APPENDIX IV.
STATEMENT OF EXPENDITURE ON NEW WORKS, ALTERATIONS AND ADDITIONS, 1950-51 (VOTE 9, SUBHEAD B.)
Work |
|
Total |
Vote |
Expenditure |
|
No. |
Service and Description |
Estimate |
1950-51 |
|
|
|
|
|
|
|
|
|
Observations |
|
|
|
|
1950-51 |
to 31/3/50 |
to 31/3/51 |
|
|
|
£ |
£ |
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
President’s Establishment: |
|
|
|
|
|
|
|
|
|
|
|
|
1 |
Arus an Uachtaráin—Improvements |
|
|
|
|
|
|
|
|
|
|
|
|
|
and Furnishing |
... |
... |
... |
92,000 |
3,680 |
2,777 |
0 |
7 |
50,884 |
16 |
1 |
53,661 |
16 |
8 |
In progress. |
|
|
|
3,680 |
2,777 |
0 |
7 |
|
|
|
|
|
|
|
|
Houses of the Oireachtas: |
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Improvement of Entrance |
... |
... |
8,000 |
820 |
1,226 |
1 |
0 |
6,333 |
17 |
11 |
7,559 |
18 |
11 |
Completed. |
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Dublin, Iveagh House—Office accommodation and Staff Restaurant |
81,500 |
30,000 |
33,087 |
7 |
4 |
28,433 |
2 |
11 |
61,520 |
10 |
3 |
In progress. |
4 |
Dublin Castle—Renovations |
... |
... |
— |
550 |
3 |
13 |
6 |
— |
3 |
13 |
6 |
Preliminary work. |
5 |
Dublin Custom House—Improvement |
|
|
|
|
|
|
|
|
|
|
|
|
|
of lay out of Grounds |
... |
... |
8,500 |
1,500 |
2,825 |
5 |
6 |
5,415 |
1 |
11 |
8,240 |
7 |
5 |
Virtually completed. |
6 |
Dublin Custom House—West |
|
|
|
|
|
|
|
|
|
|
|
|
|
Courtyard Approach—Alterations |
... |
450 |
450 |
477 |
4 |
9 |
— |
477 |
4 |
9 |
In progress. |
7 |
Dublin Inland Revenue, 14/15 Upper O’Connell Street—Additional Sanitary |
|
|
|
|
|
|
|
|
|
|
|
|
|
Accommodation |
... |
... |
... |
500 |
500 |
485 |
5 |
0 |
— |
485 |
5 |
0 |
In progress. |
8 |
Lifford Customs and Excise—Official |
|
|
|
|
|
|
|
|
|
|
|
|
|
Garage and Married Quarters |
... |
9,200 |
3,000 |
1,767 |
5 |
8 |
6,834 |
0 |
5 |
8,601 |
6 |
1 |
In progress. |
9 |
Waterford Government Offices— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Erection |
... |
... |
... |
... |
182,100 |
5,000 |
2,331 |
11 |
1 |
6,157 |
2 |
9 |
2,331
6,157 |
11
2 |
1
9 |
This work is now combined with Waterford Post Office, previously a separate work. In progress. |
10 |
Office of Public Works—Central Engineering Workshop and Stores— |
|
|
|
|
|
|
|
|
|
|
|
|
|
New premises |
... |
... |
... |
... |
252,500 |
20,000 |
10,585 |
7 |
1 |
11,288 |
18 |
5 |
21,874 |
5 |
6 |
In progress. |
11 |
Cenotaph |
... |
... |
... |
... |
13,000 |
12,000 |
15,971 |
17 |
9 |
6,666 |
1 |
5 |
22,637 |
19 |
2 |
In progress. |
|
Harbours: |
|
|
|
|
|
|
|
|
|
|
|
|
12 |
Buncrana—Improvements |
... |
... |
1,050 |
1,050 |
— |
— |
— |
Postponed. |
13 |
Dun Laoghaire—Provision of Crane |
... |
8,600 |
8,600 |
— |
— |
— |
Postponed. |
14 |
Dun Laoghaire—Public Lighting |
... |
2,300 |
2,300 |
— |
— |
— |
Postponed. |
|
|
|
£84,950 |
£67,534 |
17 |
8 |
|
|
|
|
|
|
|
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
|
|
15 |
Fisheries Branch—2 Kildare Place— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Installation of Laboratory |
... |
450 |
450 |
790 |
7 |
6 |
56 |
11 |
4 |
846 |
18 |
10 |
In progress. |
16 |
Land Rehabilitation Section— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional accommodation |
... |
... |
... |
1,000 |
1,000 |
848 |
19 |
1 |
— |
848 |
19 |
1 |
In progress. |
17 |
Botanic Gardens—Erection of New |
|
|
|
|
|
|
|
|
|
|
|
|
|
Fern House |
... |
... |
... |
... |
6,000 |
5,000 |
20 |
9 |
8 |
— |
20 |
9 |
8 |
Preliminary work. |
18 |
Athenry Agricultural School—Poultry |
|
|
|
|
|
|
|
|
|
|
|
|
|
Hatchery |
... |
... |
... |
... |
3,550 |
3,500 |
— |
— |
— |
Postponed. |
19 |
Athenry Agricultural School— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Provision of Electric Power |
... |
... |
480 |
350 |
52 |
16 |
6 |
130 |
13 |
3 |
183 |
9 |
9 |
In progress. |
20 |
Ballyhaise Agricultural School—New |
|
|
|
|
|
|
|
|
|
|
|
|
|
Piggeries |
... |
... |
... |
... |
7,500 |
5,000 |
3,151 |
6 |
3 |
1,962 |
3 |
5 |
5,113 |
9 |
8 |
In progress. |
21 |
Clonakilty Agricultural School— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Poultry Hatchery |
... |
... |
... |
3,125 |
3,000 |
3 |
2 |
9 |
— |
3 |
2 |
9 |
Preliminary work. |
22 |
Grange Stud and Dairy Farm— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Adaptations |
... |
... |
... |
... |
21,000 |
5,000 |
1,910 |
17 |
8 |
— |
1,910 |
17 |
8 |
In progress. |
23 |
Johnstown Castle—Adaptations and |
|
|
|
|
|
|
|
|
|
|
|
|
|
Renovations |
... |
... |
... |
... |
85,000 |
36,000 |
22,050 |
15 |
6 |
53,188 |
12 |
11 |
75,239 |
8 |
5 |
In progress. |
24 |
Munster Institute—Introduction of |
|
|
|
|
|
|
|
|
|
|
|
|
|
Shannon Electric Power |
... |
... |
2,500 |
350 |
338 |
2 |
6 |
1,115 |
4 |
7 |
1,453 |
7 |
1 |
In progress. |
25 |
Munster Institute—Poultry Hatchery |
4,500 |
4,500 |
— |
— |
— |
Postponed. |
26 |
Veterinary College—Improvements |
... |
123,000 |
1,650 |
3,863 |
17 |
10 |
72,237 |
9 |
10 |
76,101 |
7 |
8 |
In progress. |
27 |
Veterinary Research Institute—New |
|
|
|
|
|
|
|
|
|
|
|
|
|
Premises |
... |
... |
... |
... |
— |
4,000 |
— |
1,032 |
17 |
7 |
1,032 |
17 |
7 |
Not proceeded with. |
27(a) |
Athenry Agricultural Station— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Accommodation for Course for Adults |
... |
3,300 |
— |
1,120 |
18 |
4 |
— |
1,120 |
18 |
4 |
In progress. |
27(c) |
Grange Farm—Cow Byres |
... |
... |
2,100 |
— |
1,125 |
0 |
0 |
— |
1,125 |
0 |
0 |
In progress. |
|
Fishery, Etc., Harbours: |
|
|
|
|
|
|
|
|
|
|
|
|
28 |
Dredging Operations—Arklow Harbour |
9,400 |
7,000 |
2,068 |
6 |
1 |
— |
2,068 |
6 |
1 |
In progress. |
29 |
Works of Economic Development— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Greencastle Harbour |
... |
9,500 |
7,000 |
339 |
8 |
9 |
— |
339 |
8 |
9 |
In progress. |
|
|
|
83,800 |
37,684 |
8 |
5 |
|
|
|
|
|
|
|
|
Department of Justice: |
|
|
|
|
|
|
|
|
|
|
|
|
30 |
Gárda Síochana Depot—New Electrical |
|
|
|
|
|
|
|
|
|
|
|
|
|
Distribution System |
... |
... |
1,000 |
1,000 |
53 |
12 |
0 |
— |
53 |
12 |
0 |
Preliminary Work. |
|
Garda Siochana Barracks: |
|
|
|
|
|
|
|
|
|
|
|
|
31 |
Dublin Metropolitan Area Harcourt Terrace (Lad Lane)—New |
|
|
|
|
|
|
|
|
|
|
|
|
|
Barracks |
... |
... |
... |
... |
30,000 |
3,000 |
2,353 |
15 |
2 |
28,893 |
10 |
0 |
31,247 |
5 |
2 |
Completed. |
32 |
Kilmainham—Adaptations |
... |
... |
800 |
800 |
200 |
0 |
0 |
— |
200 |
0 |
0 |
In progress. |
33 |
Stillorgan—New Barrack |
... |
... |
10,000 |
10 |
— |
188 |
14 |
10 |
188 |
14 |
10 |
Postponed. |
|
Co. Cavan: |
|
|
|
|
|
|
|
|
|
|
|
|
34 |
Blacklion—New Barrack |
... |
... |
5,000 |
10 |
— |
1 |
13 |
9 |
1 |
13 |
9 |
Preliminary Work. |
35 |
Swanlinbar—New Barrack |
... |
... |
6,000 |
10 |
— |
— |
— |
Postponed. |
|
Co. Clare: |
|
|
|
|
|
|
|
|
|
|
|
|
36 |
Ardnacrusha—New Barrack |
... |
... |
800 |
700 |
— |
— |
— |
Postponed. |
37 |
Connolly—New Barrack |
... |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
38 |
Doolin—New Barrack |
... |
... |
... |
4,000 |
10 |
— |
8 |
5 |
10 |
8 |
5 |
10 |
Preliminary Work |
39 |
Feakle—New Barrack |
... |
... |
... |
— |
10 |
— |
— |
— |
Postponed. |
40 |
Labasheeda—New Barrack |
... |
... |
— |
10 |
— |
— |
— |
Postponed. |
41 |
Newmarket-on-Fergus—New Barrack |
10,000 |
10 |
— |
1 |
5 |
0 |
1 |
5 |
0 |
Postponed. |
42 |
Tulla—New Barrack |
... |
... |
5,000 |
10 |
— |
|
4 |
0 |
|
4 |
0 |
Postponed. |
|
Co. Cork: |
|
|
|
|
|
|
|
|
|
|
|
|
43 |
Knocknagree—New Barrack |
... |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
44 |
Liscarroll—New Barrack |
... |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
45 |
Watergrasshill—New Barrack |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
|
Co. Donegal |
|
|
|
|
|
|
|
|
|
|
|
|
46 |
Bundoran—New Barrack |
5,500 |
2,500 |
— |
— |
— |
Postponed. |
47 |
Carrigans—Adaptations |
— |
10 |
|
4 |
2 |
2 |
1 |
6 |
2 |
5 |
8 |
Preliminary Work. |
48 |
Carrigart—New Barrack |
... |
... |
6,000 |
10 |
— |
— |
— |
Postponed. |
49 |
Castlefin—New Barrack |
... |
... |
6,000 |
10 |
2 |
9 |
9 |
8 |
4 |
4 |
10 |
14 |
1 |
Preliminary Work. |
50 |
Churchill—New Barrack |
... |
... |
5,500 |
2,200 |
2,260 |
3 |
9 |
2,916 |
9 |
8 |
5,176 |
13 |
5 |
In progress. |
51 |
Clogher—Adaptations |
... |
... |
600 |
10 |
— |
|
17 |
4 |
|
17 |
4 |
Preliminary Work. |
52 |
Dungloe—Adaptations |
... |
... |
500 |
10 |
— |
— |
— |
Postponed. |
53 |
Glencolumbkille—Adaptations |
... |
600 |
10 |
— |
— |
— |
Postponed. |
54 |
Glenties—Adaptations |
... |
... |
400 |
10 |
— |
— |
— |
Postponed. |
55 |
Kilmacrennan—New Barrack |
... |
5,500 |
10 |
— |
18 |
7 |
2 |
18 |
7 |
2 |
Preliminary Work. |
56 |
Milford—Adaptations |
... |
... |
... |
950 |
10 |
— |
— |
— |
Postponed. |
|
Co. Dublin: |
|
|
|
|
|
|
|
|
|
|
|
|
57 |
Lucan—Improvements |
... |
... |
1,250 |
1,250 |
997 |
17 |
6 |
— |
997 |
17 |
6 |
In progress. |
|
Co. Galway |
|
|
|
|
|
|
|
|
|
|
|
|
58 |
Ardrahan—Adaptations |
... |
... |
1,300 |
10 |
— |
10 |
3 |
8 |
10 |
3 |
8 |
Preliminary Work. |
59 |
Athenry—New Barrack |
... |
... |
12,000 |
10 |
|
12 |
10 |
2 |
17 |
11 |
3 |
10 |
9 |
Preliminary Work. |
60 |
Lettermore—Adaptations |
... |
... |
— |
10 |
— |
1 |
8 |
7 |
1 |
8 |
7 |
Postponed. |
61 |
Portumna—New Barrack |
... |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
62 |
Roundstone—New Barrack |
... |
... |
5,500 |
10 |
— |
8 |
6 |
8 |
8 |
6 |
8 |
Preliminary Work. |
|
Co. Kerry: |
|
|
|
|
|
|
|
|
|
|
|
|
63 |
Kilgarvan—New Barrack |
... |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
64 |
Knocknagoshel—New Barrack |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
|
Co. Kilkenny: |
|
|
|
|
|
|
|
|
|
|
|
|
65 |
Freshford—New Barrack |
... |
... |
6,000 |
10 |
— |
15 |
10 |
0 |
15 |
10 |
0 |
Postponed. |
|
Laoighis: |
|
|
|
|
|
|
|
|
|
|
|
|
66 |
Mountrath—New Barrack |
... |
... |
5,250 |
2,770 |
|
2 |
11 |
— |
|
2 |
11 |
Preliminary Work. |
|
Co. Leitrim: |
|
|
|
|
|
|
|
|
|
|
|
|
67 |
Ballinamore—New Barrack |
... |
... |
6,000 |
10 |
— |
— |
— |
Postponed. |
68 |
Cloone—New Barrack |
... |
... |
... |
5,500 |
10 |
— |
|
9 |
10 |
|
9 |
10 |
Postponed. |
69 |
Drumsna—New Barrack |
... |
... |
6,400 |
10 |
— |
— |
— |
Postponed. |
|
Co. Longford: |
|
|
|
|
|
|
|
|
|
|
|
|
70 |
Lanesboro’—New Barrack |
... |
... |
5,500 |
10 |
— |
— |
— |
Postponed. |
|
Co. Louth: |
|
|
|
|
|
|
|
|
|
|
|
|
71 |
Ballymascanlon—New Barrack |
... |
— |
10 |
— |
— |
— |
Postponed. |
72 |
Castlebellingham—New Barrack |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
|
Co. Mayo: |
|
|
|
|
|
|
|
|
|
|
|
|
73 |
Achill Sound—New Barrack |
... |
... |
4,050 |
250 |
51 |
15 |
0 |
3,796 |
19 |
7 |
3,848 |
14 |
7 |
Completed. |
74 |
Kilkelly—New Barrack |
... |
... |
— |
10 |
— |
3 |
13 |
10 |
3 |
13 |
10 |
Postponed. |
75 |
Kilmaine—New Barrack |
... |
... |
5,000 |
3,400 |
3,740 |
0 |
0 |
500 |
17 |
5 |
4,240 |
17 |
5 |
In progress. |
|
Co. Monaghan: |
|
|
|
|
|
|
|
|
|
|
|
|
76 |
Ballybay—New Barrack |
... |
... |
5,500 |
10 |
— |
3 |
5 |
0 |
3 |
5 |
0 |
Postponed. |
77 |
Newbliss—New Barrack |
... |
... |
4,500 |
10 |
— |
— |
— |
Postponed. |
|
Offaly: |
|
|
|
|
|
|
|
|
|
|
|
|
78 |
Cloghan—New Barrack |
... |
... |
5,500 |
10 |
— |
2 |
0 |
0 |
2 |
0 |
0 |
Postponed. |
79 |
Mountbolus—New Barrack |
... |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
80 |
Shannonbridge—New Barrack |
... |
6,000 |
10 |
— |
— |
— |
Postponed. |
|
Co. Roscommon: |
|
|
|
|
|
|
|
|
|
|
|
|
81 |
Kilmore—New Barrack |
... |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
82 |
Roscommon—New Barrack |
... |
... |
35,000 |
10,000 |
— |
2,580 |
15 |
2 |
2,580 |
15 |
2 |
Demolition work |
83 |
Strokestown—New Barrack |
... |
... |
17,000 |
10 |
— |
— |
— |
Postponed. |
|
Co. Sligo: |
|
|
|
|
|
|
|
|
|
|
|
|
84 |
Ballinafad—New Barrack |
... |
... |
6,000 |
10 |
— |
— |
— |
Postponed. |
85 |
Collooney—New Barrack |
... |
... |
6,100 |
10 |
— |
— |
— |
Postponed. |
86 |
Enniscrone—New Barrack |
... |
... |
11,150 |
600 |
717 |
19 |
6 |
11,992 |
1 |
8 |
12,710 |
1 |
2 |
Completed. |
87 |
Strandhill—New Barrack |
... |
... |
5,500 |
10 |
— |
— |
— |
Postponed. |
|
Co. Tipperary: |
|
|
|
|
|
|
|
|
|
|
|
|
88 |
Mullinahone—New Barrack |
... |
5,000 |
10 |
2 |
11 |
6 |
— |
2 |
11 |
6 |
Preliminary Work. |
89 |
Thurles—New Barrack |
... |
... |
32,500 |
4,000 |
5 |
13 |
10 |
— |
5 |
13 |
10 |
Preliminary Work. |
|
Co. Waterford |
|
|
|
|
|
|
|
|
|
|
|
|
90 |
Aglish—New Barrack |
... |
... |
— |
10 |
— |
— |
— |
Postponed. |
91 |
Waterford—New Barrack |
... |
... |
99,000 |
10 |
279 |
3 |
6 |
664 |
7 |
11 |
943 |
11 |
5 |
In progress. |
|
Co. Westmeath: |
|
|
|
|
|
|
|
|
|
|
|
|
92 |
Rochfortbridge—New Barrack |
... |
— |
10 |
— |
|
6 |
7 |
|
6 |
7 |
Preliminary Work. |
|
Co. Wexford: |
|
|
|
|
|
|
|
|
|
|
|
|
93 |
Coolgreany—Adaptations |
... |
... |
— |
10 |
— |
6 |
5 |
9 |
6 |
5 |
9 |
Preliminary Work. |
94 |
New Ross—New Barrack |
... |
... |
16,000 |
12,000 |
1,160 |
4 |
4 |
20 |
0 |
0 |
1,180 |
4 |
4 |
In progress. |
|
Co. Wicklow: |
|
|
|
|
|
|
|
|
|
|
|
|
95 |
Ashford—New Barrack |
... |
... |
— |
10 |
— |
— |
— |
Postponed. |
96 |
Baltinglass—New Barrack |
... |
... |
17,000 |
6,000 |
— |
|
5 |
6 |
|
5 |
6 |
Postponed. |
97 |
Roundwood—New Barrack |
... |
... |
5,000 |
10 |
— |
— |
— |
Postponed. |
98 |
New Works, Alterations and Additions at other Garda Síochána Barracks |
— |
5,000 |
3,479 |
10 |
8 |
33,810 |
2 |
8 |
37,289 |
13 |
4 |
|
99 |
Minor New Works at Garda Síochána |
|
|
|
|
|
|
|
|
|
|
|
|
|
Barracks |
... |
... |
... |
... |
— |
4,000 |
1,198 |
13 |
11 |
709 |
19 |
9 |
1,908 |
13 |
8 |
|
|
|
|
£60,000 |
£16,504 |
10 |
4 |
|
|
|
|
|
|
|
|
Department of Education: |
|
|
|
|
|
|
|
|
|
|
|
|
100 |
St. Joseph’s (West Dublin Model) |
|
|
|
|
|
|
|
|
|
|
|
|
|
School—Electric Lighting |
... |
... |
500 |
500 |
239 |
0 |
0 |
— |
239 |
0 |
0 |
In progress. |
101 |
National Schools—Grants for |
|
|
|
|
|
|
|
|
|
|
|
|
|
Building, Enlarging, Enclosing, etc. |
... |
750,000 |
700,000 |
530,312 |
15 |
8 |
— |
530,312 |
15 |
8 |
Expenditure represents grants which matured for payment. |
102 |
Coláiste Moibhi, Shanganagh Castle, |
|
|
|
|
|
|
|
|
|
|
|
|
|
Adaptations and Renovations |
... |
59,000 |
15,000 |
284 |
17 |
1 |
14,921 |
2 |
4 |
15,205 |
19 |
5 |
In progress. |
103 |
National Gallery—Electric Installation |
6,000 |
180 |
441 |
17 |
4 |
5,821 |
19 |
3 |
6,263 |
16 |
7 |
In progress. |
104 |
Reformatory School, Daingean— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Adaptions |
... |
... |
... |
... |
... |
63,500 |
9,000 |
85 |
16 |
1 |
29,874 |
13 |
8 |
29,960 |
9 |
9 |
In progress. |
104a |
Council of Education |
... |
... |
... |
500 |
— |
471 |
19 |
9 |
— |
471 |
19 |
9 |
In progress. |
|
|
|
£724,680 |
£531,836 |
5 |
11 |
|
|
|
|
|
|
|
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
|
|
105 |
Headquarters Buildings—Adaptations |
11,100 |
1,450 |
1,948 |
1 |
10 |
8,231 |
12 |
1 |
10,179 |
13 |
11 |
In progress. |
|
Gaeltacht Services: |
|
|
|
|
|
|
|
|
|
|
|
|
106 |
Elly Bay Toy Factory—Rebuilding |
4,600 |
3,000 |
2,777 |
8 |
8 |
1,782 |
15 |
0 |
4,560 |
3 |
8 |
In progress. |
107 |
Geesala Knitting Centre— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Improvements |
... |
... |
... |
... |
1,650 |
1,650 |
1,360 |
19 |
1 |
— |
1,360 |
19 |
1 |
In progress. |
108 |
New Spinning Factory, Kilcar, Co. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Donegal |
... |
... |
... |
... |
60,250 |
7,700 |
2,775 |
9 |
3 |
38,572 |
3 |
0 |
41,347 |
12 |
3 |
In progress. |
109 |
Spiddal Toy Factory—Adaptations |
... |
1,090 |
350 |
577 |
15 |
9 |
727 |
9 |
9 |
1,305 |
5 |
6 |
In progress. |
110 |
Tourmakeady Knitting Centre— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Adaptations |
... |
... |
... |
... |
6,250 |
2,000 |
28 |
2 |
9 |
235 |
19 |
4 |
264 |
2 |
1 |
Preliminary work. |
|
|
|
£16,150 |
£9,467 |
17 |
4 |
|
|
|
|
|
|
|
|
Department of Industry and Commerce: |
|
|
|
|
|
|
|
|
|
|
|
|
111 |
New Headquarters, Kildare Street |
... |
256,000 |
500 |
571 |
8 |
5 |
255,054 |
17 |
2 |
255,626 |
5 |
7 |
In progress. |
112 |
Industrial Development Authority— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Adaptations |
... |
... |
... |
... |
2,700 |
350 |
238 |
11 |
4 |
2,268 |
1 |
9 |
2,506 |
13 |
1 |
In progress. |
113 |
Valentia Observatory—Adaptations |
|
|
|
|
|
|
|
|
|
|
|
|
|
and additions |
... |
... |
... |
50,000 |
1,100 |
790 |
4 |
4 |
395 |
6 |
4 |
1,185 |
10 |
8 |
In progress. |
|
|
|
£1,950 |
£1,600 |
4 |
1 |
|
|
|
|
|
|
|
|
Department of Posts and Telegraphs: |
|
|
|
|
|
|
|
|
|
|
|
|
114 |
Dublin, New Post Office, St. Andrew |
|
|
|
|
|
|
|
|
|
|
|
|
|
Street |
... |
... |
... |
... |
... |
33,000 |
16,000 |
9,577 |
3 |
5 |
5,575 |
3 |
6 |
15,152 |
6 |
11 |
In progress. |
115 |
Dublin, Pearse Street Sorting Office— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Extension of Postmen’s Office |
... |
4,500 |
700 |
803 |
7 |
10 |
3,555 |
5 |
1 |
4,358 |
12 |
11 |
In progress. |
116 |
Dublin P. O. Factory—Rebuilding, etc. |
52,000 |
6,000 |
3,641 |
2 |
11 |
2,909 |
18 |
10 |
6,551 |
1 |
9 |
In progress. |
117 |
Cork Head Post Office—Improvements |
13,250 |
11,300 |
1,496 |
15 |
1 |
3,471 |
4 |
11 |
4,968 |
0 |
0 |
In progress. |
118 |
Drogheda New Post Office and |
|
|
|
|
|
|
|
|
|
|
|
|
|
Telephone Exchange |
... |
... |
... |
30,000 |
500 |
4 |
3 |
6 |
9 |
13 |
8 |
13 |
17 |
2 |
Preliminary Work. |
119 |
Dundalk Post Office—Improvements |
... |
3,950 |
1,950 |
2,112 |
19 |
10 |
1,930 |
0 |
0 |
4,042 |
19 |
10 |
In progress. |
120 |
Kilrush New Post Office |
... |
... |
— |
600 |
— |
— |
— |
Postponed. |
121 |
Loughrea Post Office—Adaptations |
... |
1,200 |
1,200 |
1,154 |
17 |
0 |
— |
1,154 |
17 |
0 |
In progress. |
122 |
Nenagh Post Office—Improvements |
... |
920 |
900 |
723 |
0 |
6 |
27 |
16 |
11 |
750 |
17 |
5 |
In progress. |
123 |
Rathluirc Post Office—Adaptations |
15,000 |
500 |
— |
— |
— |
Postponed. |
124 |
Improved Sorting Equipment at Post |
|
|
|
|
|
|
|
|
|
|
|
|
|
Offices |
... |
... |
... |
... |
15,500 |
10,250 |
5,052 |
5 |
3 |
— |
5,052 |
5 |
3 |
In progress. |
|
Wireless Broadcasting: |
|
|
|
|
|
|
|
|
|
|
|
|
125 |
Dublin G.P.O. Studio and Office |
|
|
|
|
|
|
|
|
|
|
|
|
|
Accommodation |
... |
... |
... |
13,450 |
7,200 |
2,710 |
7 |
0 |
6,106 |
5 |
9 |
8,816 |
12 |
9 |
In progress. |
126 |
Dublin, Phoenix Hall, Exchequer Street |
|
|
|
|
|
|
|
|
|
|
|
|
|
—Adaptations |
... |
... |
... |
6,950 |
500 |
30 |
11 |
5 |
4,034 |
11 |
6 |
4,065 |
2 |
11 |
In progress. |
127 |
Athlone High Power Short Wave |
|
|
|
|
|
|
|
|
|
|
|
|
|
Station |
... |
... |
... |
... |
18,235 |
250 |
— |
17,733 |
7 |
8 |
17,733 |
7 |
8 |
In progress. |
|
|
|
£57,850 |
£27,306 |
13 |
9 |
|
|
|
|
|
|
|
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
|
|
128 |
Dublin G.H.Q. Parkgate Street— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Storage |
... |
... |
... |
... |
500 |
500 |
350 |
0 |
0 |
— |
350 |
0 |
0 |
In progress. |
129 |
Clancy Barracks — Installation of |
|
|
|
|
|
|
|
|
|
|
|
|
|
Heating in Lower Barrack |
... |
5,000 |
5,000 |
4,154 |
4 |
3 |
692 |
11 |
8 |
4,846 |
15 |
11 |
In progress. |
130 |
Baldonnell Camp—Re-roofing Hangar |
|
|
|
|
|
|
|
|
|
|
|
|
|
No. 4 |
... |
... |
... |
... |
30,000 |
20,000 |
9,162 |
4 |
3 |
16,801 |
1 |
5 |
25,963 |
5 |
8 |
In progress. |
131 |
Cork Collins Barrack—Junior Officers’ |
|
|
|
|
|
|
|
|
|
|
|
|
|
Married Quarters |
... |
... |
... |
25,845 |
20,000 |
18,331 |
18 |
3 |
4,247 |
1 |
2 |
22,578 |
19 |
5 |
In progress. |
132 |
Haulbowline Dockyard—New Jetty |
... |
70,000 |
50,000 |
10,251 |
1 |
9 |
15,570 |
2 |
1 |
25,821 |
3 |
10 |
In progress. |
132a |
Curragh Camp—Extension of Magazines |
76,860 |
— |
6,359 |
2 |
4 |
759 |
19 |
3 |
7,119 |
1 |
7 |
In progress. |
|
|
|
£95,500 |
£48,608 |
10 |
10 |
|
|
|
|
|
|
|
|
Department of Social Welfare: |
|
|
|
|
|
|
|
|
|
|
|
|
133 |
Ballina Employment Exchange— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Erection |
... |
... |
... |
... |
25,000 |
2,000 |
— |
— |
— |
Postponed. |
134 |
Kilkenny Employment Exchange— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Adaptations |
... |
... |
... |
... |
1,500 |
1,750 |
678 |
0 |
0 |
— |
678 |
0 |
0 |
In progress. |
135 |
Waterford Employment Exchange— |
|
|
|
|
|
|
|
|
|
|
|
|
|
Erection |
... |
... |
... |
... |
51,800 |
10,000 |
649 |
18 |
0 |
337 |
2 |
9 |
987 |
0 |
9 |
Preliminary Work. |
|
|
|
£13,750 |
£1,327 |
18 |
0 |
|
|
|
|
|
|
|
|
Department of Health: |
|
|
|
|
|
|
|
|
|
|
|
|
136 |
Dundrum Asylum—Adaptations to |
|
|
|
|
|
|
|
|
|
|
|
|
|
provide Infirmary Unit |
... |
... |
1,900 |
1,900 |
— |
— |
— |
Postponed. |
137 |
Dundrum Asylum—Improved Cooking |
|
|
|
|
|
|
|
|
|
|
|
|
|
Facilities |
... |
... |
... |
... |
1,300 |
1,300 |
8 |
12 |
6 |
— |
8 |
12 |
6 |
Preliminary |
138 |
Dundrum Asylum—Improvements to |
|
|
|
|
|
|
|
|
|
|
|
Work. |
|
Governor’s Residence |
... |
... |
1,100 |
900 |
1,079 |
11 |
0 |
168 |
10 |
0 |
1,248 |
1 |
0 |
In progress. |
|
|
|
£4,100 |
£1,088 |
3 |
6 |
|
|
|
|
|
|
|
139 |
Minor New Works: |
... |
... |
... |
— |
12,000 |
7,587 |
12 |
6 |
1,561 |
0 |
7 |
9,148 |
13 |
1 |
|
140 |
Urgent and Unforeseen Works: |
... |
— |
20,000 |
10,319 |
11 |
3 |
— |
10,319 |
11 |
3 |
|
141 |
Minor Balance of Expenditure on |
|
|
|
|
|
|
|
|
|
|
|
|
|
Works of Prior Years: |
... |
... |
— |
7,500 |
15,915 |
8 |
4 |
69,938 |
0 |
7 |
85,853 |
8 |
11 |
|
|
|
|
£1,186,730 |
£780,785 |
3 |
6 |
|
|
|
|
|
|
|
|
Deduct for Works which may not be |
|
|
|
|
|
|
|
|
|
|
|
|
|
carried out during the year |
... |
— |
20,730 |
— |
|
|
|
|
|
|
|
|
|
|
£1,166,000 |
£780,785 |
3 |
6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No. 98—NEW WORKS, ALTERATIONS AND ADDITIONS AT OTHER GARDA SIOCHANA BARRACKS.
No. |
Service and Description |
Expenditure |
Observations |
1950-51 |
to 31/3/50 |
to 31/3/51 |
|
|
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
Metropolitan Area: |
|
|
|
|
|
|
|
|
|
|
1 |
Dublin Castle, Detective Branch—Adaptations, etc. |
699 |
1 |
8 |
— |
699 |
1 |
8 |
In progress. |
44 of 1949/50 |
Garda Síochána Depot—Extension of Hospital |
... |
137 |
2 |
9 |
— |
137 |
2 |
9 |
Preliminary Work. |
|
Co. Cavan: |
|
|
|
|
|
|
|
|
|
|
53 of 1949/50 |
Kilnaleck—New Barrack |
... |
... |
... |
... |
463 |
0 |
0 |
3,867 |
4 |
9 |
4,330 |
4 |
9 |
Completed. |
|
Co. Donegal: |
|
|
|
|
|
|
|
|
|
|
70 of 1949/50 |
Convoy—New Barrack |
... |
... |
... |
... |
849 |
16 |
11 |
5,257 |
12 |
4 |
6,107 |
9 |
3 |
Completed. |
|
Co. Mayo: |
|
|
|
|
|
|
|
|
|
|
95 of 1949/50 |
Ballycastle—New Barrack |
... |
... |
... |
... |
69 |
5 |
6 |
4,118 |
7 |
11 |
4,187 |
13 |
5 |
Completed. |
|
Co. Meath: |
|
|
|
|
|
|
|
|
|
|
99 of 1949/50 |
Trim—New Barrack |
... |
... |
... |
... |
... |
920 |
3 |
10 |
17,011 |
10 |
1 |
17,931 |
13 |
11 |
Completed. |
|
Co. Monaghan |
|
|
|
|
|
|
|
|
|
|
2 |
Monaghan—Adaptations |
... |
... |
... |
... |
330 |
0 |
0 |
— |
330 |
0 |
0 |
Completed. |
|
Co. Roscommon: |
|
|
|
|
|
|
|
|
|
|
105 of 1949/50 |
Athleague—New Barrack |
... |
... |
... |
... |
11 |
0 |
0 |
3,555 |
7 |
7 |
3,566 |
7 |
7 |
Completed. |
|
|
£3,479 |
10 |
8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No. 99—MINOR NEW WORKS AT GARDA SIOCHANA BARRACKS.
No. |
Service and Description |
Expenditure |
Observations |
1950-51 |
to 31/3/50 |
to 31/3/51 |
|
|
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
Metropolitan Area: |
|
|
|
|
|
|
|
|
|
|
120/12 of 1948/49 |
Dublin Castle and other Garda Barracks—Installation of Teleprinters and incidental structural works, etc. |
7 |
10 |
0 |
224 |
11 |
9 |
232 |
1 |
9 |
In progress. |
124/5 of 1949/50 |
Dublin Castle—Adaptation of former Riding School |
|
|
|
|
|
|
|
|
|
|
|
as a Garage |
... |
... |
... |
... |
... |
1 |
6 |
4 |
161 |
16 |
4 |
163 |
2 |
8 |
In progress. |
124/4 of 1949/50 |
College Street—Improvements to Electric Lighting, provision of additional sanitary accommodation |
|
|
|
|
|
|
|
|
|
|
|
and of shelving |
... |
... |
... |
... |
... |
22 |
16 |
0 |
243 |
16 |
2 |
266 |
12 |
2 |
Completed. |
7 |
Store Street—Improvements |
... |
... |
... |
... |
45 |
8 |
5 |
— |
45 |
8 |
5 |
Completed. |
|
Co. Carlow: |
|
|
|
|
|
|
|
|
|
|
2 |
Borris—New Sanitary fittings, painting, etc. |
... |
293 |
18 |
2 |
— |
293 |
18 |
2 |
Completed. |
|
Co. Donegal: |
|
|
|
|
|
|
|
|
|
|
6 |
Pettigo—Catch Drain |
... |
... |
... |
... |
... |
150 |
0 |
0 |
— |
150 |
0 |
0 |
Completed. |
|
Co. Dublin: |
|
|
|
|
|
|
|
|
|
|
9 |
Dun Laoghaire—Provision of independent boiler and |
|
|
|
|
|
|
|
|
|
|
|
drying room |
... |
... |
... |
... |
... |
11 |
18 |
10 |
— |
11 |
18 |
10 |
Completed. |
|
Co. Kildare: |
|
|
|
|
|
|
|
|
|
|
4 |
Kildare—Provision of screen and internal sanitary |
|
|
|
|
|
|
|
|
|
|
|
accommodation |
... |
... |
... |
... |
... |
137 |
13 |
11 |
— |
137 |
13 |
11 |
Completed. |
|
Co. Kilkenny: |
|
|
|
|
|
|
|
|
|
|
8 |
Castlecomer—New concrete path |
... |
... |
... |
146 |
6 |
0 |
— |
146 |
6 |
0 |
Completed. |
|
Co. Sligo: |
|
|
|
|
|
|
|
|
|
|
3 |
Sligo—Alterations to provide office accommodation |
|
|
|
|
|
|
|
|
|
|
|
for Garda Superintendent and his staff |
... |
... |
180 |
0 |
0 |
— |
180 |
0 |
0 |
Completed. |
|
Co. Waterford: |
|
|
|
|
|
|
|
|
|
|
1 |
Tramore—Provision of baths, hot water system, etc. |
201 |
16 |
3 |
— |
201 |
16 |
3 |
Completed. |
|
|
£1,198 |
13 |
11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No. 139—MINOR NEW WORKS.
No. |
Service and Description |
Expenditure |
Observations |
1950-51 |
to 31/3/50 |
to 31/3/51 |
|
|
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
232/14 of 1949/50 |
Central Heating Station—Provision of carbon |
|
|
|
|
|
|
|
|
|
|
|
di-oxide indicators and recorders |
... |
... |
... |
35 |
5 |
7 |
200 |
0 |
0 |
235 |
5 |
7 |
Completed. |
|
Office of Public Works: |
|
|
|
|
|
|
|
|
|
|
5 |
(a) Provision of cubicle for Superintending Clerk |
103 |
0 |
2 |
— |
103 |
0 |
2 |
Completed. |
6 |
(b) Provision of lift from Registry |
... |
... |
134 |
19 |
7 |
— |
134 |
19 |
7 |
Completed. |
14 |
(c) Phoenix Park—Provision of gas supply at Fort |
|
|
|
|
|
|
|
|
|
|
|
Lodge and Deerkeeper’s Lodge |
... |
... |
... |
215 |
0 |
4 |
— |
215 |
0 |
4 |
Completed. |
38 |
(d) Phoenix Park—Electrical Installation in Lodges |
310 |
11 |
9 |
— |
310 |
11 |
9 |
Completed. |
21 |
(e) District Office, Portlaoighise—Provision of |
|
|
|
|
|
|
|
|
|
|
|
extra room, furniture, etc. |
... |
... |
... |
304 |
19 |
5 |
— |
304 |
19 |
5 |
Completed. |
30 |
Valuation Office—Provision of new outside staircase |
309 |
0 |
0 |
— |
309 |
0 |
0 |
Completed. |
34 |
Stationery Office—Provision of Shelving |
... |
... |
132 |
4 |
4 |
— |
132 |
4 |
4 |
Completed. |
|
Revenue Department: |
|
|
|
|
|
|
|
|
|
|
48 |
(a) Custom House, Dublin—Filing accommodation |
65 |
16 |
4 |
— |
65 |
16 |
4 |
Completed. |
|
(b) 11-13 Upper O’Connell Street, Dublin— |
|
|
|
|
|
|
|
|
|
|
|
Installation of Hot Water System |
... |
... |
102 |
19 |
9 |
— |
102 |
19 |
9 |
Completed. |
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
23 |
Government Buildings, West Block—Provision of |
|
|
|
|
|
|
|
|
|
|
|
Porch in Room 13 |
... |
... |
... |
... |
... |
98 |
0 |
4 |
— |
98 |
0 |
4 |
Completed. |
28 |
Government Buildings, South Block—Provision of |
|
|
|
|
|
|
|
|
|
|
|
Enquiry Office |
... |
... |
... |
... |
... |
261 |
18 |
9 |
— |
261 |
18 |
9 |
Completed. |
59 |
Fisheries Branch—2.3 Kildare Place—Provision of |
|
|
|
|
|
|
|
|
|
|
|
Messenger’s box |
... |
... |
... |
... |
... |
14 |
15 |
3 |
— |
14 |
15 |
3 |
In progress. |
232/19 of 1949/50 |
Ballyhaise Agricultural Station—Provision of |
|
|
|
|
|
|
|
|
|
|
|
Laboratory Bench |
... |
... |
... |
... |
... |
37 |
3 |
6 |
175 |
0 |
0 |
212 |
3 |
6 |
Completed. |
10 |
Botanic Gardens—Erection of additional shelving |
|
|
|
|
|
|
|
|
|
|
|
and provision of store |
... |
... |
... |
... |
128 |
19 |
10 |
— |
128 |
19 |
10 |
Completed. |
13 |
Clonakilty Agricultural School—Provision of lunch |
|
|
|
|
|
|
|
|
|
|
|
room for farm workers |
... |
... |
... |
... |
229 |
17 |
11 |
— |
229 |
17 |
11 |
Completed. |
27 |
Munster Institute—Erection of ctesiphon house for |
|
|
|
|
|
|
|
|
|
|
|
poultry |
... |
... |
... |
... |
... |
... |
... |
1 |
3 |
7 |
— |
1 |
3 |
7 |
Preliminary Work. |
|
Department of Justice: |
|
|
|
|
|
|
|
|
|
|
43 |
Four Courts—County Registrar, improved |
|
|
|
|
|
|
|
|
|
|
|
accommodation |
... |
... |
... |
... |
... |
... |
487 |
1 |
4 |
— |
487 |
1 |
4 |
Completed. |
44 |
Courts of Justice—Central Scrivenery Office— alterations in connection with installation of photostat |
|
|
|
|
|
|
|
|
|
|
|
machine |
... |
... |
... |
... |
... |
... |
150 |
4 |
10 |
— |
150 |
4 |
10 |
In progress. |
232/25 of 1949/50 |
38 Mountjoy Square, Dublin—Preparation of rooms |
|
|
|
|
|
|
|
|
|
|
|
and supply of furniture for Probation Officers |
... |
22 |
13 |
3 |
134 |
17 |
11 |
157 |
11 |
2 |
Completed. |
|
Department of Education: |
|
|
|
|
|
|
|
|
|
|
|
National Museum— |
|
|
|
|
|
|
|
|
|
|
185/36 of 1947/48 |
(a) Installation of Italian Statuary. |
... |
... |
28 |
0 |
0 |
416 |
4 |
3 |
444 |
4 |
3 |
Completed. |
15 |
(b) Alterations to Costume Exhibition case |
... |
172 |
11 |
4 |
— |
172 |
11 |
4 |
Completed. |
37 |
(c) Improved lighting in Loom Room and Folk |
|
|
|
|
|
|
|
|
|
|
|
Room |
... |
... |
... |
... |
... |
... |
233 |
7 |
4 |
— |
233 |
7 |
4 |
Completed. |
|
National College of Art— |
|
|
|
|
|
|
|
|
|
|
2 |
(a) Structural alterations and improvements in |
|
|
|
|
|
|
|
|
|
|
|
heating and lighting |
... |
... |
... |
... |
130 |
14 |
1 |
— |
130 |
14 |
1 |
In progress. |
29 |
(b) Provision of Enquiry Office in Hall |
... |
... |
111 |
10 |
1 |
— |
111 |
10 |
1 |
In progress. |
51 |
(c) Adaptation of two rooms to accommodate new |
|
|
|
|
|
|
|
|
|
|
|
class |
... |
... |
... |
... |
... |
... |
89 |
1 |
0 |
— |
89 |
1 |
0 |
Completed. |
17 |
National Gallery—Improvements to Caretaker’s |
|
|
|
|
|
|
|
|
|
|
|
quarters |
... |
... |
... |
... |
... |
... |
342 |
9 |
2 |
— |
342 |
9 |
2 |
Completed. |
|
National Library— |
|
|
|
|
|
|
|
|
|
|
8 |
(a) Erection of partition and shelving in Map Room |
150 |
4 |
8 |
— |
150 |
4 |
8 |
Completed. |
35 |
(b) Provision of Shelving and Lighting in Exhibition |
|
|
|
|
|
|
|
|
|
|
|
Room |
... |
... |
... |
... |
... |
... |
308 |
11 |
5 |
— |
308 |
11 |
5 |
Completed. |
16 |
Coláiste Einne—Installation of New Boiler |
... |
... |
238 |
13 |
4 |
— |
238 |
13 |
4 |
Completed. |
46 |
Genealogical Office—Electrical installation and |
|
|
|
|
|
|
|
|
|
|
|
building up door opes |
... |
... |
... |
... |
... |
90 |
7 |
2 |
— |
90 |
7 |
2 |
Completed. |
55 |
National Education Office—General repairs, |
|
|
|
|
|
|
|
|
|
|
|
redecoration, etc., at Gatekeeper’s Lodge |
... |
... |
... |
62 |
2 |
10 |
— |
62 |
2 |
10 |
In progress. |
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
24 |
24 Upper Merrion Street—Erection of partition, etc., |
|
|
|
|
|
|
|
|
|
|
|
in Enquiry Office |
... |
... |
... |
... |
... |
93 |
13 |
3 |
— |
93 |
13 |
3 |
Completed. |
|
Gaeltacht Services: |
|
|
|
|
|
|
|
|
|
|
18 |
(a) Dunlop House—Erection of steel angle iron |
... |
232 |
16 |
0 |
— |
232 |
16 |
0 |
Completed. |
32 |
(b) Elly Bay Toy Factory—Provision of tank and |
|
|
|
|
|
|
|
|
|
|
|
Petrol Pump |
... |
... |
... |
... |
... |
124 |
11 |
0 |
— |
124 |
11 |
0 |
Completed. |
|
Department of Industry and Commerce: |
|
|
|
|
|
|
|
|
|
|
32/232 of 1949/50 |
Griffith Barracks—Preparation of rooms for rationing |
|
|
|
|
|
|
|
|
|
|
|
section |
... |
... |
... |
... |
... |
... |
... |
26 |
4 |
4 |
153 |
6 |
1 |
179 |
10 |
5 |
Completed. |
20 |
44-45 Merrion Square—Additions and alterations |
... |
98 |
1 |
6 |
— |
98 |
1 |
6 |
Completed. |
39 |
Kildare Street—Sound proofing of copying rooms and |
|
|
|
|
|
|
|
|
|
|
|
erection of indoor porch |
... |
... |
... |
... |
157 |
7 |
4 |
— |
157 |
7 |
4 |
In progress. |
42 |
27 Eden Quay—Alterations |
... |
... |
... |
... |
28 |
11 |
9 |
— |
28 |
11 |
9 |
In progress. |
47 |
Kildare Street—Provision of protective bars to ground |
|
|
|
|
|
|
|
|
|
|
|
floor windows at West Side |
... |
... |
... |
... |
111 |
0 |
0 |
— |
111 |
0 |
0 |
Completed. |
|
Department of Posts and Telegraphs: |
|
|
|
|
|
|
|
|
|
|
23/232 of 1949/50 |
10 Parnell Square, Dublin—Structural work in |
|
|
|
|
|
|
|
|
|
|
|
connection with installation of lift |
... |
... |
... |
26 |
3 |
7 |
100 |
0 |
0 |
126 |
3 |
7 |
Completed. |
33 |
Ballsbridge Post Office—Improvements to sorting |
|
|
|
|
|
|
|
|
|
|
|
office, retiring rooms, public office, etc. |
... |
... |
357 |
19 |
11 |
— |
357 |
19 |
11 |
Completed. |
45 |
Carrick-on-Shannon Post Office—Erection of glazed |
|
|
|
|
|
|
|
|
|
|
|
enclosure in sorting office |
... |
... |
... |
... |
146 |
12 |
6 |
— |
146 |
12 |
6 |
Completed. |
53 |
Pearse Street, Dublin—Provision of additional |
|
|
|
|
|
|
|
|
|
|
|
accommodation for bicycles |
... |
... |
... |
... |
11 |
6 |
0 |
— |
11 |
6 |
0 |
Preliminary work. |
58 |
133-136 Capel Street, Dublin—Preparation of floors |
|
|
|
|
|
|
|
|
|
|
|
to take machines, alterations to doors, etc. |
... |
8 |
19 |
7 |
— |
8 |
19 |
7 |
In progress. |
69 |
Aldborough House—Provision of new entrance gate |
|
|
|
|
|
|
|
|
|
|
|
and sloping footpath |
... |
... |
... |
... |
99 |
12 |
10 |
— |
99 |
12 |
10 |
Completed. |
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
9/232 of 1949/50 |
G.H.Q., Parkgate Street—Fitting doors to shelving in |
|
|
|
|
|
|
|
|
|
|
|
Archives Section |
... |
... |
... |
... |
... |
73 |
16 |
2 |
42 |
2 |
9 |
115 |
18 |
11 |
Completed. |
22 |
G.H.Q. Annexe—Provision of wash-hand basin, etc. |
122 |
14 |
7 |
— |
122 |
14 |
7 |
Completed. |
49 |
G.H.Q.—Fitting plugs for electric dictating and |
|
|
|
|
|
|
|
|
|
|
|
transcribing machines |
... |
... |
... |
... |
... |
114 |
19 |
3 |
— |
114 |
19 |
3 |
Completed. |
|
Department of Social Welfare: |
|
|
|
|
|
|
|
|
|
|
21/232 of 1949/50 |
Werburgh Street Employment Exchange— |
|
|
|
|
|
|
|
|
|
|
|
Improvement of Heating System |
... |
... |
... |
... |
|
18 |
6 |
226 |
5 |
5 |
227 |
3 |
11 |
Completed. |
31 |
Limerick Employment Exchange—Improvement of |
|
|
|
|
|
|
|
|
|
|
|
electric installation |
... |
... |
... |
... |
... |
284 |
17 |
3 |
— |
284 |
17 |
3 |
In progress. |
54 |
Belmullet Employment Exchange—Provision of |
|
|
|
|
|
|
|
|
|
|
|
additional lighting points, shelving, furniture, etc. |
... |
|
4 |
6 |
— |
|
4 |
6 |
Preliminary work. |
|
Department of Health: |
|
|
|
|
|
|
|
|
|
|
29/232 of 1949/50 |
Custom House, Dublin—Provision of electric plugs |
|
|
|
|
|
|
|
|
|
|
|
for wire recorders and supply of cabinets |
... |
... |
197 |
16 |
2 |
113 |
4 |
2 |
311 |
0 |
4 |
In progress. |
9 |
Custom House—Extension of Dictograph Facilities |
... |
163 |
4 |
10 |
— |
163 |
4 |
10 |
Completed. |
66 |
Dundrum Asylum—Improvements to clinical offices |
|
|
|
|
|
|
|
|
|
|
|
and sleeping quarters of female attendants |
... |
2 |
13 |
5 |
— |
2 |
13 |
5 |
Preliminary work. |
|
|
£7,587 |
12 |
6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No. 140—URGENT AND UNFORESEEN WORKS.
No. |
Service and Description |
Expenditure |
Observations |
1950-51 |
to 31/3/50 |
to 31/3/51 |
|
|
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
15 |
Revenue Department—Custom House, Dublin— |
|
|
|
|
|
|
|
|
|
|
|
Provision of Staff restaurant |
... |
... |
... |
... |
434 |
6 |
8 |
— |
434 |
6 |
8 |
In progress. |
18 |
Stationery Office—Installation of rotaprint machines, |
|
|
|
|
|
|
|
|
|
|
|
etc. |
... |
... |
... |
... |
... |
... |
45 |
1 |
5 |
— |
45 |
1 |
5 |
In progress. |
5 |
Office of Public Works—Phoenix Park, provision of |
|
|
|
|
|
|
|
|
|
|
|
shelters for relief Gate keepers |
... |
... |
... |
4 |
5 |
11 |
— |
4 |
5 |
11 |
Preliminary work. |
|
Comptroller and Auditor General |
|
|
|
|
|
|
|
|
|
|
3 |
32 Upper Merrion Street—Adaptations |
... |
... |
1,174 |
13 |
3 |
— |
1,174 |
13 |
3 |
In progress. |
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
4 |
Government Buildings—Provision of improved accommodation for typing staff, supply of furniture, and |
|
|
|
|
|
|
|
|
|
|
|
provision of additional sanitary accommodation |
... |
997 |
0 |
3 |
— |
997 |
0 |
3 |
In progress. |
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
7 |
23 Upper Merrion Street—Provision of additional sanitary accommodation on top floor of concrete |
|
|
|
|
|
|
|
|
|
|
|
building |
... |
... |
... |
... |
... |
... |
479 |
4 |
4 |
— |
479 |
4 |
4 |
In progress. |
11 |
Gaeltacht Services—Kilcar, Co. Donegal— |
|
|
|
|
|
|
|
|
|
|
|
Adaptations |
... |
... |
... |
... |
... |
... |
... |
120 |
13 |
11 |
— |
120 |
13 |
11 |
In progress. (Sanction of £1,750 includes cost of house). |
|
Department of Industry and Commerce: |
|
|
|
|
|
|
|
|
|
|
1 |
Kildare Street—Provision of new water storage tank |
1,030 |
19 |
6 |
— |
1,030 |
19 |
6 |
In progress. |
12 |
Griffith Barracks—Adaptations and Redecoration, |
|
|
|
|
|
|
|
|
|
|
|
etc. |
... |
... |
... |
... |
... |
... |
... |
2,848 |
2 |
4 |
— |
2,848 |
2 |
4 |
In progress. |
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
10 |
Saint Bricin’s Hospital—Provision of new Lift and |
|
|
|
|
|
|
|
|
|
|
|
Motor Room |
... |
... |
... |
... |
... |
... |
8 |
2 |
6 |
— |
8 |
2 |
6 |
Preliminary expenditure. |
16 |
Ratra, Phoenix Park—Adaptations and provision of |
|
|
|
|
|
|
|
|
|
|
|
furniture |
... |
... |
... |
... |
... |
... |
378 |
3 |
9 |
— |
378 |
3 |
9 |
In progress. |
|
Department of External Affairs: |
|
|
|
|
|
|
|
|
|
|
6 |
London Embassy—Adaptation of 17 Grosvenor Place, |
|
|
|
|
|
|
|
|
|
|
|
supply of furniture |
... |
... |
... |
... |
2,591 |
0 |
9 |
— |
2,591 |
0 |
9 |
In progress. |
|
Department of Health: |
|
|
|
|
|
|
|
|
|
|
2 |
Dundrum Asylum—Provision of two airing |
|
|
|
|
|
|
|
|
|
|
|
courts |
... |
... |
... |
... |
... |
... |
... |
207 |
16 |
8 |
— |
207 |
16 |
8 |
In progress. |
|
|
£10,319 |
11 |
3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No. 141—MINOR BALANCES OF EXPENDITURE.
No. |
Service and Description |
Expenditure |
Observations |
1950-51 |
to 31/3/50 |
to 31/3/51 |
|
|
£ |
s. |
d. |
£ |
s. |
d. |
£ |
s. |
d. |
|
|
Houses of the Oireachtas: |
|
|
|
|
|
|
|
|
|
|
3 of 1949/50 |
(a) Preparation of busts of Pádraig Pearse and |
|
|
|
|
|
|
|
|
|
|
|
and other National Leaders |
... |
... |
... |
180 |
4 |
4 |
1,286 |
9 |
9 |
1,466 |
14 |
1 |
In progress. |
4 of 1948/49 |
(b) Extension of Electric Clock System |
... |
... |
53 |
7 |
3 |
520 |
6 |
4 |
573 |
13 |
7 |
Completed. |
234 of 1949/50 |
|
|
|
|
|
|
|
|
|
|
|
|
Department of Finance: |
|
|
|
|
|
|
|
|
|
|
21 of 1948/49 |
Central Heating of Government Establishments— |
|
|
|
|
|
|
|
|
|
|
234 of 1949/50 |
Conversion to oil burning |
... |
... |
... |
... |
517 |
10 |
0 |
15,004 |
15 |
4 |
15,522 |
5 |
4 |
In progress |
239/12 of 1948/49 |
2-3 Merrion Square Adaptations |
... |
... |
... |
35 |
4 |
9 |
2,198 |
9 |
3 |
2,233 |
14 |
0 |
Completed. |
234 of 1949/50 |
|
|
|
|
|
|
|
|
|
|
|
229/15 of 1948/49 |
Revenue Department—11-15 Upper O’Connell St., |
|
|
|
|
|
|
|
|
|
|
234 of 1949/50 |
Dublin, 14/15 St. Andrew St. and Dublin Castle |
|
|
|
|
|
|
|
|
|
|
|
—Adaptations and furniture |
... |
... |
... |
... |
1,145 |
2 |
3 |
2,819 |
13 |
1 |
3,964 |
15 |
4 |
In progress. |
|
Department of Agriculture: |
|
|
|
|
|
|
|
|
|
|
233/40 of 1949/50 |
Government Buildings, Dublin—Alterations and adaptations to provide additional accommodation |
115 |
15 |
5 |
1,102 |
5 |
9 |
1,218 |
1 |
2 |
In progress. |
25 of 1949/50 |
Kildare Place—Central Heating |
... |
... |
... |
58 |
2 |
0 |
645 |
17 |
6 |
703 |
19 |
6 |
Completed. |
28 of 1949/50 |
Athenry Agricultural Station—Improvement of Water |
|
|
|
|
|
|
|
|
|
|
|
Supply |
... |
... |
... |
... |
... |
... |
339 |
10 |
8 |
72 |
1 |
3 |
411 |
11 |
11 |
Consulting |
|
|
|
|
|
|
|
|
|
|
|
Engineers’ Fees. |
31 of 1949/50 |
Clonakilty Agricultural Station—New Buildings |
... |
22 |
5 |
0 |
241 |
16 |
9 |
264 |
1 |
9 |
In progress (water supply.) |
38 of 1949/50 |
Veterinary Research Laboratory—Additional Cold |
|
|
|
|
|
|
|
|
|
|
|
Storage, etc. |
... |
... |
... |
... |
... |
543 |
17 |
3 |
72 |
12 |
7 |
616 |
9 |
10 |
In progress |
39 of 1949/50 |
Glenties Fish Hatchery—improvements to Manager’s |
|
|
|
|
|
|
|
|
|
|
|
House |
... |
... |
... |
... |
... |
... |
170 |
0 |
0 |
129 |
17 |
2 |
299 |
17 |
2 |
In progress. |
35 of 1949/50 |
Munster Institute—Improved accommodation |
... |
92 |
2 |
11 |
33 |
5 |
3 |
125 |
8 |
2 |
Completed. |
|
Department of Justice: |
|
|
|
|
|
|
|
|
|
|
233/1 of 1949/50 |
Garda Síochána Headquarters—Alterations and |
|
|
|
|
|
|
|
|
|
|
|
Improvements |
... |
... |
... |
... |
... |
4,517 |
8 |
10 |
13,985 |
6 |
2 |
18,502 |
15 |
0 |
In progress. |
233/10 of 1949/50 |
Four Courts—Adaptation of rooms in Circuit Court |
|
|
|
|
|
|
|
|
|
|
|
Building |
... |
... |
... |
... |
... |
... |
204 |
14 |
6 |
867 |
6 |
7 |
1,072 |
1 |
1 |
In progress. |
47 of 1949/50 |
Public Record Office—Restoration of air raid shelter |
|
|
|
|
|
|
|
|
|
|
|
as record repository |
... |
... |
... |
... |
... |
81 |
17 |
0 |
40 |
0 |
7 |
121 |
17 |
7 |
In progress. |
|
Department of Education: |
|
|
|
|
|
|
|
|
|
|
95 of 1946/47 |
Coláiste Einne—Improvements |
... |
... |
... |
480 |
13 |
6 |
553 |
4 |
8 |
1,033 |
18 |
2 |
Completed. |
234 of 1949/50 |
|
|
|
|
|
|
|
|
|
|
|
|
Department of Local Government: |
|
|
|
|
|
|
|
|
|
|
229/8 of 1948/49 |
Custom House, Dublin—Adaptations and provision |
|
|
|
|
|
|
|
|
|
|
234 of 1949/50 |
of Dictaphone machines |
... |
... |
... |
... |
412 |
4 |
8 |
1,309 |
3 |
2 |
1,721 |
7 |
10 |
Completed. |
|
Department of Lands: |
|
|
|
|
|
|
|
|
|
|
229/9 of 1948/49 |
21 Upper Merrion Street—Provision of Luncheon |
|
|
|
|
|
|
|
|
|
|
234 of 1949/50 |
Club and equipment |
... |
... |
... |
... |
... |
765 |
1 |
4 |
1,769 |
9 |
7 |
2,534 |
10 |
11 |
In progress. |
|
Gaeltacht Industries: |
|
|
|
|
|
|
|
|
|
|
141 of 1949/50 |
(a) Bruckless Lace and Embroidery centre— |
|
|
|
|
|
|
|
|
|
|
|
Renovation and Extension |
... |
... |
... |
... |
215 |
2 |
0 |
953 |
0 |
11 |
1,168 |
2 |
11 |
In progress. |
143 of 1949/50 |
(b) Crolly Toy Factory—Provision of Water Supply, |
|
|
|
|
|
|
|
|
|
|
|
sanitary accommodation, etc. |
... |
... |
... |
|
15 |
4 |
100 |
17 |
10 |
101 |
13 |
2 |
Preliminary Work. |
139 of 1949/50 |
(c) Annagry Factory—Renovation and adaptation |
... |
247 |
12 |
0 |
1,789 |
2 |
2 |
2,036 |
14 |
2 |
Completed. |
138 of 1949/50 |
(d) Dublin Central Marketing Depot—Alterations |
|
|
|
|
|
|
|
|
|
|
|
and improvements |
... |
... |
... |
... |
33 |
3 |
11 |
719 |
0 |
8 |
752 |
4 |
7 |
Completed. |
|
Department of Posts and Telegraphs: |
|
|
|
|
|
|
|
|
|
|
233/16 of 1949/50 |
Provision of improved Sorting Fittings at Post Offices |
7 |
11 |
0 |
516 |
15 |
7 |
524 |
6 |
7 |
In progress. |
233/20 of 1949/50 |
Leitrim House, Dublin—Conversion of store and lofts |
|
|
|
|
|
|
|
|
|
|
|
to drawing office |
... |
... |
... |
... |
... |
20 |
16 |
11 |
418 |
2 |
5 |
438 |
19 |
4 |
Completed. |
162 of 1949/50 |
Birr Post Office—Adaptations |
... |
... |
... |
... |
4 |
5 |
10 |
22 |
0 |
0 |
26 |
5 |
10 |
In progress. |
186/10 of 1947/48 230 of 1948/49 |
Wireless Broadcasting—Adaptation of former Portobello Bridge Post Office premises for use as an |
|
|
|
|
|
|
|
|
|
|
|
additional Broadcasting Studio |
... |
... |
... |
... |
1 |
6 |
9 |
821 |
10 |
7 |
822 |
17 |
4 |
In progress. |
155 of 1949/50 |
Dublin Engineering Branch, Distillery Road— |
|
|
|
|
|
|
|
|
|
|
|
Adaptations |
... |
... |
... |
... |
... |
... |
... |
1 |
4 |
5 |
114 |
9 |
5 |
115 |
13 |
10 |
Preliminary Work. |
165 of 1949/50 |
Claremorris Post Office—Extension |
... |
... |
8 |
4 |
2 |
1,300 |
6 |
6 |
1,308 |
10 |
8 |
Completed. |
|
Department of Defence: |
|
|
|
|
|
|
|
|
|
|
206 of 1949/50 |
Curragh Camp—New Married Quarters |
... |
... |
292 |
12 |
4 |
11,951 |
17 |
2 |
12,244 |
9 |
6 |
Completed. |
160/28 of 1948/47 |
26 Westland Row, Dublin—Provision of |
|
|
|
|
|
|
|
|
|
|
234 of 1949/50 |
accommodation and furniture for Bureau of Military History |
... |
|
5 |
8 |
926 |
9 |
2 |
926 |
14 |
10 |
Completed. |
233/13 of 1949/50 |
Coláiste Caoimhin—Preparation of room and provision of furniture for the Pensions Referee Advisory |
|
|
|
|
|
|
|
|
|
|
|
Committee and staff |
... |
... |
... |
... |
... |
256 |
9 |
6 |
135 |
1 |
5 |
391 |
10 |
11 |
Completed. |
|
Department of External Affairs: |
|
|
|
|
|
|
|
|
|
|
233/21 of 1949/50 |
Iveagh House—Supply and installation of Chandeliers |
318 |
5 |
0 |
150 |
0 |
11 |
468 |
5 |
11 |
Completed. |
229/7 of 1948/49 |
Iveagh House—Adaptation and supply of furniture, |
|
|
|
|
|
|
|
|
|
|
234 of 1949/50 |
etc., to meet accommodation for extra staff |
... |
22 |
17 |
6 |
3,402 |
0 |
9 |
3,424 |
18 |
3 |
Completed. |
233/18 of 1949/50 |
Lisbon Legation—Improvements to official residence |
|
|
|
|
|
|
|
|
|
|
|
and supply of furniture |
... |
... |
... |
... |
667 |
1 |
11 |
1,603 |
18 |
7 |
2,271 |
0 |
6 |
In progress. |
229 of 1948/49 |
Ottawa Legation—Repairs, decoration and furnishing |
363 |
14 |
6 |
9,072 |
13 |
8 |
9,436 |
8 |
2 |
Completed. |
233 of 1949/50 |
Washington Legation—Adaptation and furnishing |
2,545 |
12 |
0 |
7,824 |
8 |
3 |
10,370 |
0 |
3 |
In progress. |
|
Department of Social Welfare: |
|
|
|
|
|
|
|
|
|
|
220 of 1949/50 |
Dublin Employment Exchange, Werburgh Street— |
|
|
|
|
|
|
|
|
|
|
|
Additional sanitary accommodation |
... |
... |
389 |
7 |
4 |
550 |
2 |
11 |
939 |
10 |
3 |
Completed. |
219 of 1949/50 |
Dublin Employment Exchange, Lower Gardiner |
|
|
|
|
|
|
|
|
|
|
|
Street—Electrical Rewiring |
... |
... |
... |
... |
290 |
17 |
0 |
543 |
7 |
6 |
834 |
4 |
6 |
In progress. |
233/6 of 1949/50 |
Dunfanaghy Employment Exchange, Co. Donegal— |
|
|
|
|
|
|
|
|
|
|
|
Alterations and improvements and provision of |
|
|
|
|
|
|
|
|
|
|
|
furniture |
... |
... |
... |
... |
... |
... |
243 |
8 |
2 |
144 |
16 |
2 |
388 |
4 |
4 |
In progress. |
|
Department of Health: |
|
|
|
|
|
|
|
|
|
|
229/18 of 1948/49 |
Custom House, Dublin—Re-arrangement of |
|
|
|
|
|
|
|
|
|
|
234 of 1949/50 |
accommodation involving structural alterations |
... |
249 |
13 |
5 |
686 |
7 |
8 |
936 |
1 |
1 |
Completed. |
|
|
£15,915 |
8 |
4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|