

 

 

1,163.90

1,021.00

2,184.90

In progress

 

Tipperary

..

..

..

..

..

 

 

60.19

164.13

224.32

In planning

 

Tralee

..

..

..

..

..

 

 

3,533.21

3,533.21

In progress

 

Walkinstown

..

..

..

..

..

 

 

615.83

4,940.38

5,556.21

Completed

 

Waterford

..

..

..

..

..

 

 

76.96

76.96

In progress

128

Training Centres

..

..

..

..

40,000.00

2,137.75

 

 

 

 

 

 

 

Detailed as follows:

 

 

 

 

Dundrum

..

..

..

..

..

 

 

1,687.75

8,825.77

10,513.52

In planning

 

Glandore Rd.

..

..

..

..

 

 

450.00

450.00

In progress

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

Posts and Telegraphs (Contd.) 

£

£

£

£

£

 

129

Warehousing and Garage Accommodation

..

..

38,000.00

21,991.89

 

 

 

 

 

 

 

Detailed as follows:

 

 

 

 

Chapelizod

..

..

..

..

..

 

 

17,774.41

17,774.41

In progress

 

Clondalkin Polefield

..

..

..

..

 

 

4,217.48

4,217.48

In planning

 

 

 

 

425,901.42

 

 

 

 

Defence 

 

 

 

 

 

 

130

G.H.Q.: Improvement Works

..

..

..

21,500.00

2,000.00

5,200.38

18,958.72

24,159.10

Virtually completed

131

Infirmary Road: Provision of Additional Accommodation

5,000.00

14,678.33

14,678.33

In planning

132

Military Billets at Government Buildings: Adaptations

135,000.00

20,000.00

23,702.05

103,209.00

126,911.05

In progress

133

St. Bricin’s Hospital: Adaptations

..

..

..

25,000.00

25,000.00

571.40

571.40

In progress

 

 

 

 

44,152.16

 

 

 

 

Foreign Affairs 

 

 

 

 

 

 

134

Embassy at Athens: Fitting out

..

..

..

80,000.00

50,000.00

80,369.38

23,973.89

104,343.27

Virtually completed

135

Embassy at Beirut: Fitting out

..

..

..

3,000.00

240.05

20,518.94

20,758.99

Suspended due to Civil War

136

Embassy at Berne: Fitting out New Chancery

..

..

26,000.00

1,000.00

104.30

27,598.24

27,702.54

Completed

137

Embassy at Bonn: Fitting out New Chancery

..

..

25,000.00

5,000.00

3,566.44

13,804.80

17,371.24

Virtually completed

138

Embassy at Bonn: Improvements to Residence

..

..

45,000.00

5,000.00

7,147.41

34,474.63

41,622.04

In progress

139

Embassy at Canberra: Erection of New Chancery

..

..

263,000.00

50,000.00

5,487.66

9,043.95

14,531.61

In planning

140

Embassy at Cairo: Fitting out

..

..

..

40,000.00

30,000.00

19,295.90

3,969.27

23,265.17

Virtually completed

141

Consulate General, New York: Improvements

..

..

32,000.00

2,000.00

540.87

32,804.15

33,345.02

Completed

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

Posts and Telegraphs (Contd.) 

£

£

£

£

£

 

142

Embassy at Copenhagen: Fitting out New Chancery

..

10,000.00

In planning

143

Embassy at Holy See: Security Works

..

..

1,000.00

In planning

142A

Embassy at Geneva: Fitting out of Residence

..

..

6,396.10

6,396.10

In planning

144

Embassy at Jeddah (including Residence for First Secretary):

 

 

 

 

 

 

 

Fittingout

..

..

..

..

..

93,000.00

30,000.00

50,722.91

44,234.41

94,957.32

Virtually completed

145

Embassy at Lagos: Improvements to Residence

..

..

26,000.00

2,406.25

2,406.25

In planning

146

Embassy at Lagos: Provision of Generator in the First Secretary’s

 

 

 

 

 

 

 

Residence

..

..

..

..

..

10,000.00

In planning

147

Embassy at Lisbon: Fitting out New Chancery

..

..

5,000.00

In planning

147A

Embassy at Lisbon: Fitting out of New Residence

..

..

2,008.97

8,624.04

10,633.01

In progress

148

Embassy at Nairobi: Fitting out

..

..

..

1,000.00

In planning

149

Embassy at Ottawa: Extension of Residence

..

..

70,000.00

50,000.00

51,812.54

1,384.42

53,196.96

In progress

150

Embassy at Paris: Replacement of Lifts

..

..

1,000.00

101.25

101.25

Deferred

151

Embassy at Rome: Fitting out of New Chancery

..

..

36,000.00

10,000.00

29,674.54

1,802.47

31,477.01

Virtually completed

152

Embassy at Teheran: Fitting out

..

..

..

48,000.00

20,000.00

6,060.72

36,695.41

42,756.13

In progress

153

Embassy at Vienna: Fitting out

..

..

..

115,000.00

50,000.00

104,036.86

41,904.57

145,941.43

In progress

154

Accommodation for Presidency of E.E.C., 1979

..

..

135,000.00

95,000.00

260,259.71

6,977.37

267,237.08

Virtually completed

154A

Embassy at Washington Renovation of Residence

..

..

79,796.77

79,796.77

In progress

 

 

 

 

710,028.63

 

 

 

 

Social Welfare 

 

 

 

 

 

 

155

Employment Exchanges Accommodation in Dublin Area

200,000.00

119,751.87

38,481.81

158,233.68

In progress

156

Dun Laoghaire New Employment Exchange

..

..

320,000.00

160,000.00

98,538.16

1,017.50

99,555.66

In progress

157

Limerick Employment Exchange

..

..

..

1,000.00

Under consideration

158

Manorhamilton Employment Exchange: Erection of new building

80,000.00

50,000.00

3,283.15

3,283.15

In planning

159

Newcastlewest New Employment Exchange

..

..

5,000.00

169.11

169.11

Under consideration

 

 

 

 

221,742.29

 

 

 

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

Foreign Affairs (Contd.) 

£

£

£

£

£

 

 

Sundry Departments 

 

 

 

 

 

 

160

New Buildings

..

..

..

..

 

 

 

 

 

 

 

 

3,150,000.00

2,685,058.41

 

 

 

 

 

 

 

Detailed as

 

 

 

 

 

 

 

follows:—

 

 

 

 

93-99 Lr. Leeson St., Dublin

..

..

..

 

 

135,198.61

547,770.48

682,969.09

Virtually completed

 

93-99 Lr. Leeson St., Dublin (Stage II)

..

..

..

 

 

336,668.22

121,359.33

458,027.55

In progress

 

Ship St. Barracks, Dublin Castle

 

 

20.35

11,780.39

11,800.74

In planning

 

Department of Defence New Headquarters, Infirmary Road,

 

 

 

 

 

 

 

Dublin

..

..

..

..

..

 

 

145,658.37

145,658.37

In planning

 

Blocks 8, 9 and 10 Dublin Castle

..

..

..

 

 

37,547.93

71,160.25

108,708.18

In planning

 

14-17 Upper Merrion St., Dublin

..

..

..

 

 

29,783.43

18,511.13

48,294.56

In progress

 

Beggar’s Bush, Haddington Rd., Dublin

..

..

 

 

475,415.16

382,276.76

857,691.92

In progress

 

Shelbourne Rd., Ballsbridge

..

..

..

 

 

12,809.00

986,116.40

998,925.40

Virtually completed

 

Proposed New Garda Headquarters Phoenix Park (Stage I)

 

 

346,659.78

1,477,060.47

1,823,720.25

In progress

 

13-14 Earlsfort Tce., Dublin

..

..

..

 

 

58,880.04

744,701.75

803,581.79

Virtually completed

 

Marlborough House Glasnevin

..

..

..

 

 

515,026.63

981,000.74

1,496,027.37

In progress

 

Waterford Government Offices

..

..

..

 

 

277,265.76

147,826.59

425,092.35

In progress

 

Cork Government Offices

..

..

..

 

 

60,177.86

23,309.07

83,486.93

In planning

 

Mullingar Government Offices

..

..

..

 

 

214,183.03

109,904.49

324,087.52

In progress

 

Portlaoise Government Offices

..

..

..

 

 

50.97

31,024.94

31,075.91

Completed

 

Navan Government Offices

..

..

..

 

 

1,423.12

1,517.56

2,940.68

In planning

 

Athlone Government Offices

..

..

..

 

 

141,299.94

17,563.27

158,863.21

In progress

 

Sligo Government Offices

..

..

..

 

 

14,482.18

14,482.18

In planning

 

Sligo (Temporary) Government Offices

..

..

 

 

19,323.00

19,323.00

In progress

 

Carrick-on-Shannon Government Offices

..

..

 

 

8,843.40

8,843.40

In planning

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

Foreign Affairs (Contd.) 

£

£

£

£

£

 

161

Fitting out of Premises for occupation

..

..

700,000.00

1,135,429.89

 

 

 

 

 

 

 

Detailed as

 

 

 

 

 

 

 

follows:—

 

 

 

 

Furniture for New Works

..

..

..

 

 

78,769.86

93,140.47

171,910.33

In progress

 

Oisin House

..

..

..

..

 

 

5,958.94

173,931.92

179,890.86

Completed

 

Earlsfort House

..

..

..

..

 

 

7,367.58

291,975.10

299,342.68

Completed

 

Ardee House, Rathmines

..

..

..

 

 

21,250.84

145,399.76

166,650.60

Completed

 

Lyon House (Revenue) O’Connell St.

..

..

 

 

10,369.15

124,045.12

134,414.27

Completed

 

Townsend St. (Social Welfare)

..

..

..

 

 

17,742.91

245,248.55

262,991.46

Virtually completed

 

Kildare Building (Setanta)

..

..

..

 

 

7,736.57

400,890.39

408,626.96

Virtually completed

 

Hawkins House, Dublin (1st and 2nd floor)

..

..

 

 

202.46

4,660.28

4,862.74

Completed

 

Molesworth Building (Setanta)

..

..

..

 

 

22,247.14

440,538.85

462,785.99

In progress

 

Nassau Building (Setanta)

..

..

..

 

 

185,983.46

216,240.48

402,223.94

In progress

 

72/76 St. Stephen’s Green

..

..

..

 

 

17,671.91

54,858.20

72,530.11

In progress

 

St. Martin’s House, Fitting out for Stationery Office

..

 

 

9,090.33

8,866.17

17,956.50

Completed

 

Galway Hynes Building (P. & T.)

..

..

..

 

 

2,552.21

3,072.59

5,624.80

Virtually completed

 

Cork Government Offices (Hibernian House)

..

..

 

 

36,660.37

38,109.41

74,769.78

In progress

 

Athlone Government Offices

..

..

..

 

 

22,863.53

4,820.36

27,683.89

Virtually completed

 

Ely Court, Ely Place

..

..

..

..

..

 

 

114,982.33

2,821.57

117,803.90

Completed

 

Park House, Dublin

..

..

..

..

..

 

 

108,206.69

3,380.72

111,587.41

Completed

 

Cumberland House, Dublin

..

..

..

 

 

39,576.89

39,576.89

In progress

 

13-15 Hatch St., Dublin

..

..

..

..

 

 

567.80

567.80

In planning

 

Baggot Bridge House, Baggot St., Dublin

..

..

 

 

116,827.51

116,827.51

Completed

 

Gandon House, Dublin

..

..

..

..

..

 

 

70,238.28

70,238.28

In progress

 

Shelbourne House

..

..

..

..

..

 

 

19,038.48

19,038.48

In progress

 

Irish Life Centre Block 1

..

..

..

..

 

 

151,072.30

151,072.30

In progress

 

Irish Life Centre, Blocks 5 and 6

..

..

..

 

 

22,338.98

22,338.98

In progress

 

Hume House 1st, 2nd and 4th floors

..

..

..

 

 

26,046.89

659.56

26,706.45

In progress

 

Apollo House 2nd, 3rd and 4th floors

..

..

 

 

7,672.39

7,672.39

In planning

 

Sackville Place (2nd floor)

..

..

..

 

 

3,394.09

3,394.09

In progress

 

Connolly Hall, Cork (2nd and 3rd floors)

..

..

 

 

9,000.00

9,000.00

In progress

 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Other Buildings 

 

 

 

 

 

 

162

Premises at Earlsfort Tce.: Adaptations for Concert Hall Purposes

2,000,000.00

750,000.00

576,410.61

231,515.46

807,926.07

In proress

162A

State Memorial to Late President Kennedy

..

..

33,800.00

137,167.84

170,967.84

Not proceeded with

 

 

 

 

 

 

 

following government

 

 

 

 

 

 

 

decision. See note 5 to

 

 

 

 

 

 

 

Appropriation

 

 

 

 

 

 

 

Account.

163

Royal Hospital Kilmainham: Restoration and Provision of

 

 

 

 

 

 

 

Conference Centre

..

..

..

..

3,260,000.00

350,000.00

68,769.68

196,334.34

265,104.02

In planning

163A

Royal Hospital Kilmainham: Relocation of National Museum

19,613.31

19,613.31

In progress

 

Artifacts at Daingean

 

 

 

 

 

 

 

 

 

 

698,593.60

 

 

 

 

General 

 

 

 

 

 

 

164

Minor New Works not exceeding £20,000 each

..

..

465,000.00

309,280.34

 

 

Details appended

165

Urgent and Unforeseen Works

..

..

..

5,000.00

45,994.33

 

 

Details appended

166

Minor Balances of Expenditure (not provided for above) on works of prior years which may not be completed on 1st January 1979

50,000.00

80,997.65

 

 

Details appended

 

 

TOTAL

11,586,000.00

9,236,468.87

 

 

 

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

President 

 

 

 

 

 

 

32

Aras an Uachtarain: Adaptation of Slater’s Shop

 

 

2,149.18

2,149.18

Completed

34

Aras an Uachtarain: Provision of storage presses in pantry near

 

 

 

 

 

 

 

kitchen

..

..

..

..

..

 

 

261.72

261.72

In progress

9

Aras an Uachtarain: Improvements to staff sitting/dining room and

 

 

 

 

 

 

 

toilets

..

..

..

..

..

 

 

1,521.83

1,521.83

Completed

 

Oireachtas 

 

 

 

 

 

 

120

Leinster House: Construction of P. & T. cable duct at Kildare St.

 

 

 

 

 

 

 

entrance

..

..

..

..

 

 

2,833.34

2,833.34

Completed

 

Taoiseach 

 

 

 

 

 

 

185/196 of

Central Statistics Office, Phibsboro Shopping Centre: Fitting out

 

 

 

 

 

 

78

of 6th floor

..

..

..

..

 

 

161.91

3,873.86

4,035.77

Completed

24

Central Statistics Office, Earlsfort Tce.: Improvements to internal

 

 

 

 

 

 

 

partitioning

..

..

..

..

 

 

1,184.00

1,184.00

Completed

 

Finance 

 

 

 

 

 

 

185/135

Ordnance Survey Office, Phoenix Park: Installation of film

 

 

 

 

 

 

of 78

processor

..

..

..

..

..

 

 

1,578.61

2,859.70

4,438.31

Completed

185/151

Ordnance Survey Office, Phoenix Park: Provision of dark room

 

 

217.95

601.30

819.25

Completed

of 78

 

 

 

 

 

 

185/159

Ordnance Survey Office, Phoenix Park: Removal of concrete plat

 

 

 

 

 

 

of 78

forms at old printing building

..

..

..

 

 

14,832.06

1,752.76

16,584.82

Completed

185/184

Ordnance Survey Office, Phoenix Park: Installation of automatic

 

 

 

 

 

 

of 78

drawing machine

..

..

..

..

 

 

1,003.34

409.16

1,412.50

Completed

60

Ordnance Survey Office, Phoenix Park: Improvements to P.A.B.X.

 

 

 

 

 

 

 

switch room

..

..

..

..

 

 

3,239.86

3,239.86

Completed

178/135

Ordnance Survey Office, Phoenix Park: Provision of map sales

 

 

 

 

 

 

of 77

office and demolition of photography studio

..

..

 

 

570.97

4,373.97

4,944.94

Completed

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

110

Ordnance Survey Office, Phoenix Park: Insulation of heating pipe

 

 

 

 

 

 

 

work

..

..

..

..

..

 

 

3,311.51

3,311.51

Completed

152

Ordnance Survey Office, Phoenix Park: Provision of dark room

 

 

203.74

203.74

In progress

185/78

Valuation Office 5/6 Ely Place: Provision of storage accommodation

 

 

 

 

 

 

of 78

in basement

..

..

..

..

 

 

728.28

489.26

1,217.54

Completed

185/153

Chief State Solicitor’s Office, Dublin Castle: Improvements

 

 

 

 

 

 

of 78

 

 

338.37

524.11

862.48

Completed

63

Civil Service Dining Club: Improvements to female toilets and rest

 

 

 

 

 

 

 

room

..

..

..

..

..

 

 

4,868.08

4,868.08

In progress

125

3 Exchange Court: Clearance of site

..

..

..

 

 

9,268.92

200.00

9,468.92

Completed

100

Dublin Castle: Conversion of gas lighting to electricity in Lower

 

 

 

 

 

 

 

Castle yard

..

..

..

..

 

 

786.71

786.71

Completed

102

Dublin Castle: Demolition of No. 1 Palace St.

..

..

 

 

13,200.00

13,200.00

In progress

111

Dublin Castle: Provision of oil storage tanks

..

..

 

 

763.24

763.24

In progress

 

Revenue Commissioners 

 

 

 

 

 

 

35

9-15 Upper O’Connell St.: Installation of computer equipment

 

 

269.20

269.20

In progress

185/212

10 Upper O’Connell St.: Partitioning of Construction Industry

 

 

 

 

 

 

of 78

Division on 1st floor

..

..

..

..

 

 

470.35

463.68

934.03

Completed

123

14-15 Upper O’Connell St.: Partitioning of 3rd floor

..

 

 

1,496.13

1,496.13

In progress

185/202

Computer Centre, St. John’s Rd.: Improvements to canteen

 

 

 

 

 

 

of 78

facilities

..

..

..

..

..

 

 

427.49

141.01

568.50

Completed

185/83

Computer Centre, St. John’s Rd.: Installation of micro-film

 

 

 

 

 

 

of 78

processor

..

..

..

..

..

 

 

66.60

1,376.42

1,443.02

Completed

185/97

Castle House: Partitioning works to 5th floor

..

..

 

 

67.30

2,049.94

2,117.24

Completed

of 78

 

 

 

 

 

 

 

21

Wicklow House: Partitioning of 2nd floor

..

..

 

 

2,290.42

2,290.42

Completed

90

Lyon House: Partitioning of 1st floor

..

..

..

 

 

1,661.94

1,661.94

In progress

151/18

Customs … Excise Office, 15 Parnell Place, Cork: Electrical and

 

 

 

 

 

 

of 75

heating installation

..

..

..

..

 

 

244.70

2,281.59

2,526.29

Completed

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

Revenue Commissioners (Contd.) 

£

£

£

£

£

 

42

Ballyconnell Customs & Excise Post: Provision of caravan and

 

 

 

 

 

 

 

toilet unit

..

..

..

..

..

 

 

6,661.72

6,661.72

In progress

66

Castlefin Customs & Excise Station: Provision of caravan

 

 

2,111.87

2,111.87

Completed

68

Greenore Customs & Excise Station: Improvements

..

 

 

3,412.37

3,412.37

Completed

5

Carrickarnon Customs & Exise Post: Electrical Improvements

 

 

1,827.86

1,827.86

Completed

121

Carrickarnon Customs & Excise Post: Erection of prefab

 

 

8,550.00

8,550.00

In progress

47

Tullamore Customs & Excise Office: Improvements

..

 

 

4,056.58

4,056.58

Completed

56

Castleblaney Customs & Excise Station: Extension

..

 

 

6,175.00

6,175.00

In progress

 

Office of Public Works 

 

 

 

 

 

 

185/55

51, St. Stephen’s Green: Enclosing of staircases and installation of

 

 

 

 

 

 

of 78

fire alarm system

..

..

..

..

 

 

1,858.15

3,771.02

5,629.17

In progress

185/163

51, St. Stephen’s Green: Extension of heating system

..

 

 

625.87

381.66

1,007.53

Completed

of 78

 

 

 

 

 

 

 

178/77

51, St. Stephen’s Green: Improvements to file storage rooms

 

 

1,172.85

553.48

1,726.33

In progress

of 77

 

 

 

 

 

 

 

185/191

Dunlaoghaire Harbour: Erection of gates

..

..

 

 

7.31

903.00

910.31

Completed

of 78

 

 

 

 

 

 

 

46

Archaeological Survey Office Mullingar: Additional

 

 

 

 

 

 

 

Accommodation

..

..

..

..

..

 

 

6,205.69

6,205.69

In progress

92

Kilkenny Castle: Provision of tea-room facilities

..

..

 

 

5,653.79

5,653.79

Completed

178/192

Phoenix Park: Furry Glen Tree planting scheme

..

..

 

 

3,038.01

215.63

3,253.64

Completed

of 77

 

 

 

 

 

 

 

126

South Eastern Drainage Maintenance H.Q. Ballycrane, Co. Wex

 

 

 

 

 

 

 

ford: Erection of new buildings

..

..

..

 

 

8,208.84

8,208.84

In progress

3

St. Stephen’s Green Park: Erection of canteen

..

..

 

 

8,382.58

8,382.58

In progress

 

Public Service 

 

 

 

 

 

 

185/93

Central Computer Unit, Inchicore: Provision of screen in foyer

 

 

6.60

3,636.32

3,642.92

Completed

of 78

 

 

 

 

 

 

 

105

Training Centre, Lansdowne House: Partitioning Works

 

 

122.04

122.04

In progress

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Justice 

 

 

 

 

 

 

185/124

Registry of Deeds: Improvements to Central Heating System

 

 

1,376.21

146.69

1,522.90

Completed

of 78

 

 

 

 

 

 

 

178/45

Registry of Deeds: Transfer of Indexing Section and installation of

 

 

4,489.62

6,794.10

11,283.72

In progress

of 77

lift

..

..

..

..

..

 

 

 

 

 

 

185/182

Courts of Justice: Improvements to Restaurant

..

..

 

 

1,801.62

1,051.97

2,853.59

Completed

of 78

 

 

 

 

 

 

 

54

Courts of Justice: Improvements to accommodation of Registrar of

 

 

 

 

 

 

 

Wards of Court

..

..

..

..

 

 

1,193.33

1,193.33

Completed

65

Courts of Justice: Fitting out of rooms leased from Incorporated

 

 

 

 

 

 

 

Law Society

..

..

..

..

 

 

2,971.68

2,971.68

In progress

108

Courts of Justice: Fitting out of accommodation for Three High

 

 

 

 

 

 

 

Court Judges

..

..

..

..

 

 

4,421.96

4,421.96

In progress

136

Courts of Justice: Improvements to toilet facilities of Bar Council

 

 

182.24

182.24

In progress

178/157

Four Courts: Improvements to Judge D’Arcy’s Room

 

 

25.73

925.06

950.79

Completed

of 77

 

 

 

 

 

 

 

115

Ormond House: Provision of window grilles, etc.

..

..

 

 

5,200.85

5,200.85

Completed

135

Metropolitan District Court: Alterations to basements of Courts 4

 

 

 

 

 

 

 

and 6

..

..

..

..

..

 

 

192.02

192.02

In progress

80

Phibsboro Centre: Fitting out of accommodation for Association

 

 

 

 

 

 

 

for Garda Sergeants and Inspectors

..

..

 

 

7,171.83

7,171.83

Completed

 

Environment 

 

 

 

 

 

 

97

Gorey Driving Test Centre: Improvements

..

..

 

 

1,368.32

1,368.32

Completed

61

O’Connell Bridge House: Partitioning of floors 2 and 8

 

 

1,274.11

1,274.11

Completed

 

Education 

 

 

 

 

 

 

44

Training College Building Marlboro St.: Improvements

 

 

12,643.16

12,643.16

In progress

171/132

Training College Building Marlboro St.: Improvements

 

 

808.63

2,555.91

3,364.54

Completed

of 76

 

 

 

 

 

 

 

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Education (Contd.) 

 

 

 

 

 

 

178/109

Marlboro St.: Fire Precautionary Works

..

..

 

 

97.52

1,002.87

1,100.39

Completed

of ’77

 

 

 

 

 

 

 

12

National Gallery: Improvements to Conservation Department

 

 

1,512.94

1,512.94

In progress

62

National Gallery: Application of protective film to roof lights

 

 

1,808.68

1,808.68

Completed

99

National Gallery: Provision of store in basement

..

..

 

 

557.40

557.40

In progress

185/160

Hawkins House: Alterations on 3rd floor

..

..

 

 

86.75

4,233.96

4,320.71

Completed

of ’78

 

 

 

 

 

 

 

 

Agriculture 

 

 

 

 

 

 

185/77

Abboststown Farm: Improvements

..

..

..

 

 

5,059.36

1,872.77

6,932.13

Completed

of ’78

 

 

 

 

 

 

 

106

Abboststown Farm: Extension to gate lodge

..

..

 

 

7,200.00

7,200.00

Completed

64

Abbotstown Farm: Improvements to Laboratory (Tuberculosis

 

 

 

 

 

 

 

Section)

..

..

..

..

..

 

 

3,172.01

3,172.01

In progress

88

Abbotstown Farm: Provision of road to Leucosis Unit

 

 

7,137.48

7,137.48

Completed

158

Abbotstown Farm: Provision of Leucosis Unit

..

..

 

 

6,000.00

6,000.00

In progress

134

Abbotstown Farm: Alterations to sewerage line

..

..

 

 

2,298.68

2,298.68

In progress

31

Abbotstown Farm: Conversion of loose boxes to boar pens

 

 

1,613.00

1,613.00

Completed

103

Abbotstown Farm: Veterinary Research Laboratory: Provision of

 

 

 

 

 

 

 

doorway into (old) grain loft

..

..

..

 

 

978.00

978.00

Completed

178/93

Thorndale Veterinary Laboratory: Provision of Nissen hut

 

 

18.04

4,342.10

4,360.14

Completed

of ’77

 

 

 

 

 

 

 

89

Thorndale Veterinary Laboratory: Alterations and improvements

 

 

2,008.41

2,008.41

In progress

185/92

Munster Institute Cork: Provision of office accommodation at for-

 

 

 

 

 

 

of ’78

mer Superintendent’s House

..

..

..

 

 

786.24

1,946.08

2,732.32

Completed

178/42

Munster Institute Cork: Electrical Installation in breeding house

 

 

847.85

2,322.00

3,169.85

Completed

of ’77

 

 

 

 

 

 

 

11

Munster Institute Cork: Installation of central heating in Manager’s

 

 

 

 

 

 

 

Residence, Pig Progeny Station

..

..

..

 

 

2,216.56

2,216.56

Completed

 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Agriculture (Contd.) 

 

 

 

 

 

 

27

Tully Bull Performance Testing Station: Improvements

 

 

1,158.75

1,158.75

Completed

107

Botanic Gardens: Provision of oil storage tanks

..

..

 

 

1,011.04

1,011.04

In progress

20

Botanic Gardens: Installation of fire and alarm systems

 

 

2,476.39

2,476.39

In progress

85

Butter Testing Station, Harcourt Tce., Improvements

 

 

11,239.26

11,239.26

In progress

93

Agriculture House Dining Club: Provision of coat hanging facilities

 

 

 

 

 

 

 

and umbrella stand

..

..

..

..

 

 

39.36

39.36

In progress

26

Athlone Regional Veterinary Laboratory: Erection of garage

 

 

2,832.50

2,832.50

Virtually completed

67

Limerick Regional Veterinary Laboratory: Improvements

 

 

795.00

795.00

In progress

75

District Veterinary Office, Navan: Provision of tarmac

 

 

3,400.00

3,400.00

Completed

50

Farm Development Nenagh: Improvements

..

..

 

 

700.00

700.00

In progress

178/110

Farm Development Claremorris: Alterations to heating and lighting

 

 

420.00

1,188.29

1,608.29

Completed

of ’77

 

 

 

 

 

 

 

 

Labour 

 

 

 

 

 

 

185/117

National Manpower: Service Waterford: Partitioning and electrical

 

 

 

 

 

 

of ’78

installation

..

..

..

..

 

 

224.10

264.85

488.95

Completed

109

National Manpower Service Sligo: Fitting out of accommodation

 

 

1,353.80

1,353.80

Completed

98

Davitt House Mespil Rd., Dublin: Partitioning works in Rooms

 

 

1,273.74

1,273.74

Completed

 

204 and 409

..

..

..

..

 

 

 

 

 

 

 

Posts and Telegraphs 

 

 

 

 

 

 

185/102

G.P.O. Dublin: Improvements arising from recruiting of post-

 

 

 

 

 

 

of ’78

women

..

..

..

..

..

 

 

1,208.75

624.95

1,833.70

In progress

185/156

G.P.O. Dublin: Central Telegraph Office: Improvements to

 

 

 

 

 

 

of ’78

delivery room

..

..

..

..

..

 

 

1,756.17

3,444.74

5,200.91

Completed

185/187

G.P.O. Dublin: Improvements to Rooms 432 and 441 etc.

 

 

472.77

1,047.55

1,520.32

Completed

of ’78

 

 

 

 

 

 

 

185/155

G.P.O. Dublin: Improvements to Room 169

..

..

 

 

424.47

66.67

491.14

Completed

of ’78

 

 

 

 

 

 

 

 


Sub.

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Posts and Telegraphs (Contd.) 

 

 

 

 

 

 

58

G.P.O. Dublin: Improvements to basement

..

..

 

 

312.38

312.38

In progress

6

Lifford Post Office: Internal adaptations

..

..

 

 

1,733.00

1,733.00

Completed

178/148

Kilkenny Area Stock Depot

..

..

..

 

 

6.99

1,483.84

1,490.83

Completed

of ’77

 

 

 

 

 

 

 

185/133

Tralee Area Stock Depot

..

..

..

 

 

43.00

813.00

856.00

Completed

of ’78

 

 

 

 

 

 

 

185/206

Arklow Area Stock Depot

..

..

..

 

 

292.50

259.00

551.50

In progress

of ’78

 

 

 

 

 

 

 

38

Glenageary Sorting Office: Provision of welfare facilities

 

 

1,417.00

1,417.00

Completed

72

Thurles Post Office: Improvements

..

..

..

 

 

6,000.000

6,000.000

Completed

 

Defence 

 

 

 

 

 

 

185/168

G.H.Q. Parkgate St.: Provision of partition in Personnel Section

 

 

33.76

120.65

154.41

Completed

of ’78

 

 

 

 

 

 

 

 

Foreign Affairs 

 

 

 

 

 

 

39

52, St. Stephen’s Green: Erection of partitions

..

..

 

 

3,466.05

3,466.05

Completed

185/183

Iveagh House: Alterations to rooms 240A and 240B

..

 

 

44.75

468.52

513.27

Completed

of ’78

 

 

 

 

 

 

 

84

Iveagh House: Provision of document lift

..

..

 

 

2,928.66

2,928.66

Completed

74

Mission to United Nations: Improvements

..

..

 

 

1,863.68

1,863.68

In progress

185/233

Lagos Embasy: Provision of air-conditioning in reception

 

 

2,807.74

2,522.45

5,330.19

Completed

of ’78

 

 

 

 

 

 

 

 

Social Welfare 

 

 

 

 

 

 

96

Gorey Social Welfare Office: Improvements

..

..

 

 

1,368.32

1,368.32

Completed

48

Tullamore Social Welfare Office: Improvements

..

..

 

 

1,352.20

1,352.20

Completed

49

Nenagh Social Welfare Office: Improvements

..

..

 

 

400.00

400.00

Completed

19

Ballyhaunis Social Welfare Office: Improvements

..

..

 

 

2,447.14

2,447.14

Completed

55

Oisin House: Partitioning work on floors 2 and 3

..

..

 

 

3,242.83

3,242.83

In progress

178/91

Victoria St. Employment Exchange: Improvements

 

 

355.90

1,915.92

2,271.82

Completed

of ’77

 

 

 

 

 

 

 

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

101

Victoria St. Employment Exchange: Improvements

..

 

 

10,400.00

10,400.00

In progress

178/107

Cobh Employment Exchange: Improvements

..

..

 

 

2,713.79

4,387.50

7,101.29

Completed

of ’77

 

 

 

 

 

 

 

10

Dundalk Employment Exchange: Installation of alarm system

 

 

1,306.04

1,306.04

In progress

18

Gardiner St. Employment Exchange: Additional alarm system

 

 

1,003.84

1,003.84

Completed

118

Werburgh St. Employment Exchange: Alterations to pay hatches

 

 

1,873.31

1,873.31

Completed

112

Werburgh St. Employment Exchange: Provision of oil storage tank

 

 

81.20

81.20

In progress

69

Phibsboro Tower: Provision of counter

..

..

 

 

1,513.07

1,513.07

Completed

 

Health 

 

 

 

 

 

 

8

General Registrar’s Office, Custom House: Improvements to

 

 

2,532.91

2,532.91

Completed

 

ground floor office

..

..

..

..

 

 

 

 

 

 

178/152 of ’77

Custom House: Alterations

..

..

..

 

 

339.07

3,495.95

3,835.02

Completed

 

Office of Public Works 

 

 

 

 

 

 

1

Papal Visit

..

..

..

..

..

 

 

45,994.33

45,994.33

Completed

DETAILS OF NO. 166—MINOR BALANCES OF EXPENDITURE

 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Oireachtas 

 

 

 

 

 

 

2 (3) of ’78

Leinster House: Security works to windows

..

..

 

 

2,046.74

23,447.88

25,494.62

Completed

2 (1) of ’78

Leinster House: Installation of Standby Generator (in combination

 

 

 

 

 

 

 

with No. 4)

..

..

..

..

 

 

888.10

67,241.24

68,129.34

Completed

 

Finance 

 

 

 

 

 

 

6A of ’78

Inishbofin, Co. Galway: Harbour Improvements

..

..

 

 

3,757.43

6,207.48

9,964.91

Completed

5A of ’78

Central Heating Station: Provision of grit arresters

..

 

 

1,818.83

9,286.85

11,105.68

Completed

4 of ’78

Government Buildings: Installation of Standby Generator (in com

 

 

 

 

 

 

 

binationwith No. 2 (1))

..

..

..

 

 

888.10

65,793.69

66,681.79

Completed

 

Revenue Commissioners 

 

 

 

 

 

 

13 (A) of ’78

Lyon House: Partitioning of 1st floor

..

..

..

 

 

2,611.44

3,000.00

5,611.44

Completed

 

Office of Public Works 

 

 

 

 

 

 

29 of ’78

Kilkenny Castle: Restoration of Picture Gallery Wing

 

 

123.24

363,966.28

364,089.52

Completed

42 of ’78

Shannon Navigation: Lanesboro New Wharf

..

..

 

 

1,835.03

11,576.73

13,411.76

Completed

45 of ’78

Shannon Navigation: Lough Allen Canal: Restoration

 

 

307.86

48,662.94

48,970.80

Completed

44 of ’78

Shannon Navigation: Albert Lock: New Jetty

..

..

 

 

1,882.35

6,435.95

8,318.30

Completed

39A of ’77

Shannon Navigation: Lough Key (Rockingham): New Quay

 

 

508.06

331.80

839.86

Completed

46 of ’78

Shannon Navigation: New Store at Rooskey

..

..

 

 

190.65

11,784.56

11,975.21

Completed

23 of ’78

Killarney National Park: Jarvey shelter and Jaunting (including

 

 

 

 

 

 

 

B.V.M. Park) Car Park

..

..

..

 

 

108.34

850.00

958.34

Completed

 

Justice 

 

 

 

 

 

 

62A of ’78

Garda Headquarters: Improvements to Officers’ Mess

 

 

25,109.62

16,967.32

42,076.94

Virtually completed

62 of ’78

Garda Headquarters: Transport Garage and Stores: Extension and

 

 

 

 

 

 

 

improvements

..

..

..

..

 

 

166.43

5,106.14

5,272.57

Completed

65A of ’78

Courts of Justice: Fitting out of Rented premises

..

..

 

 

8,083.53

69,341.13

77,424.66

Completed

 


 

 

 

 

Expenditure

 

Work

 

 

 

 

 

 

Observations

 

Service and Description

Total

Vote

 

 

 

 

No.

 

 

 

 

 

 

 

 

 

Estimate

1979

1979

To 31/12/78

To 31/12/79

 

 

 

£

£

£

£

£

 

 

Education 

 

 

 

 

 

 

71 of ’78

National Gallery: Alterations

..

..

..

 

 

7,400.00

2,530.78

9,930.78

Completed

 

Agriculture 

 

 

 

 

 

 

76 of ’78

Castlebar: New Offices

..

..

..

 

 

1,522.88

1,311,290.40

1,312,813.28

Completed

92 of ’78

Kildalton College; Improvements

..

..

..

 

 

4,018.74

7,105.30

11,124.04

Completed

80 of ’78

Abbotstown Farm: Incinerator

..

..

..

 

 

3,294.00

37,890.75

41,184.75

Completed

77A of ’78

Botanic Gardens: Provision of additional oil storage tanks

 

 

46.31

46.31

Work being carried out as Minor New Work under revised limits (No. 164 (107))

 

Industry Commerce and Energy 

 

 

 

 

 

 

102 of ’78

Geological Survey Office, Kildare St.: Improvements

..

 

 

49.20

8,444.15

8,493.35

Completed

 

Posts and Telegraphs 

 

 

 

 

 

 

145 of ’78

Monaghan Area Engineering Headquarters

..

..

 

 

621.43

1,021.00

1,642.43

Completed

141 of ’78

Enniscorthy: Improvement of accommodation for postal vans

 

 

7,740.62

9,000.00

16,740.62

Completed

 

Foreign Affairs 

 

 

 

 

 

 

171 of ’78

E.E.C. Mission, Brussels: Fitting out of new Residence

 

 

900.28

13,219.15

14,119.43

Completed

156 of ’76

Embassy at Luxembourg: Fitting out for occupation

..

 

 

2,972.22

54,064.31

57,036.53

Completed

161 of ’77

Embassy at London: Adaptations

..

..

..

 

 

996.60

12,808.80

13,805.40

Completed

162 of ’78

Embassy at Moscow (including staff residence): Fitting out for

 

 

 

 

 

 

 

occupation

..

..

..

..

 

 

545.62

140,956.01

141,501.63

Completed

163A of ’78

Permanent Representative to the U.N. at Geneva: Fitting out of

 

 

 

 

 

 

 

Residence

..

..

..

..

 

 

64.00

6,604.23

6,668.23

Completed

 

Social Welfare 

 

 

 

 

 

 

179 of ’78

Arklow Social Welfare Office: Provision of accommodation for

 

 

 

 

 

 

 

Medical Referee

..

..

..

..

 

 

500.00

4,767.85

5,267.85

Completed