APPENDIX 10.
STATEMENT OF EXPENDITURE ON NEW WORKS, ALTERATIONS AND ADDITIONS, 1971-72 (VOTE 8: SUBHEAD E).
|
|
|
|
Expenditure |
|
Work |
Service and Description |
Total |
Vote |
|
|
|
Observations |
No. |
|
Estimate |
1971-72 |
1971-72 |
To 31/3/71 |
To 31/3/72 |
|
|
Oireachtas: |
£ |
£ |
£ |
£ |
£ |
|
1 (1) |
Leinster House—Extension and Alterations |
.. |
.. |
780,000 |
2,000 |
5,323.18 |
765,406.88 |
770,730.06 |
Completed. |
1 (2) |
Leinster House—Translating system |
.. |
.. |
.. |
.. |
5,000 |
5,000 |
— |
— |
— |
In planning. |
1 (3) |
Seanad—Provision of Sound—Reinforcement System in |
|
|
|
|
|
|
|
Seanad Chamber |
.. |
.. |
.. |
.. |
.. |
.. |
6,000 |
1,000 |
1,036.26 |
3,924.29 |
4,960.55 |
Completed. |
|
|
|
|
6,359.44 |
|
|
|
|
Department of an taoiseach: |
|
|
|
|
|
|
2 (1) |
Dublin Castle, State Apartments—Rebuilding of |
|
|
|
|
|
|
|
Drawingroom/Bedroom Block and Main Entrance |
.. |
.. |
508,000 |
5,000 |
1,660.34 |
502,672.86 |
504,333.20 |
do. |
2 (2) |
State Apartments—Extension of early warning system |
.. |
9,000 |
2,000 |
— |
— |
— |
In planning. |
|
|
|
|
1,660.34 |
|
|
|
|
Department of finance: |
|
|
|
|
|
|
3 |
Provision of Central Computing Unit |
.. |
.. |
.. |
300,000 |
110,000 |
33,359.04 |
12.00 |
33,371.04 |
In Progress. |
4 |
Improvements at No. 4 Kildare Street |
.. |
.. |
.. |
17,000 |
5,000 |
16,040.08 |
2,524.20 |
18,564.28 |
do. |
5 |
Fitting out of new Office Premises for Occupation |
.. |
|
25,000 |
56,607.29 |
|
|
|
|
|
|
|
detailed as follows: |
|
|
|
|
Additional Accommodation—Arkle House, Lower Mount |
|
|
|
|
|
|
|
Street, Dublin |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,071.77 |
8,242.16 |
11,313.93 |
Completed. |
|
Additional Accommodation—Apollo House, Tara Street, |
|
|
|
|
|
|
|
Dublin |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,270.58 |
15,730.72 |
20,001.30 |
do. |
|
Additional Accommodation—Phibsboro |
.. |
.. |
.. |
|
|
12,724.93 |
17,132.96 |
29,857.89 |
do. |
|
Additional Accommodation—Hynes Building, Galway |
.. |
|
|
5,475.34 |
8,705.45 |
14,180.79 |
Completed. |
|
Additional Accommodation—Cumberland House, Dublin |
|
|
4,979.18 |
— |
4,979.18 |
In Progress. |
|
Additional Accommodation—39 Dawson Street |
.. |
.. |
|
|
6,144.98 |
— |
6,144.98 |
do. |
|
Additional Accommodation—3 South Frederick Street, |
|
|
|
|
|
|
|
Dublin |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
5,174.26 |
— |
5,174.26 |
do. |
|
Additional Accommodation—Pearse House, Dublin |
.. |
|
|
14,766.25 |
— |
14,766.25 |
do. |
6 |
Revenue Commissioners—Dublin Castle Stamping Branch— |
|
|
|
|
|
|
|
New Premises |
.. |
.. |
.. |
.. |
.. |
.. |
1,085,000 |
250,000 |
377,904.06 |
310,680.38 |
688,584.44 |
do. |
7 |
Revenue Commissioners—Arus Brugha—Computer Fire |
|
|
|
|
|
|
|
Precautions and Additional Air-conditioning |
.. |
.. |
21,500 |
5,000 |
13,126.36 |
8,973.72 |
22,100.08 |
Completed. |
8 |
Revenue Commissioners—Arus Brugha—Adaptations and |
|
|
|
|
|
|
|
Roof Canteen |
.. |
.. |
.. |
.. |
.. |
.. |
37,000 |
20,000 |
4,684.66 |
1,996.00 |
6,680.66 |
In Progress. |
9 |
Revenue Commissioners—11/15 Upper O’Connell Street; |
|
|
|
|
|
|
|
Adaptations |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
45,000 |
15,000 |
4,764.54 |
25,575.46 |
30,340.00 |
In Progress. |
10 |
Ferryhill, Co. Louth—New Frontier Post |
.. |
.. |
.. |
8,000 |
1,000 |
— |
— |
— |
In Planning. |
10A |
Blacklion Customs Frontier Post—Co. Cavan—Road |
|
|
|
|
|
|
|
Station and Garage |
.. |
.. |
.. |
.. |
.. |
.. |
12,000 |
|
2,920.75 |
4,375.75 |
7,296.50 |
In Progress. |
11 |
Office of Public Works, Dublin; Central Engineering Workshop. Provision of New Central Heating System |
Not yet made |
5,000 |
— |
— |
— |
Under consideration. |
12 |
Office of Public Works, Dublin—Central Building |
|
|
|
|
|
|
|
Maintenance Workshop—Adaptations |
.. |
.. |
.. |
.. |
30,000 |
1,000 |
— |
— |
— |
In Planning. |
13 |
Monaghan—New Government Offices |
.. |
.. |
.. |
12,000 |
2,000 |
3,936.00 |
7,000.00 |
10,936.00 |
Completed. |
14 |
Drogheda—New Offices for various Departments |
.. |
.. |
115,000 |
10,000 |
2,000.00 |
1,200.00 |
3,200.00 |
In Planning. |
15(1) |
Ordnance Survey—New Printing Building |
.. |
.. |
.. |
76,000 |
1,000 |
— |
— |
— |
do. |
15(2) |
Ordnance Survey—Improvement of Residential Quarters |
10,000 |
1,000 |
— |
— |
— |
do. |
16 |
New Office Block, Kildare Place—Adaptations |
.. |
.. |
500,000 |
100,000 |
42,000.00 |
— |
42,000.00 |
In Progress. |
17 |
Garden of Remembrance: Inscription on Back Wall and |
|
|
|
|
|
|
|
erection of Sculpture |
.. |
.. |
.. |
.. |
.. |
4,000 |
2,000 |
5,652.90 |
— |
5,652.90 |
In Progress. |
17(A) |
Garden of Remembrance—Memorial Sculpture |
.. |
.. |
40,000 |
6,000 |
8,036.09 |
32,440.19 |
40,476.28 |
Completed. |
18 |
State Memorial to the late President Kennedy |
.. |
.. |
3,810,000 |
1,000 |
19,575.19 |
98,792.65 |
118,367.84 |
In Planning. |
19 |
Memorial to Roger Casement in Glasnevin Cemetry |
.. |
5,000 |
1,000 |
394,25 |
2,100.00 |
2,494.25 |
In Progress. |
20 |
Scoil Éanna. Restoration of Buildings. Stage I |
.. |
.. |
20,000 |
10,000 |
10,465.97 |
— |
10,465.97 |
do. |
21 |
Restoration of Royal Hospital, Kilmainham, Stage II |
.. |
Not yet made |
1,000 |
— |
— |
— |
In Planning. |
22 |
Office of Public Works. Structural Works and Alterations, |
|
|
|
|
|
|
|
50/51 St. Stephen’s Green |
.. |
.. |
.. |
.. |
.. |
15,000 |
10,000 |
12,766.30 |
8,719.55 |
21,485.85 |
In Progress. |
23 (1) |
Bourn Vincent National Park—Improvements to Farmyard |
7,500 |
2,000 |
546.69 |
5,220.23 |
5,766.92 |
do. |
23 (2) |
Bourn Vincent National Park—Public toilets at Muckross |
|
|
|
|
|
|
|
Gardens |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
10,800 |
7,950 |
2,006.12 |
1,350.00 |
3,356.12 |
In Progress. |
23 (3) |
Bourn Vincent, Muckross House—Heating and Lighting |
|
|
|
|
|
|
|
installations |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
16,200 |
2,500 |
4,050.58 |
16,454.60 |
20,505.18 |
Completed. |
23(4) |
Bourn Vincent, Muckross House—Road Works and |
|
|
|
|
|
|
|
Provision of Car Park |
.. |
.. |
.. |
.. |
.. |
11,000 |
3,000 |
5,961.01 |
4,930.61 |
10,891.62 |
do. |
24 (1) |
Kilkenny Castle—Garage and Store |
.. |
.. |
.. |
8,000 |
4,550 |
1,267.07 |
— |
1,267.07 |
In Progress. |
24(2) |
Kilkenny Castle—Restoration of Picture Gallery Wing |
.. |
70,000 |
25,000 |
— |
— |
— |
In Planning. |
25 |
Dunmore Caves Kilkenny—Visitor Centre |
.. |
.. |
.. |
12,000 |
10,000 |
32.75 |
250.00 |
282.75 |
do. |
26 |
Phoenix Park Extension—General Development |
.. |
.. |
Not yet made |
5,000 |
648.59 |
— |
648.59 |
In Planning. |
27 |
Shannon Navigation—General Improvements |
.. |
.. |
100,000 |
25,000 |
11,808.30 |
— |
11,808.30 |
In Progress. |
|
|
|
|
640,554.59 |
|
|
|
|
Department of justice: |
|
|
|
|
|
|
28 |
Garda Síochána Depot, Phoenix Park—Improvement of |
|
|
|
|
|
|
|
Workshop Accommodation |
.. |
.. |
.. |
.. |
23,000 |
5,000 |
2,847.85 |
12,892.20 |
15,740.05 |
In Progress. |
29 |
Garda Headquarters—Technical Bureau—Improvements |
23,000 |
5,000 |
741.88 |
18,606.96 |
19,348.84 |
In Progress. |
30 |
Garda Training Centre, Templemore—Adaptations, etc. |
.. |
647,000 |
2,000 |
— |
640,640.12 |
640,640.12 |
Completed. |
31 |
Erection of New Garda Stations |
.. |
.. |
.. |
.. |
— |
140,000 |
171,125.59 |
|
|
|
|
|
|
|
Detailed as follows: |
|
|
|
|
Dublin Metropolitan Division: |
|
|
|
|
|
|
|
Ballyfermot |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
12,451.97 |
37,157.23 |
49,609.20 |
Completed. |
|
Ballymun |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,085.18 |
— |
4,085.18 |
In Progress. |
|
Kevin Street |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
34,063.00 |
10,575.48 |
44,638.48 |
Completed. |
|
Rathmines |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
24,856.00 |
15,914.60 |
40,770.60 |
Virtually Completed. |
|
Store Street |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,000.00 |
1,748.08 |
4,748.08 |
In Planning. |
|
Co. Clare: |
|
|
|
|
|
|
|
Ennistymon |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,181.04 |
24,700.00 |
28,881.04 |
Completed. |
|
Kilrush |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,405.00 |
13,445.71 |
16,850.71 |
do. |
|
Co. Dublin: |
|
|
|
|
|
|
|
Coolock |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
5.75 |
27.611.03 |
27,616.78 |
do. |
|
Dundrum |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
10,593.49 |
29,874.20 |
40,467.69 |
do. |
|
Raheny |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
20,615.00 |
25,216.55 |
45,831.55 |
do. |
|
Co. Galway: |
|
|
|
|
|
|
|
Clifden |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
8,237.67 |
9,558.00 |
17,795.67 |
do. |
|
Co. Kildare: |
|
|
|
|
|
|
|
Droichead Nua |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,328.79 |
18,515.06 |
20,843.85 |
do. |
|
Co. Kikenny: |
|
|
|
|
|
|
|
Graiguenamanagh |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
270.00 |
— |
270.00 |
In Planning. |
|
Co. Laois: |
|
|
|
|
|
|
|
Ballickmoyler (Arles) |
.. |
.. |
.. |
.. |
.. |
|
|
558.25 |
5,980.27 |
6,538.52 |
Completed. |
|
Co. Leitrim: |
|
|
|
|
|
|
|
Kiltyclogher |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,550.00 |
6,750.00 |
10,300.00 |
do. |
|
Co. Meath: |
|
|
|
|
|
|
|
Ballivor |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
233.00 |
6,038.24 |
6,271.24 |
do. |
|
Co. Offaly: |
|
|
|
|
|
|
|
Birr |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
8,000.00 |
7,200.00 |
15,200.00 |
Completed. |
|
Co. Sligo: |
|
|
|
|
|
|
|
Aclare |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,325.00 |
7,650.00 |
8,975.00 |
do. |
|
Co. Tipperary: |
|
|
|
|
|
|
|
Portroe |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
965.00 |
7,110.00 |
8,075.00 |
do. |
|
Co. Waterford: |
|
|
|
|
|
|
|
Portlaw |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,811.45 |
— |
2,811.45 |
In Progress. |
|
Waterford City |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
25,160.00 |
2,000.00 |
27,160.00 |
do. |
|
Co. Westmeath: |
|
|
|
|
|
|
|
Moate |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
230.00 |
84.75 |
314.75 |
In Planning. |
|
Co. Wicklow: |
|
|
|
|
|
|
|
Carnew |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
200.00 |
— |
200.00 |
do. |
31A |
Houses for Married Members of Garda Síochána |
.. |
.. |
|
|
37,609.00 |
1,097,938.00 |
1,135,547.00 |
|
32 |
Improvement Schemes at existing Garda Stations |
.. |
.. |
|
60,000 |
50,789.05 |
|
|
|
|
|
|
|
Detailed as follows: |
|
|
|
Sub. No. |
Dublin metropolitan division: |
|
|
|
|
|
|
23/85 of 70/71 |
An Taoiseach’s Residence, Rathgar—Protection Hut |
.. |
|
|
352.65 |
6.50 |
359.15 |
Completed. |
73 |
An Taoiseach’s Residence, Rathgar—Improved Garda |
|
|
|
— |
|
|
|
accommodation |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
26.45 |
— |
26.45 |
In Progress. |
32 |
Bridewell |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,093.09 |
— |
1,093.09 |
do. |
27/55 of 69/70 |
Clontarf |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
313.75 |
535.41 |
849.16 |
do. |
23/52 of 70/71 |
Garda Hut at City Gate, Áras an Uachtaráin |
.. |
.. |
|
|
51.00 |
1,143.00 |
1,194.00 |
In Progress. |
55 |
Clondalkin |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
725.00 |
— |
725.00 |
Completed. |
31 |
Donnybrook |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,080.48 |
— |
1,080.48 |
In Progress. |
67 |
Finglas |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
827.46 |
— |
827.46 |
Completed. |
28 |
Garda Depot, Improvements to heating, etc. |
.. |
.. |
|
|
1,750.32 |
— |
1,750.32 |
In Progress. |
63 |
Garda Depot, Mapping Office |
.. |
.. |
.. |
.. |
|
|
510.00 |
— |
510.00 |
Completed. |
35 |
Kilmainham—Alterations |
.. |
.. |
.. |
.. |
.. |
|
|
372.41 |
— |
372.41 |
In Progress. |
7 |
Kilmainham—Improve toilet facilities |
.. |
.. |
.. |
|
|
84.04 |
— |
84.04 |
do. |
41 |
Pearse Street—Provision of Oil Fired Central Heating |
.. |
|
|
1,387.30 |
— |
1,387.30 |
Completed. |
23/38 of 70/71 |
Dalkey |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
51.53 |
570.57 |
622.10 |
do. |
|
Co. Cavan: |
|
|
|
|
|
|
27/41 of 69/70 |
Finea |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
562.54 |
1,220.00 |
1,782.54 |
do. |
27/35 of 69/70 |
Cavan |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,901.98 |
1,942.50 |
3,844.48 |
do. |
|
Co. Clare: |
|
|
|
|
|
|
27/44 of 69/70 |
Quin |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
206.00 |
1,450.28 |
1,656.28 |
Completed. |
51 |
Crusheen |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
530.00 |
— |
530.00 |
do. |
19 |
Kilkee |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
945.00 |
— |
945.00 |
In Progress. |
|
Co. Cork: |
|
|
|
|
|
|
9 |
Crookstown |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,641.82 |
— |
1,641.82 |
In Progress. |
27/70 of 69/70 |
Goleen |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
572.07 |
2,000.00 |
2,572.07 |
Completed. |
23/49 of 70/71 |
Glenville |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
835.00 |
815.00 |
1,650.00 |
In Progress. |
27/87 of 69/70 |
Union Quay |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
23.26 |
1,117.33 |
1,140.59 |
Completed. |
34 |
Skibbereen |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
285.10 |
— |
285.10 |
In Progress. |
23/44 of 70/71 |
Rathduff |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
520.00 |
990.00 |
1,510.00 |
do. |
36 |
Ballinspittle |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
573.75 |
— |
573.75 |
Completed. |
|
Co. Donegal: |
|
|
|
|
|
|
23/60 of 70/71 |
Carrick |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
227.00 |
2,044.03 |
2,271.03 |
do. |
23/78 of 70/71 |
Churchill |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
396.82 |
810.00 |
1,206.82 |
do. |
23/42 of 70/71 |
Kerrykeel |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
386.56 |
1,215.00 |
1,601.56 |
do. |
|
Co. Dublin: |
|
|
|
|
|
|
23/73 of 70/71 |
Glencairn (Huts for Garda) |
.. |
.. |
.. |
.. |
|
|
388.96 |
517.83 |
906.79 |
do. |
60 |
Cabinteely (Hut for Garda) |
.. |
.. |
.. |
.. |
|
|
435.72 |
— |
435.72 |
do. |
|
Co. Galway: |
|
|
|
|
|
|
31/41 of 65/66 |
Corrandulla |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
263.94 |
1,050.00 |
1,313.94 |
Completed. |
23/74 of 70/71 |
Loughgeorge |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
334.64 |
1,100.00 |
1,434.64 |
do. |
38 |
Milltown |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
50.00 |
— |
50.00 |
In Progress. |
|
Co. Kerry: |
|
|
|
|
|
|
14 |
Listowel |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
555.36 |
— |
555.36 |
Completed. |
39 |
Farranfore |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
220.00 |
— |
220.00 |
In Progress. |
29 |
Kenmare |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
317.00 |
— |
317.00 |
Completed. |
|
Co. Kildare: |
|
|
|
|
|
|
23/50 of 70/71 |
Monasterevan |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,408.04 |
350.00 |
1,758.04 |
do. |
27/96 of 69/70 |
Rathangan |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
158.05 |
700.00 |
858.05 |
do. |
23/48 of 70/71 |
Athy |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,595.22 |
4,050.00 |
8,645.22 |
do. |
22 |
Carbury |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
500.00 |
— |
500.00 |
In Progress. |
|
Co. Leitrim: |
|
|
|
|
|
|
27/14 of 69/70 |
Keshearrigan |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
790.15 |
1,710.00 |
2,500.15 |
do. |
|
Co. Limerick: |
|
|
|
|
|
|
23 |
Mary Street, Limerick |
.. |
.. |
.. |
.. |
.. |
|
|
535.00 |
— |
535.00 |
do. |
20 |
Kilfinane |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
146.89 |
— |
146.89 |
do. |
23/51 of 70/71 |
Ballingarry |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
871.24 |
765.00 |
1,636.24 |
Completed. |
27/72 of 69/70 |
Hospital |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
60.80 |
2,018.02 |
2,078.80 |
Completed. |
23/79 of 70/71 |
Edward Street, Limerick |
.. |
.. |
.. |
.. |
.. |
|
|
295.60 |
107.50 |
403.10 |
In Progress. |
|
Co. Longford: |
|
|
|
|
|
|
27/58 of 69/70 |
Smear |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
544.72 |
1,350.00 |
1,894.72 |
Completed. |
44 |
Ballymahon |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
311.30 |
— |
311.30 |
do. |
|
Co. Mayo: |
|
|
|
|
|
|
23/23 of 70/71 |
Kiltimagh |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
6.00 |
1,065.97 |
1,071.97 |
do. |
23/61 of 70/71 |
Ballyvary |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
690.76 |
1,800.00 |
2,490.76 |
do. |
32/88 of 67/68 |
Glenamoy |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
215.00 |
2,023.75 |
2,238.75 |
do. |
|
Co. Meath: |
|
|
|
|
|
|
23/62 of 70/71 |
Ceanannus Mór |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
3,730.00 |
2,160.00 |
5,890.00 |
do. |
23/87 of 70/71 |
Dunshaughlin |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
240.00 |
650.00 |
890.00 |
In Progress. |
Sub No. |
Co. Offaly: |
|
|
|
|
|
|
27 |
Kilcormac |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
550.00 |
— |
550.00 |
In Progress. |
27/65 of 69/70 |
Rhode |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
571.16 |
1,520.00 |
2,091.16 |
Completed. |
23/35 of 70/71 |
Tullamore |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
729.93 |
810.00 |
1,539.93 |
do. |
|
Co. Roscommon: |
|
|
|
|
|
|
24 |
Taughmaconnell |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,199.00 |
117.75 |
2,316.75 |
Completed. |
23/16 of 70/71 |
Tulsk |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
378.22 |
1,800.00 |
2,178.22 |
do. |
23/13 of 70/71 |
Ballyforan |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,442.33 |
1,467.25 |
2,909.58 |
do. |
|
Co. Sligo: |
|
|
|
|
|
|
27/32 of 69/70 |
Enniscrone |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
313.38 |
1,800.00 |
2,113.38 |
In Progress. |
|
Co. Tipperary: |
|
|
|
|
|
|
25 |
Clogheen |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
810.00 |
— |
810.00 |
Completed. |
|
Co. Waterford: |
|
|
|
|
|
|
|
Waterford City |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,167.94 |
— |
1,167.94 |
do. |
|
Co. Westmeath: |
|
|
|
|
|
|
13 |
Ballymore |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,115.00 |
— |
2,115.00 |
In Progress. |
57 |
Kinnegad |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,467.22 |
— |
1,467.22 |
Completed. |
Sub. No. |
Co. Wexford: |
|
|
|
|
|
|
8 |
Ballycullane |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,380.93 |
— |
1,380.93 |
Completed. |
27/52 of 69/70 |
Ferns |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
380.00 |
3,182.50 |
3,562.50 |
do. |
15 |
Wexford |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
487.17 |
— |
487.17 |
In Progress. |
|
Co. Wicklow: |
|
|
|
|
|
|
47 |
Arklow |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
900.00 |
— |
900.00 |
Completed. |
32A |
Provision of Accommodation for Female Clerical Assistants |
|
|
|
|
|
|
|
in existing Garda Stations |
.. |
.. |
.. |
.. |
.. |
|
|
1,900.17 |
— |
1,900.17 |
In Progress. |
33 |
Garda Síochána—Provision of Alternative Accommodation |
|
|
|
|
|
|
|
for Garda Personnel at Dublin Castle |
.. |
.. |
.. |
75,000 |
25,000 |
10,152.22 |
15,789.12 |
25,941.34 |
do. |
34 |
Courts of Justice—Renewal of defective Stonework |
.. |
60,000 |
10,000 |
10,022.23 |
36,465.36 |
46,487.59 |
Completed. |
|
|
|
|
285,187.99 |
|
|
|
|
Department of local government: |
|
|
|
|
|
|
35 |
Erection of extra storeys on Cross Blocks at the Custom |
|
|
|
|
|
|
|
House, Dublin |
.. |
.. |
.. |
.. |
.. |
.. |
75,000 |
15,000 |
— |
— |
|
Under Review. |
|
Department of education: |
|
|
|
|
|
|
36 |
Athlone—New Offices |
.. |
.. |
.. |
.. |
.. |
.. |
1,250,000 |
5,000 |
5,665.45 |
12,533.81 |
18,199.26 |
In Planning. |
37 |
National Library and Museum—Renewal of Stonework |
|
|
|
|
|
|
|
(Stage III) |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
50,000 |
16,000 |
10,810.00 |
37,461.55 |
48,271.55 |
Completed. |
38 |
National Schools—Grants for Building, Enlarging, |
|
|
|
|
|
|
|
Enclosing, etc. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
— |
3,325,000 |
3,665,142.30 |
— |
|
|
39 |
Dublin Preventive Centre, Finglas |
.. |
.. |
.. |
.. |
341,500 |
25,000 |
57,482.24 |
317,319.14 |
374,801.38 |
In Progress. |
40 |
Dublin Institute for Advanced Studies—Accommodation |
168,000 |
10,000 |
23,530.51 |
129,919.51 |
153,450.02 |
Completed. |
40A |
Coláiste Mhuire, 28 Parnell Square—Adaptations |
.. |
.. |
|
|
13,000.00 |
— |
13,000.00 |
do. |
|
|
|
|
3,775,630.50 |
|
|
|
|
Department of lands: |
|
|
|
|
|
|
41 |
Castlebar—New Offices |
.. |
.. |
.. |
.. |
.. |
1,650,000 |
5,000 |
6,875.00 |
17,851.89 |
24,726.89 |
In Planning. |
41A |
21/29, 31/33 Merrion Street, Improvement of Electrical and |
|
|
|
|
|
|
|
Heating Installations |
.. |
.. |
.. |
.. |
.. |
35,000 |
|
6,121.56 |
35,037.80 |
41,159.36 |
Completed. |
42 |
Shelton Abbey Forestry School: Improvement of Sewage Disposal System and Provision of Domestic Water Supply |
|
|
|
|
|
|
|
and Water Supply for Fire Fighting |
.. |
.. |
.. |
30,000 |
1,000 |
— |
426.97 |
426.97 |
Under Consideration. |
|
|
|
|
12,996.56 |
|
|
|
|
Department of agriculture and fisheries: |
|
|
|
|
|
|
43 |
Botanic Gardens, Office and Toilet Accommodation |
.. |
Not yet made |
1,000 |
— |
— |
— |
In Planning. |
44 |
Regional Veterinary and Dairy Produce Laboratories |
.. |
202,500 |
40,000 |
24,308.13 |
151,699.63 |
176,007.76 |
Completed. |
45 (1) |
Abbotstown Farm: Experimental Animals Accommodation |
168,500 |
2,000 |
7,256.07 |
166,302.93 |
173,559.00 |
do. |
45 (2) |
Abbotstown Farm—New Post Mortem Unit |
.. |
.. |
30,000 |
10,000 |
14,200.04 |
13,424.41 |
27,625.35 |
do. |
45 (3) |
Abbotstown Farm—New Laboratory Block |
.. |
.. |
143,000 |
75,000 |
80,977.33 |
11,959.13 |
92,936.46 |
In Progress. |
45 (4) |
Abbotstown Farm—Adaptations of outbuildings to form |
|
|
|
|
|
|
|
additional laboratories |
.. |
.. |
.. |
.. |
.. |
31,000 |
15,000 |
25,244.77 |
6,271.10 |
31,515.87 |
Completed. |
45 (5) |
Abbotstown Farm—Adaptations to Top Floor West Block |
|
|
|
|
|
|
|
of Farmyard Buildings |
.. |
.. |
.. |
.. |
.. |
10,000 |
1,000 |
— |
— |
— |
In Planning. |
45 (6) |
Abbotstown Farm—Experimental Piggery |
.. |
.. |
.. |
21,000 |
1,000 |
— |
— |
— |
do. |
45 (7) |
Abbotstown Farm—Pig Disease etc. Research Laboratories |
21,000 |
1,000 |
58.99 |
270.00 |
328.99 |
do. |
45 (8) |
Abbotstown Farm—Drainage and Sewerage Works |
.. |
6,500 |
— |
6,390.00 |
408.00 |
6,798.00 |
In Progress. |
46 |
Backweston Farm—New Farm Buildings |
.. |
.. |
.. |
52,000 |
25,000 |
7,718.05 |
2,746.93 |
10,464.98 |
In Progress. |
47 |
Performance Testing Station for Beef Bulls at Tully West, |
|
|
|
|
|
|
|
Co. Kildare |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
64,000 |
40,000 |
3,507.51 |
— |
3,507.51 |
In Planning. |
48 |
Thorndale, Drumcondra—Additional Laboratory |
|
|
|
|
|
|
|
Accommodation |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
22,000 |
2,000 |
2,664.53 |
20,778.67 |
23,443.20 |
Completed. |
48A |
Ballyhaise Agricultural School—Sewerage scheme |
.. |
16,000 |
— |
2,131.46 |
13,273.76 |
15,405.22 |
do. |
49 |
Veterinary College, Ballsbridge—Accommodation for |
|
|
|
|
|
|
|
Haematology |
.. |
.. |
.. |
.. |
.. |
.. |
5,400 |
5,000 |
900.00 |
— |
900.00 |
In Progress. |
50 |
Construction Works at Major Fishery Harbours and |
|
|
|
|
|
|
|
Payment to Fishery Harbour Centres Fund |
.. |
.. |
3,500,000 |
400,000 |
145,068.28 |
— |
— |
|
|
|
|
|
Detailed as follows: |
|
|
|
|
Castletownbere |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
115,000.00 |
426,086.03 |
541,086.03 |
In Progress. |
|
Dunmore East |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
20,341.82 |
541,130.56 |
561,472.38 |
do. |
|
Galway |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
175.29 |
29,432.24 |
29,607.53 |
do. |
|
Howth |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,551.17 |
32,643.88 |
37,195.05 |
do. |
|
Killybegs |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
5,000.00 |
212,757.68 |
217,757.68 |
do. |
51 |
Works of Economic Development |
.. |
.. |
.. |
.. |
1,000,000 |
200,000 |
60,970.30 |
— |
— |
|
|
|
|
|
Detailed as follows: |
|
|
|
|
Burtonport—Survey |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
805.20 |
16,753.40 |
17,558.60 |
Completed. |
|
Cleggan |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,267.53 |
— |
2,267.53 |
In Progress. |
|
Cahirciveen—Survey |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,083.00 |
— |
1,083.00 |
In Progress. |
|
Kilmore Quay |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
19,954.00 |
54,274.16 |
74,228.16 |
In Progress. |
|
Killala |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
23,070.81 |
26,873.15 |
49,943.96 |
do. |
|
Howth |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
601.22 |
465,477.88 |
466,079.10 |
Completed. |
|
Port Magee—Survey |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
490.50 |
17.95 |
508.45 |
do. |
|
Reen/Castletownshend |
.. |
.. |
.. |
.. |
.. |
|
|
8,383.99 |
15,138.70 |
23,522.69 |
do. |
|
Skerries |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,282.36 |
29,381.00 |
33,663.36 |
do. |
|
Renard Point |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
31.69 |
32,768.03 |
32,799.72 |
do. |
|
|
|
|
381,396.36 |
|
|
|
|
Department of labour: |
|
|
|
|
|
|
52 |
Clifden—New Employment Exchange |
.. |
.. |
.. |
16,800 |
2,000 |
8,412.56 |
7,290.00 |
15,702.56 |
Completed. |
53 |
Belmullet New Government Offices |
.. |
.. |
.. |
.. |
16,000 |
5,000 |
10,415.07 |
— |
10,415.07 |
In Progress. |
|
|
|
|
18,827.63 |
|
|
|
|
Department of posts and telegraphs: |
|
|
|
|
|
|
54 |
Dublin, Amiens Street—Former Sorting Office, Adaptations |
7,600 |
4,000 |
276.97 |
3,591.24 |
3,868.21 |
Virtually Completed. |
55 |
Dublin, Ballyfermot—New Sorting Office, Erection |
.. |
44,000 |
2,000 |
21,192.65 |
20,796.49 |
41,989.14 |
Completed. |
56 |
Dublin, Blackrock Post Office—Modernisation |
.. |
.. |
5,000 |
5,000 |
— |
— |
— |
In Planning. |
57 (1) |
Dublin, Dundrum—Computer Building, Erection |
.. |
.. |
70,000 |
30,000 |
3.75 |
— |
3.75 |
do. |
57 (2) |
Dublin, Dundrum—Engineering Training Centre, Erection |
37,500 |
5,000 |
— |
— |
— |
do. |
58 |
Dublin, Glenageary Sorting Office—Erection |
.. |
.. |
72,000 |
27,000 |
14,291.00 |
— |
14,291.00 |
In Progress. |
59 |
Dublin, Harmonstown Sorting Office—Extension |
.. |
.. |
13,000 |
2,000 |
275.00 |
— |
275.00 |
In Planning. |
60 |
Dublin, Phibsboro Post Office—Extension |
.. |
.. |
.. |
63,000 |
10,000 |
1,451.76 |
37.90 |
1,489.66 |
do. |
61 (1) |
Dublin, St. John’s Road Depot—New Warehouses etc. |
.. |
270,000 |
10,000 |
9,676.37 |
275,699.98 |
285,376.35 |
Virtually Completed. |
61 (2) |
Dublin, St. John’s Road Depot—Garage |
.. |
.. |
.. |
6,500 |
5,000 |
5.18 |
— |
5.18 |
Under Consideration. |
62 |
Dublin, Stillorgan Sorting Office—Erection |
.. |
.. |
Not yet made |
1,000 |
— |
— |
— |
do. |
63 |
Ballyhaunis Post Office—Modernisation |
.. |
.. |
.. |
5,000 |
4,000 |
— |
— |
— |
In Planning. |
64 |
Castlebar Engineering Headquarters and Garage |
.. |
.. |
4,000 |
1,000 |
149.03 |
— |
149.03 |
In Progress. |
65 |
Cavan—New Post Office |
.. |
.. |
.. |
.. |
.. |
63,000 |
30,000 |
47,248.71 |
17,047.20 |
64,295.91 |
Completed. |
66 |
Clonmel—New Post Office |
.. |
.. |
.. |
.. |
.. |
58,500 |
2,000 |
— |
848.25 |
848.25 |
In Planning. |
67 (1) |
Cork Sorting Office—Adaptations |
.. |
.. |
.. |
.. |
28,000 |
15,000 |
— |
— |
— |
Under Review. |
67 (2) |
Cork Post Office—Strongroom |
.. |
.. |
.. |
.. |
5,300 |
3,000 |
4,755.45 |
383.67 |
5,139.12 |
Completed. |
68 |
Donegal New Post Office |
.. |
.. |
.. |
.. |
.. |
68,000 |
1,000 |
— |
— |
— |
In Planning. |
69 |
Dungarvan—New Post Office |
.. |
.. |
.. |
.. |
30,000 |
2,000 |
— |
132.55 |
132.55 |
In Planning. |
69 A |
Galway—Hynes Building, Partitioning |
.. |
.. |
.. |
5,000 |
— |
2,000.00 |
— |
2,000.00 |
In Progress. |
70 |
Listowel—New Post Office |
.. |
.. |
.. |
.. |
.. |
30,000 |
5,000 |
10.00 |
50.16 |
60.16 |
In Planning. |
71 |
Mullingar—New Post Office |
.. |
.. |
.. |
.. |
.. |
50,000 |
1,000 |
— |
658.20 |
658.20 |
do. |
72 |
Nenagh—New Post Office |
.. |
.. |
.. |
.. |
.. |
55,000 |
15,000 |
1,628.20 |
2,093.45 |
3,721.65 |
do. |
73 |
Portlaoise—New Post Office |
.. |
.. |
.. |
.. |
.. |
60,000 |
25,000 |
36,168.54 |
14,967.41 |
51,135.95 |
Virtually Completed. |
|
|
|
|
139,132.61 |
|
|
|
|
Department of defence: |
|
|
|
|
|
|
73A |
General Head Quarters, Parkgate Street—Fire Escape Stairs |
7,200 |
— |
3,150.00 |
— |
3,150.00 |
In Progress. |
|
|
|
|
3,150.00 |
|
|
|
|
General: |
|
|
|
|
|
|
74 |
Minor New Works not exceeding £5,000 each |
.. |
.. |
|
90,000 |
138,439.98 |
— |
138,439.98 |
|
75 |
Urgent and Unforeseen Works |
.. |
.. |
.. |
.. |
|
5,000 |
— |
— |
— |
|
76 |
Balances of Expenditure on works of prior years which |
|
|
|
|
|
|
|
might not have been completed on 1st April, 1971 |
.. |
|
45,000 |
44,534.72 |
— |
44,534.72 |
|
|
|
|
5,525,000 |
5,447,870.72 |
|
|
|
|
DETAILS OF No. 74—MINOR NEW WORKS |
|
President’s establishment: |
|
|
|
|
|
|
64/94 of 70/71 |
Arus an Uachtarain—Provision of Waiting Room |
.. |
|
|
76.72 |
495.00 |
571.72 |
Completed. |
64/47 of 70/71 |
City Gate Lodge—Provision of Toilet Facilities etc. |
.. |
|
|
12.00 |
270.00 |
282.00 |
do. |
|
Oireachtas: |
|
|
|
|
|
|
64/72 of 70/71 |
Leinster House—Annunciator System C.C. Television |
.. |
|
|
332.66 |
3,935.54 |
4,268.20 |
do. |
40 |
Leinster House—Enlargement of Car Park |
.. |
.. |
.. |
|
|
385.50 |
— |
385.50 |
do. |
19 |
Leinster House—Security Unit |
.. |
.. |
.. |
.. |
|
|
445.50 |
— |
445.50 |
do. |
116 |
Leinster House—New Division Bell System |
.. |
.. |
|
|
1,715.65 |
— |
1,715.65 |
Virtually Completed. |
59 |
Leinster House—Hut for Military Guard |
.. |
.. |
.. |
|
|
81.69 |
— |
81.69 |
In Progress. |
|
An taoiseach: |
|
|
|
|
|
|
64/77 of 70/71 |
Census of Population (Griffith Barracks)—Improvements |
|
|
1,115.40 |
254.89 |
1,370.29 |
Completed. |
77 |
Plaque at Mansion House, Dublin—(50th Anniversary of |
|
|
|
|
|
|
|
Truce) |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
297.82 |
— |
297.82 |
do. |
49 |
Statistics Branch (Griffith Barracks)—Heating Improvements |
|
|
344.11 |
— |
344.11 |
do. |
90 |
Provision and Erection of 1916 Commemoration Plaques |
|
|
730.80 |
— |
730.80 |
do. |
64/79 of 70/71 |
St. Patrick’s Hall, Dublin Castle—R.H.A. Exhibition |
.. |
|
|
201.43 |
1,926.14 |
2,127.57 |
do. |
|
Department of finance: |
|
|
|
|
|
|
23 |
State Laboratory—Improvements to Store |
.. |
.. |
.. |
|
|
1,904.39 |
— |
1,904.39 |
Virtually Completed. |
64/98 of 70/71 |
Chief State Solicitors Office, Dublin Castle |
.. |
.. |
.. |
|
|
2,612.32 |
1,074.65 |
3,686.97 |
do. |
75 |
72-76 St. Stephen’s Green—File Storage in Basement |
.. |
|
|
264.60 |
— |
264.60 |
Completed. |
22 |
72-76 St. Stephen’s Green—Storage |
.. |
.. |
.. |
.. |
|
|
90.00 |
— |
90.00 |
In Progress. |
|
Revenue commissioners: |
|
|
|
|
|
|
80/26 of 69/70 |
Galway Custom House—Improvements |
.. |
.. |
.. |
|
|
247.80 |
375.00 |
622.80 |
Completed. |
8 |
Tralee Custom House, Co. Kerry—Electrical Improvements |
|
|
700.00 |
— |
700.00 |
Virtually Completed. |
80/160 of 69/70 |
Cork Custom House—Accommodation |
.. |
.. |
.. |
|
|
75.73 |
1,791.56 |
1,867.29 |
Completed. |
15 |
Muff Customs and Excise Frontier Post |
.. |
.. |
.. |
|
|
1,002.79 |
— |
1,002.79 |
do. |
64/65 of 70/71 |
26 Harcourt Street—Adaptations |
.. |
.. |
.. |
.. |
|
|
157.25 |
2,129.31 |
2,286.56 |
In Progress. |
64/76 of 70/71 |
Lansdowne House—Improvements |
.. |
.. |
.. |
.. |
|
|
503.17 |
596.82 |
1,099.99 |
Completed. |
64/70 of 70/71 |
Dundalk Customs and Excise Office—Prefabricated Building |
|
|
48.50 |
1,891.50 |
1,940.00 |
do. |
29 |
Sligo Custom House—Alterations |
.. |
.. |
.. |
.. |
|
|
426.12 |
— |
426.12 |
do. |
31 |
Waterford Government Buildings—Adaptations |
.. |
.. |
|
|
2,942.12 |
— |
2,942.12 |
In Progress. |
21 |
Estate Duty Office—Storage Accommodation |
.. |
.. |
|
|
476.70 |
— |
476.70 |
Completed. |
80/147 of 69/70 |
Thurles Income Tax Office—Improvements |
.. |
.. |
|
|
314.14 |
665.95 |
980.09 |
do. |
|
Office of public works |
|
|
|
|
|
|
64/57 of 70/71 |
51 St. Stephen’s Green—Adaptations |
.. |
.. |
.. |
|
|
119.95 |
4,261.14 |
4,381.09 |
do. |
64/83 of 70/71 |
Archaeological Survey, Field Headquarters, Mullingar |
.. |
|
|
879.87 |
1,125.00 |
2,004.87 |
do. |
64/116 of |
Rock of Cashel—Caretaker’s Cottage—Extension and |
|
|
1,066.00 |
630.00 |
1,696.00 |
In Progress. |
70/71 |
Improvements |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
|
|
|
|
28 |
Central Engineering Workshop—Furniture Production Unit |
|
|
|
|
|
|
|
—Dust Control Unit |
.. |
.. |
.. |
.. |
.. |
|
|
2,008.26 |
— |
2,008.26 |
Virtually Completed. |
41 |
Castlebar District Office—Adaptations |
.. |
.. |
.. |
|
|
500.00 |
— |
500.00 |
Completed. |
39 |
Scoil Éanna—Development of Grounds |
.. |
.. |
.. |
|
|
5,075.41 |
— |
5,075.41 |
Virtually Completed. |
10 |
Phoenix Park, Whitegate Lodge—Improvements |
.. |
.. |
|
|
1,080.00 |
— |
1,080.00 |
In Progress. |
20 |
Phoenix Park, Whitefields—Improvements |
.. |
.. |
.. |
|
|
1,976.00 |
— |
1,976.00 |
In Progress. |
53 |
Bourn Vincent Memorial Park—Temporary Office |
.. |
|
|
4,218.02 |
— |
4,218.02 |
In Progress. |
61 |
Derrynane Abbey—Development Works |
.. |
.. |
.. |
|
|
1,182.74 |
— |
1,182.74 |
do. |
64/29 of 70/71 |
Phoenix Park—Provision of Gatekeeper’s Hut |
.. |
.. |
|
|
265.29 |
1,198.00 |
1,463.29 |
Completed. |
55 |
Dun Laoghaire Harbour—Repairing of Lights |
.. |
.. |
|
|
2,634.87 |
— |
2,634.87 |
do. |
64/82 of 70/71 |
Battlebridge—New Quay |
.. |
.. |
.. |
.. |
.. |
|
|
1,456.19 |
1,643.07 |
3,099.26 |
do. |
24 |
Battlebridge—Lock House—Extension and Improvements |
|
|
740.00 |
— |
740.00 |
In Progress. |
64/81 of 70/71 |
Lanesboro—New Quay |
.. |
.. |
.. |
.. |
.. |
|
|
298.42 |
314.63 |
613.05 |
do. |
145 |
Lanesboro—Dismantling of Temporary Bridge |
.. |
.. |
|
|
453.00 |
— |
453.00 |
Completed. |
|
Stationery office: |
|
|
|
|
|
|
80/91 of |
Beggar’s Bush, Dublin—Provision of Toilet Facilities, |
|
|
|
|
|
|
69/70 |
Block F |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
284.01 |
867.61 |
1,151.62 |
Completed. |
81/97 of 68/69 |
Beggar’s Bush—Improvements |
.. |
.. |
.. |
.. |
|
|
69.59 |
859.49 |
929.08 |
do. |
|
Valuation office: |
|
|
|
|
|
|
80/149 |
Ordnance Survey Office—Provision of new General Stores |
|
|
|
|
|
|
of 69/70 |
Office |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
485.58 |
12.24 |
497.82 |
do. |
101 |
7/8 Ely Place, Dublin—Improvements |
.. |
.. |
.. |
|
|
98.23 |
— |
98.23 |
In Progress. |
|
General: |
|
|
|
|
|
|
80/10 of |
Government Buildings, Dublin—Improvement of Com- |
|
|
|
|
|
|
69/70 |
munication System |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,072.00 |
17.73 |
1,089.73 |
Completed. |
80/80 of |
Royal Dublin Society, Ballsbridge—Scientific and Technical |
|
|
|
|
|
|
69/70 |
Exhibition |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
10.23 |
1,594.85 |
1,605.08 |
do. |
|
Department of justice: |
|
|
|
|
|
|
64/74 of 70/71 |
Land Registry—Alterations etc. |
.. |
.. |
.. |
.. |
|
|
1,436.86 |
2,728.40 |
4,165.26 |
Virtually Completed. |
87 |
Registry of Deeds—Improvements |
.. |
.. |
.. |
.. |
|
|
489.99 |
— |
489.99 |
In Progress. |
99 |
State Paper Office—Improvements |
.. |
.. |
.. |
.. |
|
|
361.07 |
— |
361.07 |
do. |
107 |
Four Courts—Adaptations |
.. |
.. |
.. |
.. |
.. |
|
|
604.91 |
— |
604.91 |
Completed. |
108 |
Dublin District Courts—Toilet Facilities |
.. |
.. |
.. |
|
|
4,243.86 |
— |
4,243.86 |
Virtually Completed. |
|
Department of local government: |
|
|
|
|
|
|
121 |
O’Connell Bridge House—Partitioning |
.. |
.. |
.. |
|
|
478.80 |
— |
478.80 |
Completed. |
144 |
Naas—Driving Test Centre |
.. |
.. |
.. |
.. |
.. |
|
|
700.00 |
— |
700.00 |
do. |
|
Department of education: |
|
|
|
|
|
|
64/93 of |
Training College Building, Marlboro Street—Rehousing of |
|
|
|
|
|
|
70/71 |
Reproduction Unit |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
2,894.48 |
183.60 |
3,078.08 |
Virtually Completed. |
128 |
Talbot House—Internal Adaptations |
.. |
.. |
.. |
|
|
59.95 |
— |
59.95 |
In Progress. |
80/140 of 69/70 |
Language Institute, 31 Fitzwilliam Square—Adaptations |
.. |
|
|
1.43 |
5,390.73 |
5,392.16 |
Completed. |
73 |
Liberty Hall—Partitioning |
.. |
.. |
.. |
.. |
.. |
|
|
320.00 |
— |
320.00 |
do. |
104 |
Irish Manuscripts Commission, 73 Merrion Square— |
|
|
|
|
|
|
|
Adaptations |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
244.28 |
— |
244.28 |
In Progress. |
85 |
Training College Building, Marlboro Street—Partitioning |
|
|
1,443.03 |
— |
1,443.03 |
Virtually Completed. |
80/174 of 69/70 |
National Museum—Provision of Humidifiers |
.. |
.. |
|
|
6.16 |
2,083.18 |
2,089.34 |
Completed. |
32 |
National Library—Common Tea Room |
.. |
.. |
.. |
|
|
2,560.29 |
— |
2,560.29 |
Virtually Completed. |
88 |
National College of Art—Improvements |
.. |
.. |
.. |
|
|
2,395.33 |
— |
2,395.33 |
In Progress. |
95 |
Central Model Schools—Storage Accommodation |
.. |
|
|
227.09 |
— |
227.09 |
do. |
72 |
Central Model Schools—Provision of Staff Room |
.. |
|
|
676.74 |
— |
676.74 |
Completed. |
84 |
Limerick Model School—Improvements |
.. |
.. |
.. |
|
|
696.00 |
— |
696.00 |
do. |
17 |
Sligo Model School—Extension |
.. |
.. |
.. |
.. |
|
|
2,246.65 |
— |
2,246.65 |
In Progress. |
|
Department of lands: |
|
|
|
|
|
|
64/95 of 70/71 |
Shelton Abbey—Forestry—Fire Protection Works |
.. |
|
|
357.00 |
2,319.79 |
2,676.79 |
Completed. |
80/127 of 69/70 |
Cork Land Commission Office—Improvements |
.. |
.. |
|
|
210.80 |
308.91 |
519.71 |
do. |
89 |
Navan Land Commission Office—Improvements |
.. |
.. |
|
|
335.51 |
— |
335.51 |
do. |
44 |
23/24 Upper Merrion Street—Electrical Works |
.. |
.. |
|
|
310.03 |
— |
310.03 |
do. |
106 |
23/24 Upper Merrion Street—Provision of Store |
.. |
.. |
|
|
156.50 |
— |
156.50 |
In Progress. |
|
Department of agriculture and fisheries |
|
|
|
|
|
|
64/65 of 70/71 |
Abbotstown Farm—Provision of Chicken Hut |
.. |
.. |
|
|
2,702.93 |
980.50 |
3,683.43 |
Virtually Completed. |
80/117 of 69/70 |
Abbotstown Farm—Provision of Snail House |
.. |
.. |
|
|
8.63 |
350.87 |
359.50 |
Completed. |
65 |
Abbotstown Farm—Improvements of Water Supply to |
|
|
|
|
|
|
|
Fish Tanks |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
264.00 |
— |
264.00 |
Completed. |
64/68 of 70/71 |
Abbotstown Farm—Fitting Entrance Gate etc. |
.. |
.. |
|
|
420.92 |
1,777.58 |
2,198.40 |
do. |
83 |
Ballsbridge Veterinary College—Conversion of Solid Fuel |
|
|
|
|
|
|
|
Boilers to Gas etc. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
4,450.72 |
— |
4,450.72 |
In Progress. |
80/161of 69/70 |
Ballsbridge Veterinary College—Improvements to |
|
|
|
|
|
|
|
Ventilation in Lecture Theatre |
.. |
.. |
.. |
.. |
.. |
|
|
6.45 |
2,155.03 |
2,161.48 |
Completed. |
94 |
Ballsbridge Veterinary College—Improvements to Animal |
|
|
|
|
|
|
|
Accommodation |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
238.00 |
— |
238.00 |
do. |
112 |
Ballsbridge Veterinary College—Adaptations to Classroom |
|
|
355.78 |
— |
355.78 |
In Progress. |
33 |
Ballyhaise Agricultural College—Adaptations |
.. |
.. |
|
|
2,940.00 |
— |
2,940.00 |
In Progress. |
92 |
Ballyhaise Agricultural College—New Electrical Sub-station |
|
|
369.75 |
— |
369.75 |
do. |
80/133 of 69/70 |
Ballyhaise Agricultural College—Water Supply to Residences |
|
|
917.97 |
— |
917.97 |
Completed. |
64/19 of 70/71 |
Munster Institute, Cork—Improvements |
.. |
.. |
.. |
|
|
459.00 |
945.00 |
1,404.00 |
do. |
80/99 of 69/70 |
Munster Institute, Cork—Provision of Partitions in |
|
|
|
|
|
|
|
Pig Progeny Station |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
425.74 |
2,442.80 |
2,868.54 |
In Progress. |
64/69 of 70/71 |
Munster Institute, Cork—Alterations |
.. |
.. |
.. |
|
|
1,808.00 |
900.00 |
2,708.00 |
Virtually Completed. |
9 |
Munster Institute, Cork—Erection of Machinery Shed |
.. |
|
|
1,425.50 |
— |
1,425.50 |
Completed. |
64/39 of 70/71 |
Mullingar Veterinary Office—Electrical Improvements etc. |
|
|
353.70 |
1,299.43 |
1,653.13 |
do. |
34 |
Mellowes Agricultural College—Toilet Facilities at Cottages |
|
|
2,880.00 |
— |
2,880.00 |
In Progress. |
14 |
Naas Veterinary Office—Laboratory |
.. |
.. |
.. |
|
|
283.90 |
— |
283.90 |
Completed. |
42 |
Thorndale Laboratory—Alterations |
.. |
.. |
.. |
.. |
|
|
2,827.90 |
— |
2,827.90 |
do. |
11 |
Sligo Portal Inspection Office—Erection of Hut |
.. |
.. |
|
|
1,974.61 |
— |
1,974.61 |
do. |
115 |
64-65 Merrion Square—Improvements |
.. |
.. |
.. |
|
|
1,349.10 |
— |
1,349.10 |
In Progress. |
|
Department of agriculture and fisheries (continued) |
|
|
|
|
|
|
64/26 of |
Fisheries, 3 Cathal Brugha Street—Gas Central |
|
|
|
|
|
|
70/71 |
Heating System |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
197.43 |
958.13 |
1,155.56 |
Completed. |
64/100 70/71 |
Fisheries, 3 Cathal Brugha Street—Adaptations |
.. |
.. |
|
|
306.44 |
374.20 |
680.64 |
do. |
|
Department of labour: |
|
|
|
|
|
|
64/31 of 70/71 |
Athlone Employment Exchange—Accommodation for |
|
|
|
|
|
|
|
Placement Service |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
182.74 |
695.00 |
877.74 |
do. |
64/11 of 70/71 |
Cork Employment Exchange—Improvements |
.. |
.. |
|
|
19.26 |
333.82 |
353.08 |
do. |
60 |
Cork—54 South Mall—Partitioning |
.. |
.. |
.. |
.. |
|
|
3,538.48 |
— |
3,538.48 |
Virtually Completed. |
80 |
Dun Laoghaire Employment Exchange—Security |
|
|
|
|
|
|
|
Improvements |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
12.13 |
— |
12.13 |
In Progress. |
105 |
Gardiner Street Employment Exchange—Adaptations |
.. |
|
|
58.77 |
— |
58.77 |
do. |
69 |
Galway Employment Exchange—Demolition Work |
.. |
|
|
490.00 |
— |
490.00 |
Completed. |
51 |
Galway Employment Exchange—Improvements |
.. |
.. |
|
|
2,332.92 |
— |
2,332.92 |
In Progress. |
66 |
Limerick Employment Exchange—Improvement of Heating |
|
|
622.31 |
— |
622.31 |
Virtually Completed. |
58 |
Sligo Placement Office—Partitioning |
.. |
.. |
.. |
|
|
564.49 |
— |
564.49 |
do. |
67 |
Tralee Employment Exchange—Improvement of Heating |
|
|
844.89 |
— |
844.89 |
do. |
64/18 of 70/71 |
Tralee Employment Exchange—Alterations |
.. |
.. |
|
|
750.60 |
1,080.00 |
1,830.00 |
In Progress. |
76 |
Werburgh Street Employment Exchange—Improvements |
|
|
936.60 |
— |
936.60 |
do. |
98 |
Waterford Manpower Office—Adaptations |
.. |
.. |
.. |
|
|
503.98 |
— |
503.98 |
do. |
|
Department of industry and commerce: |
|
|
|
|
|
|
80/157 of 69/70 |
Companies Registration Office, 13/14 Earlsfort Terrace— |
|
|
|
|
|
|
|
Accommodation |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
59.03 |
4,548.72 |
4,607.75 |
Completed. |
48 |
Griffith Barracks—Patents Office—Heating of Store |
.. |
|
|
344.11 |
— |
344.11 |
do. |
|
Department of transport and power: |
|
|
|
|
|
|
64/64 of 70/71 |
2 Eden Quay, Mercantile Marine Office |
.. |
.. |
.. |
|
|
89.52 |
357.57 |
447.09 |
Completed. |
80/77 of 69/70 |
Malin Head Wireless Station—Improvements |
.. |
.. |
|
|
582.80 |
2,262.00 |
2,844.80 |
do. |
35 |
Cork, Mercantile Marine Office—Improvements |
.. |
.. |
|
|
1,674.95 |
— |
1,674.95 |
In Progress. |
|
Department of posts and telegraphs: |
|
|
|
|
|
|
64/56 of 70/71 |
General Post Office—Formation of Pay Room |
.. |
.. |
|
|
70.09 |
575.38 |
645.47 |
Completed. |
82 |
General Post Office—Partitioning |
.. |
.. |
.. |
.. |
|
|
883.00 |
— |
883.00 |
do. |
64/99 of 70/71 |
Sherriff Street, Central Sorting Office—Enclosure for Oil |
|
|
|
|
|
|
|
Tank |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,748.32 |
3,600.00 |
5,348.32 |
do. |
52 |
Sherriff Street, Central Sorting Office—Extension |
|
|
|
— |
|
|
|
of Rest Room, etc. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
172.43 |
— |
172.43 |
In Progress. |
45 |
Sherriff Street, Central Sorting Office—Ímproved Security |
|
|
250.00 |
— |
250.00 |
Completed. |
80/114 of 69/70 |
Cork Post Office—Improvements to Dining Club |
.. |
.. |
|
|
1,482.47 |
69.60 |
1,552.07 |
do. |
86 |
Cork Sorting Office—Improvements |
.. |
.. |
.. |
|
|
2,148.18 |
— |
2,148.18 |
Virtually Completed. |
64/67 of 70/71 |
Dun Laoghaire Post Office—Extension to Sorting Office |
.. |
|
|
104.00 |
1,972.95 |
2,076.95 |
Completed. |
74 |
Post Office Stores—Infirmary Road—Toilet Facilities |
.. |
|
|
281.17 |
— |
281.17 |
In Progress. |
38 |
Rathmines Sorting Office—Temporary Accommodation etc. |
|
|
624.41 |
— |
624.41 |
Completed. |
64/25 of 70/71 |
Amiens Street, Parcels Office—Improvements |
.. |
.. |
|
|
7.97 |
499.32 |
507.29 |
In Progress. |
141 |
Post Office Stores—St. John’s Road—Prefabricated Building |
|
|
1,756.73 |
— |
1,756.73 |
Virtually Completed. |
80/143 of 69/70 |
10/12 Trinity Street—Adaptations etc. |
.. |
.. |
.. |
|
|
6.90 |
401.28 |
408.18 |
Completed. |
118 |
Hammam Buildings—Improvements |
.. |
.. |
.. |
|
|
46.58 |
— |
46.58 |
In Progress. |
78 |
Limerick Post Office—Improvements |
.. |
.. |
.. |
|
|
19.54 |
— |
19.54 |
do. |
36 |
Castlebar Post Office—Improvements |
.. |
.. |
.. |
|
|
711.88 |
— |
711.88 |
Completed. |
26 |
I ifford Post Office—Improvements |
.. |
.. |
.. |
.. |
|
|
900.00 |
— |
900.00 |
In Progress. |
25 |
Dundalk Post Office—Improvements |
.. |
.. |
.. |
|
|
3,600.00 |
— |
3,600.00 |
do. |
68 |
Droichead Nua Post Office—Provision of Cable Chamber |
|
|
275.00 |
— |
275.00 |
Completed. |
91 |
Kilkenny Post Office—Improvement to Flooring |
.. |
.. |
|
|
1,117.00 |
— |
1,117.00 |
do. |
138 |
Bandon Post Office—Improvements |
.. |
.. |
.. |
.. |
|
|
1,800.00 |
— |
1,800.00 |
In Progress. |
64 |
Enris Post Office—Adaptations |
.. |
.. |
.. |
.. |
|
|
533.95 |
— |
533.95 |
Completed. |
64/120 of 70/71 |
Monaghan Post Office—Provision of Canteen |
.. |
.. |
|
|
720.00 |
990.00 |
1,710.00 |
In Progress. |
64/20 of 70/71 |
Gorey Post Office—Improvements |
.. |
.. |
.. |
.. |
|
|
1,253.98 |
2,385.00 |
3,638.98 |
Completed. |
|
Department of defence: |
|
|
|
|
|
|
64/86 of 70/71 |
Parkgate Street—Adaptations |
.. |
.. |
.. |
.. |
|
|
308.80 |
173.93 |
482.73 |
Completed. |
64/32 of 70/71 |
Parkgate Street—Central Heating in Red House |
.. |
.. |
|
|
165.00 |
1,257.05 |
1,422.05 |
do. |
18 |
Parkgate Street—Conversion of Heating System |
.. |
.. |
|
|
1,438.55 |
— |
1,438.55 |
do. |
93 |
Parkgate Street—Improvement of Electrical Supply |
.. |
|
|
251.91 |
— |
251.91 |
do. |
63 |
Parkgate Street—Fitting out of New Training Centre |
.. |
|
|
211.84 |
— |
211.84 |
Completed. |
103 |
Parkgate Street—Adaptations |
.. |
.. |
.. |
.. |
|
|
155.39 |
— |
155.39 |
do. |
80/83 of 69/70 |
Colaiste Caoimhin—Adaptations |
.. |
.. |
.. |
.. |
|
|
103.62 |
940.83 |
1,044.45 |
do. |
64/33 of 70/71 |
Colaiste Caoimhin—Improvement of Heating |
.. |
.. |
|
|
483.00 |
2,296.92 |
2,779.92 |
do. |
102 |
Colaiste Caoimhin—Improvements |
.. |
.. |
.. |
.. |
|
|
857.45 |
— |
857.45 |
In Progress. |
46 |
Colaiste Caoimhin—Improvements |
.. |
.. |
.. |
.. |
|
|
487.00 |
— |
487.00 |
do. |
81 |
Cabra—Storage Accommodation |
.. |
.. |
.. |
.. |
|
|
591.80 |
— |
591.80 |
Completed. |
|
Department of foreign affairs: |
|
|
|
|
|
|
47 |
Iveagh House—Provision of New Fireplace |
.. |
.. |
|
|
819.00 |
— |
819.00 |
Completed. |
64/84 of 70/71 |
Iveagh House—Adaptations |
.. |
.. |
.. |
.. |
.. |
|
|
354.00 |
929.87 |
1,283.87 |
do. |
57 |
Ottawa Embassy—Provision of Air Conditioning |
.. |
.. |
|
|
1,220.86 |
— |
1,220.86 |
do. |
|
Department of social welfare: |
|
|
|
|
|
|
50 |
Dun Laoghaire Social Welfare Office—Improvements |
.. |
|
|
363.06 |
— |
363.06 |
do. |
119 |
Áras Mhic Dhiarmada—Basement Store |
.. |
.. |
.. |
|
|
9.03 |
— |
9.03 |
In Progress. |
16 |
Gort Social Welfare Office—Prefabricated Building |
.. |
|
|
1,366.00 |
— |
1,366.00 |
Virtually Completed. |
62 |
Fermoy Social Welfare Office—Adaptations |
.. |
.. |
|
|
531.29 |
— |
531.29 |
Completed. |
143 |
Naas Social Welfare Office—Prefabricated Building |
.. |
|
|
700.00 |
— |
700.00 |
do. |
DETAILS OF No. 76—MINOR BALANCES OF EXPENDITURE.
|
|
|
|
Ependiture |
|
Work |
Service and Description |
Total |
Vote |
|
|
|
Observations |
No. |
|
Estimate |
1971-72 |
1971-72 |
To 31/3/71 |
To 31/3/72 |
|
|
Department of finance: |
|
|
|
|
|
|
4A of |
State Buildings, Kildare Street and Merrion Street—New |
|
|
468.21 |
39,594.93 |
40,063.14 |
Completed. |
70/71 |
Electricity Distribution System |
.. |
.. |
.. |
.. |
|
|
|
|
|
|
4 of 69/70 |
St. Martin’s House—Additional Accommodation |
.. |
.. |
|
|
259.72 |
14,487.69 |
14,747.41 |
do. |
4A of |
O’Connell Bridge House, Dublin—Additional |
|
|
|
|
|
|
66/67 |
Accommodation |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
17.00 |
5,867.84 |
5,884.84 |
do. |
13 of 70/71 |
Mullingar—New Government Offices |
.. |
.. |
.. |
|
|
2,248.17 |
7,858.20 |
10,106.37 |
do. |
|
Revenue commissioners: |
|
|
|
|
|
|
8 of 70/71 |
Áras Brugha—Extension to Computer Room |
.. |
.. |
|
|
59.00 |
2,814.49 |
2,873.49 |
|
7 of 68/69 |
Drumbilla—Frontier Post |
.. |
.. |
.. |
.. |
.. |
|
|
50.00 |
4,910.42 |
4,960.42 |
Completed. |
8 of 66/67 |
Dundalk—New Customs Road Station |
.. |
.. |
.. |
|
|
33.33 |
31,441.00 |
31,474.33 |
do. |
10 of 70/71 |
Kildrum—New Frontier Post |
.. |
.. |
.. |
.. |
|
|
730.00 |
4,590.00 |
5,320.00 |
do. |
65/1 of 70/71 |
Lifford Customs Post |
.. |
.. |
.. |
.. |
.. |
|
|
4,546.71 |
765.00 |
5,311.71 |
do. |
11A of |
Civil Service Commission, 45 Upper O’Connell Street— |
|
|
|
|
|
|
68/69 |
Improvements |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
5.46 |
9,723.18 |
9,728.64 |
do. |
18A of 70/71 |
Dun Laoghaire Harbour—Car Ferry Terminals |
.. |
.. |
|
|
4,723.55 |
1,141,340.46 |
1,146,064.01 |
do. |
8 of 67/68 |
Dublin Castle—Rebuilding of Cross Block |
.. |
.. |
.. |
|
|
242.29 |
145,860.43 |
146,102.72 |
do. |
17/1 of 69/70 |
Garden of Remembrance—Architectural Works |
.. |
.. |
|
|
9,548.43 |
181,290.37 |
190,838.80 |
do. |
18/1 of 70/71 |
Kilkenny Castle—Development of Grounds as Public Park |
|
|
1,145.77 |
27,706.16 |
28,851.93 |
In Progress. |
23 of 67/68 |
Wolfe Tone Memorial—Dublin |
.. |
.. |
.. |
.. |
|
|
37.84 |
15,664.31 |
15,702.15 |
Completed. |
|
Department of justice: |
|
|
|
|
|
|
25A of 70/71 |
Land Registry—Additional Accommodation—Stage 11 |
.. |
|
|
590.00 |
268,961.02 |
269,551.02 |
Completed. |
|
Department of local government: |
|
|
|
|
|
|
25A of |
O’Connell Bridge House, Dublin—Additional |
|
|
|
|
|
|
66/6 |
Accommodation |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
63.00 |
26,962.74 |
27,025.74 |
Completed. |
|
Department of education: |
|
|
|
|
|
|
32 of 70/71 |
National College of Art—Additional Accommodation |
.. |
|
|
1,472.19 |
11,625.22 |
13,097.41 |
Completed. |
37 of 69/70 |
National Gallery—Extension |
.. |
.. |
.. |
.. |
.. |
|
|
7,500.00 |
448,726.36 |
456,226.36 |
do. |
30 of 70/71 |
St. Conleth’s Reformatory—Daingean—Improvements |
.. |
|
|
455.75 |
4,105.10 |
4,560.85 |
do. (Curtailed Scheme). |
|
Department of lands: |
|
|
|
|
|
|
34A of |
Land Commission—Accommodation for Management |
|
|
|
|
|
|
70/71 |
Services Unit and Fire Protection Work for Computer |
|
|
|
|
|
|
|
Area |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
67.50 |
12,537.81 |
12,605.31 |
Completed. |
38 of 69/70 |
Saint Martin’s House—Additional Accommodation |
.. |
|
|
32.52 |
6,985.08 |
7,017.60 |
do. |
|
Department of agriculture and fisheries: |
|
|
|
|
|
|
50/3 of 68/69 |
Abbotstown Farm—Foundation Stock Farmyard |
.. |
.. |
|
|
20.47 |
90,914.68 |
90,935.15 |
do. |
36 of 70/71 |
Botanic Gardens—Improvement of Glasshouse Heating |
.. |
|
|
241.38 |
5,577.25 |
5,818.63 |
do. |
47 of |
Ballsbridge Veterinary College—New Radiography Unit |
|
|
|
|
|
|
68/69 |
and Extension of Operating Theatre |
.. |
.. |
.. |
|
|
85.59 |
24,382.85 |
24,468.44 |
do. |
42A of 70/71 |
Ennis Agricultural Office—Extension |
.. |
.. |
.. |
|
|
1,326.30 |
4,590.00 |
5,916.30 |
do. |
51 of 69/70 |
Munster Institute—New Laboratories |
.. |
.. |
.. |
.. |
|
|
33.50 |
24,567.89 |
24,601.39 |
Completed. |
55/3 of |
Mellowes Agricultural College, Athenry—Erection of |
|
|
|
|
|
|
68/69 |
Employees’ Cottages |
.. |
.. |
.. |
.. |
.. |
|
|
807.60 |
5,408.92 |
6,216.52 |
do. |
41 of |
Mellowes Agricultural College, Athenry—Improvement of |
|
|
|
|
|
|
70/71 |
Water Supply |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
850.78 |
15,840.27 |
16,691.05 |
do. |
34A of |
O’Connell Bridge House, Dublin—Additional |
|
|
|
|
|
|
66/67 |
Accommodation |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
33.00 |
14,795.55 |
14,828.55 |
do. |
43 of 69/70 |
Saint Martin’s House—Additional Accommodation |
.. |
|
|
411.92 |
4,431.47 |
4,843.39 |
Completed. |
|
Department of labour: |
|
|
|
|
|
|
63 of 67/8 |
Ansley House |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
0.38 |
70,328.36 |
70,328.74 |
do. |
|
Department of transport and power: |
|
|
|
|
|
|
49A of |
O’Connell Bridge House, Dublin—Additional |
|
|
|
|
|
|
66/67 |
Accommodation |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
12.00 |
4,328.98 |
4,340.98 |
do. |
|
Department of posts and telegraphs: |
|
|
|
|
|
|
47A of 70/71 |
Aldboro House—New Strongroom |
.. |
.. |
.. |
.. |
|
|
9.84 |
4,864.64 |
4,874.48 |
do. |
51 of 70/71 |
Cahirciveen—New Post Office |
.. |
.. |
.. |
.. |
|
|
1,412.57 |
7,560.09 |
8,972.66 |
do. |
53 of 70/71 |
Claremorris—New Post Office |
.. |
.. |
.. |
.. |
|
|
19.65 |
33,098.06 |
33,117.71 |
do. |
48A of 70/71 |
Dublin—10 Parnell Square—Adaptations |
.. |
.. |
.. |
|
|
5.81 |
18,583.29 |
18,589.10 |
do. |
60 of 69/70 |
Dublin—New Central Sorting Office, Sherriff Street |
.. |
|
|
496.09 |
910,686.45 |
911,182.54 |
do. |
49A of 70/71 |
Dublin—Clondalkin Pole Field Store |
.. |
.. |
.. |
|
|
144.00 |
1,620.00 |
1,764.00 |
do. |
50A of |
Dublin—Phibsboro Postal Training Centre—Partitioning |
|
|
|
|
|
|
70/71 |
etc. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
17.90 |
4,710.04 |
4,727.94 |
do. |
|
Macroom—New Post Office |
.. |
.. |
.. |
.. |
.. |
|
|
1,308.00 |
15,410.48 |
16,718.48 |
do. |
|
Department of defence: |
|
|
|
|
|
|
80 of 67/68 |
Colaiste Caoimhin—Installation of Computer |
.. |
.. |
|
|
99.50 |
4,725.51 |
4,825.01 |
Completed. |
65 of 63/64 |
Curragh Camp—New Catholic Church |
.. |
.. |
.. |
|
|
66.00 |
118,546.99 |
118,612.99 |
do. |
|
Department of foreign affairs: |
|
|
|
|
|
|
62B of |
Copenhagen—New Embassy Residence—Adaptations and |
|
|
|
|
|
|
70/71 |
Furniture |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
1,355.64 |
9,445.89 |
10,801.53 |
do. |
82/1 of 68/69 |
Dublin—30 Earlsfort Terrace—Additional Accommodation |
|
|
15.04 |
2,425.11 |
2,440.15 |
do. |
62A of |
New York Consulate General—New Accommodation and |
|
|
|
|
|
|
70/71 |
Adaptations |
.. |
.. |
.. |
.. |
.. |
.. |
.. |
|
|
360.34 |
32,625.63 |
32,985.97 |
do. |
|
Department of social welfare: |
|
|
|
|
|
|
63 of 70/71 |
Dundrum, Co. Dublin—New Social Welfare Office |
.. |
|
|
1,104.98 |
1,502.48 |
2,607.46 |
do. |
|